| Sno. | State Name | Proposal No. | RO/Ministry File Number | Proposal Name | Category | User Agency Name | Area (ha.) | Proposal Status | Proposal initially received on(Date) | Proposal Pending Since(Date) | View Report on Allocation of Fresh forest land (Form-A) Part-I | View Report (Part-II to Part-V and Stage-I Clearances) | View TimeLine Details | Other Related Documents | Whether EC required (if so, status)? |
|
1
|
Bihar
|
FP/BR/ROAD/21548/2016
|
|
Up-gradation of Katihar-Balrampur section of SH-98 from existing km 0.000 to km 65.100 in to 2 lanes with paved shoulders in Katihar District in the State of Bihar
|
Road
|
BIHAR STATE ROAD DEVELOPMENT CORPORATION
|
17.121
|
Pending With UA
|
01-Jan-1900
|
16-Jan-2026
|
|
|
|
|
No
|
|
2
|
Bihar
|
FP/BR/Others/43414/2019
|
|
Jio Digital Fibre Pvt Ltd
|
Others
|
Jio Digital Fibre Private Limited
|
0.08795
|
Pending With UA
|
01-Jan-1900
|
27-Nov-2025
|
|
|
|
|
No
|
|
3
|
Bihar
|
FP/BR/VELEC/37236/2018
|
|
Village electrification under Deen Dayal Upadhyay Grameen Vidhyuthikaran Yojana
|
Village Electricity
|
SOUTH BIHAR POWER DISTRIBUTION COMPANY LIMITED
|
4.941
|
Pending With UA
|
01-Jan-1900
|
02-Feb-2025
|
|
|
|
|
No
|
|
4
|
Bihar
|
FP/BR/ROAD/152693/2022
|
|
Construction HL RCC Bridge over salkhan jor at Narganjo to Bakhoribathan Road under PMGSY Package No. BR-15R-505 Jhajha Block District Jamui Bihar
|
Road
|
EXECUTIVE ENGINEER RURAL WORKS DEPARTMENT WORKS DIVISION JHAJHA
|
0.0154
|
Pending at DFO/DCF
|
19-Oct-2023
|
23-Mar-2023
|
|
|
|
|
No
|
|
5
|
Bihar
|
FP/BR/Approach/150479/2021
|
|
Diversion of 0.01815 ha of forest land for construction of approach road for opening retail outlet of BPCL on Sarafra-Siwan Road in Siwan district of Bihar.
|
Approach Access
|
VINOD KUMAR YADAV
|
0.01815
|
Pending at DFO/DCF
|
11-Jan-2026
|
13-Mar-2023
|
|
|
|
|
No
|
|
6
|
Bihar
|
FP/BR/Approach/146905/2021
|
|
The proposal for establishment of retail out-let dealership of M/s Indian Biofuel Company Ltd. Location Supaul to Sukhpur Solhani on SH 66 District Supaul Bihar.
|
Approach Access
|
SUCHETA CHAND
|
0.01875
|
Pending at DFO/DCF
|
19-Jul-2025
|
01-Feb-2023
|
|
|
|
|
No
|
|
7
|
Bihar
|
FP/BR/ROAD/149507/2021
|
|
Manikpur Sahebganj section of NH 139W from Km 0+000 to Km 42.800 under BRT Scheme for upgradation to 4 lane divided carriageway which is falling in Muzaffarpur and Purbi Champaran districts of Bihar
|
Road
|
NATIONAL HIGHWAY AUTHORITY OF INDIA
|
23.692
|
Pending at DFO/DCF
|
18-Aug-2022
|
18-Aug-2022
|
|
|
|
|
No
|
|
8
|
Bihar
|
FP/BR/ROAD/153719/2022
|
|
Construction of Two Lane ROB and its approaches in Lieu of Existing level Crossing (L.C No-77C) at Km. 24 on NH-327A on EPC Mode in the State of Bihar
|
Road
|
PUBLIC WORK DEPARTMENT (NATIONAL HIGHWAY)PATNA BIHAR
|
0.0971
|
Pending at DFO/DCF
|
21-Jun-2022
|
21-Jun-2022
|
|
|
|
|
No
|
|
9
|
Bihar
|
FP/BR/ROAD/35128/2018
|
|
Construction of all weather road. Only clearing of vegetation may required, no cutting of tree of trimming of branches will be required along the alignment of Forest Clearance PMGSY Road from L027-T01 to Bahera (VR 7) in Bhabhua District
|
Road
|
EXECUTIVE ENGINEER RWD WORKS DIVISION BHABUA
|
9.17
|
Pending at DFO/DCF
|
07-Jun-2022
|
07-Jun-2022
|
|
|
|
|
No
|
|
10
|
Bihar
|
FP/BR/OFC/140432/2021
|
|
Jio Digital Fibre Pvt Ltd.
