Sno. | State Name | Proposal No. | RO/Ministry File Number | Proposal Name | Category | User Agency Name | Area (ha.) | Proposal Status | Date of Stage-I | View Report on Allocation of Fresh forest land (Form-A) Part-I | View Report (Part-II to Part-V and Stage-I Clearances) | View TimeLine Details | Site Inspection Report | Other Related Documents | Whether EC required (if so, status)? |
1
|
Himachal Pradesh
|
FP/HP/ROAD/51141/2020
|
FC/HPB/06/10/2022
|
C/O OF JAROL TO THARU KM 0/0 TO 3/00
|
Road
|
HIMACHAL PRADESH PUBLIC WORK DEPARTMENT
|
0.996
|
IN-PRINCIPLE
|
29-Sep-2022
|
|
|
|
|
|
No
|
2
|
Himachal Pradesh
|
FP/HP/Others/8205/2014
|
8B/HP/01/17/2019/FC
|
Sewerage Scheme Shah Talai
|
Others
|
EXECUTIVE ENGINEER
|
0.5712
|
IN-PRINCIPLE
|
11-Sep-2020
|
|
|
|
|
|
Yes
Proposal No.:
EC File No.:
Proposal Status: No Proposal no.
|
3
|
Himachal Pradesh
|
FP/HP/HYD/41472/2019
|
FC/HPB/01/26/2021
|
Construction of Lower Iku Small Hydro Project
|
Hydel
|
SANJEEV HYDRO PROJECTS PRIVATE LIMITED
|
0.6806
|
IN-PRINCIPLE
|
06-Dec-2024
|
|
|
|
|
|
No
|
4
|
Himachal Pradesh
|
FP/HP/ROAD/25203/2017
|
8B/HP/06/13/2019/FC
|
CONSTRUCTION OF LINK ROAD NAGROTA-KULANDAR-CHACKNWAR-PALI KM. 0/0 TO 9/250.
|
Road
|
HIMACHAL PRADESH PUBLIC WORK DEPARTMENT
|
3.66
|
IN-PRINCIPLE
|
29-Oct-2020
|
|
|
|
|
|
No
|
5
|
Himachal Pradesh
|
FP/HP/MIN/30477/2017
|
8C/HP/05/27/2021/FC
|
sand,stone and bajri mining project by sh Tepender Singh Saini
|
Mining
|
MINING PROJECT BY SH TEPENDER SINGH SAINI
|
6.2255
|
IN-PRINCIPLE
|
03-Jan-2025
|
|
|
|
|
|
Yes
Proposal Status: EC application yet to be submitted
|
6
|
Himachal Pradesh
|
FP/HP/Others/123004/2021
|
FC/HPB/09/52/2021
|
Diversion of 0.561098 hectare of Forest Land for the Construction of Sewerage Treatment Plant 5.00 MLD for Zone No. 1 within the Jurisdiction of Bilaspur Forest Division
|
Others
|
JAL SHAKTI VIBHAG GOVT. OF HIMACHAL PRADESH
|
0.56109
|
IN-PRINCIPLE
|
07-Mar-2022
|
|
|
|
|
|
Yes
Proposal Status: EC application yet to be submitted
|
7
|
Himachal Pradesh
|
FP/HP/ROAD/47651/2020
|
8B/HP/06/10/2021/FC
|
C/o Rajnagar to Bhandar via Rupani KM 0/000 to 4/300
|
Road
|
HPPWD
|
1.58
|
IN-PRINCIPLE
|
19-Aug-2021
|
|
|
|
|
|
No
|
8
|
Himachal Pradesh
|
FP/HP/ROAD/17709/2016
|
8B/HP/06/59/2017/FC
|
C/O link road from Daand to Bhasua
|
Road
|
HIMACHAL PRADESH PUBLIC WORK DEPARTMENT
|
5.96
|
IN-PRINCIPLE
|
30-Jan-2018
|
|
|
|
|
|
No
|
9
|
Himachal Pradesh
|
FP/HP/ROAD/18346/2016
|
8B/HPB/06/53/2016
|
Diversion of 1.625 hec. area for C/O Prem Nagar Chandog road via Bara Chakli km 7/0 to 10/200
