| Sno. | State Name | Proposal No. | RO/Ministry File Number | Proposal Name | Category | User Agency Name | Area (ha.) | Proposal Status | Date of Stage-I | View Report on Allocation of Fresh forest land (Form-A) Part-I | View Report (Part-II to Part-V and Stage-I Clearances) | View TimeLine Details | Site Inspection Report | Other Related Documents | Whether EC required (if so, status)? |
|
1
|
Karnataka
|
FP/KA/WATER/31233/2018
|
No.4-KRB1180/2019-BAN
|
Providing Water supply scheme to Hassan city
|
Drinking Water
|
KARNATAKA URBAN WATER SUPPLY AND DRAINAGE BOARD
|
0.9894
|
IN-PRINCIPLE
|
26-Jun-2019
|
|
|
|
|
|
No
|
|
2
|
Karnataka
|
FP/KA/TRANS/144502/2021
|
F.No.4-KRB1443/2023-BAN
|
Construction of new 110K V LILO line of 10.235Kms on DC towers from 110KV Guledgudda - Ilkal line to Proposed 110/11kV Nagaral S P S/S corridor of 0.428Kms in Sy No.9 in Sabalahunasi Village, in Guledgudda Taluk, Bagalkot District in favor of Executive Engineer (Ele), Major works division Bagalkot, KPTCL Sector No-45 Navanagar, Bagalkot District
|
Transmission Line
|
MAJOR WORKS DIVISION,KPTCL,BAGALKOT
|
0.9416
|
IN-PRINCIPLE
|
29-Mar-2023
|
|
|
|
|
|
No
|
|
3
|
Karnataka
|
FP/KA/Approach/47989/2020
|
F.No.4-KRB1341/2022-BAN
|
Diversion of forest land in keligeri village, Dharward Taluk for additional interconnectivity between the two ends of the arch shaped campus of Indian Institute of Technology,Dharwad
|
Approach Access
|
INDIAN INSTITUTE OF TECHNOLOGY DHARWARD
|
0.66
|
IN-PRINCIPLE
|
08-Mar-2023
|
|
|
|
|
|
No
|
|
4
|
Karnataka
|
FP/KA/ROAD/156224/2022
|
F.No.4-KRC1400/2022-BAN
|
Diversion of 25.763 Ha of forest land in Hosanagara (T), Shimoga (D) for Construction of 2 L-PS road from Km 55.6-Adagodi to Km 90.7-Mavinakoppa of NH766C with 4 major bridges across Sharavathi Backwaters
|
Road
|
EXECUTIVE ENGINEER, NH DIVISION, SHIMOGA
|
25.763
|
IN-PRINCIPLE
|
07-Jul-2025
|
|
|
|
|
|
No
|
|
5
|
Karnataka
|
FP/KA/ROAD/45454/2020
|
F.No.4-KRB1294/2021-BAN/
|
Improvements of Existing road to Malemalleshwara Swamy Temple Coming in 0.94 Hectares of forest Land out of 17.03 Hectares of forest land already leased to Suzlon energy limited, in Seegegudda kaval in Hassan Taluk and Hassan District
|
Road
|
EXECUTIVE ENGINEER HASSAN
|
0.94
|
IN-PRINCIPLE
|
29-Sep-2021
|
|
|
|
|
|
No
|
|
6
|
Karnataka
|
FP/KA/TRANS/23117/2016
|
F.No.4-KRB1150/2018-BAN
|
For laying / Establishment of 11 KV H/T AB Bunch Cable transmission line from Sulkeri Mogru to Panjala & Mallige enclosure passing through Naravi RF, Karkala Wildlife Division, Belthangady Taluk, D.K. District in favour of the Assistant Executive Engineer (Ele) MESCOM O&M Sub Division, Belthangady
|
Transmission Line
|
MANGALORE ELECTRICITY SUPPLY COMPANY LIMITED
|
0.0647
|
IN-PRINCIPLE
|
17-Mar-2025
