| Sno. | State Name | Proposal No. | RO/Ministry File Number | Proposal Name | Category | User Agency Name | Area (ha.) | Proposal Status | Date of Stage-I | View Report on Allocation of Fresh forest land (Form-A) Part-I | View Report (Part-II to Part-V and Stage-I Clearances) | View TimeLine Details | Site Inspection Report | Other Related Documents | Whether EC required (if so, status)? |
|
1
|
Gujarat
|
FP/GJ/Others/17261/2015
|
6-GJB045/2017-BHO
|
Hind Marine Works Jamnagar
|
Others
|
HIND MARINE WORKS
|
4.9
|
IN-PRINCIPLE
|
02-May-2019
|
|
|
|
|
|
No
|
|
2
|
Gujarat
|
FP/GJ/ROAD/25483/2017
|
6-GJB036/2019-BHO
|
Proposal for diversion of 1.20 ha. Reserved forest land for the project of Widening and Strengthening Construction of Jira-Hirava-Patala Road K.M. 0/00 to 9/500 (Working Section 4/630 to 6/230) (O.D.R) Village : Hirava, Ta. : Dhari, Dist. Amreli in Gujarat State.
|
Road
|
R N B PANCHAYAT DIVISION AMRELI
|
1.2
|
IN-PRINCIPLE
|
24-Jul-2023
|
|
|
|
|
|
No
|
|
3
|
Gujarat
|
FP/GJ/WATER/118273/2021
|
6-GJB081/2021-BHO
|
Machchhu-1 Based Bamanbor Gr. W.S.S (WSS-6 General) Connectivity
|
Drinking Water
|
DEPUTY EXECUTIVE ENGINEER, P.H. WORK SUB DIVISION-RAJKOT
|
0.945
|
IN-PRINCIPLE
|
20-May-2022
|
|
|
|
|
|
No
|
|
4
|
Gujarat
|
FP/GJ/WATER/8397/2014
|
6-GJB055/2015-BHO
|
SJMMSVY
|
Drinking Water
|
NAGAR SEVA SADAN DAHOD
|
0.086
|
IN-PRINCIPLE
|
19-Jan-2016
|
|
|
|
|
|
No
|
|
5
|
Gujarat
|
FP/GJ/IRRIG/14657/2015
|
6-GJB038/2017-BHO
|
Sardar Sarovar Narmada Nigam LTD
|
Irrigation
|
SARDAR SAROVAR NARMADA NIGAM IMITED
|
3.3588
|
IN-PRINCIPLE
|
21-Mar-2018
|
|
|
|
|
|
No
|
|
6
|
Gujarat
|
FP/GJ/IRRIG/17409/2016
|
6-GJB04/2017-BHO
|
SSP, SBC, Morbi Branch
|
Irrigation
|
SARDAR SAROVAR NARMADA NIGAM LTD
|
0.6174
|
IN-PRINCIPLE
|
25-Oct-2017
|
|
|
|
|
|
No
|
|
7
|
Gujarat
|
FP/GJ/MIN/42424/2019
|
6-GJC048/2020-BHO
|
Mangrol - Valia Lignite Mine GIPCL.
|
Mining
|
SLPP-GUJARAT INDUSTRIES POWER COMPANY LTD.
|
3.0684
|
IN-PRINCIPLE
|
28-Mar-2023
|
|
|
|
|
|
EC File NA
|
|
8
|
Gujarat
|
FP/GJ/Others/28992/2017
|
6-GJB026/2019-BHO
|
Conveyor Corridor for Lakhpat Cement Works
|
Others
|
ADANI CEMENTATION LIMITED
|
2.6564
|
IN-PRINCIPLE
|
28-Jun-2019
|
|
|
|
|
|
Yes
Proposal No.: IA/GJ/IND/69706/2017
EC File No.: IA-J-11011/494/2017-IA-II(I)
Proposal Status: EC Granted
|
|
9
|
Gujarat
|
FP/GJ/Others/37381/2018
|
6-GJB047/2019-BHO
|
Diversion of 0.4189 ha of Forest land in Dwarka taluka for HRIDAY project at Beyt, Ta:- Dwarka, Dist.:- Devbhumi Dwarka in Favour of Chief Officer Nagarpalika, Okha.
