Sno. | State Name | Proposal No. | RO/Ministry File Number | Proposal Name | Category | User Agency Name | Area (ha.) | Proposal Status | Proposal initially received on(Date) | Proposal Pending Since(Date) | View Report on Allocation of Fresh forest land (Form-A) Part-I | View Report (Part-II to Part-V and Stage-I Clearances) | View TimeLine Details | Other Related Documents | Whether EC required (if so, status)? |
1
|
Rajasthan
|
FP/RJ/ROAD/15973/2015
|
|
Construction of BT Road from Sone Ka Gurja Simarra Village to Uwasa Village.
|
Road
|
PUBLIC WORKS DEPARTMENT RAJASTHAN JAIPUR
|
0.96
|
Pending With UA
|
01-Jan-1900
|
23-Jul-2024
|
|
|
|
|
No
|
2
|
Rajasthan
|
FP/RJ/WATER/153642/2022
|
|
KALITEER LIFT SCHEME,DHOLPUR(RAJASTHAN)
|
Drinking Water
|
SE,WRD, DHOLPUR (RAJ)
|
9.5611
|
Pending at Nodal Officer
|
28-Aug-2024
|
04-Jul-2024
|
|
|
|
|
No
|
3
|
Rajasthan
|
FP/RJ/ROAD/34310/2018
|
|
Construction and widening of ramgarh mata ji parikrma road
|
Road
|
PUBLIC WORKS DEPARTMENT
|
9.06
|
Pending at CF/CCF
|
29-Aug-2024
|
18-Aug-2023
|
|
|
|
|
No
|
4
|
Rajasthan
|
FP/RJ/ROAD/152647/2022
|
|
Construction of approach road to foosod mata ji
|
Road
|
P.W.D DISTT DIVISON TAWA
|
0.59
|
Pending at CF/CCF
|
03-Sep-2024
|
24-Apr-2023
|
|
|
|
|
No
|
5
|
Rajasthan
|
FP/RJ/TRANS/30091/2017
|
|
CONSTRUCTION OF 220 KV S/C SURATGARH - PADAMPUR TRANSMISSION LINE, DISTRICT-SRI GANGANAGAR (RAJ.)
|
Transmission Line
|
RAJASTHAN RAJYA VIDYUT PRASARAN NIGAM LTD HANUMANGARH
|
1.3407
|
Pending at CF/CCF
|
09-Sep-2024
|
20-Jul-2022
|
|
|
|
|
No
|
6
|
Rajasthan
|
FP/RJ/ROAD/149378/2021
|
|
Upgradation of Road from Bhanpura Kalan to Gol Via Nagal Tulsidas, Toda Meena, Tala, Jaichandpura , Gathwari, Bobari , Under PMGSY-III, District -Jaipur (Rajasthan)
|
Road
|
PUBLIC WORKS DEPARTMENT RAJASTHAN
|
4.584
|
Pending at DFO/DCF
|
06-Sep-2024
|
21-Jan-2022
|
|
|
|
|
No
|
7
|
Rajasthan
|
FP/RJ/ROAD/30083/2017
|
|
Construction of shahbad to rajpur road
|
Road
|
PUBLIC WORKS DEPARTMENT
|
4
|
Pending at DFO/DCF
|
13-Sep-2024
|
08-Oct-2020
|
|
|
|
|
No
|
8
|
Rajasthan
|
FP/RJ/ROAD/34657/2018
|
|
Construction of road chorakhari to nayagoun via maheshpur
|
Road
|
PUBLIC WORKS DEPARTMENT
|
1.872
|
Pending at DFO/DCF
|
13-Sep-2024
|
21-Sep-2020
|
|
|
|
|
No
|
9
|
Rajasthan
|
FP/RJ/IRRIG/27263/2017
|
8-34/2019-FC
|
SUBMERGANCE OF HATHIADEH MEDIUM IRRIGATION PROJECT
|
Irrigation
|
WATER RESOURCES DEPARTMENT
|
286.47
|
Pending at Nodal Officer
|
02-Sep-2024
|
12-Mar-2019
|
|
|
|
|
No
|
10
|
Rajasthan
|
FP/RJ/Others/20036/2016
|
8-18/2023-FC
|
