| Sno. | State Name | Proposal No. | RO/Ministry File Number | Proposal Name | Category | User Agency Name | Area (ha.) | Proposal Status | Proposal initially received on(Date) | Proposal Pending Since(Date) | View Report on Allocation of Fresh forest land (Form-A) Part-I | View Report (Part-II to Part-V and Stage-I Clearances) | View TimeLine Details | Other Related Documents | Whether EC required (if so, status)? |
|
1
|
Karnataka
|
FP/KA/IRRIG/41736/2019
|
|
Construction of Varahi Lift irrigation canal including construction of Jack Well/ Pump House, Delivery Chamber Canal Network with 33 Kv Sub Station to create 2723 Ha. Of Command Area in Villages of 28-Haladi, Avarase,Vandaru,Hegguunje,Shiriyaru,Billadi,Yadtadi,Kawadi-18,Achladi-20, Kavadi, Naduru and Shiruru in Kundapura,Udupi & Brahmawara Taluk
|
Irrigation
|
EXECUTIVE ENGINEER KNNL VARAHI PROJECT
|
17.49
|
Pending at DFO/DCF
|
12-Aug-2021
|
08-Apr-2026
|
|
|
|
|
No
|
|
2
|
Karnataka
|
FP/KA/TRANS/37754/2018
|
|
LILO of One Ckt of Narendra(Existing)-Narendra(New) 400kV D/C Quad Transmission Line
|
Transmission Line
|
GOA TAMNAR TRANSMISSION PROJECT LIMITED
|
174.652
|
Pending at DFO/DCF
|
19-Jan-2019
|
25-Mar-2026
|
|
|
|
|
No
|
|
3
|
Karnataka
|
FP/KA/TRANS/37754/2018
|
|
LILO of One Ckt of Narendra(Existing)-Narendra(New) 400kV D/C Quad Transmission Line
|
Transmission Line
|
GOA TAMNAR TRANSMISSION PROJECT LIMITED
|
174.652
|
Pending at DFO/DCF
|
19-Jan-2019
|
25-Mar-2026
|
|
|
|
|
No
|
|
4
|
Karnataka
|
FP/KA/TRANS/37754/2018
|
|
LILO of One Ckt of Narendra(Existing)-Narendra(New) 400kV D/C Quad Transmission Line
|
Transmission Line
|
GOA TAMNAR TRANSMISSION PROJECT LIMITED
|
174.652
|
Pending at DFO/DCF
|
19-Jan-2019
|
25-Mar-2026
|
|
|
|
|
No
|
|
5
|
Karnataka
|
FP/KA/SCH/20566/2016
|
8-58/2016-FC
|
Diversion of Forest Land in the name of Registrar Rani Channamma University Belagavi
|
School
|
RCU BELAGAVI
|
27.3963
|
Pending at DFO/DCF
|
20-Aug-2016
|
17-Mar-2026
|
|
|
|
|
No
|
|
6
|
Karnataka
|
FP/KA/ROAD/156860/2022
|
|
Diversion of 0.0456 ha of forest land in Sy No.7 of Gowdalli Village, Sirsi (T), U.K (D) for connecting Approach Road to Malki Land Sy No.4/3, 4,/9, 5/4 & 5/5 of Gowdalli (V),Sirsi (T), U.K (D) in fav
|
Road
|
HULEKAL RAMACHANDRA
|
0.0456
|
Pending at DFO/DCF
|
21-Jun-2022
|
16-Mar-2026
|
|
|
|
|
No
|
|
7
|
Karnataka
|
FP/KA/MIN/6858/2014
|
|
Diversion of additional area over and extent of 101.52ha (Originally 167.63ha.) area of forest land for KUMARASWAMY IRON ORE MINE, in ML No.1111, NMDC LTD, DIST- BALLARI, KARNATAKA.
