| Sno. | State Name | Proposal No. | RO/Ministry File Number | Proposal Name | Category | User Agency Name | Area (ha.) | Proposal Status | Date of Stage-I | View Report on Allocation of Fresh forest land (Form-A) Part-I | View Report (Part-II to Part-V and Stage-I Clearances) | View TimeLine Details | Site Inspection Report | Other Related Documents | Whether EC required (if so, status)? |
|
1
|
Bihar
|
FP/BR/TRANS/26112/2017
|
FC/25/2017
|
220 KV DC (HTLS) Nawada New - Gaya New (Khizersarai) transmission line
|
Transmission Line
|
BIHAR GRID COMPANY LTD
|
0.1715
|
IN-PRINCIPLE
|
11-Mar-2018
|
|
|
|
|
|
No
|
|
2
|
Bihar
|
FP/BR/Others/27141/2017
|
FP/BR/OTHERS/27141/2017
|
Diversion of 0.0165 ha of forest land for construction of approach road for opening retail outlet of BPCL on NH-107, Malichauk-Sonwarsa Road in Saharsa district of Bihar.
|
Others
|
AMARJEET KUMAR BPCL
|
0.0165
|
IN-PRINCIPLE
|
30-May-2018
|
|
|
|
|
|
No
|
|
3
|
Bihar
|
FP/BR/TRANS/26948/2017
|
47/16 FC
|
400KV D/C (QUAD) NABINAGAR-GAYA TRANSMISSION LINE
|
Transmission Line
|
POWER GRID GAYA
|
1.7158
|
IN-PRINCIPLE
|
18-Oct-2017
|
|
|
|
|
|
No
|
|
4
|
Bihar
|
FP/BR/Others/51189/2020
|
FP/BR/Others/51189/2020/4765
|
Diversion of 0.006 ha of forest land for construction of approach road for opening retail outlet for Bio-diesel of Goal Gas Pvt. Ltd. on SH-55A Gharghra-Bakhari Road in Begusarai district of Bihar.
|
Others
|
PRVEEN KUMAR
|
0.006
|
IN-PRINCIPLE
|
26-Jul-2021
|
|
|
|
|
|
No
|
|
5
|
Bihar
|
FP/BR/Others/46317/2020
|
FP/BR/Others/46317/2020
|
Diversion of 0.021 ha of forest land for construction of approach road for opening retail outlet of BPCL on side of Koilwar-Babura in Bhojpur district of Bihar.
|
Others
|
RAJESH KUMAR SINGH
|
0.021
|
IN-PRINCIPLE
|
14-Sep-2020
|
|
|
|
|
|
No
|
|
6
|
Bihar
|
FP/BR/Approach/157585/2022
|
FP/BR/Approach/157585/2022
|
Diversion of 0.018 ha of forest land for construction of approach road for opening retail outlet of HPCL on SH-77 Road in Araria district of Bihar.
|
Approach Access
|
CHHOTU KUMAR
|
0.018
|
IN-PRINCIPLE
|
22-Nov-2024
|
|
|
|
|
|
No
|
|
7
|
Bihar
|
FP/BR/ROAD/157408/2022
|
FP/BR/ROAD/157408/2022
|
Construction of 4/6 Laning of Arrah-Sasaram-Patna road section of NH-119A from Km 00+000 to Km 34+800 (Ring Road) under Bharatmala Pariyojana (Lot-7/Package-2) in the State of Bihar (Package-III)
|
Road
|
NATIONAL HIGHWAYS AUTHORITY OF INDIA PIU PATNA
|
1.964
|
IN-PRINCIPLE
|
26-Jan-2025
|
|
|
|
|
|
No
|
|
8
|
Bihar
|
FP/BR/ROAD/154991/2022
|
FP/BR/ROAD/154991/2022
|
Umagaon Kaluahi Saharghat Rahika Bideshwar Bheja
|
Road
|
National Highways Authority of India
|
37.507
|
IN-PRINCIPLE
|
20-May-2025
|
|
|
|
|
|
No
|
|
9
|
Bihar
|
FP/BR/Pipeline/43116/2019
|
Van Bhumi 45/2020
|
City Gas Distribution Project, Jehanabad
|
Pipeline
|
Indian Oil Corporation Limited
|
0.58766
|
IN-PRINCIPLE
|
18-Jun-2020
|
|
|
|
|
|
No
|
|
10
|
Bihar
|
FP/BR/RAIL/84637/2020
|
FP/BR/RAIL/84637/2020
|
Construction of New Broad Gauge Railway Line from Jatdumri to Daniawan (23.8 Km)
|
Railway
|
RAIL VIKAS NIGAM LIMITED PATNA
|
0.2
|
IN-PRINCIPLE
|
14-Mar-2022
|
|
|
|
|
|
No
|
|
11
|
Bihar
|
FP/BR/Others/36089/2018
|
FP/BR/OTHERS/36089/2018
|
Diversion of 0.0075 ha of forest land for construction of approach road for opening retail outlet of IOCL on the side of Dalsinghsarai-Samastipur Road in Samastipur district of Bihar.