|
Optical Fibre Cable
|
Jio Digital Fibre Private Limited
|
0.00822
|
Pending at DFO/DCF
|
07-May-2022
|
07-May-2022
|
|
|
|
|
No
|
|
11
|
Bihar
|
FP/BR/Approach/118860/2021
|
|
The proposal for establishment of retail out-let dealership of M/s Bharat Petroleum Corporation Ltd. Location Between Jagdishpur and Puraini on SH-19 District-Bhagalpur Bihar.
|
Approach Access
|
NIRAJ KUMAR
|
0.018
|
Pending at CF/CCF
|
14-Sep-2025
|
24-Sep-2021
|
|
|
|
|
No
|
|
12
|
Bihar
|
FP/BR/Others/70466/2020
|
|
Diversion of 0.010275 ha of forest land for construction of approach road for opening retail outlet of IOCL on Sasaram-Karahgar Road in Rohtas district of Bihar.
|
Others
|
AKSHAY KUMAR SINGH
|
0.01028
|
Pending at CF/CCF
|
14-Sep-2025
|
23-Sep-2021
|
|
|
|
|
No
|
|
13
|
Bihar
|
FP/BR/Others/139661/2021
|
|
Diversion of 0.013875 ha of forest land for construction of approach road for opening retail outlet of BPCL on Madhubani-Babubarhi-Khutona Road in Madhubani district of Bihar.
|
Others
|
DEEPAK KUMAR SINGH
|
0.01388
|
Pending at DFO/DCF
|
27-Nov-2025
|
08-Sep-2021
|
|
|
|
|
No
|
|
14
|
Bihar
|
FP/BR/Others/125670/2021
|
|
Diversion of 0.006 ha of forest land for construction of approach road for opening retail outlet of Goal Bio Oil Ltd, of Bio Diesel on Darbhanga-Kalyanpur Road in Darbhanga district of Bihar.
|
Others
|
SANTOSH YADAV
|
0.006
|
Pending at DFO/DCF
|
27-Nov-2025
|
07-Sep-2021
|
|
|
|
|
No
|
|
15
|
Bihar
|
FP/BR/Others/40629/2019
|
|
Diversion of 0.0195 ha of forest land for construction of approach road for opening retail outlet of IOCL on side of Arrah-Buxar (NH-84) Road in Buxar district of Bihar.
|
Others
|
AKASH DEEP
|
0.0195
|
Pending at Nodal Officer
|
08-Apr-2025
|
03-Sep-2021
|
|
|
|
|
No
|
|
16
|
Bihar
|
FP/BR/Others/118030/2020
|
|
Diversion of 0.01425 ha of forest land for construction of approach road for opening retail outlet of HPCL on SH-12 Road in Siwan district of Bihar.
|
Others
|
SUNIL KUMAR MISHRA
|
0.01425
|
Pending at CF/CCF
|
14-Sep-2025
|
27-Aug-2021
|
|
|
|
|
No
|
|
17
|
Bihar
|
FP/BR/Others/79389/2020
|
|
Diversion of 0.0135 ha of forest land for construction of approach road for opening retail outlet of HPCL on NH-83 Road in Gaya district of Bihar.
|
Others
|
SANJAY PRASAD
|
0.0135
|
Pending at CF/CCF
|
14-Sep-2025
|
14-Aug-2021
|
|
|
|
|
No
|
|
18
|
Bihar
|
FP/BR/OFC/119323/2021
|
|
ROW Permission for KM laying Optical Fiber Cable in Atari Jethian Road
|
Optical Fibre Cable
|
AFAQUE SIDDIQUE
|
0.985
|
Pending at Nodal Officer
|
08-Apr-2025
|
14-Aug-2021
|
|
|
|
|
No
|
|
19
|
Bihar
|
FP/BR/Others/126820/2021
|
|
Diversion of 0.036 ha of forest land for construction of approach road for opening retail outlet of BPCL on NH-85 Chhapra-Siwan Road in Saran district of Bihar.
