Sno. | State Name | Proposal No. | RO/Ministry File Number | Proposal Name | Category | User Agency Name | Area (ha.) | Proposal Status | Date of Stage-I | View Report on Allocation of Fresh forest land (Form-A) Part-I | View Report (Part-II to Part-V and Stage-I Clearances) | View TimeLine Details | Site Inspection Report | Other Related Documents | Whether EC required (if so, status)? |
1
|
Karnataka
|
FP/KA/HYD/12749/2015
|
4-KRB1148/2018-BAN
|
3MW Beedalli Project
|
Hydel
|
MESSRS KODAGU HYDEL PROJECTS PVT LTD
|
0.994
|
IN-PRINCIPLE
|
13-Jul-2018
|
|
|
|
|
|
No
|
2
|
Karnataka
|
FP/KA/IRRIG/28934/2017
|
4-KRB1345/2022-BAN
|
Diversion of 2.16813 Ha of Forest land for Veerabhadreshwara Lift Irrigation Scheme in Chitrabhanukote, Nagnapr, Laxanatti and Dadanatti villages of Mudhol taluka, Bagalkot Dist in favour of KNNL
|
Irrigation
|
KNNL
|
2.16813
|
IN-PRINCIPLE
|
22-Mar-2022
|
|
|
|
|
|
EC File NA
|
3
|
Karnataka
|
FP/KA/ROAD/10844/2015
|
4-KRB 1104/2017-BAN
|
Raghavendra Stone crushing Works, Tattisar
|
Road
|
RAGHAVENDRA STONE CRUSHING WORKS AT TATTISAR
|
0.081
|
IN-PRINCIPLE
|
06-Oct-2017
|
|
|
|
|
|
Yes
Proposal Status: EC application yet to be submitted
|
4
|
Karnataka
|
FP/KA/ROAD/29864/2017
|
No.4-KRB 1194/ 2019-BAN
|
Hullikeri Tanda to Halki
|
Road
|
EXECUTIVE ENGINEER KRRDA PROJECT DIVISION GOKAK DIST BELAGAVI
|
0.7
|
IN-PRINCIPLE
|
23-Jul-2019
|
|
|
|
|
|
No
|
5
|
Karnataka
|
FP/KA/IRRIG/45295/2020
|
No.4-KRB1253/2020-BAN
|
Laying of 490 mm Dia MS Pipe Line for Lifting / pumping the secondary treated water from Kandavara lake to Poornasagara kere and onwards to fill tanks in Chikkaballapura Districts
|
Irrigation
|
EXECUTIVE ENGINEER MINOR IRRIGATION AND GROUD WATER RESOURCE DIVISION CHIKKABALAPURA
|
0.15
|
IN-PRINCIPLE
|
12-Aug-2020
|
|
|
|
|
|
No
|
6
|
Karnataka
|
FP/KA/Approach/47989/2020
|
F.No.4-KRB1341/2022-BAN
|
Diversion of forest land in keligeri village, Dharward Taluk for additional interconnectivity between the two ends of the arch shaped campus of Indian Institute of Technology,Dharwad
|
Approach Access
|
INDIAN INSTITUTE OF TECHNOLOGY DHARWARD
|
0.66
|
IN-PRINCIPLE
|
08-Mar-2023
|
|
|
|
|
|
No
|
7
|
Karnataka
|
FP/KA/ROAD/142140/2021
|
F.No.4-KRB1347/2022-BAN/
|
Dviersion of 0.06 Ha of forest land in sy no 14 of Benavalli, Village, Kerehalli Hobali, Hosanagara taluk Shivamogga dist, (Shivamogga forest division) for construction of low cost ROB and Birur-Talguppa section great seperator at Km 105/100-200 and Km 133/700-800 in favour of Assistant divisional engineer, Shivmaogga
|
Road
|
ASSISTANT DIVISIONAL ENGINEER SHIVAMOGGA
|
0.06
|
IN-PRINCIPLE
|
24-Mar-2022
|
|
|
|
|
|
No
|
8
|
Karnataka
|
FP/KA/ROAD/22392/2016
|
4-KRB1125/2017-BAN
|
Diversion of 4.388 Ha Forest land for the purpose of improvement of road from Pattadkallu to kamatagi
|
Road
|
KSHIP
|
4.388
|
IN-PRINCIPLE
|
14-Feb-2018
|
|
|
|
|
|
Yes
Proposal No.:
EC File No.:
Proposal Status: No Proposal no.