|
Others
|
SUPRIYA
|
0.0075
|
IN-PRINCIPLE
|
03-Jun-2019
|
|
|
|
|
|
No
|
|
12
|
Bihar
|
FP/BR/Others/35669/2018
|
FC/93/2018
|
Reliance Jio Infocomm Limited, Bihar
|
Others
|
Jio Digital Fibre Private Limited
|
0.408945
|
IN-PRINCIPLE
|
12-Sep-2019
|
|
|
|
|
|
No
|
|
13
|
Bihar
|
FP/BR/Others/39867/2019
|
FP/BR/OTHERS/39867/2019
|
Diversion of 0.0252 ha of forest land for construction of approach road for opening retail outlet of BPCL on side of NH-57 East-West-Expy in Madhubani district of Bihar.
|
Others
|
MANOJ KUMAR SINGH MADHUBANI
|
0.0252
|
IN-PRINCIPLE
|
15-Nov-2019
|
|
|
|
|
|
No
|
|
14
|
Bihar
|
FP/BR/Others/41033/2019
|
FC/83/2019
|
Installation of solar lights on road sides near Mandar Hill on Mandar-Bounsi Road Maharana Mor to Mandar and Mandar to Sambalpur under Mandar Hill and Ang. Pradesh Circuit under Swadesh Darshan Scheme
|
Others
|
DEPARTMENT OF TOURISM GOVT OF BIHAR
|
0.275
|
IN-PRINCIPLE
|
19-Dec-2019
|
|
|
|
|
|
No
|
|
15
|
Bihar
|
FP/BR/SCH/129289/2021
|
Van Bhumi 045/2016
|
Other Backward Class Girls residential+2 High School Gaya
|
School
|
DWO GAYA
|
1.30308
|
IN-PRINCIPLE
|
16-Mar-2021
|
|
|
|
|
|
No
|
|
16
|
Bihar
|
FP/BR/Others/43046/2019
|
FP/BR/Others/43046/2019
|
Diversion of 0.0225 ha of forest land for construction of approach road for opening retail outlet of HPCL on side of NH-57 in Madhubani district of Bihar.
|
Others
|
JOHNEY EMMANUEL TIRKEY
|
0.0225
|
IN-PRINCIPLE
|
15-Apr-2020
|
|
|
|
|
|
No
|
|
17
|
Bihar
|
FP/BR/OFC/34899/2018
|
FC/59/2018
|
Deoghar Telephone exchange – Chakai Telephone Exchange 48F OFC route
|
Optical Fibre Cable
|
BHARAT SANCHAR NIGAM LIMITED
|
0.9
|
IN-PRINCIPLE
|
27-Feb-2019
|
|
|
|
|
|
No
|
|
18
|
Bihar
|
FP/BR/Approach/149032/2021
|
FP/BR/APPROACH/149032/2021
|
Diversion of 0.01455 ha of forest land for construction of approach road for opening retail outlet of BPCL on SH-70 Road in Gaya district of Bihar.
|
Approach Access
|
ANAND KUMAR
|
0.01762
|
IN-PRINCIPLE
|
27-Oct-2022
|
|
|
|
|
|
No
|
|
19
|
Bihar
|
FP/BR/TRANS/28765/2017
|
40/2016 (F. C.)