LAND FOR EXTENTION OF BHAMASHAH KRISHI UPAJ MANDI SAMITI
|
Others
|
KRISHI UPAJ MANDI SAMITY KOTA
|
96
|
Pending at DFO/DCF
|
05-Sep-2024
|
29-Jun-2017
|
|
|
|
|
No
|
11
|
Rajasthan
|
FP/RJ/ROAD/6997/2014
|
8B/RJ/06/26/2015
|
Upgradation of road from Kasbathana to Bamangawan
|
Road
|
PUBLIC WORKS DEPARTMENT
|
5.2
|
IN-PRINCIPLE
|
01-Jan-1900
|
01-Jan-1900
|
|
|
|
|
No
|
12
|
Rajasthan
|
FP/RJ/ROAD/17995/2016
|
F.1(56)Forest/2016
|
construction of aprooch road ramthi to rasulpura
|
Road
|
PUBLIC WORKS DEPARTMENT JHALAWAR
|
0.936
|
IN-PRINCIPLE
|
01-Jan-1900
|
01-Jan-1900
|
|
|
|
|
No
|
13
|
Rajasthan
|
FP/RJ/ROAD/48584/2020
|
1(44)forest/2021
|
Construction of Approach Road for Proposed Hindustan Petroleum Corp. Ltd. Retail Outlet on Barmer City - Dhorimanna Road (NH-68) between KM Stone No. 163-164 (Chainage: 163/616 - 163/576) RHS in Khasra No. 2466/699, At Village -Mahabar Peethal, Tehsil - Barmer, District - Barmer, Raj
|
Road
|
HINDUSTAN PETROLEUM CORPORATION LTD JODHPUR
|
0.1962
|
IN-PRINCIPLE
|
01-Jan-1900
|
01-Jan-1900
|
|
|
|
|
No
|
14
|
Rajasthan
|
FP/RJ/Pipeline/42970/2019
|
1(93)Forest/2021
|
Sewerage Project Kishangarh Under Amrut Yojna, District-Ajmer, Rajasthan
|
Pipeline
|
MUNICIPAL COUNCIL KISHANGARH, AJMER
|
0.1025
|
IN-PRINCIPLE
|
01-Jan-1900
|
01-Jan-1900
|
|
|
|
|
No
|
15
|
Rajasthan
|
FP/RJ/WATER/15016/2015
|
8B-Raj024/2022JPR
|
RURAL WATER SUPPLY SCHEME VILLAGE SONKHARI
|
Drinking Water
|
PHED
|
0.05
|
IN-PRINCIPLE
|
01-Jan-1900
|
01-Jan-1900
|
|
|
|
|
No
|
16
|
Rajasthan
|
FP/RJ/HYD/121439/2021
|
8-25/2023-FC
|
Construction of Shahpur (1800 MW) Pumped Storage Project by M/s Greenko Energies Private Limited, in Hanumanthkhera, Mungawali villages, G.P.-Mundiyar , Tehsil-Shahbad , Baran District , Rajasthan
|
Hydel
|
GREENKO ENERGIES PRIVATE LIMITED
|
407.8227
|
IN-PRINCIPLE
|
01-Jan-1900
|
01-Jan-1900
|
|
|
|
|
Yes
Proposal Status: EC application yet to be submitted
|
17
|
Rajasthan
|
FP/RJ/REHAB/21882/2016
|
8-61/2017-FC
|
Village Relocation
|
Rehabilitation
|
CHIEF WILDLIFE WARDEN JAIPUR
|
100
|
IN-PRINCIPLE
|
11-Sep-2017
|
01-Jan-1900
|
|
|
|
|
No
|
18
|
Rajasthan
|
FP/RJ/WATER/18811/2016
|
8B/Raj/08/41/2015
|
Chambal-Bhilwara Water Supply Project (Phase-I)
|
Drinking Water
|
PUBLIC HEALTH ENGINEERING DEPARTMENT
|
15.0015
|
IN-PRINCIPLE
|
01-Jan-1900
|
01-Jan-1900
|
|
|
|
|
No
|
19
|
Rajasthan
|
FP/RJ/OFC/43491/2019
|
1(37) Van/2020
|
Laying of Underground Optical Fiber Cable along the road within the existing ROW from KMS - 0/0 to KMS 54.789 km (Udaipur - Chawand Road), District – Udaipur (Raj.)