|
Mining
|
NMDC LIMITED DONIMALAI
|
101.52
|
Pending at DFO/DCF
|
16-Dec-2014
|
12-Mar-2026
|
|
|
|
|
No
|
|
8
|
Karnataka
|
FP/KA/MIN/47146/2020
|
|
Pipeline Conveyor Belt, Service Road, Stock Yard, Transmission Line, Water Pipeline and Other allied Activities for Transportation of Iron Ore of Thimmappanagudi Iron Ore Mine ML. No. 2605 of KSMCL.
|
Mining
|
KARNATAKA STATE MINERALS CORPORATION LIMITED
|
19.304
|
Pending at DFO/DCF
|
07-Oct-2020
|
10-Mar-2026
|
|
|
|
|
No
|
|
9
|
Karnataka
|
FP/KA/MIN/143973/2021
|
|
Diversion of 4.035 Ha of Forest land for New approach road in connection with M/s Kirloskar Bharath Mines ML No.0016 of M/s. KFIL
|
Mining
|
KIRLOSKAR FERROUS INDUSTRIES LTD
|
4.035
|
Pending at DFO/DCF
|
28-Mar-2022
|
02-Mar-2026
|
|
|
|
|
No
|
|
10
|
Karnataka
|
FP/KA/Others/19191/2016
|
|
Laying of OFC by Reliance Jio Infocomm Ltd in Bandipur Tiger Reserve, Chamarajanagar District.
|
Others
|
JIO DIGITAL FIBER PRIVATE LIMITED
|
1.2
|
Pending at DFO/DCF
|
12-Apr-2018
|
01-Mar-2026
|
|
|
|
|
No
|
|
11
|
Karnataka
|
FP/KA/Others/19191/2016
|
|
Laying of OFC by Reliance Jio Infocomm Ltd in Bandipur Tiger Reserve, Chamarajanagar District.
|
Others
|
JIO DIGITAL FIBER PRIVATE LIMITED
|
1.2
|
Pending at DFO/DCF
|
12-Apr-2018
|
01-Mar-2026
|
|
|
|
|
No
|
|
12
|
Karnataka
|
FP/KA/OFC/142791/2021
|
|
Jio Digital Fiber Underground OFC Cable from Agumbe to Karimene in Sagar and shimogga Division
|
Optical Fibre Cable
|
JIO DIGITAL FIBER PRIVATE LIMITED
|
0.7345
|
Pending at DFO/DCF
|
25-Jul-2022
|
01-Mar-2026
|
|
|
|
|
No
|
|
13
|
Karnataka
|
FP/KA/OFC/155716/2022
|
|
laying JIO Optical Fiber Cable along the Right of Way in NH-PWD road from Krishnanagar-Bannihatti, Rajapura-bannihatti & Ramadurga-Appayinahalli in Bellary and Vijayanagara Forests Divisions of Sandur & Kudligi Taluks in Bellary & Vijayanagara Districts.
|
Optical Fibre Cable
|
JIO DIGITAL FIBER PRIVATE LIMITED
|
0.5569
|
Pending at DFO/DCF
|
30-Jun-2022
|
22-Jan-2026
|
|
|
|
|
No
|
|
14
|
Karnataka
|
FP/KA/OFC/143805/2021
|
|
laying JIO Optical Fiber Cable along the Right of Way in NH-PWD road from Theerthahalli-Shivamogga and Agumbe-Kattekoppa in Theerthahalli and Shivamogga Taluk, Shivamogga District, Shivamogga Division.
|
Optical Fibre Cable
|
JIO DIGITAL FIBER PRIVATE LIMITED
|
1.55389
|
Pending at DFO/DCF
|
13-Jul-2022
|
21-Jan-2026
|
|
|
|
|
No
|
|
15
|
Karnataka
|
FP/KA/MIN/50114/2020
|
|
Diversion of 32.49 Ha of forest land (30.09 Ha for mining lease and 2.40 Ha for Approach Road) In Ramanamalai Block Forest, Sandur Taluk, Ballari District ( Ramdev Iron Ore Mine ML No 2563: erstwhile C-category mine e-auctioned), in favor of M/s. MSPL Limited, the Preferred Bidder.