|
Others
|
AMARJEET KUMAR SINGH
|
0.036
|
Pending at DFO/DCF
|
24-Nov-2025
|
01-Jul-2021
|
|
|
|
|
No
|
|
20
|
Bihar
|
FP/BR/Others/43487/2019
|
|
Jio Digital Fibre Private Limited
|
Others
|
Jio Digital Fibre Private Limited
|
0.32058
|
Pending at DFO/DCF
|
15-Apr-2021
|
15-Apr-2021
|
|
|
|
|
No
|
|
21
|
Bihar
|
FP/BR/Approach/120389/2021
|
|
The proposal for establishment of retail out-let dealership of M/s Indian Oil Corporation Ltd.
|
Approach Access
|
SMT. VINITA KUMARI
|
0.024
|
Pending at DFO/DCF
|
11-Feb-2026
|
13-Mar-2021
|
|
|
|
|
No
|
|
22
|
Bihar
|
FP/BR/Approach/70767/2020
|
|
The proposal for establishment of retail out-let dealership of M/s Hindustan Petroleum Corporation Ltd. Location Within 7 KM from Khaira Police Station on Khaira-Amin Road towards Amin District-Jamui
|
Approach Access
|
BIKASH PRASAD SINGH
|
0.015
|
Pending at CF/CCF
|
14-Sep-2025
|
11-Mar-2021
|
|
|
|
|
No
|
|
23
|
Bihar
|
FP/BR/Approach/116385/2020
|
|
The proposal for establishment of retail out-let dealership of M/s Bharat Petroleum Corporation Ltd. Location Within 3 KM of RL Mahto Institute of Education Towards Rosera on SH-88 District Samastipur
|
Approach Access
|
LALAN KUMAR
|
0.0255
|
Pending at DFO/DCF
|
08-Sep-2021
|
11-Mar-2021
|
|
|
|
|
No
|
|
24
|
Bihar
|
FP/BR/Approach/49535/2020
|
|
The proposal for establishment of retail out-let dealership of M/s Bharat Petroleum Corporation Ltd.
|
Approach Access
|
SHRI RAJESH KUMAR SIKANDRA
|
0.02124
|
Pending at CF/CCF
|
14-Sep-2025
|
27-Feb-2021
|
|
|
|
|
No
|
|
25
|
Bihar
|
FP/BR/Others/49985/2020
|
|
Diversion of 0.01125 ha of forest land for construction of approach road for opening retail outlet of BPCL on Chaira-Chodiha Road in Jamui district of Bihar.
|
Others
|
VIJAY KUMAR SINGH
|
0.01125
|
Pending at Nodal Officer
|
10-Oct-2021
|
25-Feb-2021
|
|
|
|
|
No
|
|
26
|
Bihar
|
FP/BR/ROAD/41292/2019
|
|
L116-L040 Chhalidohar to Ambabar (Track 116)
|
Road
|
EXECUTIVE ENGINEER RWD WORKS DIVISION AURANGABAD
|
0.75
|
Pending at DFO/DCF
|
12-Feb-2021
|
12-Feb-2021
|
|
|
|
|
No
|
|
27
|
Bihar
|
FP/BR/Others/41294/2019
|
|
Reliance Jio Infocomm Ltd.
|
Others
|
Jio Digital Fibre Private Limited
|
0.36579
|
Pending at DFO/DCF
|
12-Feb-2021
|
12-Feb-2021
|
|
|
|
|
No
|
|
28
|
Bihar
|
FP/BR/ROAD/41377/2019
|
|
PMGSY Road of T01 Chatra More to Pawai (VR1)
|
Road
|
EXECUTIVE ENGINEER RWD WORKS DIVISION AURANGABAD
|
0.506
|
Pending at DFO/DCF
|
12-Feb-2021
|
12-Feb-2021
|
|
|
|
|
No
|
|
29
|
Bihar
|
FP/BR/ROAD/41390/2019
|
|
PMGSY Road project L059-T04 Tatariya (Track 59)
|
Road
|
EXECUTIVE ENGINEER RWD WORKS DIVISION AURANGABAD
|
1.2
|
Pending at DFO/DCF
|
12-Feb-2021
|
12-Feb-2021
|
|
|
|
|
No
|
|
30
|
Bihar
|
FP/BR/ROAD/41395/2019
|
|
PMGSY Road project of L115-T06 Chilami to Pachrukhiya
|
Road
|
EXECUTIVE ENGINEER RWD WORKS DIVISION AURANGABAD
|
8.62
|
Pending at DFO/DCF
|
12-Feb-2021
|
12-Feb-2021
|
|
|
|
|
No
|
|
31
|
Bihar
|
FP/BR/ROAD/119449/2021
|
|
T02 Aurangabad to Bishunpur Package No. BR-02R-748 Length 8.00 KM
|
Road
|
EXECUTIVE ENGINEER RWD WORKS DIVISION AURANGABAD
|
2.5
|
Pending at DFO/DCF
|
12-Feb-2021
|
12-Feb-2021
|
|
|
|
|
No
|
|
32
|
Bihar
|
FP/BR/ROAD/54736/2020
|
|
Rehabilitation and Up gradation of 2–lane with Paved Shoulders configuration of NH-133E from Bhagalpur to Baljhor Basti (Bihar & Jharkhand state border) In the state of Bihar on EPC mode.