|
Optical Fibre Cable
|
DINESH ENGINEERS LIMITED DEPL
|
0.72
|
IN-PRINCIPLE
|
01-Jan-1900
|
01-Jan-1900
|
|
|
|
|
No
|
20
|
Rajasthan
|
FP/RJ/ROAD/7127/2014
|
8B/Raj/06/24/2015
|
bt ROAD FROM MAMLI LAKSHMIPURA TO PATPADI
|
Road
|
PUBLIC WORKS DEPARTMENT
|
1.14
|
IN-PRINCIPLE
|
01-Jan-1900
|
01-Jan-1900
|
|
|
|
|
No
|
21
|
Rajasthan
|
FP/RJ/OFC/50901/2020
|
1(9)forest/2021
|
Laying of Underground Optical Fiber Cable Along the NH-21(old NH11) Road Within the Existing Row from Mahuwa to Samleti GP, NTR –T Joint to Patoli , Hadiya to Teekri Jafran NH Crosing and Hadiya T-Joint to Pali T-Joint –District-Dausa (Rajasthan)
|
Optical Fibre Cable
|
BHARAT BROADBAND NETWORK LIMITED
|
0.1602
|
IN-PRINCIPLE
|
01-Jan-1900
|
01-Jan-1900
|
|
|
|
|
No
|
22
|
Rajasthan
|
FP/RJ/OFC/150722/2022
|
1(72)forest/2022
|
“Laying of Underground Optical Fiber Cable Along the Road Within the Existing Row from Abu Road To Gujrat Border on Ambaji Road, Gujrat Border (Ambaji) to Boribooj fanta on NH-927A and Bhoola To Kot, M/s Telesonic Networks Limited. District -Sirohi (Rajasthan)”
|
Optical Fibre Cable
|
TELESONIC NETWORKS LIMITED
|
1.584
|
IN-PRINCIPLE
|
01-Jan-1900
|
01-Jan-1900
|
|
|
|
|
No
|
23
|
Rajasthan
|
FP/RJ/Others/150590/2021
|
8-05/2022-FC
|
Diversion of 466.592 ha. Forest land for Construction of New Green Field Airport Kota, District- Bundi in the State of Rajasthan
|
Others
|
AIRPORT AUTHORITY OF INDIA KOTA
|
466.592
|
IN-PRINCIPLE
|
01-Jan-1900
|
01-Jan-1900
|
|
|
|
|
Yes
Proposal Status: EC application yet to be submitted
|
24
|
Rajasthan
|
FP/RJ/OFC/51041/2020
|
8B/RAJ/12/30/2021/FC
|
Laying of Underground Optical Fiber Cable along the (Ratlam - Bamnia road within the existing ROW from KMS - 0/0 to KMS 11/00 Km) District - Banswara (Raj.)