|
Mining
|
MSPL LIMITED
|
32.49
|
Pending at DFO/DCF
|
22-Dec-2020
|
21-Jan-2026
|
|
|
|
|
No
|
|
16
|
Karnataka
|
FP/KA/Canal/37818/2018
|
|
Diversion of 61 ha of forest land for construction of Tumkur Branch Canal of Upper Bhadra Project
|
Canal
|
VISVESVARAYA JALA NIGAM LTD
|
61
|
Pending at DFO/DCF
|
25-Jul-2019
|
12-Nov-2025
|
|
|
|
|
Yes
Proposal No.: IA/KA/RIV/27139/2015
EC File No.: J-12011/6/2015-IA-1
Proposal Status: EC Granted
|
|
17
|
Karnataka
|
FP/KA/Canal/37818/2018
|
|
Diversion of 61 ha of forest land for construction of Tumkur Branch Canal of Upper Bhadra Project
|
Canal
|
VISVESVARAYA JALA NIGAM LTD
|
61
|
Pending at DFO/DCF
|
25-Jul-2019
|
12-Nov-2025
|
|
|
|
|
Yes
Proposal No.: IA/KA/RIV/27139/2015
EC File No.: J-12011/6/2015-IA-1
Proposal Status: EC Granted
|
|
18
|
Karnataka
|
FP/KA/Canal/37818/2018
|
|
Diversion of 61 ha of forest land for construction of Tumkur Branch Canal of Upper Bhadra Project
|
Canal
|
VISVESVARAYA JALA NIGAM LTD
|
61
|
Pending at DFO/DCF
|
25-Jul-2019
|
12-Nov-2025
|
|
|
|
|
Yes
Proposal No.: IA/KA/RIV/27139/2015
EC File No.: J-12011/6/2015-IA-1
Proposal Status: EC Granted
|
|
19
|
Karnataka
|
FP/KA/HYD/152438/2022
|
|
Diversion of 23.3876 Ha of Forest land for the Generation of 130 MW Pumped Storage Power Project (Hydel Power Project) in Sy no 224 in Bannihatti Village, Sy No 39 & 64 in Lingadahalli Village, and Sy No 1A in Kodalu Village of Toranagallu Hobali and Donimalai Reserve forest of Sandur Taluk, Ballari District
|
Hydel
|
JSW RENEWABLE ENERGY (VIJAYANAGAR) LIMITED
|
23.3876
|
Pending at DFO/DCF
|
04-Jun-2022
|
14-Oct-2024
|
|
|
|
|
Yes
Proposal Status: EC application yet to be submitted
|
|
20
|
Karnataka
|
FP/KA/Others/141414/2021
|
|
Establishment of petrol bunk premises in Sy No 55 of Kundaragi Village, Bilagi Taluk, Bagalkot District in favour of Gopal M iti, Navanagar Bagalkot, Bagalkot District
|
Others
|
GOPAL M ITI
|
0.0965
|
Pending at DFO/DCF
|
22-Jun-2021
|
20-Feb-2024
|
|
|
|
|
No
|
|
21
|
Karnataka
|
FP/KA/IND/26920/2017
|
|
Established the Effluent Treatment Plant-II in F.S. No. 22 of Kerwad Villge, and Sy. No.3 of Dandeli, Dandeli Taluk, Uttara Kannada District, Karnataka
|
Industry
|
WEST COAST PAPER MILLS LIMITED
|
16.19
|
Pending at DFO/DCF
|
31-Mar-2022
|
22-Dec-2023
|
|
|
|
|
No
|
|
22
|
Karnataka
|
FP/KA/IND/20069/2016
|
|
Diversion of 3.30 ha. of Forest land for Formation of Road from Cane yard of Gem Sugars to Kundaragi-Janamatti main Road
|
Industry
|
GEM SUGARS LTD KUNDARAGI VILLAGE BILAGI TALUK BAGALKOT DISTRICT
|
3.3
|
Pending at DFO/DCF
|
19-Jan-2017
|
18-Dec-2023
|
|
|
|
|
No
|
|
23
|
Karnataka
|
FP/KA/ROAD/41495/2019
|
|
1. Development of Major Arterial Road, Phase -1 in Nada Prabhu Kempegowda Layout 2. Development of RMP Roads and 12M Road in Block–8 under Nada Prabhu Kempegowda Layout
|
Road
|
BANGALORE DEVELOPMENT AUTHORITY BDA
|
1.8941
|
Pending at DFO/DCF
|
16-Mar-2023
|
05-Dec-2023
|
|
|
|
|
Yes
Proposal Status: EC application yet to be submitted
|
|
24
|
Karnataka
|
FP/KA/MIN/42914/2019
|
|
Diversion of Forest land measuring 12.97 Ha for Mining Activity and 0.97 Ha for Road connecting to Mining Lease i.e ML.No:2649 in Hungund Taluk, Bagalkot District, Karnataka.