|
132 KV S/C Biharshif - Sheikhpura (New) Transmision Line
|
Transmission Line
|
BGCL BIHARSHARIF
|
0.054
|
IN-PRINCIPLE
|
15-Jun-2018
|
|
|
|
|
|
No
|
|
20
|
Bihar
|
FP/BR/TRANS/28918/2017
|
59/2017 (FC)
|
132 KV D/C Jamui (new)-Banka (new) TL
|
Transmission Line
|
BSPTCL BANKA
|
0.486
|
IN-PRINCIPLE
|
25-Jul-2018
|
|
|
|
|
|
No
|
|
21
|
Bihar
|
FP/BR/ROAD/30705/2017
|
FP/BR/ROAD/30705/2017
|
We are seeking prior approval to cut the trees under forest Division saran (Chapra) of the Sonepur-Darihara Road having chainage 0.00-21.00 KM
|
Road
|
ROAD CONSTRUCTION DEPARTMENT
|
44.16
|
IN-PRINCIPLE
|
26-Sep-2018
|
|
|
|
|
|
No
|
|
22
|
Bihar
|
FP/BR/ROAD/22535/2016
|
Van Bhumi 114/2020
|
Reliance Jio Infocomm Limited
|
Road
|
Jio Digital Fibre Private Limited
|
0.69048
|
IN-PRINCIPLE
|
23-Dec-2020
|
|
|
|
|
|
No
|
|
23
|
Bihar
|
FP/BR/Approach/50183/2020
|
FP/BR/Approach/50183/2020
|
The proposal for establishment of retail out-let dealership of M/s Bharat Petroleum Corporation Ltd.
|
Approach Access
|
REEMA KUMARI
|
0.0255
|
IN-PRINCIPLE
|
24-Feb-2021
|
|
|
|
|
|
No
|
|
24
|
Bihar
|
FP/BR/Others/32260/2018
|
FC/13/2018
|
Reliance Jio Infocomm Limited
|
Others
|
Jio Digital Fibre Private Limited
|
0.72336
|
IN-PRINCIPLE
|
18-Mar-2020
|
|
|
|
|
|
No
|
|
25
|
Bihar
|
FP/BR/Pipeline/43542/2019
|
Van Bhumi 44/2020
|
City Gas Distribution Project GA Aurangabad
|
Pipeline
|
Indian Oil Corporation Limited
|
0.0898
|
IN-PRINCIPLE
|
18-Jun-2020
|
|
|
|
|
|
No
|
|
26
|
Bihar
|
FP/BR/OFC/145492/2021
|
Van Bhumi 115/2021
|
Nalanda district in Islampur Block 7 KM trenching/HDD work for BSNL OFC laying work along panhar TE to Kochra.
|
Optical Fibre Cable
|
BSNL NALANDA
|
0.02954
|
IN-PRINCIPLE
|
26-Oct-2021
|
|
|
|
|
|
No
|
|
27
|
Bihar
|
FP/BR/RAIL/21907/2016
|
FP/BR/Rail/21907/2016
|
road over bridge on NH-101
|
Railway
|
NORTH EASTERN RAILWAY
|
1.361
|
IN-PRINCIPLE
|
06-Mar-2019
|
|
|
|
|
|
No
|
|
28
|
Bihar
|
FP/BR/Others/120998/2021
|
FP/BR/Others/120998/2021
|
Diversion of 0.015 ha of forest land for construction of approach road for opening retail outlet of IOCL on SH-77 Road in Purnea district of Bihar.
|
Others
|
MADHULATA KUMARI
|
0.015
|
IN-PRINCIPLE
|
07-Mar-2023
|
|
|
|
|
|
No
|
|
29
|
Bihar
|
FP/BR/ROAD/29990/2017
|
FP/BR/ROAD/29990/2017
|
Widening to intermediate lane & Strengthening cum output & performance based road assets maintenance work of road from Lachur to Jamui-Garhi-Rupawel-Kawakol-Road (SH-82) at Rupawel via Kund Ghat, Janmasthali
|
Road
|
ROAD CONSTRUCTION DEPARTMENT, ROAD DIVISION, JAMUI
|
5.795
|
IN-PRINCIPLE
|
06-Dec-2018
|
|
|
|
|
|
No
|
|
30
|
Bihar
|
FP/BR/Approach/149796/2021
|
FP/BR/Approach/149796/2021
|
Diversion of 0.0195 ha of forest land for construction of approach road for opening retail outlet of Reliance Jio bp Mobility ltd. on SH-15 Tehsil-Nasriganj Road in Rohtas district of Bihar.