|
Optical Fibre Cable
|
M/S TELESONIC NETWORKS LIMITED
|
0.0667
|
IN-PRINCIPLE
|
01-Jan-1900
|
01-Jan-1900
|
|
|
|
|
No
|
25
|
Rajasthan
|
FP/RJ/Others/150590/2021
|
8-05/2022-FC
|
Diversion of 466.592 ha. Forest land for Construction of New Green Field Airport Kota, District- Bundi in the State of Rajasthan
|
Others
|
AIRPORT AUTHORITY OF INDIA KOTA
|
466.592
|
IN-PRINCIPLE
|
07-Dec-2022
|
01-Jan-1900
|
|
|
|
|
Yes
Proposal Status: EC application yet to be submitted
|
26
|
Rajasthan
|
FP/RJ/ROAD/7554/2014
|
1(45)Forest/2015
|
const.of A/R to Meerokhari
|
Road
|
PWD
|
0.9
|
IN-PRINCIPLE
|
01-Jan-1900
|
01-Jan-1900
|
|
|
|
|
No
|
27
|
Rajasthan
|
FP/RJ/TRANS/8925/2014
|
|
WELSPUN RENEWABLES ENERGY PVT.LTD
|
Transmission Line
|
WELSPUN RENEWABLES ENERGY PVT LIMITED
|
2.416
|
IN-PRINCIPLE
|
01-Jan-1900
|
01-Jan-1900
|
|
|
|
|
No
|
28
|
Rajasthan
|
FP/RJ/WATER/26264/2017
|
8B/RAJ/08/26/2017/FC
|
Trambay station Harizan Basti OHSR
|
Drinking Water
|
EXECUTIVE ENGINEER PHED CITY DN I AJMER
|
0.0225
|
IN-PRINCIPLE
|
01-Jan-1900
|
01-Jan-1900
|
|
|
|
|
No
|
29
|
Rajasthan
|
FP/RJ/ROAD/30449/2017
|
F.1(34)Forest/2018
|
Construction of road Taraj to Tara devi village
|
Road
|
PWD
|
0.87
|
IN-PRINCIPLE
|
01-Jan-1900
|
01-Jan-1900
|
|
|
|
|
No
|
30
|
Rajasthan
|
FP/RJ/ROAD/46675/2020
|
8B/RAJ/06/36/2020
|
Construction of Approach Road for Proposed Bio-Diesel Plant, on NH-62(Old-NH-15) Chainage No 209+621 to 209 +671(RHS)AT Chak 7 BLW,SQ No-55,Killa No 21-25 At Village- Kenchiya,Tehsil-Pilibanga , Dist
|
Road
|
M/S JUGGLER HAWK INDUSTRIES PVT. LTD.
|
0.2239
|
IN-PRINCIPLE
|
01-Jan-1900
|
01-Jan-1900
|
|
|
|
|
No
|
31
|
Rajasthan
|
FP/RJ/TRANS/116897/2020
|
8B/Raj/04/19/2021/FC
|
Construction of 220 KV S/C Transmission line for Power Evacuation from 200 MW Solar Power Project of M/s Mahindra Susten Private Limited, Village – Khari Charnan, Tehsil – Kolayat, District – Bikaner, Rajasthan to RVPN 220 KV Gajner Substation (Total Length 8.547 km)
|
Transmission Line
|
MAHINDRA SUSTEN PVT. LTD.
|
0.0812
|
IN-PRINCIPLE
|
01-Jan-1900
|
01-Jan-1900
|
|
|
|
|
No
|
32
|
Rajasthan
|
FP/RJ/ROAD/35700/2018
|
1(68)forest/2021
|
IOCl New retail outlet at Village Shubhdand District Nagaur
|
Road
|
INDIAN OIL CORPRATION LIMITED
|
0.1887
|
IN-PRINCIPLE
|
01-Jan-1900
|
01-Jan-1900
|
|
|
|
|
No
|
33
|
Rajasthan
|
FP/RJ/Approach/149635/2021
|
8B/RAJ001/2023-JPR
|
Construction of Approach Road for Proposed Indian Oil Corporation Limited Retail Outlet on Birdhawal to Chhatargarh Road between KM Stone No. 43-44 (Chainage: 43/195 - 43/230) LHS in Kila No. 16, 17/2, Plot No. 23/30, Murba No. 19 Village-2 DOA, Tehsil - Suratgarh, District- Sri Ganganagar, Raj.