|
Others
|
OKHA NAGAR PALIKA
|
0.4189
|
IN-PRINCIPLE
|
13-Dec-2019
|
|
|
|
|
|
No
|
|
10
|
Gujarat
|
FP/GJ/ROAD/14924/2015
|
6-GJB020/2016-BHO
|
Tarsada-Kakarapar-Vyara Road
|
Road
|
EXECUTIVE ENGINEER
|
1.53
|
IN-PRINCIPLE
|
20-May-2016
|
|
|
|
|
|
No
|
|
11
|
Gujarat
|
FP/GJ/ROAD/15000/2015
|
6-GJB023/2016-BHO
|
Unai-Buhari-Madhi-Mandvi-Zankhvav Road
|
Road
|
EXECUTIVE ENGINEER
|
0.88
|
IN-PRINCIPLE
|
01-Jun-2016
|
|
|
|
|
|
No
|
|
12
|
Gujarat
|
FP/GJ/ROAD/24246/2017
|
6-GJB047/2018-BHO
|
Widening from Km 97.00 to 102.325 (Danta to Ambaji Road) of SH-56
|
Road
|
PUBLIC WORK DEPARTMENT
|
2.0021
|
IN-PRINCIPLE
|
29-Jul-2020
|
|
|
|
|
|
No
|
|
13
|
Gujarat
|
FP/GJ/TRANS/152956/2022
|
FC-6/GJC-59/2022-GNR
|
Diversion of 6.5367 Ha. Reserved forest land proposed to be diverted on favour of Gujarat Energy Transmission Corporation Limited for Erection of 66 KV Padardi-Bodidara S/C Line on D/C Panther tower w
|
Transmission Line
|
GUJARAT ENERGY TRANSMISSION CORP LTD
|
6.5367
|
IN-PRINCIPLE
|
30-Oct-2022
|
|
|
|
|
|
No
|
|
14
|
Gujarat
|
FP/GJ/Pipeline/38338/2019
|
6-GJB026/2020-BHO
|
Laying of 20” Ø (API 5L X65, PSLII, LSAQ) LPG Pipeline Across/Parallel various Roads from Mundra Ports to GAIL Receiving Station at Mithi Rohar.
|
Pipeline
|
ADANI PORTS AND SPECIAL ECONOMIC ZONE LTD
|
1.1509
|
IN-PRINCIPLE
|
23-Oct-2020
|
|
|
|
|
|
No
|
|
15
|
Gujarat
|
FP/GJ/TRANS/29063/2017
|
FC-6/GJC-55/2022-GNR
|
Erection of 66kV D/C Tower line from exist 66kV Subir substation to proposed 66kV Morzira substation.
|
Transmission Line
|
GUJARAT ENERGY TRANSMISSION CORP LTD
|
14.7031
|
IN-PRINCIPLE
|
21-Dec-2023
|
|
|
|
|
|
No
|
|
16
|
Gujarat
|
FP/GJ/Others/17492/2016
|
6-GJB017/2017-BHO
|
Environmental Rejuvenation of Tithal Seafront
|
Others
|
BDSURATI
|
0.998
|
IN-PRINCIPLE
|
18-Oct-2019
|
|
|
|
|
|
No
|
|
17
|
Gujarat
|
FP/GJ/TRANS/143460/2021
|
FC-6/GJB-44/2022-GNR
|
Diversion of 0.0480 Ha. Of Protected Forest land
|
Transmission Line
|
VENA ENERGY SHIVALIK WIND POWER PVT. LTD.