|
9
|
Karnataka
|
FP/KA/IND/26447/2017
|
F.No.4-KRB 1346/2022-BAN
|
BALDOTA STEEL AND POWER LIMITED
|
Industry
|
AARESS IRON AND STEEL LIMITED
|
1.745
|
IN-PRINCIPLE
|
21-Feb-2025
|
|
|
|
|
|
No
|
10
|
Karnataka
|
FP/KA/ROAD/29278/2017
|
F.No.4-KRB1161/2018-BAN
|
For formation of approach road connecting existing road to our crusher in Chitradurga District in favour of Veeresh, Partner, M/s SHIVAPARAM CONSTRUCTIONS STONE CRUSHER, T. Yammiganuru Grama, Holalkere Taluk, Chitradurga District.
|
Road
|
SHIVAPARAM CONSTRACTION
|
0.692
|
IN-PRINCIPLE
|
18-Feb-2025
|
|
|
|
|
|
No
|
11
|
Karnataka
|
FP/KA/ROAD/6847/2014
|
4-KRB 1055/2015-BAN
|
CONSTRUCTION OF BRIDGE ACROSS KUMARADHARA RIVER
|
Road
|
KARNATAKA ROAD DEVELOPMENT CORPORATION LTD
|
0.16
|
IN-PRINCIPLE
|
02-Jun-2015
|
|
|
|
|
|
No
|
12
|
Karnataka
|
FP/KA/TRANS/38788/2019
|
F.No.KRC1287/2021-BAN
|
Construction of the Proposed 110kV S/c Line on DC Towers from the existing 110/11kV Thogarsi sub-station to the proposed 10MVA 110/11kV sub-station at Kuppagudde in Soraba Taluk, Shivamogga District.
|
Transmission Line
|
KARNATAKA POWER TRANSMISSION CORPORATION LIMITED
|
6.073276
|
IN-PRINCIPLE
|
02-Jun-2022
|
|
|
|
|
|
No
|
13
|
Karnataka
|
FP/KA/WATER/26128/2017
|
F.No.4-KRB1141/2018-BAN
|
Contraction of vented dam in providing water supply scheme to Kollur village, Kundapur forest division in favor of Executive Officer Sri Mookambika Temple Kollur
|
Drinking Water
|
SRI MOOKAMBIKA TEMPLE KOLLUR
|
0.352
|
IN-PRINCIPLE
|
11-Dec-2018
|
|
|
|
|
|
No
|
14
|
Karnataka
|
FP/KA/ROAD/15173/2015
|
4-KRB 1083/2016-BAN
|
Improvement to the road from Hengavalli Irgi to SH road
|
Road
|
K SURESH SHETTY
|
1.375
|
IN-PRINCIPLE
|
01-Aug-2016
|
|
|
|
|
|
No
|
15
|
Karnataka
|
FP/KA/WATER/19533/2016
|
F.No.4-KRB1241/2020-BAN/
|
Providing CWSS to Bukkasagara Devasamudra and other 5 Villages in Hospet Taluk Ballari District
|
Drinking Water
|
Assistant Executive Engineer
|
0.597
|
IN-PRINCIPLE
|
06-Jan-2022
|
|
|
|
|
|
No
|
16
|
Karnataka
|
FP/KA/MIN/39765/2019
|
F.No.4-KRB1386/2022-BAN
|
Diversion of 0.8148 Ha (revised from 1.4406 ha) of forestland for Approach Road to and from Ubbalagundi Iron Ore Mine ML No. 008 in Ubbalagundi RF of Ballari Range, Ubbalagundi Village, Sandur Taluk, Ballari District
|
Mining
|
JSW Steel Limited
|
0.8148
|
IN-PRINCIPLE
|
16-Oct-2024
|
|
|
|
|
|
No
|
17
|
Karnataka
|
FP/KA/OFC/41791/2019
|