|
Mining
|
MS DODDANAVAR BROTHERS
|
13.94
|
Pending at DFO/DCF
|
17-Feb-2020
|
23-Nov-2023
|
|
|
|
|
EC File NA
|
|
25
|
Karnataka
|
FP/KA/Canal/38030/2019
|
|
Modification to Stage II approved FC proposal involving diversion of 111.57 Ha of forest land in Jankal, Devaragudda and Lakkihalli Reserve Forest of Hosadurga and Hiriyur Forest Ranges, Chitradurga Forest Division for construction of Chitradurga Branch Canal.
|
Canal
|
VISVESVARAYA JALA NIGAM LTD
|
103.6
|
Pending at DFO/DCF
|
29-Jul-2020
|
18-Oct-2023
|
|
|
|
|
EC File NA
|
|
26
|
Karnataka
|
FP/KA/Canal/38030/2019
|
|
Modification to Stage II approved FC proposal involving diversion of 111.57 Ha of forest land in Jankal, Devaragudda and Lakkihalli Reserve Forest of Hosadurga and Hiriyur Forest Ranges, Chitradurga Forest Division for construction of Chitradurga Branch Canal.
|
Canal
|
VISVESVARAYA JALA NIGAM LTD
|
103.6
|
Pending at DFO/DCF
|
29-Jul-2020
|
18-Oct-2023
|
|
|
|
|
EC File NA
|
|
27
|
Karnataka
|
FP/KA/SubStation/148026/2021
|
|
Establishing new 1x10MVA, 110/11kV S/S Hattargi at Sirsi, Uttarkannada District
|
Sub Station
|
KARNATAKA POWER TRANSMISSION CORPORATION LIMITED
|
0.9831
|
Pending at DFO/DCF
|
27-Dec-2021
|
31-May-2023
|
|
|
|
|
No
|
|
28
|
Karnataka
|
FP/KA/TRANS/154485/2022
|
|
Construction of 7.005 kms of 33 kV D/C Transmission line from the Proposed 220/33 KV Pooling Substation at Kakkuppi village to the Proposed Windfarm, in Sy No. 286, 368, 283, 282, 280, 301, 302, 304 306, and 314 of Kakkuppi village in Kudligi Taluk, and Sy No. 229 of Agrahara village kudligi Taluk, Bellary Forest Division, karnataka State
|
Transmission Line
|
RENEW GREEN ENERGY SOLUTIONS PRIVATE LIMITED
|
4.338
|
Pending at DFO/DCF
|
12-Oct-2022
|
24-Feb-2023
|
|
|
|
|
No
|
|
29
|
Karnataka
|
FP/KA/Others/34662/2018
|
|
Post facto approval for already constructed Government Engineering College, Ramanagara at Sy No.1 of Doddamannagudde Village, Kasaba Hobli, Ramanagara Taluk & District in favour of Principal, Government Engineering College, Ramanagara
|
Others
|
GOVERNMENT ENGINEERING COLLEGE RAMANAGARA DEPARTMENT OF TECHNICAL EDUCATION GOVERNMENT OF KARNATAKA
|
7.81
|
Pending at DFO/DCF
|
22-Jan-2021
|
18-Jan-2023
|
|
|
|
|
No
|
|
30
|
Karnataka
|
FP/KA/Others/27787/2017
|
|
Shiva Prathishthan Seva Sameeti
|
Others
|