|
Approach Access
|
Indian Oil Corporation Limited
|
0.0614
|
IN-PRINCIPLE
|
01-Jan-1900
|
01-Jan-1900
|
|
|
|
|
No
|
34
|
Rajasthan
|
FP/RJ/ROAD/7757/2014
|
1(52)Forest/2015
|
Approch road Barodiya to Jatamari
|
Road
|
EXECUTIVE ENGINEER
|
0.994
|
IN-PRINCIPLE
|
01-Jan-1900
|
01-Jan-1900
|
|
|
|
|
No
|
35
|
Rajasthan
|
FP/RJ/ROAD/6982/2014
|
8B/Rj/06/20/2015
|
Road from Gordhanpura to Ghatta
|
Road
|
PUBLIC WORKS DEPARTMENT
|
2.22
|
IN-PRINCIPLE
|
01-Jan-1900
|
01-Jan-1900
|
|
|
|
|
No
|
36
|
Rajasthan
|
FP/RJ/ROAD/34833/2018
|
F.1(4)Forest/2019
|
Widening and construction of road from Govt. Hospital road Junction at NH-62to Kisan Chowk Side.
|
Road
|
URBAN IMPROVEMENT TRUST SRI GANGANAGAR
|
0.3825
|
IN-PRINCIPLE
|
01-Jan-1900
|
01-Jan-1900
|
|
|
|
|
No
|
37
|
Rajasthan
|
FP/RJ/ROAD/10911/2015
|
8B/Raj/06/35/2015/FC
|
Construction of road from Hinglot to madnakheri
|
Road
|
EXECUTIVE ENGINEER PWD DIV CHHABRA
|
2.27
|
IN-PRINCIPLE
|
01-Jan-1900
|
01-Jan-1900
|
|
|
|
|
No
|
38
|
Rajasthan
|
FP/RJ/ROAD/42702/2019
|
8B/RAJ052/2022-JPR
|
Widening of Road and Construction of Divider from Sr. School Lohagal to police Chowki Shastri Nagar Ajmer, District-Ajmer, Rajasthan".
|
Road
|
AJMER DEVELOPMENT AUTHORITY
|
1.789
|
IN-PRINCIPLE
|
01-Jan-1900
|
01-Jan-1900
|
|
|
|
|
No
|
39
|
Rajasthan
|
FP/RJ/OFC/144983/2021
|
1(15)Forest/2023
|
Permission for laying underground OFC in Forest area along road from Vijaipur - Rooppura from Lat/Long 24.791558/75.718341 to 24.765172/75.740787 for total length of 4.063 KM and total area 0.1828 ha in Chittorgarh District, Rajasthan
|
Optical Fibre Cable
|
JIO DIGITAL FIBER PVT LTD
|
0.1828
|
IN-PRINCIPLE
|
01-Jan-1900
|
01-Jan-1900
|
|
|
|
|
No
|
40
|
Rajasthan
|
FP/RJ/WATER/10622/2015
|
F.1(105)Forest/2015
|
water supply and sewerage project in Tonk town under RUIDP Phase III
|
Drinking Water
|
PHED
|
0.1435
|
IN-PRINCIPLE
|
01-Jan-1900
|
01-Jan-1900
|
|
|
|
|
No
|
41
|
Rajasthan
|
FP/RJ/ROAD/14903/2015
|
8B/RAJ/06/43/2015/FC
|
missing link dooni anwa road to chandli maata jee
|
Road
|
EXECUTIVE ENGINEER RAJASTHAN STATE AGRICULTURAL MARKTING BOARD DIVISION TONK
|
2.1
|
IN-PRINCIPLE
|
01-Jan-1900
|
01-Jan-1900
|
|
|
|
|
No
|
42
|
Rajasthan
|
FP/RJ/ROAD/30198/2017
|
F.1(13)Forest/2018
|
Construction of Missing Link Road from Dhani Raikan to Dhani Ranasar Forest Land Area 0.3750 ha
|
Road
|
DEPARTMENT OF AGRICULTURE MARKETING RAJASTHAN
|
0.375
|
IN-PRINCIPLE
|
01-Jan-1900
|
01-Jan-1900
|
|
|
|
|
No
|
43
|
Rajasthan
|
FP/RJ/OFC/43151/2019
|
1(76)forest/2020
|
Laying of Uder Grouond Optical Fibre Cable From Jaipur (Nindar Mod) to Kaladera ( Via Nindar, Jairampura ,Jahota, Jalsoo, Raghunathpura & Mundiya ) for Jio Digital Fiber Private Limited”