F.No.4-KRB1317/2021-BAN/
|
Laying of BSNL OF cable in Hassan - Kattaya route,Hassan District, Karnataka. (From Hanumathapura Branch Join Connector to Gorur Telephone Exchange)
|
Optical Fibre Cable
|
BHARAT SANCHAR NIGAM LIMITED
|
0.1619
|
IN-PRINCIPLE
|
16-Nov-2021
|
|
|
|
|
|
No
|
18
|
Karnataka
|
FP/KA/WATER/31233/2018
|
No.4-KRB1180/2019-BAN
|
Providing Water supply scheme to Hassan city
|
Drinking Water
|
KARNATAKA URBAN WATER SUPPLY AND DRAINAGE BOARD
|
0.9894
|
IN-PRINCIPLE
|
26-Jun-2019
|
|
|
|
|
|
No
|
19
|
Karnataka
|
FP/KA/ROAD/18723/2016
|
4-KRB1115/2017-BAN
|
For construction of Bridge & approach road in Karwar Forest Division, UK District in favour of the EE, PWP & IWT Department, Karwar.
|
Road
|
EXECUTIVE ENGINEER
|
0.153
|
IN-PRINCIPLE
|
11-Aug-2017
|
|
|
|
|
|
No
|
20
|
Karnataka
|
FP/KA/TRANS/23117/2016
|
F.No.4-KRB1150/2018-BAN
|
For laying / Establishment of 11 KV H/T AB Bunch Cable transmission line from Sulkeri Mogru to Panjala & Mallige enclosure passing through Naravi RF, Karkala Wildlife Division, Belthangady Taluk, D.K. District in favour of the Assistant Executive Engineer (Ele) MESCOM O&M Sub Division, Belthangady
|
Transmission Line
|
MANGALORE ELECTRICITY SUPPLY COMPANY LIMITED
|
0.0647
|
IN-PRINCIPLE
|
17-Mar-2025
|
|
|
|
|
|
No
|
21
|
Karnataka
|
FP/KA/Approach/36720/2018
|
F.No.4-KRB 1489/2024-BAN
|
Approach Road to Biogen Wellness Private Limited - Proposed Tourism and Hospitality Facility at Kagal & Kiribele Villlage, Kumta Taluk, Uttara Kannada District
|
Approach Access
|
BIOGEN WELLNESS PRIVATE LIMITED
|
0.9896
|
IN-PRINCIPLE
|
05-Nov-2024
|
|
|
|
|
|
Yes
Proposal Status: EC application yet to be submitted
|
22
|
Karnataka
|
FP/KA/Others/21722/2016
|
4-KRB 1109/2017-BAN
|
Panchayath office Building
|
Others
|
GRAM PANCHAYAT
|
0.809
|
IN-PRINCIPLE
|
23-Feb-2018
|
|
|
|
|
|
No
|
23
|
Karnataka
|
FP/KA/ROAD/33965/2018
|
F.No.KRA1243/2020-BAN
|
Construction of widening to Two/Four lane with paved shoulders from km. 0.000 to km. 101.400 NH-50 in Bidar District
|
Road
|
EXECUTIVE ENGINEER NATIONAL HIGHWAY DIVISION
|
40.79
|
IN-PRINCIPLE
|
28-Dec-2020
|
|
|
|
|
|
Yes
Proposal Status: EC application yet to be submitted
|
24
|
Karnataka
|
FP/KA/TRANS/144502/2021
|
F.No.4-KRB1443/2023-BAN
|
