| Sno. | State Name | Proposal No. | RO/Ministry File Number | Proposal Name | Category | User Agency Name | Area (ha.) | Proposal Status | Date of Stage-I | View Report on Allocation of Fresh forest land (Form-A) Part-I | View Report (Part-II to Part-V and Stage-I Clearances) | View TimeLine Details | Site Inspection Report | Other Related Documents | Whether EC required (if so, status)? |
|
1
|
Uttar Pradesh
|
FP/UP/ROAD/9076/2015
|
P-17/14-2-2015-800(68)/2015
|
Construction (New) of Purab tola link road of Robertsganj Tehsil,Obra Division,Sonebhadra district under State Uttar Pradesh.
|
Road
|
PUBLIC WORKS DEPARTMENT
|
0.3
|
IN-PRINCIPLE
|
07-Aug-2015
|
|
|
|
|
|
No
|
|
2
|
Uttar Pradesh
|
FP/UP/TRANS/11592/2015
|
8B/UP/04/33/2015/FC
|
Proposed Lying Under Ground Electric Cable under RAPDRP Project
|
Transmission Line
|
DAKSHINANCHAL VIDUT VITRAN NIGAM LIMITED
|
0.39
|
IN-PRINCIPLE
|
20-Oct-2015
|
|
|
|
|
|
No
|
|
3
|
Uttar Pradesh
|
FP/UP/ROAD/10456/2015
|
8B/UP/06/30/2015/FC
|
widening of old NH-28 Lucknow Faizabad National highway(city portion Barabanki) along with divider and levelled footpath
|
Road
|
EXECUTIVE ENGINEER CD PWD BARABANKI
|
1.48
|
IN-PRINCIPLE
|
16-Oct-2015
|
|
|
|
|
|
No
|
|
4
|
Uttar Pradesh
|
FP/UP/ROAD/10971/2015
|
8B/UP/06/12/2015
|
Widening of two lane to four lane of NH-92 (New NH-719) km 60.000 to km 69.850
|
Road
|
EXECUTIVE ENGINEER NH DIVISION L N V ETAWAH
|
7.7285
|
IN-PRINCIPLE
|
15-Jun-2015
|
|
|
|
|
|
No
|
|
5
|
Uttar Pradesh
|
FP/UP/Others/8614/2014
|
P-601/14-2-2016-800(25)/2016
|
IOCL RETAIL OUTLET KM 132-133 ALLAHABAD-FAIZABAD ROAD N.H 330 A(OLD 96)
|
Others
|
INDIAN OIL CORPORATION LIMITED
|
0.084
|
IN-PRINCIPLE
|
29-Apr-2016
|
|
|
|
|
|
Yes
EC File No.: 930/NOC/2014
Proposal Status: EC Granted
|
|
6
|
Uttar Pradesh
|
FP/UP/Others/17767/2016
|
p56/14-2-2016-800(51)/2016
|
Proposed HPCL Retail Outlet on Iglas-Aligarh Road, District Aligarh
|
Others
|
Hindustan Petroleum Corporation Limited
|
0.077
|
IN-PRINCIPLE
|
03-May-2016
|
|
|
|
|
|
No
|
|
7
|
Uttar Pradesh
|
FP/UP/ROAD/17176/2015
|
P-77/14-2-2016-800(76)/2016
|
Churamanpurwa-Mohamadpur Link Road
|
Road
|
PUBLIC WORK DEPARTMENT
|
0.0345
|
IN-PRINCIPLE
|
12-May-2016
|
|
|
|
|
|
No
|
|
8
|
Uttar Pradesh
|
FP/UP/Others/15816/2015
|
p 33/14-2-2016-800(31)/2016
|
Proposed BPCL Retail Outlet on Lucknow-Hardoi-Shahjahanpur(SH-25) Road in District Hardoi
|
Others
|
BHARAT PETROLEUM CORPORATION LIMITED
|
0.08176
|
IN-PRINCIPLE
|
26-Apr-2016
|
|
|
|
|
|
No
|
|
9
|
Uttar Pradesh
|
FP/UP/ROAD/17575/2016
|
8B/UP/06/37/2016
|
Construction of Four Lane: Jalaun to Orai (Bilrayan - Panwari Road SH21 From Km 352.00 to 370.450, Bypass No. 1 & 2 and Remaining Part of NH 25) District-Jalaun, Uttar Pradesh