|
Road
|
HIMACHAL PRADESH PUBLIC WORK DEPARTMENT
|
1.625
|
IN-PRINCIPLE
|
08-Dec-2016
|
|
|
|
|
|
No
|
10
|
Himachal Pradesh
|
FP/HP/ROAD/11150/2015
|
8B/HPB/06/82/2015
|
C/O bridge over Beas River at Manali
|
Road
|
HIMACHAL PRADESH PUBLIC WORK DEPARTMENT
|
0.3433
|
IN-PRINCIPLE
|
19-Sep-2016
|
|
|
|
|
|
No
|
11
|
Himachal Pradesh
|
FP/HP/TRANS/49351/2020
|
8B/HP/04/25/2021/FC
|
CONSTRUCTION OF FALLING IN ROW FROM TOWER NO. 46, 47,48,48A (ADDLE. TOWER) TO TOWER NO. 49 OF 132 KV D/C TRANSMISSION LINE KANGOO-BIJINI-BAJOURA COMING IN THE PROJECT ALIGNMENT OF FOUR LINING (KIRATPU
|
Transmission Line
|
CHIEF ENGINEER (ES) HAMIRPUR
|
0.2704
|
IN-PRINCIPLE
|
12-Oct-2021
|
|
|
|
|
|
No
|
12
|
Himachal Pradesh
|
FP/HP/ROAD/17841/2016
|
8B/HP/06/18/2019/FC
|
C/O kharsi Dughal road
|
Road
|
PUBLIC WORK DEPARTMENT
|
1.21
|
IN-PRINCIPLE
|
31-Jul-2020
|
|
|
|
|
|
No
|
13
|
Himachal Pradesh
|
FP/HP/SubStation/142137/2021
|
FC/HPB/108/2023
|
Construction of 33kV HT Line Sub station Bhadwar, Nurpur in District Kangra
|
Sub Station
|
HPSEBL
|
0.232
|
IN-PRINCIPLE
|
09-Oct-2024
|
|
|
|
|
|
No
|
14
|
Himachal Pradesh
|
FP/HP/Others/153006/2022
|
FC/HPB/14/2023
|
Construction Solid Waste Management Plant at Kasol G.P.Kasol
|
Others
|
RURAL DEVELOPMENT DEPARTMENT & PANCHAYATI RAJ DEPARTMENT
|
0.1982
|
IN-PRINCIPLE
|
22-Nov-2024
|
|
|
|
|
|
Yes
Proposal Status: EC application yet to be submitted
|
15
|
Himachal Pradesh
|
FP/HP/ROAD/154923/2022
|
FC/HPC/06/181/2022
|
Proposal for diversion of additional Forest Land requirement for four laning of NH-05 from Shakral Village to Dhalli section (Shimla Bypass Package II from Km 146+300 to Km 156+560 and Shimla Connectivity from Km 0+000 to Km 0+725 for Design length – 10.985 Km) in already approved FCA case of the entire section from Kaithlighat to Dhalli
|
Road
|
NATIONAL HIGHWAY AUTHORITY OF INDIA PIU SHIMLA
|
19.1788
|
IN-PRINCIPLE
|
03-Aug-2023
|
|
|
|
|
|
No
|
16
|
Himachal Pradesh
|
FP/HP/ROAD/48987/2020
|
FC/HPB/73/2023
|
C/O CHILLON TO CHOWKIMRIGWAL ROAD KM 0/00 TO 8/00
|
Road
|
HIMACHAL PRADESH PUBLIC WORK DEPARTMENT
|
1.92
|
IN-PRINCIPLE
|
22-Jun-2024
|
|
|
|
|
|
No
|
17
|
Himachal Pradesh
|
FP/HP/Others/9860/2015
|
8B/HPB/09/84/2015
|
Fruit Plant Nutrition Laboratory, Dabbi
|
Others
|
DEPUTY DIRECTOR
|
0.1031
|
IN-PRINCIPLE
|
27-Jan-2017
|
|
|
|
|
|
No
|
18
|
Himachal Pradesh
|
FP/HP/Others/22048/2016
|
8B/HP/09/74/2017/FC
|
Fire Post Service
|
Others
|
COMMANDANT HOME GUARDS SEVENTH BATTALION KULLU HP
|
0.0405
|
IN-PRINCIPLE
|
06-Feb-2018
|
|
|
|
|
|
No
|
19
|
Himachal Pradesh