Construction of new 110K V LILO line of 10.235Kms on DC towers from 110KV Guledgudda - Ilkal line to Proposed 110/11kV Nagaral S P S/S corridor of 0.428Kms in Sy No.9 in Sabalahunasi Village, in Guledgudda Taluk, Bagalkot District in favor of Executive Engineer (Ele), Major works division Bagalkot, KPTCL Sector No-45 Navanagar, Bagalkot District
|
Transmission Line
|
MAJOR WORKS DIVISION,KPTCL,BAGALKOT
|
0.9416
|
IN-PRINCIPLE
|
29-Mar-2023
|
|
|
|
|
|
No
|
25
|
Karnataka
|
FP/KA/ROAD/140781/2021
|
F.No.4-KRB1449/2023-BAN
|
Diversion of 2.4346 ha of forest land for improvement of existing Road from Pathapalya to Polanayakanapalli via Singappagarapalli, Kamasanapalli, Gummallapalli Villages (CH: 3.219km to 4.285KM and Ch: 7.2KM to 8.929 Km) Mittemari & Pathapalya [H], Bagepalli [T], Chikkaballapura [D] in favour of the Executive Engineer, Project Division (PMGSY),Chic
|
Road
|
EE PMGSY CHIKKABALLAPURA (KRRDA)
|
2.4346
|
IN-PRINCIPLE
|
02-May-2023
|
|
|
|
|
|
No
|
26
|
Karnataka
|
FP/KA/ROAD/143079/2021
|
F.No.4-KRB1418/2023-BAN
|
Widening and Formation of 30.00 Mtr wide road from Kundalahalli ( Old Airport Road) to Gunjur Paly Via BWSSB Treatment plant (Road UP to Gunjur Palya Main Road) as per RMP-2015
|
Road
|
EXECUTIVE ENGINEER, ROAD INFRASTRUCTURE MAHADEVAPURA
|
0.99
|
IN-PRINCIPLE
|
24-Feb-2023
|
|
|
|
|
|
No
|
27
|
Karnataka
|
FP/KA/ROAD/154088/2022
|
F.No.4-KRB1487/2024-BAN
|
Diversion of 0.02460 ha of forest land for connectivity road [for residential Layout purpose] falls in Sy No.81 of Bachaganv Village, Bachaganv Deemed Forest, Sirsi Hobli, & Taluk, U.K District, Sirsi
|
Road
|
VENKATARAMAN GOVIND BHAT, TUDUGUNI VILLAGE, SIRSI TALUK, KUMTA ROAD, UTTARA KANNADA DISTRICT
|
0.0246
|
IN-PRINCIPLE
|
21-Feb-2025
|
|
|
|
|
|
No
|
28
|
Karnataka
|
FP/KA/ROAD/44184/2020
|
F.No.4-KRB1357/2022-BAN/
|
Diversion of 0.1218 ha. Forest land for construction of access road from forest land Sy. No. 24 of Village Herajenahalli, Hobli: Chennarayanadurga, Taluk: Koratagere, Dist. Tumkuru. to approach Private land located at survey no. 28 of Village Herajenahalli, Hobli: Chennarayanadurga, Taluk: Koratagere, Dist. Tumakuru by Mr. Vikram K M
|
Road
|
SHRI VIKRAM K M
|
0.1218
|
IN-PRINCIPLE
|
23-Jun-2022
|
|
|
|
|
|
No
|
29
|
Karnataka
|
FP/KA/ROAD/49295/2020
|
F.No.4-KRC1343/2022-BAN
|
Development of Bangalore Ring Road ((STRR) Phase-II NH-948A) from Ramanagara to Peddamadhagondapalli (Km 82.200 to 140.000) - 57.800 km in District Ramanagara and Bangalore Urban of Karnataka State and District Krishnagiri of Tamil Nadu State.
