Sno. | State Name | Proposal No. | RO/Ministry File Number | Proposal Name | Category | User Agency Name | Area (ha.) | Proposal Status | Date of Stage-I | View Report on Allocation of Fresh forest land (Form-A) Part-I | View Report (Part-II to Part-V and Stage-I Clearances) | View TimeLine Details | Site Inspection Report | Other Related Documents | Whether EC required (if so, status)? |
1
|
Karnataka
|
FP/KA/VELEC/18450/2016
|
FEE 06 FLL 2017
|
Electrification of Anemala Hadi Hamlet in Hunsur Division
|
Village Electricity
|
CESC HUNSUR
|
0.1512
|
IN-PRINCIPLE
|
14-Mar-2017
|
|
|
|
|
|
No
|
2
|
Karnataka
|
FP/KA/ROAD/10844/2015
|
4-KRB 1104/2017-BAN
|
Raghavendra Stone crushing Works, Tattisar
|
Road
|
RAGHAVENDRA STONE CRUSHING WORKS AT TATTISAR
|
0.081
|
IN-PRINCIPLE
|
06-Oct-2017
|
|
|
|
|
|
Yes
Proposal Status: EC application yet to be submitted
|
3
|
Karnataka
|
FP/KA/HYD/12749/2015
|
4-KRB1148/2018-BAN
|
3MW Beedalli Project
|
Hydel
|
MESSRS KODAGU HYDEL PROJECTS PVT LTD
|
0.994
|
IN-PRINCIPLE
|
13-Jul-2018
|
|
|
|
|
|
No
|
4
|
Karnataka
|
FP/KA/ROAD/29864/2017
|
No.4-KRB 1194/ 2019-BAN
|
Hullikeri Tanda to Halki
|
Road
|
EXECUTIVE ENGINEER KRRDA PROJECT DIVISION GOKAK DIST BELAGAVI
|
0.7
|
IN-PRINCIPLE
|
23-Jul-2019
|
|
|
|
|
|
No
|
5
|
Karnataka
|
FP/KA/MIN/34838/2018
|
8-81/1992-FC Vol.
|
Conveyor project of M/s Vedanta Limited
|
Mining
|
VEDANTA LIMITED IRON ORE KARNATAKA
|
7.978
|
IN-PRINCIPLE
|
15-Oct-2019
|
|
|
|
|
|
No
|
6
|
Karnataka
|
FP/KA/MIN/37101/2018
|
8-39/2003-FC (Vol.)
|
Approach Road to Karadikolla Iron Ore Mine (ML No 2487) of MSPL Limited
|
Mining
|
MSPL LIMITED
|
4.85
|
IN-PRINCIPLE
|
24-May-2021
|
|
|
|
|
|
No
|
7
|
Karnataka
|
FP/KA/IRRIG/28934/2017
|
4-KRB1345/2022-BAN
|
Diversion of 2.16813 Ha of Forest land for Veerabhadreshwara Lift Irrigation Scheme in Chitrabhanukote, Nagnapr, Laxanatti and Dadanatti villages of Mudhol taluka, Bagalkot Dist in favour of KNNL
|
Irrigation
|
KNNL
|
2.16813
|
IN-PRINCIPLE
|
22-Mar-2022
|
|
|
|
|
|
EC File NA
|
8
|
Karnataka
|
FP/KA/OFC/142721/2021
|
FEE 05 FLL 2023
|
laying JIO Optical Fiber Cable along the Right of Way of road from Kodasani- Ankola-Kudlagadde in Ankola Taluk, Uttara Kannda District, Karwar Forest Division.
|
Optical Fibre Cable
|
JIO DIGITAL FIBER PRIVATE LIMITED
|
1.53939
|
IN-PRINCIPLE
|
07-Mar-2023
|
|
|
|
|
|
No
|
9
|
Karnataka
|
FP/KA/VELEC/18479/2016
|
FEE 02 FLL 2017
|
Electrification of Thimmanahosahalli Hadi Hamlet at Hunsur Division under DDG Scheme.