|
0.048
|
IN-PRINCIPLE
|
22-Jul-2022
|
|
|
|
|
|
No
|
|
18
|
Gujarat
|
FP/GJ/TRANS/156865/2022
|
FC-6/GJB-65/2022-JPR
|
Diversion of 0.004 ha. Reserve Forest Land for 11 KV HT Power Supply Cable from Talwada Overhead Water Tank to Terminal Technology Company at Village – Zaroli, Taluka – Umbergaon, District – Valsad.
|
Transmission Line
|
GALVA DECO PARTS PRIVATE LIMITED
|
0.004
|
IN-PRINCIPLE
|
21-Dec-2022
|
|
|
|
|
|
No
|
|
19
|
Gujarat
|
FP/GJ/WATER/37837/2018
|
6-GJB051/2019-BHO
|
Designing, Construction, Testing & Commissioning of Intake Well cum Pump House, Water Treatment Plant, Clear water reservoir cum Pump House, Providing, Lowering Testing and Commissioning of Rising Main and Transmission Mains, Surge Control Devices on Pipelines, Civil, Electromechanical Works and Instrumentation Works including all allied works comp
|
Drinking Water
|
VADODARA MUNICIPAL CORPORATION
|
3.4134
|
IN-PRINCIPLE
|
28-Apr-2020
|
|
|
|
|
|
No
|
|
20
|
Gujarat
|
FP/GJ/Others/15884/2015
|
6-GJB019/2017-BHO
|
construction of approach road for factory of Troikaa Pharmaceuticals Ltd. abutting on SH - 17 at Km 43.300, Left Side at Survey no. 2019, 2022 & 2023 at Village: Virochannagar, Taluka: Sanand, District:Ahmedabad, State:Gujarat.
|
Others
|
TROIKAA PHARMACEUTICALS LIMITED
|
0.0412
|
IN-PRINCIPLE
|
14-Sep-2023
|
|
|
|
|
|
No
|
|
21
|
Gujarat
|
FP/GJ/ROAD/14895/2015
|
6-GJB06/2016-BHO
|
Nadiad-Petlad-Khambhat Road
|
Road
|
EXECUTIVE ENGINEER
|
0.9
|
IN-PRINCIPLE
|
18-Mar-2016
|
|
|
|
|
|
No
|
|
22
|
Gujarat
|
FP/GJ/VELEC/16107/2015
|
6-GJB01/2018-BHO
|
11 k.v Electric Line Zankhiya
|
Village Electricity
|
PASCHIM GUJARAT VIJ COMPANY LIMITED
|
0.3507
|
IN-PRINCIPLE
|
14-Nov-2018
|
|
|
|
|
|
No
|
|
23
|
Gujarat
|
FP/GJ/IRRIG/20202/2016
|
6-GJB025/2018-BHO
|
Proposed for passing underground p.v.c pipe line
|
Irrigation
|
NAROTTAM V DOBARIYA
|
0.0402
|
IN-PRINCIPLE
|
19-Nov-2019
|
|
|
|
|
|
No
|
|
24
|
Gujarat
|
FP/GJ/Pipeline/118131/2020
|
FC-6/GJB-67/2022-JPR
|
Permission for laying of 300 mm dia Water pipeline for Providing water from Dena Branch Canal to Sun Pharma DF Plant at Halol In Halol Taluka of Panchmahal District
|
Pipeline
|
M/S. SUN PHARMACEUTICAL INDUSTRIES LIMITED
|
0.0485
|
IN-PRINCIPLE
|
21-Dec-2022
|
|
|
|
|
|
No
|
|
25
|
Gujarat
|
FP/GJ/ROAD/14466/2015
|
FC-6/GJB-52/2022-GNR
|
Permission grant of use of road from Willingdon dam to Datar HillS(Nawab of Junagadh the road use at that time) for transporting goods /materials throaugh vhicles like as tractor fore maintenance Trust & Its kitchen for all communities
|
Road
|
ADMINISTRATOR UPLA DATAR DARGAH TRUST AND MAMLATDAR JUNAGADH CITY
|
0.9885
|
IN-PRINCIPLE
|
06-Sep-2023
|
|
|
|
|
|
No
|
|
26
|
Gujarat
|
FP/GJ/ROAD/39817/2019
|
6-GJC044/2021-BHO
|
Road Wideining of Majara Talod Harsol Gambhoi Road Km 23/540 to 56/540
|
Road
|
EXECUTIVE ENGINEER HIMMATNAGAR
|
17.33
|
IN-PRINCIPLE
|
24-Jan-2022
|
|
|
|
|
|
No
|
|
27
|
Gujarat
|
FP/GJ/WATER/27692/2017
|
6-GJB017/2020-BHO
|
Girnar Mountain W.S.S.