|
Road
|
EE BHAGALPUR NH
|
46.5848
|
Pending at DFO/DCF
|
29-Jan-2021
|
29-Jan-2021
|
|
|
|
|
No
|
|
33
|
Bihar
|
FP/BR/Others/22792/2016
|
|
Reliance Jio Infocomm Limited
|
Others
|
Jio Digital Fibre Private Limited
|
1.0275
|
Pending at Nodal Officer
|
08-Apr-2025
|
11-Dec-2020
|
|
|
|
|
No
|
|
34
|
Bihar
|
FP/BR/ROAD/45171/2020
|
|
L090-L085 to Barsodi Under PMGSY Package No. BR-12R-1037 Agreement No. 83 SBD/2018-19 under Barachatti Block in RWD Sherghati in Gaya District, Bihar Length 3.60 KM
|
Road
|
EE RWD WORK DIVISION SHERGHATI
|
2.16
|
Pending at DFO/DCF
|
12-Nov-2020
|
12-Nov-2020
|
|
|
|
|
Yes
Proposal Status: EC application yet to be submitted
|
|
35
|
Bihar
|
FP/BR/ROAD/45176/2020
|
|
L091 GT Road to Nare Under PMGSY Package No. BR-12R-1041 Agreement No. 83 SBD/2018-19 under Barachatti Block in RWD Sherghati in Gaya District, Bihar Length 5.17 KM
|
Road
|
EE RWD WORK DIVISION SHERGHATI
|
0.6
|
Pending at DFO/DCF
|
12-Nov-2020
|
12-Nov-2020
|
|
|
|
|
No
|
|
36
|
Bihar
|
FP/BR/ROAD/45177/2020
|
|
L092-L039 to Kadal Under PMGSY Package No. BR-12R-1042 Agreement No. 82 SBD/2018-19 under Barachatti Block in RWD Sherghati in Gaya District.
|
Road
|
EE RWD WORK DIVISION SHERGHATI
|
0.438
|
Pending at DFO/DCF
|
12-Nov-2020
|
12-Nov-2020
|
|
|
|
|
No
|
|
37
|
Bihar
|
FP/BR/ROAD/45668/2020
|
|
PMGSY Malaypur Barhat Road to Karmegh Pagckage No. BR-15R-346)
|
Road
|
EXECUTIVE ENGINEER RURAL WORKS DEPARTMENT WORKS DIVISION JAMUI
|
9.6
|
Pending at DFO/DCF
|
23-Jul-2020
|
23-Jul-2020
|
|
|
|
|
No
|
|
38
|
Bihar
|
FP/BR/ROAD/44939/2020
|
|
PMGSY L087-Jamui Kharagpur Road to Adwaria (TRACK87) Pagckage No. 15RRP-56)
|
Road
|
EXECUTIVE ENGINEER RURAL WORKS DEPARTMENT WORKS DIVISION JAMUI
|
1.2
|
Pending at DFO/DCF
|
06-Jul-2020
|
06-Jul-2020
|
|
|
|
|
No
|
|
39
|
Bihar
|
FP/BR/ROAD/44993/2020
|
|
PMGSY L056-Kohbarba more Katahara River REO Road to Harchak (TRACK56) Pagckage No. BR15R235)
|
Road
|
EXECUTIVE ENGINEER RURAL WORKS DEPARTMENT WORKS DIVISION JAMUI
|
1.14
|
Pending at DFO/DCF
|
06-Jul-2020
|
06-Jul-2020
|
|
|
|
|
No
|
|
40
|
Bihar
|
FP/BR/ROAD/44994/2020
|
|
PMGSY L113-Kamlu MNP Road to Kajhatari (TRACK113) Pagckage No. BR15R327)
|
Road
|
EXECUTIVE ENGINEER RURAL WORKS DEPARTMENT WORKS DIVISION JAMUI
|
1.2
|
Pending at DFO/DCF
|
06-Jul-2020
|
06-Jul-2020
|
|
|
|
|
No
|
|
41
|
Bihar
|
FP/BR/ROAD/45666/2020
|
|
PMGSY L022-Sondipi Karamtanr Road to Thari (TRACK22) 15RRP-60 Pagckage No. BR15R238)
|
Road
|