SHIVA PRATHISHTHAN SEVA SAMEETI
|
0.502
|
Pending at DFO/DCF
|
23-Sep-2017
|
16-Jan-2023
|
|
|
|
|
No
|
|
31
|
Karnataka
|
FP/KA/IRRIG/47729/2020
|
|
Construction of Godachinmalki LIS, Stage-II, (Laying of underground Pipeline) in Akkatangiral , Shigiholli, Rajankatti & Khangaon Village of Gokak Taluka, Belgaum District
|
Irrigation
|
KARNATAKA NEERAVARI NIGAM LIMITED
|
0.96
|
Pending at DFO/DCF
|
25-Nov-2021
|
20-Dec-2022
|
|
|
|
|
No
|
|
32
|
Karnataka
|
FP/KA/ROAD/36676/2018
|
|
Approach road to Shri Veeranjaneya Temple
|
Road
|
SHREE VEERANJANEYA RELIGIOUS AND CHARITABLE TRUST(R)
|
0.2121956
|
Pending at DFO/DCF
|
24-Jan-2022
|
21-Sep-2022
|
|
|
|
|
No
|
|
33
|
Karnataka
|
FP/KA/ROAD/44945/2020
|
|
For approach road (Cart Track) to private land at Sy No.338 of Mundigesara Village,Sirsi Taluk U.K District
|
Road
|
SRI SHIVAMURTHY MURUGHA SHARANARU
|
0.06
|
Pending at DFO/DCF
|
28-Jul-2020
|
02-Jul-2022
|
|
|
|
|
No
|
|
34
|
Karnataka
|
FP/KA/Others/29876/2017
|
|
EXTENSION OF APMC YELLAPUR MAIN MARKET YARD
|
Others
|
AGRICULTURE PRODUCE MARKET COMMITTEE, YELLAPUR
|
2
|
Pending at DFO/DCF
|
07-Sep-2019
|
26-May-2022
|
|
|
|
|
No
|
|
35
|
Karnataka
|
FP/KA/Others/30144/2017
|
|
GRANT OF FOREST LAND FOR ESTABLISHING SUB-MARKET YARD AT UMMACHGI VILLAGE
|
Others
|
AGRICULTURE PRODUCE MARKET COMMITTEE, YELLAPUR
|
1.4
|
Pending at DFO/DCF
|
18-Oct-2019
|
25-May-2022
|
|
|
|
|
No
|
|
36
|
Karnataka
|
FP/KA/ROAD/128188/2021
|
|
For construction of approach road [Form existing Road to My Patta Land] passing through Sy No.297/A1A1A1A of Shatageri Village & MF of Karwara Division, U.K District Infavour of Mayur R Nayak, Aramane
|
Road
|
MAYUR R NAYAK ARAMANE KC ROAD ANKOLA POST AND TALUK D.K DISTRICT
|
0.2814
|
Pending at DFO/DCF
|
18-May-2022
|
18-May-2022
|
|
|
|
|
No
|
|
37
|
Karnataka
|
FP/KA/Others/147131/2021
|
|
Forest Clearance of 0.46 Ha. Forest Land in Svy. No. 47 Kothanur Village, K R Puram Hobli, Bangalore East Taluk, Bangalore Urban District for developed infrastructure of Army Institute of Hotel Management and Catering Technology.
|
Others
|
ARMY INSTITUTE OF HOTEL MANAGEMENT & CATERING TECHNOLOGY
|
0.46
|
Pending at DFO/DCF
|
24-Mar-2022
|
24-Mar-2022
|
|
|
|
|
No
|
|
38
|
Karnataka
|
FP/KA/TRANS/27085/2017
|
|
66kV Hegganur line
|
Transmission Line
|
Karnataka Power Corporation Ltd.