|
|
|
|
|
|
No
|
|
7
|
Karnataka
|
FP/KA/TRANS/41479/2019
|
F.No.4-KRB1268/2020-BAN
|
Heightening of existing Ehv electrical power transmission lines of 66Kv class in the forest land bearing sy no 38, U.M.kaval, Kengeri-3 hobli, Bangalore south taluk
|
Transmission Line
|
KARNATAKA POWER TRANSMISSION CORPORATION LIMITED
|
0.9518
|
IN-PRINCIPLE
|
19-Nov-2020
|
|
|
|
|
|
No
|
|
8
|
Karnataka
|
FP/KA/OFC/143839/2021
|
F.No.4-KRB1446/2023-BAN
|
Jio laying Optical Fiber Cable along the RoW of the road from Chincholi-Chimmanchodi & Kalluru-Lingapura in Chincholi Taluk of Kalburgi and Chitaguppa Talukf of Bidar District , Kalburgi Forest Divisions and Bidar Forest Division
|
Optical Fibre Cable
|
JIO DIGITAL FIBER PRIVATE LIMITED
|
0.855293
|
IN-PRINCIPLE
|
18-Nov-2024
|
|
|
|
|
|
No
|
|
9
|
Karnataka
|
FP/KA/ROAD/10844/2015
|
4-KRB 1104/2017-BAN
|
Raghavendra Stone crushing Works, Tattisar
|
Road
|
RAGHAVENDRA STONE CRUSHING WORKS AT TATTISAR
|
0.081
|
IN-PRINCIPLE
|
06-Oct-2017
|
|
|
|
|
|
Yes
Proposal Status: EC application yet to be submitted
|
|
10
|
Karnataka
|
FP/KA/ROAD/15173/2015
|
4-KRB 1083/2016-BAN
|
Improvement to the road from Hengavalli Irgi to SH road
|
Road
|
K SURESH SHETTY
|
1.375
|
IN-PRINCIPLE
|
01-Aug-2016
|
|
|
|
|
|
No
|
|
11
|
Karnataka
|
FP/KA/WATER/26128/2017
|
F.No.4-KRB1141/2018-BAN
|
Contraction of vented dam in providing water supply scheme to Kollur village, Kundapur forest division in favor of Executive Officer Sri Mookambika Temple Kollur
|
Drinking Water
|
SRI MOOKAMBIKA TEMPLE KOLLUR
|
0.352
|
IN-PRINCIPLE
|
11-Dec-2018
|
|
|
|
|
|
No
|
|
12
|
Karnataka
|
FP/KA/ROAD/55323/2020
|
F.No.4-KRB1452/2023-BAN
|
Diversion of 2.5254 Ha of forest land in Kenkere village chiknayakanahalli Taluk, Tumkur District for Reconstruction of two-lane road with Paved shoulders from Huliyar to K.B Cross section and from KB Cross to Nelligere section of NH-150A in the State of Karnataka on EPC Mode
|
Road
|
REGIONAL OFFICE, MINISTRY OF ROAD TRANSPORT & HIGHWAYS (MORT&H), GOVT OF INDIA, KARNATAKA
|
2.5254
|
IN-PRINCIPLE
|
11-Jul-2023
|
|
|
|
|
|
No
|
|
13
|
Karnataka
|
FP/KA/ROAD/55323/2020
|
F.No.4-KRB1452/2023-BAN
|
Diversion of 2.5254 Ha of forest land in Kenkere village chiknayakanahalli Taluk, Tumkur District for Reconstruction of two-lane road with Paved shoulders from Huliyar to K.B Cross section and from KB Cross to Nelligere section of NH-150A in the State of Karnataka on EPC Mode
|
Road
|
REGIONAL OFFICE, MINISTRY OF ROAD TRANSPORT & HIGHWAYS (MORT&H), GOVT OF INDIA, KARNATAKA
|
2.5254
|
IN-PRINCIPLE
|
11-Jul-2023
|
|
|
|
|
|
No
|
|
14
|
Karnataka
|
FP/KA/WATER/19533/2016
|
F.No.4-KRB1241/2020-BAN/
|
Providing CWSS to Bukkasagara Devasamudra and other 5 Villages in Hospet Taluk Ballari District
|