EXECUTIVE ENGINEER RURAL WORKS DEPARTMENT WORKS DIVISION JAMUI
|
4.2
|
Pending at DFO/DCF
|
06-Jul-2020
|
06-Jul-2020
|
|
|
|
|
No
|
|
42
|
Bihar
|
FP/BR/ROAD/44721/2020
|
|
Construction of all weather road. Only clearing of vegetation may required, no cutting of tree or trimming of branches will be required along the alignment of L031 to Kon Bhabhani Road of Adhaura Bloc
|
Road
|
EXECUTIVE ENGINEER RWD WORKS DIVISION BHABUA
|
0.49
|
Pending at DFO/DCF
|
01-Jul-2020
|
01-Jul-2020
|
|
|
|
|
No
|
|
43
|
Bihar
|
FP/BR/ROAD/33833/2018
|
|
PMGSY Road L043-L027 to Sohdag (VR 21)
|
Road
|
EXECUTIVE ENGINEER RWD WORKS DIVISION BHABUA
|
1.925
|
Pending at DFO/DCF
|
30-Jun-2020
|
30-Jun-2020
|
|
|
|
|
No
|
|
44
|
Bihar
|
FP/BR/ROAD/33836/2018
|
|
L048-L027 to Yadav Tola (VR25) PMGSY Road
|
Road
|
EXECUTIVE ENGINEER RWD WORKS DIVISION BHABUA
|
0.945
|
Pending at DFO/DCF
|
30-Jun-2020
|
30-Jun-2020
|
|
|
|
|
No
|
|
45
|
Bihar
|
FP/BR/ROAD/33851/2018
|
|
L039-Kham Kala L038 to Chaudharna (VR 18)
|
Road
|
EXECUTIVE ENGINEER RWD WORKS DIVISION BHABUA
|
7
|
Pending at DFO/DCF
|
30-Jun-2020
|
30-Jun-2020
|
|
|
|
|
No
|
|
46
|
Bihar
|
FP/BR/ROAD/33859/2018
|
|
L030-Lohra Toi to Morhapa PMGSY Road
|
Road
|
EXECUTIVE ENGINEER RWD WORKS DIVISION BHABUA
|
19.1
|
Pending at DFO/DCF
|
30-Jun-2020
|
30-Jun-2020
|
|
|
|
|
No
|
|
47
|
Bihar
|
FP/BR/ROAD/44718/2020
|
|
Construction of all weather road. Only clearing of vegetation may required, no cutting of tree or trimming of branches will be required along the alignment of T01 to Khondhar Road of Adhaura Block in
|
Road
|
EXECUTIVE ENGINEER RWD WORKS DIVISION BHABUA
|
6.3
|
Pending at DFO/DCF
|
30-Jun-2020
|
30-Jun-2020
|
|
|
|
|
No
|
|
48
|
Bihar
|
FP/BR/ROAD/44722/2020
|
|
Construction of all weather road. Only clearing of vegetation may required, no cutting of tree or trimming of branches will be required along the alignment of L026 to Kadhar Khurd Road of Adhaura Bloc
|
Road
|
EXECUTIVE ENGINEER RWD WORKS DIVISION BHABUA
|
0.42
|
Pending at DFO/DCF
|
30-Jun-2020
|
30-Jun-2020
|
|
|
|
|
No
|
|
49
|
Bihar
|
FP/BR/Others/33618/2018
|
|
Reliance Jio Infocomm Limited, Bihar
|
Others
|
Jio Digital Fibre Private Limited
|
0.09453
|
Pending at DFO/DCF
|
26-Mar-2020
|
26-Mar-2020
|
|
|
|
|
No
|
|
50
|
Bihar
|
FP/BR/Others/35236/2018
|
|
Reliance Jio Infocomm Limited, Bihar
|
Others
|
Jio Digital Fibre Private Limited
|
0.618144
|
Pending at DFO/DCF
|
26-Mar-2020
|
26-Mar-2020
|
|
|
|
|
No
|
|