|
Drinking Water
|
DEPUTY EXECUTIVE ENGINEER JUNAGADH
|
0.83
|
IN-PRINCIPLE
|
26-Jun-2020
|
|
|
|
|
|
No
|
|
28
|
Gujarat
|
FP/GJ/IRRIG/11081/2015
|
6-GJB07/2016-BHO
|
SSNNL
|
Irrigation
|
SSNNL
|
0.7927
|
IN-PRINCIPLE
|
03-Aug-2016
|
|
|
|
|
|
No
|
|
29
|
Gujarat
|
FP/GJ/ROAD/152123/2022
|
6-GJA003/2024-GNR
|
Project of Widening and Strengthening of Tithal-Valsad-Dharampur road K.M. 0/0 to 31/4 (W/S 8/0 to 31/4) Ta. Dist. Valsad.
|
Road
|
ROAD AND BUILDING SUB DIVISION, VALSAD
|
40.365
|
IN-PRINCIPLE
|
05-Nov-2024
|
|
|
|
|
|
No
|
|
30
|
Gujarat
|
FP/GJ/ROAD/25106/2017
|
6-GJC065/2018-BHO
|
Diversion of 22.80 ha. Protected Forest land for the work of construction of cement concrete road With other underground amenities like, water supply, Drainage, Storm drainage line, Street light etc.. and allied works from Pal (RTO) Hajira Road to Palanporegam Canal culvert and on both side of existing canal from pal- palanpore – Bhesan Gauravpath
|
Road
|
SURAT MUNICIPAL CORPORATION
|
22.8
|
IN-PRINCIPLE
|
N/A
|
|
|
|
|
|
No
|
|
31
|
Gujarat
|
FP/GJ/Approach/145618/2021
|
FC-6/GJB-1/2022-GNR
|
APPROCH ACCESS ROAD
|
Approach Access
|
POWERICA LIMITED
|
0.241
|
IN-PRINCIPLE
|
08-Jun-2022
|
|
|
|
|
|
No
|
|
32
|
Gujarat
|
FP/GJ/ROAD/119742/2021
|
FC-6/GJB-29/2022-GNR
|
The Project of Widening 7.00 meter to 10.00 meter of S.H.No.172 Vyara – Bheskatri - Kalibel – Pimpari road K.m 00/000 to 06/800
|
Road
|
(R&B) SUB DIVISION, WAGHAI
|
0.057
|
IN-PRINCIPLE
|
26-Jul-2022
|
|
|
|
|
|
No
|
|
33
|
Gujarat
|
FP/GJ/ROAD/24624/2017
|
6-GJC08/2018-BHO
|
Widening from Km 79.200 to Km100.00 of section SH-9
|
Road
|
PUBLIC WORK DEPARTMENT
|
29.64
|
IN-PRINCIPLE
|
21-Mar-2018
|
|
|
|
|
|
No
|
|
34
|
Gujarat
|
FP/GJ/ROAD/24624/2017
|
6-GJC08/2018-BHO
|
Widening from Km 79.200 to Km100.00 of section SH-9
|
Road
|
PUBLIC WORK DEPARTMENT