Drinking Water
|
Assistant Executive Engineer
|
0.597
|
IN-PRINCIPLE
|
06-Jan-2022
|
|
|
|
|
|
No
|
|
15
|
Karnataka
|
FP/KA/OFC/41791/2019
|
F.No.4-KRB1317/2021-BAN/
|
Laying of BSNL OF cable in Hassan - Kattaya route,Hassan District, Karnataka. (From Hanumathapura Branch Join Connector to Gorur Telephone Exchange)
|
Optical Fibre Cable
|
BHARAT SANCHAR NIGAM LIMITED
|
0.1619
|
IN-PRINCIPLE
|
16-Nov-2021
|
|
|
|
|
|
No
|
|
16
|
Karnataka
|
FP/KA/ROAD/33965/2018
|
F.No.KRA1243/2020-BAN
|
Construction of widening to Two/Four lane with paved shoulders from km. 0.000 to km. 101.400 NH-50 in Bidar District
|
Road
|
EXECUTIVE ENGINEER NATIONAL HIGHWAY DIVISION
|
40.79
|
IN-PRINCIPLE
|
28-Dec-2020
|
|
|
|
|
|
Yes
Proposal Status: EC application yet to be submitted
|
|
17
|
Karnataka
|
FP/KA/TRANS/24339/2017
|
No.4-KRB1258/2020-BAN
|
For Construction of 33KV / 11 KV Sub-Station at Rajaramapura-Sampaje Village in Sullia Taluk, Dakshina Kannada District, Mangalore Forest Division in favour of the EE, O&M Division, MESCOM, Puttur, D.K.
|
Transmission Line
|
MESCOM
|
0.8
|
IN-PRINCIPLE
|
06-Oct-2020
|
|
|
|
|
|
No
|
|
18
|
Karnataka
|
FP/KA/ROAD/6847/2014
|
4-KRB 1055/2015-BAN
|
CONSTRUCTION OF BRIDGE ACROSS KUMARADHARA RIVER
|
Road
|
KARNATAKA ROAD DEVELOPMENT CORPORATION LTD
|
0.16
|
IN-PRINCIPLE
|
02-Jun-2015
|
|
|
|
|
|
No
|
|
19
|
Karnataka
|
FP/KA/IND/26447/2017
|
F.No.4-KRB 1346/2022-BAN
|
BALDOTA STEEL AND POWER LIMITED
|
Industry
|
AARESS IRON AND STEEL LIMITED
|
1.745
|
IN-PRINCIPLE
|
21-Feb-2025
|
|
|
|
|
|
No
|
|
20
|
Karnataka
|
FP/KA/ROAD/29864/2017
|
No.4-KRB 1194/ 2019-BAN
|
Hullikeri Tanda to Halki
|
Road
|
EXECUTIVE ENGINEER KRRDA PROJECT DIVISION GOKAK DIST BELAGAVI
|
0.7
|
IN-PRINCIPLE
|
23-Jul-2019
|
|
|
|
|
|
No
|
|
21
|
Karnataka
|
FP/KA/Pipeline/143458/2021
|
F.No.4-KRB1444/2023-BAN
|
Diversion of 0.0138 ha of forest land at Sy No.75 of Mantur Village & Mantur RF, Mudhol Taluk, Bagalkot District for laying pipeline for Agricultural and Drinking water purpose in favour of Rajendra Ramappa S/o Ramappa Metagudda residing at Mantur Village and Post, Mudhol Taluk Bagalkot District
|
Pipeline
|
RAJENDRA RAMAPPA METAGUDDA
|
0.0138
|
IN-PRINCIPLE
|
13-Apr-2023
|
|
|
|
|
|
No
|
|
22
|
Karnataka
|
FP/KA/Others/21722/2016
|
4-KRB 1109/2017-BAN
|
Panchayath office Building
|
Others
|
GRAM PANCHAYAT
|
0.809
|
IN-PRINCIPLE
|
23-Feb-2018
|
|
|
|
|
|
No
|
|
23
|
Karnataka
|
FP/KA/WATER/153757/2022
|
F.No.4-KRB1485/2024-BAN
|
Diversion of 0.02342 ha of forest land for laying of Pipeline passing through Sy No.5 of Basavanapura (V) & Sy No.15 of Kalkere (V), Anekal (T), Urban (D), Bannerghatta Division [from Existing pipeline to Nimhans in Sakalavara Village] in favour of the AEE, BWSSB, South-Village-1, Sub Division, Bangalore.