|
Road
|
PDPWDORAI
|
35.71435
|
IN-PRINCIPLE
|
28-Jul-2016
|
|
|
|
|
|
No
|
|
10
|
Uttar Pradesh
|
FP/UP/ROAD/20045/2016
|
8B/UP/06/59/2016
|
Protected Forest Land Proposed for Construction of Cycle Track from Bakshi Ka Talab To(CH.482.00 to 488.750)Madiaon along NH-24 in District Lucknow
|
Road
|
CONSTRUCTION DIVISION ONE PWD LUCKNOW
|
4.8
|
IN-PRINCIPLE
|
29-Aug-2016
|
|
|
|
|
|
No
|
|
11
|
Uttar Pradesh
|
FP/UP/Others/17403/2016
|
P-138/14-2-2016-800(131)/2016
|
Proposed BPCL. Retail Outlet On SH-26 Balrampur-Utraula Road, District: Balrampur (Uttar Pradesh)
|
Others
|
BHARAT PETROLEUM CORPORATION LIMITED
|
0.08391
|
IN-PRINCIPLE
|
27-Sep-2016
|
|
|
|
|
|
No
|
|
12
|
Uttar Pradesh
|
FP/UP/Others/13921/2015
|
8B/UP/06/39/2016/FC
|
Proposal for the diversion rd side protected forest strip for the construction of Approach road to New Essar oil Ltd. Retail outlet on Agra-Fatehabad road,between km. 23 to 24 Mewali kalan Tehsil-Fatehabad dist- Agra
|
Others
|
Essar Oil Limited
|
0.0748
|
IN-PRINCIPLE
|
27-Dec-2016
|
|
|
|
|
|
No
|
|
13
|
Uttar Pradesh
|
FP/UP/ROAD/11059/2015
|
2300/14-2-2016-800(87)/2016
|
Const. of Razapur link road under SCP - 2013-14
|
Road
|
EXECUTIVE ENGINEER
|
0.064
|
IN-PRINCIPLE
|
29-Dec-2016
|
|
|
|
|
|
No
|
|
14
|
Uttar Pradesh
|
FP/UP/Others/27643/2017
|
P-142/14-2-2017-800(139)/2017
|
Protected Forest Land Proposed to be diverted for Exit/Entry approach to BPCL Retail Outlet on Delhi- Kanpur Road (NH-91) , AT KM 126, (Chainage.125.910), Village:- Sikanderpur Bhukrawali, District:- Aligarh
|
Others
|
BHARAT PETROLEUM CORPORATION LIMITED
|
0.055668
|
IN-PRINCIPLE
|
12-Feb-2018
|
|
|
|
|
|
No
|
|
15
|
Uttar Pradesh
|
FP/UP/Others/23468/2017
|
8B/UP/09/69/2017/FC
|
Forest Land Proposed to be diverted for Siti Energy Limited CNG Station on Delhi-Bareilly-Lucknow Road Old NK-24 (City Portion) in km. 164 (CH. 163.100) At Khasra No. 196/3, Village- Mustafabad Tehsil- Moradabad District- Moradabad
|
Others
|
SITI ENERGY LIMITED VASANT KUNJ NEW DELHI
|
0.1009
|
IN-PRINCIPLE
|
06-Mar-2018
|
|
|
|
|
|
No
|
|
16
|
Uttar Pradesh
|
FP/UP/Others/31649/2018
|
P-64/14-2-2018-800(57)/2018
|
Protected Forest Land proposed to be diverted for Exit/Entry approach of of HPCL Retail Outlet on Lalganj-Kalankar Road,in KM 20 Gata No.1406 Village:Naraee, District: Pratapgarh
|
Others
|
Hindustan Petroleum Corporation Limited
|
0.082772
|
IN-PRINCIPLE
|
04-Sep-2018
|
|
|
|
|
|
No
|
|
17
|
Uttar Pradesh
|
FP/UP/Others/26536/2017
|
140/14-2-2018-800(21)/2018
|
OF Cable laying from Charthawal Village turn(Km 71.6Km) to Bhopa TE(Km 92) on Panipat-Khatima Road in Muzaffarnagar district by BSNL