|
Approach Access
|
VIKALP
|
0.0195
|
IN-PRINCIPLE
|
14-Oct-2024
|
|
|
|
|
|
No
|
|
31
|
Bihar
|
FP/BR/OFC/147360/2021
|
Van Bhumi 127/2021
|
In Nalanda district Asthawa, Silao, Harnaut and Rahui Block total 89.71 KM trenching/HDD Work for BSNL OFC laying along in Road Side
|
Optical Fibre Cable
|
BSNL NALANDA
|
2.0525
|
IN-PRINCIPLE
|
28-Dec-2021
|
|
|
|
|
|
No
|
|
32
|
Bihar
|
FP/BR/Others/34650/2018
|
FP/BR/OTHERS/34650/2018
|
Diversion of 0.0105 ha of forest land for construction of approach road for opening retail outlet of IOCL on the side of Samastipur-Sarairanjan-Patori Road in Samastipur district of Bihar.
|
Others
|
RAJENDRA DAS
|
0.0105
|
IN-PRINCIPLE
|
19-Jul-2019
|
|
|
|
|
|
No
|
|
33
|
Bihar
|
FP/BR/Approach/152074/2022
|
FP/BR/Approach/152074/2021
|
Diversion of 0.045 ha of forest land for construction of approach road for opening retail outlet of IOCL on NH-105 (Old) 527B (New) Darbhanga-Jai Nagar Road in Darbhanga district of Bihar.
|
Approach Access
|
SUDHIR KUMAR
|
0.045
|
IN-PRINCIPLE
|
26-Sep-2022
|
|
|
|
|
|
No
|
|
34
|
Bihar
|
FP/BR/TRANS/26497/2017
|
FC/97/2016
|
220 KV D/C Sheikhpura (new)-Jamalpur (new) TL
|
Transmission Line
|
BGCL BIHARSHARIF
|
0.644
|
IN-PRINCIPLE
|
06-Jul-2018
|
|
|
|
|
|
No
|
|
35
|
Bihar
|
FP/BR/TRANS/26497/2017
|
FC/97/2016
|
220 KV D/C Sheikhpura (new)-Jamalpur (new) TL
|
Transmission Line
|
BGCL BIHARSHARIF
|
0.644
|
IN-PRINCIPLE
|
06-Jul-2018
|
|
|
|
|
|
No
|
|
36
|
Bihar
|
FP/BR/TRANS/26497/2017
|
FC/97/2016
|
220 KV D/C Sheikhpura (new)-Jamalpur (new) TL
|
Transmission Line
|
BGCL BIHARSHARIF
|
0.644
|
IN-PRINCIPLE
|
06-Jul-2018
|
|
|
|
|
|
No
|
|
37
|
Bihar
|
FP/BR/TRANS/26111/2017
|
FC/23/2017
|
132 KV Gaya New Bodhgaya Wazirganj LILO transmission line
|
Transmission Line
|
BIHAR GRID COMPANY LTD
|
0.0945
|
IN-PRINCIPLE
|
24-May-2017
|
|
|
|
|
|
No
|
|
38
|
Bihar
|
FP/BR/Others/45405/2020
|
FP/BR/Others/45405/2020
|
STORM WATER DRAINAGE PROJECT
|
Others
|
EE BUIDCO SUPAUL
|
0.09
|
IN-PRINCIPLE
|
19-Oct-2020
|
|
|
|
|
|
No
|
|
39
|
Bihar
|
FP/BR/Others/47349/2020
|
FP/BR/Others/47349/2020
|
Diversion of 0.0075 ha of forest land for construction of approach road for opening retail outlet of IOCL on side of Mirganj-Bhagipatti-Samaur Road in Gopalganj district of Bihar.