|
FP/HP/ROAD/148886/2021
|
FC/HPB/06/153/2022
|
Two laning with paved shoulders from End of Hamirpur Bypass (Chil Bahal) to Bhangbar section via Jwalamukhi from km 138+295 to Km 175+270 (Package IV) of existing NH 88 (New NH-3 & 303)
|
Road
|
National Highways Authority of India
|
2.1338
|
IN-PRINCIPLE
|
23-Feb-2023
|
|
|
|
|
|
No
|
20
|
Himachal Pradesh
|
FP/HP/ROAD/148886/2021
|
FC/HPB/06/153/2022
|
Two laning with paved shoulders from End of Hamirpur Bypass (Chil Bahal) to Bhangbar section via Jwalamukhi from km 138+295 to Km 175+270 (Package IV) of existing NH 88 (New NH-3 & 303)
|
Road
|
National Highways Authority of India
|
2.1338
|
IN-PRINCIPLE
|
23-Feb-2023
|
|
|
|
|
|
No
|
21
|
Himachal Pradesh
|
FP/HP/ROAD/14514/2015
|
8B/HP/06/26/2021/FC
|
C/O link road village Muhain km. 0/0 to 1/00 in Distt. Bilaspur (H.P)
|
Road
|
HIMACHAL PRADESH PUBLIC WORK DEPARTMENT
|
1.1026
|
IN-PRINCIPLE
|
30-Nov-2021
|
|
|
|
|
|
No
|
22
|
Himachal Pradesh
|
FP/HP/ROAD/18624/2016
|
8B/HP/06/75/2021/FC
|
C/o link road village Boh to Hambar km. 0/0 to 0/725
|
Road
|
HIMACHAL PRADESH PUBLIC WORK DEPARTMENT
|
0.448
|
IN-PRINCIPLE
|
28-Sep-2021
|
|
|
|
|
|
No
|
23
|
Himachal Pradesh
|
FP/HP/ROAD/11163/2015
|
8B/HPB/06/63/2016
|
C/o Bag - Kayalu Road
|
Road
|
HIMACHAL PRADESH PUBLIC WORK DEPARTMENT
|
6.6997
|
IN-PRINCIPLE
|
18-Jan-2017
|
|
|
|
|
|
No
|
24
|
Himachal Pradesh
|
FP/HP/ROAD/11163/2015
|
8B/HPB/06/63/2016
|
C/o Bag - Kayalu Road
|
Road
|
HIMACHAL PRADESH PUBLIC WORK DEPARTMENT
|
6.6997
|
IN-PRINCIPLE
|
18-Jan-2017
|
|
|
|
|
|
No
|
25
|
Himachal Pradesh
|
FP/HP/ROAD/9555/2015
|
8b/hp/06/44/2021/FC
|
Thather to Ghatot via draman
|
Road
|
HIMACHAL PRADESH PUBLIC WORK DEPARTMENT
|
0.7194
|
IN-PRINCIPLE
|
30-Sep-2021
|
|
|
|
|
|
No
|
26
|
Himachal Pradesh
|
FP/HP/HYD/147118/2021
|
FC/HPB/01/104/2022
|
Jiwa-II (1.75 MW) SHEP
|
Hydel
|
BEHAL MOTORS
|
0.8223
|
IN-PRINCIPLE
|
30-Jan-2025
|
|
|
|
|
|
No
|
27
|
Himachal Pradesh
|
FP/HP/HYD/37189/2018
|
8B/HP/01/71/2020/FC
|
Kasol Hydro Power Project
|
Hydel
|
MS BEENA BUTAIL PALMPUR
|
1.496448
|
IN-PRINCIPLE
|
12-Dec-2024
|
|
|
|
|
|
No
|
28
|
Himachal Pradesh
|
FP/HP/ROAD/153206/2022
|
FC/HPB/06/15/2024
|
Construction of link road from Barayali Budmo Stoti Shiv Nagar 0/00 to 4/150 Km
|
Road
|
HIMACHAL PRADESH PUBLIC WORK DEPARTMENT
|
1.3711
|
IN-PRINCIPLE
|
22-Nov-2024
|
|
|
|
|
|
No
|
29
|
Himachal Pradesh
|
FP/HP/ROAD/34634/2018
|
8B/HP/06/74/2019/FC
|
Link road from Chintpurni Talwara Road (Jhurni Mod) to Nangal via Sunhet Jabbre RD 0/0 to 3/056 in district Kangra (H.P.)