|
Others
|
BSNL MEERUT UP WEST CIRCLE
|
0.918
|
IN-PRINCIPLE
|
19-Apr-2018
|
|
|
|
|
|
No
|
|
18
|
Uttar Pradesh
|
FP/UP/Others/23489/2017
|
P-102/14-2-2017-800(101)/2017
|
BSNL OFC Laying from Chainage Km 66 +230 M( Numais Road Crossing ) on NH 92 Etawah to Chainage Km 74+560 M (Udi Mod Crossing) on NH 92, Part of Bhind -Etawah OFC Route
|
Others
|
BBHARAT SANCHAR NIGAM LIMITED
|
0.37485
|
IN-PRINCIPLE
|
22-Sep-2017
|
|
|
|
|
|
No
|
|
19
|
Uttar Pradesh
|
FP/UP/ROAD/30577/2017
|
8B/UP/06/46/2018/FC
|
Protected Forest Land proposed to be diverted for construction of Flyover on Rambagh Railway Line In City Allahabad District Allahabad
|
Road
|
UP STATE BRIDGE CORPORATION LTD. BRIDGE CONSTRUCTION UNIT ALLAHABAD
|
0.0152
|
IN-PRINCIPLE
|
04-May-2018
|
|
|
|
|
|
No
|
|
20
|
Uttar Pradesh
|
FP/UP/Others/31314/2018
|
P-71/14-2-2018-800(84)/2018
|
Construction of Entry and Exit for New HPCL Retail Outlet and protected land is required to be diverted (Under FCA Act 1980 for Non forestry purpose) site situated at villageGunnaur Abdul Hai khasra no.347,348,349 along Meerit-Badaun (Badaun-Babrala) Road km.145 Chainage 144.957 (L.H.S.) Tehsil Gunnaur District Sambha; (U.P.)
|
Others
|
HINDUSTAN PETROLEUM CORPORATION LTD.
|
0.076964
|
IN-PRINCIPLE
|
22-May-2018
|
|
|
|
|
|
No
|
|
21
|
Uttar Pradesh
|
FP/UP/Others/29427/2017
|
P-88/14-2-2018-800(81)/2018
|
Forest Land proposed for Exit/Entry and Middle of Indian Oil Corporation Ltd Retail Outlet on Budaun Kadarchok Gangapur Road Km-1 Ch. 0.765, Khasra No.282 Village: Shekhupur, Tehsil: Budaun, District: Badaun
|
Others
|
Indian Oil Corporation Limited (IOCL)
|
0.049748
|
IN-PRINCIPLE
|
22-May-2018
|
|
|
|
|
|
No
|
|
22
|
Uttar Pradesh
|
FP/UP/TRANS/21318/2016
|
P-131/14-2-2017-800(125)/2017
|
Powergrid 765kV D/C Orai - Aligarh Transmission line Part-1 of PkgTE06 under WR - NR IRSS Scheme
|
Transmission Line
|
POWER GRID CORPORATION OF INDIA LTD
|
0.268
|
IN-PRINCIPLE
|
17-Jan-2018
|
|
|
|
|
|
No
|
|
23
|
Uttar Pradesh
|
FP/UP/Others/23090/2016
|
2974/14-2-2017-800(123)/2017
|
Approch road for HPCL retail outlet at village Surir kalan banger khasara no.1025
|
Others
|
HINDUSTAN PETROLEUM COORPERATION LIMITED
|
0.049172
|
IN-PRINCIPLE
|
19-Jan-2018
|
|
|
|
|
|
No
|
|
24
|
Uttar Pradesh
|
FP/UP/ROAD/30202/2017
|
P-126/14-2-2018-800(112)/2018
|
Forest Land Proposed to be diverted for Widening and Strengthening of (SH-57) Gorakhapur-Pipraich-Kaptanganj Road from km. 7.000 to 8.200km in Gorakhapur District
|
Road
|
CONSTRUCTION DIVISION BUILDING PWD GORAKHPUR
|
0.96
|
IN-PRINCIPLE
|
04-Jul-2018
|
|
|
|
|
|
No
|
|
25
|
Uttar Pradesh
|