|
Drinking Water
|
BANGALORE WATER SUPPLY AND SEWERAGE BOARD (BWSSB)
|
0.02342
|
IN-PRINCIPLE
|
04-Jun-2024
|
|
|
|
|
|
No
|
|
24
|
Karnataka
|
FP/KA/IRRIG/28934/2017
|
4-KRB1345/2022-BAN
|
Diversion of 2.16813 Ha of Forest land for Veerabhadreshwara Lift Irrigation Scheme in Chitrabhanukote, Nagnapr, Laxanatti and Dadanatti villages of Mudhol taluka, Bagalkot Dist in favour of KNNL
|
Irrigation
|
KNNL
|
2.16813
|
IN-PRINCIPLE
|
22-Mar-2022
|
|
|
|
|
|
EC File NA
|
|
25
|
Karnataka
|
FP/KA/ROAD/18723/2016
|
4-KRB1115/2017-BAN
|
For construction of Bridge & approach road in Karwar Forest Division, UK District in favour of the EE, PWP & IWT Department, Karwar.
|
Road
|
EXECUTIVE ENGINEER
|
0.153
|
IN-PRINCIPLE
|
11-Aug-2017
|
|
|
|
|
|
No
|
|
26
|
Karnataka
|
FP/KA/ROAD/120467/2021
|
F.No.4-KRB1313/2021-BAN
|
4 L of Addahole (Near Gundya) to Bantwal Cross Section (Pkg-01) from Design Km. 255.140 to Design Km. 270.270 of NH-75 (Old NH-48)
|
Road
|
NATIONAL HIGHWAYS AUTHORITY OF INDIA PIU MANGALORE
|
2.5315
|
IN-PRINCIPLE
|
11-Jul-2023
|
|
|
|
|
|
No
|
|
27
|
Karnataka
|
FP/KA/OFC/144741/2021
|
F.No.4-KRB1492/2024-BAN
|
Laying Underground OFC cable all along Roght of Way of NH/SH/PWD/ Road from Biligalluru-Nagvalli in Biligalluru,Nadawada Bidaruru,Karumane,Mandhavalli,Aravadhi,Muddhane,Kanapagaru,Banukuli,Chennakonda, Thalale and Skakkarebyle Villages, Sagara, Shimogga and Thirthahalli Taluk of Shivamogga Wild Life (Sharavathi Wild Life and Sakkarebyle) in Shivam
|
Optical Fibre Cable
|
JIO DIGITAL FIBER PRIVATE LIMITED
|
1.1594
|
IN-PRINCIPLE
|
20-Jan-2026
|
|
|
|
|
|
No
|
|
28
|
Karnataka
|
FP/KA/ROAD/49295/2020
|
F.No.4-KRC1343/2022-BAN
|
Development of Bangalore Ring Road ((STRR) Phase-II NH-948A) from Ramanagara to Peddamadhagondapalli (Km 82.200 to 140.000) - 57.800 km in District Ramanagara and Bangalore Urban of Karnataka State and District Krishnagiri of Tamil Nadu State.