|
Road
|
HIMACHAL PRADESH PUBLIC WORK DEPARTMENT
|
1.3953
|
IN-PRINCIPLE
|
15-May-2019
|
|
|
|
|
|
No
|
30
|
Himachal Pradesh
|
FP/HP/ROAD/19288/2016
|
8B/HPB/06/47/2016
|
C/O Gaonsari Goskwari Rausi road
|
Road
|
HIMACHAL PRADESH PUBLIC WORK DEPARTMENT
|
2.0252
|
IN-PRINCIPLE
|
02-Jan-2017
|
|
|
|
|
|
No
|
31
|
Himachal Pradesh
|
FP/HP/HYD/13963/2015
|
8B/HP/01/39/2017/FC
|
14 MW UHL S.H.E.P.
|
Hydel
|
PURI OIL MILLS LIMITED
|
12.4332
|
IN-PRINCIPLE
|
14-Feb-2019
|
|
|
|
|
|
No
|
32
|
Himachal Pradesh
|
FP/HP/HYD/44517/2020
|
FC/HPB/01/51/2021
|
C/O Braguna Small Hydro Project 1.5 MW
|
Hydel
|
M/s Ometa Hydro Power Pvt. Ltd
|
0.9854
|
IN-PRINCIPLE
|
06-Dec-2024
|
|
|
|
|
|
No
|
33
|
Himachal Pradesh
|
FP/HP/Others/143614/2021
|
FC/HPB/09/82/2022
|
Construction of Police Station, State Vigilance and Anti Corruption Bureau, Shimla.
|
Others
|
STATE VIGILANCE AND ANTI CORRUPTION BUREAU
|
0.1077
|
IN-PRINCIPLE
|
30-Dec-2022
|
|
|
|
|
|
No
|
34
|
Himachal Pradesh
|
FP/HP/ROAD/151117/2022
|
FC/HPC/06/154/2022
|
Additional Forest land requirement of 11.7936 ha. for four laning of proposed Shimla Bypass from Kaithalighat to Shakral Section (Package-I) of NH-22 (Chainage from Km 128.835 to Km.146.300) in already approved FCA case of the entire section from Kaithlighat to Dhalli
|
Road
|
NATIONAL HIGHWAY AUTHORITY OF INDIA PIU SHIMLA
|
11.7936
|
IN-PRINCIPLE
|
27-Mar-2023
|
|
|
|
|
|
No
|
35
|
Himachal Pradesh
|
FP/HP/ROAD/45528/2020
|
8b/hp/road/45528/2020
|
C/o link road from kandla to bangati km 0/0 to 3/725
|
Road
|
HPPWD
|
2.23
|
IN-PRINCIPLE
|
18-Aug-2021
|
|
|
|
|
|
No
|
36
|
Himachal Pradesh
|
FP/HP/ROAD/42526/2019
|
8B/HP/06/37/2021/FC
|
construction of Tanda Kohla Tikkari Kawal Kothi Sidhkothi Via Baba Balak Nath Mandir Thapla Dari ka Nal Sidhyani Road Km.0/0 To 11/340.
|
Road
|
HPPWD
|
2.2876
|
IN-PRINCIPLE
|
09-Oct-2024
|
|
|
|
|
|
No
|
37
|
Himachal Pradesh
|
FP/HP/ROAD/24362/2017
|
8B/UCP/06/93/2019/FC
|
C/o Dhadu (Dhatrog) to Bholala Road
|
Road
|
PUBLIC WORK DEPARTMENT
|
3.432
|
IN-PRINCIPLE
|
08-Sep-2020
|
|
|
|
|
|
No
|
38
|
Himachal Pradesh
|
FP/HP/WATER/148410/2021
|
FC/HPB/59/2023
|
Construction of LWSS PC Habitation to Village Haripur & Multi Village Piped Water Supply Scheme of Dehra Block in Tehsil Haripur, District Kangra
|
Drinking Water
|
IRRIGATION AND PUBLIC HEALTH GOVT OF HP
|
1.0041
|
IN-PRINCIPLE
|
25-Sep-2023
|
|
|
|
|
|
No
|
39
|
Himachal Pradesh
|
FP/HP/WATER/148410/2021
|
FC/HPB/59/2023
|
Construction of LWSS PC Habitation to Village Haripur & Multi Village Piped Water Supply Scheme of Dehra Block in Tehsil Haripur, District Kangra
|
Drinking Water
|
IRRIGATION AND PUBLIC HEALTH GOVT OF HP
|
1.0041
|
IN-PRINCIPLE
|
25-Sep-2023
|
|
|
|
|
|
No
|
40
|
Himachal Pradesh
|
FP/HP/Others/42501/2019
|
FC/HPB/09/22/2022
|
C/o Proposed Sub Depot and Bus Stand, at Khundian, Distt. Kangra, H.P.