FP/UP/Others/25541/2017
|
8B/UP/06/19/2018/FC
|
Protected Forest Land Proposed to be diverted for Exit/Entry of Essar Oil Retail Outlet On Palwal- Tappal-Aligarh Road (SH-22A) At KM.74 Chanage 73-800M, At Khasra No.141 A, Village: Lahosara Bisawan, Block-Lodha, Taluka: Aligarh, District: Aligarh
|
Others
|
Essar Oil Limited
|
0.075028
|
IN-PRINCIPLE
|
31-Jul-2018
|
|
|
|
|
|
No
|
|
26
|
Uttar Pradesh
|
FP/UP/Others/32407/2018
|
P-151/14-2-2018-800(140)/2018
|
Proposed Forest Land for Approach Road (Exit/Entry) for Hindustan Petroleum corporation Limited Retail Outlet On MDR-102 Mathura- Sadabad Road CH. 36.59(LHS) Khasra No. 161, Village:Aturre, Tehsil: Sadabad , District : Hathras
|
Others
|
Hindustan Petroleum Corporation Limited
|
0.0604885646
|
IN-PRINCIPLE
|
10-Oct-2018
|
|
|
|
|
|
No
|
|
27
|
Uttar Pradesh
|
FP/UP/TRANS/31506/2018
|
8B/UP/04/22/2018/FC
|
765kV D/C Orai - Aligarh Transmission line Part-4 of PkgTE09 under WR - NR IRSS Scheme
|
Transmission Line
|
POWERGRID CORPORATION OF INDIA LTD ALIGARH
|
1.6677
|
IN-PRINCIPLE
|
19-Nov-2018
|
|
|
|
|
|
No
|
|
28
|
Uttar Pradesh
|
FP/UP/TRANS/26448/2017
|
8B/UP/04/37/2018/FC
|
765 KV D/C Orai-Aligarh Transmission Line Part-III(PKG TE08) under WR-NR IRSS Scheme
|
Transmission Line
|
POWERGRID MAINPURI
|
2.8256
|
IN-PRINCIPLE
|
22-Nov-2018
|
|
|
|
|
|
No
|
|
29
|
Uttar Pradesh
|
FP/UP/TRANS/26448/2017
|
8B/UP/04/37/2018/FC
|
765 KV D/C Orai-Aligarh Transmission Line Part-III(PKG TE08) under WR-NR IRSS Scheme
|
Transmission Line
|
POWERGRID MAINPURI
|
2.8256
|
IN-PRINCIPLE
|
22-Nov-2018
|
|
|
|
|
|
No
|
|
30
|
Uttar Pradesh
|
FP/UP/Others/23174/2016
|
8B/UP/06/8/2018/FC
|
Forest Land Proposed to be diverted for Exit/Entry approach of HPCL Retail Outlet on Bilgram-Unnao Road (SH-38), At Gata No-229,230, Village:- Chandpur,Tehsil:- Bilgram, District:- Hardoi
|
Others
|
Hindustan Petroleum Corporation Limited
|
0.08471
|
IN-PRINCIPLE
|
09-Apr-2019
|
|
|
|
|
|
No
|
|
31
|
Uttar Pradesh
|
FP/UP/Approach/45401/2020
|
8B/UP/06/121/2020
|
Protected Forest Land for Exit/Entry Approach to Proposed New IOCL Retail Outlet on Fatehgarh(Farrukhabad)-Gurusaigan Road(SH-29A) in Betwwen Km.24 to 25(Ch.23.972),At Khasra No.134K,Village:Malikpur,District:Kannauj
|
Approach Access
|
INDIAN OIL CORPORATION LIMITED AGRA TERMINAL
|
0.165455
|
IN-PRINCIPLE
|
19-Oct-2020
|
|
|
|
|
|
No
|
|
32
|
Uttar Pradesh
|
FP/UP/Others/24318/2017
|
2446/81-2-2020-800(161)/2017
|
Relicance 4G Project for Laying of Optical Fibre Cable (OFC) along with road on SH - 5 (Varanasi-Shaktinagar Road) from Km. 87.00 to 115.00, of total Km. 28.00 & 0.2901 Ha. in Social Forestry Division Obra, District: Obra - UP.