|
Road
|
NATIONAL HIGHWAYS AUTHORITY OF INDIA PIU BANGALORE EXPRESSWAY
|
11
|
IN-PRINCIPLE
|
04-Mar-2025
|
|
|
|
|
|
Yes
Proposal Status: EC application yet to be submitted
|
30
|
Karnataka
|
FP/KA/ROAD/55323/2020
|
F.No.4-KRB1452/2023-BAN
|
Diversion of 2.5254 Ha of forest land in Kenkere village chiknayakanahalli Taluk, Tumkur District for Reconstruction of two-lane road with Paved shoulders from Huliyar to K.B Cross section and from KB Cross to Nelligere section of NH-150A in the State of Karnataka on EPC Mode
|
Road
|
REGIONAL OFFICE, MINISTRY OF ROAD TRANSPORT & HIGHWAYS (MORT&H), GOVT OF INDIA, KARNATAKA
|
2.5254
|
IN-PRINCIPLE
|
11-Jul-2023
|
|
|
|
|
|
No
|
31
|
Karnataka
|
FP/KA/ROAD/55323/2020
|
F.No.4-KRB1452/2023-BAN
|
Diversion of 2.5254 Ha of forest land in Kenkere village chiknayakanahalli Taluk, Tumkur District for Reconstruction of two-lane road with Paved shoulders from Huliyar to K.B Cross section and from KB Cross to Nelligere section of NH-150A in the State of Karnataka on EPC Mode
|
Road
|
REGIONAL OFFICE, MINISTRY OF ROAD TRANSPORT & HIGHWAYS (MORT&H), GOVT OF INDIA, KARNATAKA
|
2.5254
|
IN-PRINCIPLE
|
11-Jul-2023
|
|
|
|
|
|
No
|
32
|
Karnataka
|
FP/KA/Pipeline/143458/2021
|
F.No.4-KRB1444/2023-BAN
|
Diversion of 0.0138 ha of forest land at Sy No.75 of Mantur Village & Mantur RF, Mudhol Taluk, Bagalkot District for laying pipeline for Agricultural and Drinking water purpose in favour of Rajendra Ramappa S/o Ramappa Metagudda residing at Mantur Village and Post, Mudhol Taluk Bagalkot District
|
Pipeline
|
RAJENDRA RAMAPPA METAGUDDA
|
0.0138
|
IN-PRINCIPLE
|
13-Apr-2023
|
|
|
|
|
|
No
|
33
|
Karnataka
|
FP/KA/ROAD/120467/2021
|
F.No.4-KRB1313/2021-BAN
|
4 L of Addahole (Near Gundya) to Bantwal Cross Section (Pkg-01) from Design Km. 255.140 to Design Km. 270.270 of NH-75 (Old NH-48)
|
Road
|
NATIONAL HIGHWAYS AUTHORITY OF INDIA PIU MANGALORE
|
2.5315
|
IN-PRINCIPLE
|
11-Jul-2023
|
|
|
|
|
|
No
|
34
|
Karnataka
|
FP/KA/WATER/139640/2021
|
F.No.4-KRB1302/2021-BAN
|
Diversion of 2.354 Ha of Forest land for the construction of Rising Main in Sy. No.59 of Adaganti, Sy.No 32 of Kaginele, Sy.No. 91,126, 127 153 of Varaha and Sy.No 291 of Nagavandha villages in Shivamogga and Haveri Districts
|
Drinking Water
|
KARNATAKA NEERAVARI NIGAM LIMITED
|
2.354
|
IN-PRINCIPLE
|
19-Jul-2021
|
|
|
|
|
|
No
|
35
|
Karnataka
|
FP/KA/WATER/139640/2021
|
F.No.4-KRB1302/2021-BAN
|
Diversion of 2.354 Ha of Forest land for the construction of Rising Main in Sy. No.59 of Adaganti, Sy.No 32 of Kaginele, Sy.No. 91,126, 127 153 of Varaha and Sy.No 291 of Nagavandha villages in Shivamogga and Haveri Districts
|
Drinking Water
|
KARNATAKA NEERAVARI NIGAM LIMITED
|
2.354