|
Others
|
HPCTBSMDA
|
1.0295
|
IN-PRINCIPLE
|
31-Oct-2023
|
|
|
|
|
|
No
|
41
|
Himachal Pradesh
|
FP/HP/Others/37339/2018
|
8B/HP/09/45/2020/FC
|
CONSTRUCTION OF HELIPAD AT KEY
|
Others
|
HIMACHAL PRADESH PUBLIC WORK DEPARTMENT
|
0.92
|
IN-PRINCIPLE
|
08-Jul-2020
|
|
|
|
|
|
No
|
42
|
Himachal Pradesh
|
FP/HP/ROAD/145157/2021
|
FC/HPB/06/09/2022
|
C/o of road from South Portal of Rohtang Tunnel to Source of Seri Nala
|
Road
|
CHIEF EN. (BRO) C/O 56 APO
|
3.7862
|
IN-PRINCIPLE
|
21-Jan-2022
|
|
|
|
|
|
No
|
43
|
Himachal Pradesh
|
FP/HP/ROAD/21187/2016
|
8B/HP/06/25/2017/FC
|
C/O link road from Kainthalghatti to Ghugvi Kot Rehali upto Dasvidhar Km.0/0 to 5/930
|
Road
|
HIMACHAL PRADESH PUBLIC WORK DEPARTMENT
|
1.3767
|
IN-PRINCIPLE
|
10-Apr-2017
|
|
|
|
|
|
No
|
44
|
Himachal Pradesh
|
FP/HP/ROAD/8164/2014
|
8B/HP/06/56/2017/FC
|
C/O road From Dummi to Kharechi 0/00 to 10/165
|
Road
|
HIMACHAL PRADESH PUBLIC WORK DEPARTMENT
|
5.6581
|
IN-PRINCIPLE
|
20-Apr-2021
|
|
|
|
|
|
No
|
45
|
Himachal Pradesh
|
FP/HP/HYD/23837/2017
|
8B/HP/01/129/2019/FC
|
SAI KOTHI-II HYDEL ELECTRIC PROJECT
|
Hydel
|
HPSEB
|
11.9813
|
IN-PRINCIPLE
|
19-Apr-2022
|
|
|
|
|
|
No
|
46
|
Himachal Pradesh
|
FP/HP/ROAD/8943/2014
|
8B/HP/06/22/2017/FC
|
Existing road from Gharog to Kanohi
|
Road
|
HIMACHAL PRADESH PUBLIC WORK DEPARTMENT
|
1.0674
|
IN-PRINCIPLE
|
28-Mar-2017
|
|
|
|
|
|
No
|
47
|
Himachal Pradesh
|
FP/HP/ROAD/25398/2017
|
8B/HP/06/86/2019/FC
|
Construction of Link road from Barnali to Upper Nari via Lower Nari
|
Road
|
HIMACHAL PRADESH PUBLIC WORK DEPARTMENT
|
1.465
|
IN-PRINCIPLE
|
20-Jan-2020
|
|
|
|
|
|
No
|
48
|
Himachal Pradesh
|
FP/HP/Others/118144/2020
|
FC/HPB/09/41/2021
|
Construction of Sewerage Treatment Plant at Chimbalhar in Tehsil palampur in District Kangra
|
Others
|
IRRIGATION AND PUBLIC HEALTH GOVT OF HP
|
0.2094
|
IN-PRINCIPLE
|
25-Feb-2022
|
|
|
|
|
|
Yes
Proposal Status: EC application yet to be submitted
|
49
|
Himachal Pradesh
|
FP/HP/ROAD/11611/2015
|
8B/HPB/06/93/2016
|
Danoghat sanjha aara Neri Plata
|
Road
|
HIMACHAL PRADESH PUBLIC WORK DEPARTMENT
|
3.8423
|
IN-PRINCIPLE
|
23-Jun-2017
|
|
|
|
|
|
No
|
50
|
Himachal Pradesh
|
FP/HP/ROAD/20230/2016
|
8B/HP/06/73/2021/FC
|
Khairian to Bakan
|
Road
|
HIMACHAL PRADESH PUBLIC WORK DEPARTMENT
|
0.513
|
IN-PRINCIPLE
|
30-Jun-2021
|
|
|
|
|
|
No
|
|