|
Optical Fibre Cable
|
JIO DIGITAL FIBRE PRIVATE LIMITED
|
0.035
|
IN-PRINCIPLE
|
01-Jan-1900
|
01-Jan-1900
|
|
|
|
|
No
|
44
|
Rajasthan
|
FP/RJ/WATER/35465/2018
|
8B/Raj/08/11/2021/FC
|
Amrut Yojana ( Water Supply Project for Urban Chittorgarh)
|
Drinking Water
|
PUBLIC HEALTH ENGINEERING DEPARTMENT CHITTORGARH
|
0.016
|
IN-PRINCIPLE
|
01-Jan-1900
|
01-Jan-1900
|
|
|
|
|
No
|
45
|
Rajasthan
|
FP/RJ/TRANS/44930/2020
|
8B/RAJ/04/10/2021
|
400 KV D/C BHADLA (PG) Bhadla 2 (TWIN HTLS) Transmission Line, District-Jodhpur, Rajasthan (Total Length 48.345 km)
|
Transmission Line
|
POWERGRID CORPORATION OF INDIA LIMITED
|
4.95
|
IN-PRINCIPLE
|
01-Jan-1900
|
01-Jan-1900
|
|
|
|
|
No
|
46
|
Rajasthan
|
FP/RJ/TRANS/150764/2022
|
8B/RAJ030/2022-JPR
|
Avaada Energy Pvt Ltd. Solar Power Plant in Kolayat Tehsil , Bikaner - Bhadla -II PS 220 KV S/C Transmission Line
|
Transmission Line
|
AVAADA ENERGY PRIVATE LIMITED
|
0.9625
|
IN-PRINCIPLE
|
01-Jan-1900
|
01-Jan-1900
|
|
|
|
|
No
|
47
|
Rajasthan
|
FP/RJ/ROAD/26222/2017
|
1(90)forest2021
|
Construction of Missing Link Road From Udaipura Road to Toda Bheem Road
|
Road
|
PUBLIC WORK DEPARTMENT
|
0.99
|
IN-PRINCIPLE
|
01-Jan-1900
|
01-Jan-1900
|
|
|
|
|
No
|
48
|
Rajasthan
|
FP/RJ/Approach/148689/2021
|
1(105)Forest/2023
|
Construction of Approach Road for Proposed Indian Oil Corporation Ltd. Retail Outlet on Bikaner-Sri Ganganagar Road (NH-62) between KM Stone No. 189 - 190 (Chainage: 189.692 to 189.727) RHS in Kila No 9 & 10 Murbba No 11, at Village - 17 STB, Tehsil-Suratgarh, District - Sri Ganganagar, Raj.
|
Approach Access
|
Indian Oil Corporation Limited
|
0.1817
|
IN-PRINCIPLE
|
01-Jan-1900
|
01-Jan-1900
|
|
|
|
|
No
|
49
|
Rajasthan
|
FP/RJ/OFC/43686/2020
|
1(134)forest/2020
|
Laying of Underground Optical Fiber Cable along the road within the existing ROW from KMS - 0/0 to KMS 58.285 = 58.285 km (Gogunda - Kirat Road) District - Udaipur (Rajasthan)
|
Optical Fibre Cable
|
DINESH ENGINEERS LTD.
|
0.3648
|
IN-PRINCIPLE
|
01-Jan-1900
|
01-Jan-1900
|
|
|
|
|
No
|
50
|
Rajasthan
|
FP/RJ/OFC/44109/2020
|
1(13)forest/2022
|
Laying of underground OFC within ROW of existing PWD road from Vijaipura-Ratangarh form Lat/long point 24.808472/75.718965° to 24.688055/75.605895° for length & area in forest is 23.222 KM & 1.045 ha and length & area in non-forest is 0.156 Km & 0.007 ha. Total length and area in forest is 23.222 KM & 1.045 ha and in non-forest is 0.156 Km & 0.007
|
Optical Fibre Cable
|
JIO DIGITAL FIBER PVT LTD
|
1.045
|
IN-PRINCIPLE
|
01-Jan-1900
|
01-Jan-1900
|
|
|
|
|
No
|
|