|
Others
|
Reliance Jeo Infocomm Ltd
|
0.2901
|
IN-PRINCIPLE
|
29-Dec-2020
|
|
|
|
|
|
No
|
|
33
|
Uttar Pradesh
|
FP/UP/ROAD/39999/2019
|
8B/UP/06/102/2019
|
Widening and strengthening of road from New NH-9 (Old NH-24) to proposed solid waste management plant at Uppar Ganga Canal Ghaziabad mile 106.775 (170.84 Km) to 107.00 (171.2 Km) and Uppar Ganga Canal Hapur mile 107.00 (171.2 Km) to 107.984 (172.775 Km) in village Galand, Pipalheda, Tehsil Dhaulana, District Hapur
|
Road
|
GHAZIABAD DEVELOPMENT AUTHORITY GHAZIABAD
|
0.8156
|
IN-PRINCIPLE
|
13-Jan-2021
|
|
|
|
|
|
No
|
|
34
|
Uttar Pradesh
|
FP/UP/Canal/44512/2020
|
8B/UP/02/166/2020
|
Forest Land Proposed to be diverted for Construction of Campierganj Branch Canal in between km.51 to 62.106 under Saryu Nahar Pariyojna in District:Maharajganj
|
Canal
|
RAPTI NAHAR NIRMAN KHAND II TULSIPUR BALRAMPUR
|
0.4
|
IN-PRINCIPLE
|
15-Jan-2021
|
|
|
|
|
|
No
|
|
35
|
Uttar Pradesh
|
FP/UP/WATER/47013/2020
|
2698/81-2-2020-800(122)/2020
|
Protected Forest Land Proposed to be Diverted for Laying of Drinking Water Pipeline along Jhansi-Bhagwantpura Road from Ch.1.00 to 4.00 Tehsil:Jhansi Under Jhansi Water Supply Reorganization Sechme Phase-1, in District: Jhansi
|
Drinking Water
|
PROJECT MANAGER ADDITIONAL CONSTRUCTION UNIT UP JAL NIGAM JHANSI
|
0.4
|
IN-PRINCIPLE
|
16-Feb-2021
|
|
|
|
|
|
No
|
|
36
|
Uttar Pradesh
|
FP/UP/Approach/48833/2020
|
8B/UP/06/74/2021/FC
|
Retail Outlet by Hindustan Petroleum Corporation Ltd. at KM 14.200 on L.H.S. of Fatehpur-Joniha Road (ODR) at Gata No. 1502, Village-Aswar Tarapur, Tahsil-Fatehpur, District-Fatehpur (UP)
|
Approach Access
|
HINDUSTAN PETROLIUM CORPORATION LIMITED
|
0.08047
|
IN-PRINCIPLE
|
30-Sep-2021
|
|
|
|
|
|
No
|
|
37
|
Uttar Pradesh
|
FP/UP/Approach/153276/2022
|
8B/UP/06/141/2022/FC
|
Proposed to IOCL Retail Outlet on Jahanabad-Pilibhit Road NH-30 (Old NH-74) in Km No. 291 (CH. No. 290.093, RHS) at Khasra No. 442, Village:-Lalauri, Tehsil:-Pilibhit, District:-Pilibhit
|
Approach Access
|
INDIAN OIL COPERATION LIMITED
|
0.198204
|
IN-PRINCIPLE
|
19-Jul-2022
|
|
|
|
|
|
No
|
|
38
|
Uttar Pradesh
|
FP/UP/Others/12699/2015
|
8B/UP/06/4/2017/FC
|
Proposed 0.167175 Hectare Protected Forest Area for Exit/Entry Approach to Essar Oil Limited Retail Outlet
|
Others
|
ESSAR OIL LIMITED
|
0.167175
|
IN-PRINCIPLE
|
21-Mar-2017
|
|
|
|
|
|
No
|
|
39
|
Uttar Pradesh
|
FP/UP/Others/20517/2016
|
8B/UP/06/95/2016/FC
|
Retail Outlet by Essar Oil Ltd at km. 17.100 on R.H.S. of SH-62, Agra-Fatehabad Road at Khasara No.- 1612, Village - Kundol in Tahsil & District Agra.
|
Others
|
ESSAR OIL LTD NOIDA
|
0.0750028
|
IN-PRINCIPLE
|
06-Jun-2017
|
|
|
|
|
|
No
|
|
40
|
Uttar Pradesh
|
FP/UP/Others/23983/2017
|
P-58/14-2-2017-800(48)/2017
|
RETAIL OUTLET BY HINDUSTAN PETROLEUM CORP. LTD., AT KM.CH. 26.332 ON L.H.S. OF MDR-113, SHAMSHABAD-RAJAKHEDA ROAD AT KHASARA NO.-203, VILL.–ETMADPUR-AJNERA IN TAH. FATEHABAD & DISTT. AGRA (U.P.)