|
Others
|
ANJU DEVI
|
0.0075
|
IN-PRINCIPLE
|
14-Jun-2021
|
|
|
|
|
|
No
|
|
40
|
Bihar
|
FP/BR/Pipeline/44839/2020
|
Van Bhumi 47/2020
|
City Gas Distribution Project
|
Pipeline
|
Indian Oil Corporation Limited
|
0.2683
|
IN-PRINCIPLE
|
11-Jun-2020
|
|
|
|
|
|
No
|
|
41
|
Bihar
|
FP/BR/TRANS/40695/2019
|
Van Bhumi 58/2020
|
Lilo on one line 132 KV Sabour-Sultanganj Transmission line
|
Transmission Line
|
BSPTCL BHAGALPUR
|
0.081
|
IN-PRINCIPLE
|
26-Jun-2020
|
|
|
|
|
|
No
|
|
42
|
Bihar
|
FP/BR/WATER/152037/2022
|
FP/BR/WATER/152037/2022
|
Ganga Water Lift Project For Drinking Water
|
Drinking Water
|
EXECUTIVE ENGINEER TILAIYA CANAL DIVISION WAZIRGANJ GAYA
|
2.1109
|
IN-PRINCIPLE
|
21-Aug-2023
|
|
|
|
|
|
No
|
|
43
|
Bihar
|
FP/BR/ROAD/34306/2018
|
FP/JH/Road/34306/2018
|
Construction of HL RCC Minor Bridge in KM 24 of NH 333(Span 2x21) in the State of Bihar
|
Road
|
EXECUTIVE ENGINEER, NH DIVISION LAKHISARAI AT MUNGER
|
0.2165
|
IN-PRINCIPLE
|
05-Aug-2019
|
|
|
|
|
|
No
|
|
44
|
Bihar
|
FP/BR/ROAD/21782/2016
|
FP/BR/ROAD/21782/2016
|
Forest Diversion Proposal of Diversion of 1.47 ha PF Land for construction of Flyover & Vehicular Underpass at Patna-Gaya-Dobhi Section of NH-83 0.00-127.00 KM
|
Road
|
PROJECT DIRECTOR NHAI PIU GAYA
|
1.47
|
IN-PRINCIPLE
|
18-Sep-2017
|
|
|
|
|
|
No
|
|
45
|
Bihar
|
FP/BR/Others/45108/2020
|
FP/BR/Others/45108/2020
|
Diversion of 0.011775 ha of forest land for construction of approach road for opening retail outlet of BPCL on Lalganj-Fakuli Road in Vaishali district of Bihar.
|
Others
|
SULEKHA DEVI
|
0.01178
|
IN-PRINCIPLE
|
28-Aug-2020
|
|
|
|
|
|
No
|
|
46
|
Bihar
|
FP/BR/Pipeline/45167/2020
|
Van Bhumi 91 /2020
|
City Gas distribution ( GA -saran,muzaffarpur ,samastipur ,vaishali)
|
Pipeline
|
Indian Oil Corporation Limited
|
0.2303
|
IN-PRINCIPLE
|
21-Sep-2020
|
|
|
|
|
|
No
|
|
47
|
Bihar
|
FP/BR/Pipeline/43535/2019
|
Van Bhumi 134/2020
|
City Gas Distribution Project (GA-Saran, Muzaffarpur, Vishali,Samastipur)
|
Pipeline
|
Indian Oil Corporation Limited
|
2.141
|
IN-PRINCIPLE
|
24-Dec-2020
|
|
|
|
|
|
No
|
|
48
|
Bihar
|
FP/BR/Approach/46497/2020
|
FP/BR/Approach/46497/2020
|
The proposal for establishment of retail out let dealership on M/S Bharat Petroliam Corporation Ltd. Location At Khiddi Rajoun Banka Within 1.3 KMS from Rajawarmore to Khaira More on RHS on SH-19. The
|
Approach Access
|
SRI ROHIT KUMAR SINGH
|
0.02424
|
IN-PRINCIPLE
|
20-Jan-2021
|
|
|
|
|
|
No
|
|
49
|
Bihar
|
FP/BR/Others/8755/2014
|
FP/BR/Others/8755/2014
|
Stadium construction at sapneri village
|
Others
|
BDO KHIZARSARAI
|
0.48564
|
IN-PRINCIPLE
|
23-Dec-2014
|
|
|
|
|
|
No
|
|
50
|
Bihar
|
FP/BR/Others/117859/2020
|
FP/BR/Others/117859/2020
|
Diversion of 0.024 ha of forest land for construction of approach road for opening retail outlet of HPCL on Chater Chowk-Santosh Bridge Road in Khagaria district of Bihar.
|
Others
|
RAJESH KUMAR
|
0.024
|
IN-PRINCIPLE
|
25-Mar-2026
|
|
|
|
|
|
No
|
|