|
Village Electricity
|
CESC HUNSUR
|
0.0565
|
IN-PRINCIPLE
|
14-Mar-2017
|
|
|
|
|
|
No
|
10
|
Karnataka
|
FP/KA/VELEC/18472/2016
|
FEE 04 FLL 2017
|
Electrification of Manimole Hadi Hamlet at Hunsur Division under DDG Scheme.
|
Village Electricity
|
CESC HUNSUR
|
0.0324
|
IN-PRINCIPLE
|
14-Mar-2017
|
|
|
|
|
|
No
|
11
|
Karnataka
|
FP/KA/IRRIG/45295/2020
|
No.4-KRB1253/2020-BAN
|
Laying of 490 mm Dia MS Pipe Line for Lifting / pumping the secondary treated water from Kandavara lake to Poornasagara kere and onwards to fill tanks in Chikkaballapura Districts
|
Irrigation
|
EXECUTIVE ENGINEER MINOR IRRIGATION AND GROUD WATER RESOURCE DIVISION CHIKKABALAPURA
|
0.15
|
IN-PRINCIPLE
|
12-Aug-2020
|
|
|
|
|
|
No
|
12
|
Karnataka
|
FP/KA/VELEC/18475/2016
|
FEE 122 FLL 2016
|
Electrification of Muleyur Hadi Hamlet at Hunsur Division under DDG Scheme.
|
Village Electricity
|
CESC HUNSUR
|
0.03945
|
IN-PRINCIPLE
|
14-Mar-2017
|
|
|
|
|
|
No
|
13
|
Karnataka
|
FP/KA/VELEC/18152/2016
|
FEE 45 FLL 2017
|
Nagarahole Hadi Village Electrification
|
Village Electricity
|
EXECUTIVE ENGINEER CESC MADIKERI
|
0.04872
|
IN-PRINCIPLE
|
04-Jul-2017
|
|
|
|
|
|
No
|
14
|
Karnataka
|
FP/KA/ROAD/22392/2016
|
4-KRB1125/2017-BAN
|
Diversion of 4.388 Ha Forest land for the purpose of improvement of road from Pattadkallu to kamatagi
|
Road
|
KSHIP
|
4.388
|
IN-PRINCIPLE
|
14-Feb-2018
|
|
|
|
|
|
Yes
Proposal No.:
EC File No.:
Proposal Status: No Proposal no.
|
15
|
Karnataka
|
FP/KA/WATER/44628/2020
|
FEE 71 FLL 2020 e
|
DIVERSION OF FOREST LAND NEAR BHAKTHRAHALLI ARASIKERE, CHINTAMANI TALUK, CHIKKABALLAPUR DISTRICT FOR CONSTRUCTION OF HOUSING CHAMBER, LAYING OF PIPELINE & 11 KV EXPRESS FEEDER LINE FOR PROVIDING WATER
|
Drinking Water
|
COMMISSIONER CMC CHINTAMANI
|
0.43574
|
IN-PRINCIPLE
|
15-Jan-2021
|
|
|
|
|
|
No
|
16
|
Karnataka
|
FP/KA/ROAD/142140/2021
|
F.No.4-KRB1347/2022-BAN/
|
Dviersion of 0.06 Ha of forest land in sy no 14 of Benavalli, Village, Kerehalli Hobali, Hosanagara taluk Shivamogga dist, (Shivamogga forest division) for construction of low cost ROB and Birur-Talguppa section great seperator at Km 105/100-200 and Km 133/700-800 in favour of Assistant divisional engineer, Shivmaogga
|
Road
|
ASSISTANT DIVISIONAL ENGINEER SHIVAMOGGA
|
0.06
|
IN-PRINCIPLE
|
24-Mar-2022
|
|
|
|
|
|
No
|
17
|
Karnataka
|
FP/KA/WATER/149106/2021
|
FEE 57 FLL 2022
|
PROVIDING FHTC'S TO BINKADAKATTI VILLAGE IN GADAG TALUK,SHINGATRAYANAKERI VILLAGE IN MUNDARAGI TALUK,KUSLAPUR,HOSUR,KADAKOL,M HOSALLI,KEREHALLI,ADRAHALLI AND MACHENAHALLI IN SHIRAHATTI TALUK OF GADAG DISTRICT THROUGH DBOT PACKAGE-2 OF MULTI VILLAGE SCHEME IMPLEMENTATION UNDER JAL JEEVAN MISSION
|
Drinking Water
|
ZILLA PANCHAYAT GADAG
|
0.13
|
IN-PRINCIPLE
|
04-May-2022
|
|
|
|
|
|
No
|
18
|
Karnataka
|
FP/KA/OFC/149526/2021