|
Others
|
HINDUSTAN PETROLEUM CORPORATION LIMITED AGRA
|
0.0744188
|
IN-PRINCIPLE
|
18-Jul-2017
|
|
|
|
|
|
No
|
|
41
|
Uttar Pradesh
|
FP/UP/ROAD/7601/2014
|
634/14-2-2015-800(37)/2015
|
Railway Underpass
|
Road
|
PUBLIC WORKS DEPARTMENT
|
0.0205
|
IN-PRINCIPLE
|
12-May-2015
|
|
|
|
|
|
No
|
|
42
|
Uttar Pradesh
|
FP/UP/Others/12702/2015
|
P-70/14-2-2015-800(121)/2015
|
Proposed 0.1512375 Hectare Protected Forest area for Entry/Exit and Middle of Retail Outlet by IOCL on SH-41, Moradabad-Thakurdwara Road
|
Others
|
Indian Oil Corporation Limited
|
0.1512375
|
IN-PRINCIPLE
|
06-Nov-2015
|
|
|
|
|
|
No
|
|
43
|
Uttar Pradesh
|
FP/UP/Others/12838/2015
|
8B/UP/06/28/2015/FC
|
Proposed 0.092Ha Protected forest area for Essar Oil Limited Retail outlet
|
Others
|
Essar Oil Limited
|
0.092
|
IN-PRINCIPLE
|
04-Nov-2015
|
|
|
|
|
|
No
|
|
44
|
Uttar Pradesh
|
FP/UP/Others/11710/2015
|
8B/UP/06/48/2015/FC
|
Retail Outlet
|
Others
|
Essar Oil Limited
|
0.072
|
IN-PRINCIPLE
|
02-Feb-2016
|
|
|
|
|
|
No
|
|
45
|
Uttar Pradesh
|
FP/UP/Others/16537/2015
|
P-68/14-2-2016-800(68)/2016
|
PROPOSAL FOR THE DIVERSION OF PROTECTED FOREST LAND FOR CONSTRUCTION OF APPROACH ROAD TO IOCL NEW RETAIL OUTLET ON ETAH-TUNDLA ROAD(SH-31)BETWEEN KM 39 - 41 VILLAGE NAWALI TEH. & DIST ETAH
|
Others
|
Indian Oil Corporation Limited
|
0.0773
|
IN-PRINCIPLE
|
29-Apr-2016
|
|
|
|
|
|
No
|
|
46
|
Uttar Pradesh
|
FP/UP/ROAD/15564/2015
|
8B/UP/06/6/2016/FC
|
Bundelkhand Vikash Nidhi (Rajyansh)
|
Road
|
PUBLIC WORKS DEPARTMENT
|
0.3
|
IN-PRINCIPLE
|
13-May-2016
|
|
|
|
|
|
No
|
|
47
|
Uttar Pradesh
|
FP/UP/ROAD/14525/2015
|
8B/UP/06/23/2016/FC
|
Construction of New Bridge/Approach Road over Hindon River at Balaini
|
Road
|
EXECUTIVE ENGINEER
|
1.215
|
IN-PRINCIPLE
|
28-Sep-2016
|
|
|
|
|
|
No
|
|
48
|
Uttar Pradesh
|
FP/UP/Others/19008/2016
|
P-151/14-2-2016-800(147)/2016
|
Proposed Forest Land for Exit/Entry and Middle for New Establishment IOCL Retail Outlet on NH-135(Old NH-07)Mirzapur-Rewa Road in KM.93.0(CH.92.878, RHS)
|
Others
|
IOCL MARKETING DIVISION ALLAHABAD
|
0.1454
|
IN-PRINCIPLE
|
10-Nov-2016
|
|
|
|
|
|
No
|
|
49
|
Uttar Pradesh
|
FP/UP/Others/19596/2016
|
P-163/14-2-2016-800(166)/2016
|
Forest Land Proposed for Exit/Entry and Middle of BPCL Retail Outlet on Mugra-Badshahpur-Janghai Link Road, in Jaunpur District
|
Others
|
BHARAT PETROLEUM CORPORATION LIMITED
|
0.06795
|
IN-PRINCIPLE
|
08-Dec-2016
|
|
|
|
|
|
No
|
|
50
|
Uttar Pradesh
|
FP/UP/Others/23491/2017
|
P-159/14-2-2017-800(158)/2017
|
BSNL OFC LAYING from Chainage Km 33 .680 (Laxmi Bai Crossing Fatehabad) to Chainage Km 35.300 (Firozabad Road Crossing) part of Fatehabad - Firozabad OFC route
|
Others
|
BBHARAT SANCHAR NIGAM LIMITED
|
0.0729
|
IN-PRINCIPLE
|
31-Jan-2018
|
|
|
|
|
|
No
|
|