|
Road
|
NATIONAL HIGHWAYS AUTHORITY OF INDIA PIU BANGALORE EXPRESSWAY
|
11
|
IN-PRINCIPLE
|
04-Mar-2025
|
|
|
|
|
|
Yes
Proposal Status: EC application yet to be submitted
|
|
29
|
Karnataka
|
FP/KA/HYD/12749/2015
|
4-KRB1148/2018-BAN
|
3MW Beedalli Project
|
Hydel
|
MESSRS KODAGU HYDEL PROJECTS PVT LTD
|
0.994
|
IN-PRINCIPLE
|
13-Jul-2018
|
|
|
|
|
|
No
|
|
30
|
Karnataka
|
FP/KA/Others/141483/2021
|
F.No.4-KRB1388/2022-BAN
|
Construction of Approach Road and Construction of bridge across Cauvery River between Talakadu , Kaliyur and Malangi village in T. Narasipura Taluk, Mysore District
|
Others
|
KARNATAKA ROAD DEVELOPMENT CORPORATION LIMITED, MYSORE
|
0.8554
|
IN-PRINCIPLE
|
04-Nov-2022
|
|
|
|
|
|
No
|
|
31
|
Karnataka
|
FP/KA/ROAD/140781/2021
|
F.No.4-KRB1449/2023-BAN
|
Diversion of 2.4346 ha of forest land for improvement of existing Road from Pathapalya to Polanayakanapalli via Singappagarapalli, Kamasanapalli, Gummallapalli Villages (CH: 3.219km to 4.285KM and Ch: 7.2KM to 8.929 Km) Mittemari & Pathapalya [H], Bagepalli [T], Chikkaballapura [D] in favour of the Executive Engineer, Project Division (PMGSY),Chic
|
Road
|
EE PMGSY CHIKKABALLAPURA (KRRDA)
|
2.4346
|
IN-PRINCIPLE
|
02-May-2023
|
|
|
|
|
|
No
|
|
32
|
Karnataka
|
FP/KA/ROAD/154088/2022
|
F.No.4-KRB1487/2024-BAN
|
Diversion of 0.02460 ha of forest land for connectivity road [for residential Layout purpose] falls in Sy No.81 of Bachaganv Village, Bachaganv Deemed Forest, Sirsi Hobli, & Taluk, U.K District, Sirsi
|
Road
|
VENKATARAMAN GOVIND BHAT, TUDUGUNI VILLAGE, SIRSI TALUK, KUMTA ROAD, UTTARA KANNADA DISTRICT
|
0.0246
|
IN-PRINCIPLE
|
21-Feb-2025
|
|
|
|
|
|
No
|
|
33
|
Karnataka
|
FP/KA/IRRIG/49031/2020
|
F.No.4-KRB1379/2022-BAN/
|
Scheme to lift water from hemavathy river near Mavinakere village of Holenarasipura Taluk to fill 160 tanks and 10 kattes of Dudda and Shantigrama hoblis of Hassan taluk for drinking purpose
|
Irrigation
|
EXECUTIVE ENGINEER,HRBC DIVISION,HOLENARASIPURA
|
0.7815
|
IN-PRINCIPLE
|
19-Oct-2022
|
|
|
|
|
|
No
|
|
34
|
Karnataka
|
FP/KA/TRANS/8118/2014
|
No.4-KRB1127/2018-BAN
|
Estimate for Establishing 1*5MVA,33/11KV substation at Subramanya inputtur Division ,Sullia Taluk
|
Transmission Line
|
ASSISTANT EXECUTIVE ENGINEER
|
0.918
|
IN-PRINCIPLE
|
17-Oct-2019
|
|
|
|
|
|
No
|
|
35
|
Karnataka
|
FP/KA/ROAD/22392/2016
|
4-KRB1125/2017-BAN
|
Diversion of 4.388 Ha Forest land for the purpose of improvement of road from Pattadkallu to kamatagi
|
Road
|
KSHIP
|
4.388
|
IN-PRINCIPLE
|
14-Feb-2018
|
|
|
|
|
|
Yes
Proposal No.:
EC File No.:
Proposal Status: No Proposal no.
|
|
36
|
Karnataka
|
FP/KA/ROAD/143079/2021
|
F.No.4-KRB1418/2023-BAN
|
Widening and Formation of 30.00 Mtr wide road from Kundalahalli ( Old Airport Road) to Gunjur Paly Via BWSSB Treatment plant (Road UP to Gunjur Palya Main Road) as per RMP-2015
|
Road
|
EXECUTIVE ENGINEER, ROAD INFRASTRUCTURE MAHADEVAPURA
|
0.99
|
IN-PRINCIPLE
|
24-Feb-2023
|
|
|
|
|
|
No
|