|
FEE 56 FLL 2022
|
Name of Project for which Forest Land is required : Jio Digital Fiber Underground OFC Cable from Karkala to Sringeri -R1-Boarder trough Reserve Forest in various villages of Chikkamagaluru and Udupi D
|
Optical Fibre Cable
|
JIO DIGITAL FIBER PRIVATE LIMITED
|
1.04368
|
IN-PRINCIPLE
|
18-Jan-2023
|
|
|
|
|
|
No
|
19
|
Karnataka
|
FP/KA/OFC/149526/2021
|
FEE 56 FLL 2022
|
Name of Project for which Forest Land is required : Jio Digital Fiber Underground OFC Cable from Karkala to Sringeri -R1-Boarder trough Reserve Forest in various villages of Chikkamagaluru and Udupi D
|
Optical Fibre Cable
|
JIO DIGITAL FIBER PRIVATE LIMITED
|
1.04368
|
IN-PRINCIPLE
|
18-Jan-2023
|
|
|
|
|
|
No
|
20
|
Karnataka
|
FP/KA/Approach/47989/2020
|
F.No.4-KRB1341/2022-BAN
|
Diversion of forest land in keligeri village, Dharward Taluk for additional interconnectivity between the two ends of the arch shaped campus of Indian Institute of Technology,Dharwad
|
Approach Access
|
INDIAN INSTITUTE OF TECHNOLOGY DHARWARD
|
0.66
|
IN-PRINCIPLE
|
08-Mar-2023
|
|
|
|
|
|
No
|
21
|
Karnataka
|
FP/KA/VELEC/18141/2016
|
FEE 43 FLL 2017
|
Keredibba Village Electrification
|
Village Electricity
|
CESC KOLLEGAL
|
0.064
|
IN-PRINCIPLE
|
04-Jul-2017
|
|
|
|
|
|
No
|
22
|
Karnataka
|
FP/KA/VELEC/18154/2016
|
FEE 48 FLL 2017
|
Begur Hadi and Gadde Hadi Village Electrification
|
Village Electricity
|
EXECUTIVE ENGINEER CESC MADIKERI
|
0.10672
|
IN-PRINCIPLE
|
04-Jul-2017
|
|
|
|
|
|
No
|
23
|
Karnataka
|
FP/KA/IRRIG/26969/2017
|
FEE 15 FLL 2018
|
Work of “Lifting / pumping 440 MLD secondary treated water from K and C valley STP &Belandoor STP to Narasapura tank and onwards to fill 126 tanks in Kolar District and Chintamani taluk in Chikkaballapura district
|
Irrigation
|
MINOR IRRIGATION DEPARTMENT
|
0.25
|
IN-PRINCIPLE
|
08-Mar-2018
|
|
|
|
|
|
No
|
24
|
Karnataka
|
FP/KA/ROAD/41113/2019
|
FEE 50 FLL 2020 e
|
Diversion of 0.894 Ha of Forest land in Sy.no 176 of Kakati village in Belgaum Taluk Belgaum District for Improvements to Hundalli Kakati road (Improvements with adjusting slope of Hudali, Dharnatti, Mutyanatti Road at Km 16.50 to17.80 in Belagavi Taluk.)
|
Road
|
EXECUTIVE ENGINEER PWP AND IWTD DIVISION BELAGAVI
|
0.894
|
IN-PRINCIPLE
|
10-Sep-2020
|
|
|
|
|
|
No
|
25
|
Karnataka
|
FP/KA/ROAD/6847/2014
|
4-KRB 1055/2015-BAN
|
CONSTRUCTION OF BRIDGE ACROSS KUMARADHARA RIVER
|
Road
|
KARNATAKA ROAD DEVELOPMENT CORPORATION LTD
|
0.16
|
IN-PRINCIPLE
|
02-Jun-2015
|
|
|
|
|
|
No
|
26
|
Karnataka
|
FP/KA/ROAD/29278/2017
|
F.No.4-KRB1161/2018-BAN
|
For formation of approach road connecting existing road to our crusher in Chitradurga District in favour of Veeresh, Partner, M/s SHIVAPARAM CONSTRUCTIONS STONE CRUSHER, T. Yammiganuru Grama, Holalkere Taluk, Chitradurga District.