|
29.64
|
IN-PRINCIPLE
|
21-Mar-2018
|
|
|
|
|
|
No
|
|
35
|
Gujarat
|
FP/GJ/WATER/26859/2017
|
6-GJB044/2018-BHO
|
Narmada river Hafeswar Basin based Bulkpipeline water supply Project
|
Drinking Water
|
EXECUTIVE ENGINEER GWSSB CHHOTAUDEPUR
|
2.4107
|
IN-PRINCIPLE
|
02-Nov-2018
|
|
|
|
|
|
No
|
|
36
|
Gujarat
|
FP/GJ/IRRIG/10623/2015
|
6-GJC041/2017-BHO
|
sardar sarovar narmadanigam, contraction dhrangadhra branch canal
|
Irrigation
|
SARDAR SAROVAR NARMADA NIGAM LTD
|
8.6779
|
IN-PRINCIPLE
|
29-Dec-2017
|
|
|
|
|
|
No
|
|
37
|
Gujarat
|
FP/GJ/Others/14205/2015
|
6-GJB062/2015-BHO
|
DNEPL
|
Others
|
RELIANCE GAS PIPELINE LIMITED
|
0.1809
|
IN-PRINCIPLE
|
07-Dec-2015
|
|
|
|
|
|
Yes
Proposal Status: EC under process
|
|
38
|
Gujarat
|
FP/GJ/ROAD/13694/2015
|
6-GJB014/2016-BHO
|
surat urban development authority
|
Road
|
SURAT URBAN DEVELOPMENT AUTHORITY
|
4.6074
|
IN-PRINCIPLE
|
30-May-2016
|
|
|
|
|
|
No
|
|
39
|
Gujarat
|
FP/GJ/ROAD/30904/2017
|
6-GJC016/2020-BHO
|
Diversion of 5.70 ha. Protected Forest land for the work of construction of cement concrete road and allied works from Anuvrat dwar junction to Jamnaba Park road(both Side) having 5.70 hectare are of Protected Forest Land with the fores department on behalf of Surat Municipal Corporation in Surat dist. of Gujarat.
|
Road
|
SURAT MUNICIPAL CORPORATION
|
5.7
|
IN-PRINCIPLE
|
25-Sep-2020
|
|
|
|
|
|
No
|
|
40
|
Gujarat
|
FP/GJ/TRANS/30413/2017
|
6-GJB048/2018-BHO
|
Land for construction of 220 KV transmission line for Wind Power Project by Srijan Energy Systems Pvt. Ltd.
|
Transmission Line
|
SRIJAN ENERGY SYSTEMS PVT LTD
|
0.945
|
IN-PRINCIPLE
|
28-Jun-2019
|
|
|
|
|
|
No
|
|
41
|
Gujarat
|
FP/GJ/IRRIG/51396/2020
|
6-GJB004/2022-FC
|
FOR LAYING WATER PIPELINE AT JAVANTRIGALA HEADWORKS (CH. 0.00) TO BILESHWAR PATIYA (CH. 7000.00) OF 200 MM DIA.