|
IN-PRINCIPLE
|
19-Jul-2021
|
|
|
|
|
|
No
|
36
|
Karnataka
|
FP/KA/WATER/41470/2019
|
F.No.KRC1373/2022-BAN
|
Laying of Water Pipe line and Water Tanks in the Bellary Forest Division, Chitradurga Forest Division and Tumakuru Forest Division for Drinking Water Supply Scheme To Rural Habitations And Town Of Pavagada Taluk In Tumkur District, Rural Habitations And Town Of Molakalmuru Taluk In Chitradurga District, Rural Habitations Of Challaker
|
Drinking Water
|
SUPERINTENDING ENGINEER RURAL WATER AND SANITATION DEPARTMENT BANGALORE CIRCLE BANGALORE
|
8.49
|
IN-PRINCIPLE
|
07-Oct-2022
|
|
|
|
|
|
No
|
37
|
Karnataka
|
FP/KA/WATER/41470/2019
|
F.No.KRC1373/2022-BAN
|
Laying of Water Pipe line and Water Tanks in the Bellary Forest Division, Chitradurga Forest Division and Tumakuru Forest Division for Drinking Water Supply Scheme To Rural Habitations And Town Of Pavagada Taluk In Tumkur District, Rural Habitations And Town Of Molakalmuru Taluk In Chitradurga District, Rural Habitations Of Challaker
|
Drinking Water
|
SUPERINTENDING ENGINEER RURAL WATER AND SANITATION DEPARTMENT BANGALORE CIRCLE BANGALORE
|
8.49
|
IN-PRINCIPLE
|
07-Oct-2022
|
|
|
|
|
|
No
|
38
|
Karnataka
|
FP/KA/WATER/48609/2020
|
F.No.4-KRB1481/2023-BAN
|
Work of Construction of Kadugodi GLR (Ground Level Reservoir) in 2.4281 Hac of forest land at Kadugodi Plantation Village, Sy No. 1/P, Bidarahalli Hobali, Bangaluru East Taluk, Bangaluru Urban Dist, Under Contract Package-12 of Cauvery water supply scheme (CWSS) Stage-V Project, JICA Funded in favor of Bangalore Water Supply and Sewerage Board.
|
Drinking Water
|
BANGALORE WATER SUPPLY AND SEWERAGE BOARD
|
2.4281
|
IN-PRINCIPLE
|
03-Apr-2024
|
|
|
|
|
|
No
|
39
|
Karnataka
|
FP/KA/IRRIG/49031/2020
|
F.No.4-KRB1379/2022-BAN/
|
Scheme to lift water from hemavathy river near Mavinakere village of Holenarasipura Taluk to fill 160 tanks and 10 kattes of Dudda and Shantigrama hoblis of Hassan taluk for drinking purpose
|
Irrigation
|
EXECUTIVE ENGINEER,HRBC DIVISION,HOLENARASIPURA
|
0.7815
|
IN-PRINCIPLE
|
19-Oct-2022
|
|
|
|
|
|
No
|
40
|
Karnataka
|
FP/KA/Others/141483/2021
|
F.No.4-KRB1388/2022-BAN
|
Construction of Approach Road and Construction of bridge across Cauvery River between Talakadu , Kaliyur and Malangi village in T. Narasipura Taluk, Mysore District
|
Others
|
KARNATAKA ROAD DEVELOPMENT CORPORATION LIMITED, MYSORE
|
0.8554
|
IN-PRINCIPLE
|
04-Nov-2022
|
|
|
|
|
|
No
|
41
|
Karnataka
|
FP/KA/TRANS/24339/2017
|
No.4-KRB1258/2020-BAN
|
For Construction of 33KV / 11 KV Sub-Station at Rajaramapura-Sampaje Village in Sullia Taluk, Dakshina Kannada District, Mangalore Forest Division in favour of the EE, O&M Division, MESCOM, Puttur, D.K.