|
Road
|
SHIVAPARAM CONSTRACTION
|
0.692
|
IN-PRINCIPLE
|
18-Feb-2025
|
|
|
|
|
|
No
|
27
|
Karnataka
|
FP/KA/IND/26447/2017
|
F.No.4-KRB 1346/2022-BAN
|
BALDOTA STEEL AND POWER LIMITED
|
Industry
|
AARESS IRON AND STEEL LIMITED
|
1.745
|
IN-PRINCIPLE
|
21-Feb-2025
|
|
|
|
|
|
No
|
28
|
Karnataka
|
FP/KA/SCH/35132/2018
|
8-27/2021-FC
|
Kuvempu University Campus
|
School
|
KUVEMPU UNIVERSITY
|
89.92
|
IN-PRINCIPLE
|
21-Mar-2025
|
|
|
|
|
|
No
|
29
|
Karnataka
|
FP/KA/SCH/35132/2018
|
8-27/2021-FC
|
Kuvempu University Campus
|
School
|
KUVEMPU UNIVERSITY
|
89.92
|
IN-PRINCIPLE
|
21-Mar-2025
|
|
|
|
|
|
No
|
30
|
Karnataka
|
FP/KA/WATER/117274/2020
|
FEE 13 FLL 2023
|
Laying of MS Pipes of 2101mm Dia and 1901 mm Dia to Facilitate the Drinking Water Supply to Bangalore Uraban Areas (City Trunk Main Along Western Route of CP10) in 0.341 hectare of forest land in Sy. No 5 Uttarahalli Manavarthe kaval Village, Ullal Hobli, Sy No 170 of Badamanavarthe kaval Village, Kengeri Hobli, Bangalore South Taluk, Bangalore Dis
|
Drinking Water
|
EXECUTIVE ENGINEER K4 BWSSB
|
0.341
|
IN-PRINCIPLE
|
27-Feb-2023
|
|
|
|
|
|
No
|
31
|
Karnataka
|
FP/KA/IRRIG/17555/2016
|
FEE 42 FLL 2016
|
Construction of Aqueduct for Dy-2 Under UTP Main Canal
|
Irrigation
|
VISVESVARAYA JALA NIGAM LIMITED
|
0.5404
|
IN-PRINCIPLE
|
04-May-2016
|
|
|
|
|
|
Yes
EC File No.: No.J-12011/37/2003-IA-1
Proposal Status: EC Granted
|
32
|
Karnataka
|
FP/KA/WATER/26128/2017
|
F.No.4-KRB1141/2018-BAN
|
Contraction of vented dam in providing water supply scheme to Kollur village, Kundapur forest division in favor of Executive Officer Sri Mookambika Temple Kollur
|
Drinking Water
|
SRI MOOKAMBIKA TEMPLE KOLLUR
|
0.352
|
IN-PRINCIPLE
|
11-Dec-2018
|
|
|
|
|
|
No
|
33
|
Karnataka
|
FP/KA/TRANS/38788/2019
|
F.No.KRC1287/2021-BAN
|
Construction of the Proposed 110kV S/c Line on DC Towers from the existing 110/11kV Thogarsi sub-station to the proposed 10MVA 110/11kV sub-station at Kuppagudde in Soraba Taluk, Shivamogga District.
|
Transmission Line
|
KARNATAKA POWER TRANSMISSION CORPORATION LIMITED
|
6.073276
|
IN-PRINCIPLE
|
02-Jun-2022
|
|
|
|
|
|
No
|
34
|
Karnataka
|
FP/KA/WATER/19212/2016
|
FEE 53 FLL 2017
|
Providing Water Supply Scheme to Imanagala and Other 37 Villages in Hiriyur Taluk Chitradurga District
|
Drinking Water
|
R W S AND SANITATION SUB DIVISION HIRIYUR
|
0.8068
|
IN-PRINCIPLE
|
15-Apr-2017
|
|
|
|
|
|
No
|
35
|
Karnataka
|
FP/KA/VELEC/18454/2016
|
FEE 01 FLL 2017
|
Electrification of Bavalligadde Hadi Hamlet at Hunsur Division under DDG Scheme.