|
Irrigation
|
DEE PHS SUB DN RANAVAV
|
0.0467
|
IN-PRINCIPLE
|
22-Feb-2022
|
|
|
|
|
|
No
|
|
42
|
Gujarat
|
FP/GJ/Others/44899/2020
|
6-GJB054/2020-BHO
|
PERMISSION FOR DIVERSION OF PROTECTED FOREST LAND FOR CONSTRUTING APPROACH ROAD TO CONNECT KARUNASAGAR PETROLEUM ON SH-175 (VALIA-ZANKHVAV) ROAD NEAR RUNDHA VILLAGE OF VALIA – TALUKA OF BHARUCH DISTRI
|
Others
|
KARUNASAGAR PETROLEUM
|
0.0575
|
IN-PRINCIPLE
|
05-May-2021
|
|
|
|
|
|
No
|
|
43
|
Gujarat
|
FP/GJ/ROAD/23754/2017
|
6-GJC070/2018-BHO
|
2/4 laning of Dhanera-Zerda Section from km 0+000 to km 11+000 of Dhanera Bypass and from km 42+300 to km 55+030 of NH-168A in the State of Gujarat - Package IV
|
Road
|
MINISTRY OF ROAD TRANSPORT & HIGHWAYS
|
20.6508
|
IN-PRINCIPLE
|
24-Jan-2019
|
|
|
|
|
|
No
|
|
44
|
Gujarat
|
FP/GJ/ROAD/36894/2018
|
6-GJB055/2020-BHO
|
Construction of Road section IV missing link of Khatiya to Machhlivad road Chainage 0/00 to 17/200 Km passes from Khatiya, Rampar, Chela Bedi, Morvadi & Vazir Khakhariya taluka of Jamnagar District.
|
Road
|
ROAD AND BUILDING SUB DIVISION JAMNAGAR
|
4.599
|
IN-PRINCIPLE
|
04-Oct-2021
|
|
|
|
|
|
No
|
|
45
|
Gujarat
|
FP/GJ/Others/20758/2016
|
FC-6/GJB-46/2022-GNR
|
Maruti Suzuki India Project At Hansalpur
|
Others
|
MARUTI SUZUKI INDIA LIMITED
|
0.0388
|
IN-PRINCIPLE
|
06-May-2025
|
|
|
|
|
|
No
|
|
46
|
Gujarat
|
FP/GJ/ROAD/18020/2016
|
6-GJC025/2017-BHO
|
The Project of Widening & Strengthening of S.H.No-74 Bavla-Dholka road K.m.0/0 to 17/600
|
Road
|
R AND B DIVISION AHMEDABAD
|
9.745
|
IN-PRINCIPLE
|
31-Aug-2017
|
|
|
|
|
|
No
|
|
47
|
Gujarat
|
FP/GJ/ROAD/38968/2019
|
6-GJB01/2021-BHO
|
Reconstruction of Gidaradi Bhaniya Road (ODR) Km 11/00 to 17/20 (Working Section Km 12/40 to 17/0)
|
Road
|
R AND B PANCHAYAT DIVISION AMRELI
|
3.45
|
IN-PRINCIPLE
|
30-Oct-2022
|
|
|
|
|
|
No
|
|
48
|
Gujarat
|
FP/GJ/ROAD/48099/2020
|
6-GJB079/2021-BHO
|
Road widening of Road No.5 and K road in Gandhinagar District
|
Road
|
CAPITAL PROJECT DIVISION NO 1
|
4.0788
|
IN-PRINCIPLE
|
27-Sep-2021
|
|
|
|
|
|
No
|
|
49
|
Gujarat
|
FP/GJ/TRANS/145414/2021
|
FC-6/GJB-30/2022-GNR
|
Construction of 220 KV Overhead Transmission Line from 765/400/220 Kv Bhuj-II (PGCIL) to 220 Kv Morjar (SESPL) PSS
|
Transmission Line
|
SRIJAN ENERGY SYSTEMS PVT LTD
|
0.118
|
IN-PRINCIPLE
|
01-Jun-2022
|
|
|
|
|
|
No
|
|
50
|
Gujarat
|
FP/GJ/IRRIG/12331/2015
|
6-GJC036/2017-BHO
|
Reserved Forest Land Diversion For Construction Charanka Distry, Patanka Distry, Garamadi Distry, Parsund Distry & Their Minors Offtaking From Kachchh Branch Canal
|
Irrigation
|
SARDAR SAROVAR NARMADA NIGAM IMITED
|
8.0224
|
IN-PRINCIPLE
|
17-Nov-2017
|
|
|
|
|
|
No
|
|