|
Transmission Line
|
MESCOM
|
0.8
|
IN-PRINCIPLE
|
06-Oct-2020
|
|
|
|
|
|
No
|
42
|
Karnataka
|
FP/KA/TRANS/8118/2014
|
No.4-KRB1127/2018-BAN
|
Estimate for Establishing 1*5MVA,33/11KV substation at Subramanya inputtur Division ,Sullia Taluk
|
Transmission Line
|
ASSISTANT EXECUTIVE ENGINEER
|
0.918
|
IN-PRINCIPLE
|
17-Oct-2019
|
|
|
|
|
|
No
|
43
|
Karnataka
|
FP/KA/WATER/153757/2022
|
F.No.4-KRB1485/2024-BAN
|
Diversion of 0.02342 ha of forest land for laying of Pipeline passing through Sy No.5 of Basavanapura (V) & Sy No.15 of Kalkere (V), Anekal (T), Urban (D), Bannerghatta Division [from Existing pipeline to Nimhans in Sakalavara Village] in favour of the AEE, BWSSB, South-Village-1, Sub Division, Bangalore.
|
Drinking Water
|
BANGALORE WATER SUPPLY AND SEWERAGE BOARD (BWSSB)
|
0.02342
|
IN-PRINCIPLE
|
04-Jun-2024
|
|
|
|
|
|
No
|
44
|
Karnataka
|
FP/KA/OFC/143839/2021
|
F.No.4-KRB1446/2023-BAN
|
Jio laying Optical Fiber Cable along the RoW of the road from Chincholi-Chimmanchodi & Kalluru-Lingapura in Chincholi Taluk of Kalburgi and Chitaguppa Talukf of Bidar District , Kalburgi Forest Divisions and Bidar Forest Division
|
Optical Fibre Cable
|
JIO DIGITAL FIBER PRIVATE LIMITED
|
0.855293
|
IN-PRINCIPLE
|
18-Nov-2024
|
|
|
|
|
|
No
|
45
|
Karnataka
|
FP/KA/WATER/146299/2021
|
F.No.4-KRC1385/2022-BAN
|
For construction New Tank with Check Dam & Connectivity Road at Sy No.17 (20 New) of Ittigehalli Village, Bhadravathi Division for recharge of Ground Water surrounding of Ittigehalli Villages in favour of EE, KNNL No.3, Bhadra Canal Division, Malebennur.
|
Drinking Water
|
CHIEF ENGINEER KARNATAKA NEERAVARI NIGAM LIMITED UPPER TUNGA PROJECT ZONE SHIVAMOGGA
|
12.1801
|
IN-PRINCIPLE
|
03-Mar-2023
|
|
|
|
|
|
No
|
46
|
Karnataka
|
FP/KA/Others/29220/2017
|
F.No.4-KRB1274/2021-BAN
|
Construction Of Ambhedkar Bhavan
|
Others
|
ASSISTANT DIRECTOR DEPT OF SOCIAL WELFARE PANDAVAPURA
|
0.0909
|
IN-PRINCIPLE
|
14-Sep-2022
|
|
|
|
|
|
No
|
47
|
Karnataka
|
FP/KA/ROAD/45454/2020
|
F.No.4-KRB1294/2021-BAN/
|
Improvements of Existing road to Malemalleshwara Swamy Temple Coming in 0.94 Hectares of forest Land out of 17.03 Hectares of forest land already leased to Suzlon energy limited, in Seegegudda kaval in Hassan Taluk and Hassan District
|
Road
|
EXECUTIVE ENGINEER HASSAN
|
0.94
|
IN-PRINCIPLE
|
29-Sep-2021
|
|
|
|
|
|
No
|