|
Village Electricity
|
CESC HUNSUR
|
0.05145
|
IN-PRINCIPLE
|
14-Mar-2017
|
|
|
|
|
|
No
|
36
|
Karnataka
|
FP/KA/ROAD/15173/2015
|
4-KRB 1083/2016-BAN
|
Improvement to the road from Hengavalli Irgi to SH road
|
Road
|
K SURESH SHETTY
|
1.375
|
IN-PRINCIPLE
|
01-Aug-2016
|
|
|
|
|
|
No
|
37
|
Karnataka
|
FP/KA/WATER/19533/2016
|
F.No.4-KRB1241/2020-BAN/
|
Providing CWSS to Bukkasagara Devasamudra and other 5 Villages in Hospet Taluk Ballari District
|
Drinking Water
|
Assistant Executive Engineer
|
0.597
|
IN-PRINCIPLE
|
06-Jan-2022
|
|
|
|
|
|
No
|
38
|
Karnataka
|
FP/KA/ROAD/144763/2021
|
FEE 53 FLL 2022
|
Improvements of road from kalakeri village to hunashikumari villagei in Dharwad taluka of Dharwad District
|
Road
|
EXECUTIVE ENGINEER PUBLIC WORKS DEPARTMENT DIVISION DHARWAD
|
0.985
|
IN-PRINCIPLE
|
21-May-2022
|
|
|
|
|
|
No
|
39
|
Karnataka
|
FP/KA/OFC/51672/2020
|
FEE 120 FLL 2022
|
PROPOSAL OF JIO DIGITAL FIBER UNDERGROUND OFC CABLE LAYING in FOREST AREA ALONG THE RIGHT OF WAY of NH/SH/OWD ROAD SIDE IN MADAMAKKI-NADUSALA, MUDRADY-VARANGA & KARVASE-KALASA OF KUDUREMUKHA DIVISION OF CHIKMAGALURU DISTRICT AND UDPUI DISTRICT
|
Optical Fibre Cable
|
JIO DIGITAL FIBER PRIVATE LIMITED
|
1.329
|
IN-PRINCIPLE
|
31-Mar-2023
|
|
|
|
|
|
No
|
40
|
Karnataka
|
FP/KA/WATER/31233/2018
|
No.4-KRB1180/2019-BAN
|
Providing Water supply scheme to Hassan city
|
Drinking Water
|
KARNATAKA URBAN WATER SUPPLY AND DRAINAGE BOARD
|
0.9894
|
IN-PRINCIPLE
|
26-Jun-2019
|
|
|
|
|
|
No
|
41
|
Karnataka
|
FP/KA/OFC/41791/2019
|
F.No.4-KRB1317/2021-BAN/
|
Laying of BSNL OF cable in Hassan - Kattaya route,Hassan District, Karnataka. (From Hanumathapura Branch Join Connector to Gorur Telephone Exchange)
|
Optical Fibre Cable
|
BHARAT SANCHAR NIGAM LIMITED
|
0.1619
|
IN-PRINCIPLE
|
16-Nov-2021
|
|
|
|
|
|
No
|
42
|
Karnataka
|
FP/KA/WATER/43438/2019
|
FEE 02 FLL 2021 e
|
Construction of water supply tank and laying water pipe lines in Mutyanatti village, Belgavi Taluka and District under Karnataka Urban Water Supply Modernization Project (KUWSMP)
|
Drinking Water
|
CC BELGAUM
|
0.25
|
IN-PRINCIPLE
|
04-Feb-2022
|
|
|
|
|
|
No
|
43
|
Karnataka
|
FP/KA/MIN/39765/2019
|
F.No.4-KRB1386/2022-BAN
|
Diversion of 0.8148 Ha (revised from 1.4406 ha) of forestland for Approach Road to and from Ubbalagundi Iron Ore Mine ML No. 008 in Ubbalagundi RF of Ballari Range, Ubbalagundi Village, Sandur Taluk, Ballari District
|
Mining
|
JSW Steel Limited
|
0.8148
|
IN-PRINCIPLE
|
16-Oct-2024
|
|
|
|
|
|
No
|
44
|
Karnataka
|
FP/KA/ROAD/149825/2021
|
FEE 145 FLL 2022
|
Diversion of 0.8806 Ha of Forest land in Sy No. 32, 40 & 45 of Kachapura village, Maski Taluk, Rayachuru District for the construction of road from anaveri to kachapura. In Favour of PWD, Rayachiru Division, Rayachuru District.