|
2.124
|
Pending at DFO/DCF
|
02-Jan-2018
|
24-Jan-2022
|
|
|
|
|
No
|
|
39
|
Karnataka
|
FP/KA/IRRIG/49163/2020
|
|
Laying of pipeline in forest lands of Gunjanur, Chinnakara, Dharmapur in (Konkal-Ho, Gurumitkal-Ta, Yadgir-Di), Narayanpur, Kandakur in (Gurumitkal-Ho, Gurumitkal-Ta, Yadgir-Di), Shakalathpalli (Mudhal-Ho, Gurumitkal-Ta, Yadgir-Di) and for filling 35 Main and 20 Secondary Tanks from Bhima River in favour of Krishan Bhagya Jala Nigam Ltd (KBJNL.)
|
Irrigation
|
KBJNL
|
0.3968
|
Pending at DFO/DCF
|
14-Jul-2021
|
12-Oct-2021
|
|
|
|
|
No
|
|
40
|
Karnataka
|
FP/KA/QRY/35030/2018
|
|
ORDINARY BUILDING STONE QUARRY IN SVY NO 61 KHURSE VILLAGE ,SAMPAKHANDA HOBLI OF SIRSI TALUK IN UTTARA KANNDA DISTRICT
|
Quarrying
|
SHRINIDHI STONE CRUSHER MANJUGUNI
|
1.97
|
Pending at DFO/DCF
|
26-Mar-2021
|
31-Jul-2021
|
|
|
|
|
No
|
|
41
|
Karnataka
|
FP/KA/Others/19387/2016
|
|
VISHWA SHANTI NEKETHANA TRUST
|
Others
|
VISHVASHANTI NIKETAN
|
0.4115
|
Pending at DFO/DCF
|
20-Jan-2017
|
17-Apr-2021
|
|
|
|
|
No
|
|
42
|
Karnataka
|
FP/KA/VELEC/18111/2016
|
|
Palar Village Electrification
|
Village Electricity
|
EXECUTIVE ENGINEER
|
0.053
|
Pending at DFO/DCF
|
10-Jun-2016
|
13-May-2020
|
|
|
|
|
No
|
|
43
|
Karnataka
|
FP/KA/TRANS/36141/2018
|
|
For laying of 240 volts insulated covered cable power line from Kabbinale to Mundani enclosure of Karkala Wild Life Division, Karkala Taluk, Udupi District in favour of the Executive Engineer, MESCOM
|
Transmission Line
|
EXECUTIVE ENGINEER MANGALORE ELECTRICITY SUPPLY COMPANY LIMITED
|
0.07
|
Pending at DFO/DCF
|
09-Jul-2019
|
09-Jul-2019
|
|
|
|
|
No
|
|
44
|
Karnataka
|
FP/KA/ROAD/12889/2015
|
|
For formation of Road in Karwar Division in favour of M/s Shanthika Crushers
|
Road
|
M/S SHANTHIKA CRUSHERS
|
0.3072
|
Pending at DFO/DCF
|
14-Mar-2016
|
26-Oct-2017
|
|
|
|
|
No
|
|
45
|
Karnataka
|
FP/KA/VELEC/18493/2016
|
|
Electrification of Metikuppe Hadi Hamlet at Hunsur Division under DDG Scheme.
|
Village Electricity
|
CESC HUNSUR
|
0.03345
|
Pending at DFO/DCF
|
10-Jun-2016
|
10-Jun-2016
|
|
|
|
|
No
|
|
46
|
Karnataka
|
FP/KA/VELEC/18125/2016
|
|
Padasalanatha Village Electricity
|
Village Electricity
|
CESC KOLLEGAL
|
0.1326
|
Pending at DFO/DCF
|
10-Jun-2016
|
10-Jun-2016
|
|
|
|
|
No
|