|
Road
|
PUBLIC WORKS DEPARTMENT, RAICHUR DIVISION
|
0.8806
|
IN-PRINCIPLE
|
20-Jan-2023
|
|
|
|
|
|
No
|
45
|
Karnataka
|
FP/KA/ROAD/150827/2022
|
fee 201 fll 2023
|
Diversion of 0.4867 ha of forest land in Sy No.145 of Achanur Village, Bagalkot Taluk and District, Bagalkote Forest Division for improvement of Achanur Hill Road to Narashimhaswamy Temple on the Hill Top in favour of Assistant Executive Engineer, Panchayat Raj Engineering Sub Division, Bagalkote
|
Road
|
ASSISTANT EXECUTIVE ENGINEER PRED SUB DIVISION BAGALKOT
|
0.4867
|
IN-PRINCIPLE
|
21-Sep-2023
|
|
|
|
|
|
No
|
46
|
Karnataka
|
FP/KA/ROAD/18723/2016
|
4-KRB1115/2017-BAN
|
For construction of Bridge & approach road in Karwar Forest Division, UK District in favour of the EE, PWP & IWT Department, Karwar.
|
Road
|
EXECUTIVE ENGINEER
|
0.153
|
IN-PRINCIPLE
|
11-Aug-2017
|
|
|
|
|
|
No
|
47
|
Karnataka
|
FP/KA/TRANS/23117/2016
|
F.No.4-KRB1150/2018-BAN
|
For laying / Establishment of 11 KV H/T AB Bunch Cable transmission line from Sulkeri Mogru to Panjala & Mallige enclosure passing through Naravi RF, Karkala Wildlife Division, Belthangady Taluk, D.K. District in favour of the Assistant Executive Engineer (Ele) MESCOM O&M Sub Division, Belthangady
|
Transmission Line
|
MANGALORE ELECTRICITY SUPPLY COMPANY LIMITED
|
0.0647
|
IN-PRINCIPLE
|
17-Mar-2025
|
|
|
|
|
|
No
|
48
|
Karnataka
|
FP/KA/OFC/54851/2020
|
FEE 54 FLL 2022
|
Jio Digital Fiber Underground OFC Cable from Halsi - Londa to Karnataka/Goa Boarder trough Reserve Forest in various villages of Uttara Karnataka and Belgavi District.
|
Optical Fibre Cable
|
JIO DIGITAL FIBER PRIVATE LIMITED
|
1.3312
|
IN-PRINCIPLE
|
18-Jan-2023
|
|
|
|
|
|
No
|
49
|
Karnataka
|
FP/KA/OFC/54851/2020
|
FEE 54 FLL 2022
|
Jio Digital Fiber Underground OFC Cable from Halsi - Londa to Karnataka/Goa Boarder trough Reserve Forest in various villages of Uttara Karnataka and Belgavi District.
|
Optical Fibre Cable
|
JIO DIGITAL FIBER PRIVATE LIMITED
|
1.3312
|
IN-PRINCIPLE
|
18-Jan-2023
|
|
|
|
|
|
No
|
50
|
Karnataka
|
FP/KA/OFC/149527/2021
|
FEE 63 FLL 2022
|
Name of Project for which Forest Land is required : Jio Digital Fiber Underground OFC Cable from Karakala to Agumbe trough Reserve Forest in various villages of Udupi and Shivamogga District.
|
Optical Fibre Cable
|
JIO DIGITAL FIBER PRIVATE LIMITED
|
0.633
|
IN-PRINCIPLE
|
18-Jan-2023
|
|
|
|
|
|
No
|
|