Ministry of Environment,Forest and Climate Change
Government of India
Tamil Nadu
State Forest Department
List of Proposals accorded Stage-II Clearance (Proposals received on or after 15th July 2014)
Help
Using this report, you can view details of proposals (Received on or after 15th July 2014) .Click on   to print
 
Proposal Year :
Region : State :
Category : Status of the Proposal :
Enter value for Search :
Note :-All areas are in Hectares(ha.)
Sno.State NameProposal No.RO/Ministry File NumberProposal NameCategoryUser Agency NameArea (ha.)Proposal StatusImportant DatesAllocation of Fresh forest land (Form-A) Part-IView Report (Part-II to Part-V and Stage-I Clearances)Stage-II Approval on
1 Tamil Nadu FP/TN/Pipeline/111896/2020 TN 018 2021 Laying pipe line from Bhavani river to Forest College Pipeline FOREST COLLEGE AND RESEARCH INSTITUTE, METTUPALAYAM 0.0117 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 Dec 2020
Stage-I Approval on : 06 Sep 2021
Compliance Report Submitted by User Agency on : 07 Apr 2022
06 Jul 2022
2 Tamil Nadu FP/TN/WATER/40316/2019 TN 02 2020 Outlived CWSS - 2017 - 18 - Shifting of 600mm AC pipe with 600mm DI pipe Gravity main from Vanjuvancheri to Oragadam BPT(LS 8100m to LS 12600m) in CWSS to Tambaram - Pallavaram in Kancheepuram Distric Drinking Water TWAD BOARD 0.0295 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Sep 2019
Stage-I Approval on : 28 Sep 2020
Compliance Report Submitted by User Agency on : 30 Nov 2020
15 Jul 2021
3 Tamil Nadu FP/TN/TRANS/7223/2014 4-TNB006/2015-CHN 765kV S/C New Salem - Madhugiri Transmission line Transmission Line POWERGRID CORPORATION OF INDIA LIMITED 3.3472 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Oct 2014
Stage-I Approval on : 08 Feb 2016
Compliance Report Submitted by User Agency on : 20 May 2016
16 Jun 2016
4 Tamil Nadu FP/TN/ROAD/43112/2019 TN 052 2020 Karaikudi - Ramanathapuram Road PIU Karaikudi NHAI 0.03 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Nov 2019
Stage-I Approval on : 16 Aug 2021
Compliance Report Submitted by User Agency on : 24 Jan 2022
06 Apr 2022
5 Tamil Nadu FP/TN/Approach/36237/2018 4-TNB032/2019-CHN Construction and improvement works of steps leading to Mahalingeswarar Temple in Mettupatti RF, Nilakottai TK, Dindigul District Approach Access BLOCK DEVELOPMENT OFFICE 0.1896 APPROVED
Proposal received(at Nodal Officer)electronically on : 29 Sep 2018
Stage-I Approval on : 12 Apr 2019
Compliance Report Submitted by User Agency on : 14 Jun 2019
06 Aug 2019
6 Tamil Nadu FP/TN/WATER/153702/2022 4-TNB103/2023-CHN CWSS to 8 TPs, 2452 Rural habitations in 11 unions with bulk provision to 3 Municipalities in Sivagangai District with river Cauvery as source Drinking Water EE TWAD PROJECT DN KULITHALAI 0.874 APPROVED
Proposal received(at Nodal Officer)electronically on : 29 Mar 2022
Stage-I Approval on : 13 Jun 2023
Compliance Report Submitted by User Agency on : 19 Jun 2023
16 Aug 2023
7 Tamil Nadu FP/TN/WATER/151721/2022 TN 030 2022 Laying of underground water pipe line (914 mm MS) across Thirukalambur R.F. in Pudukottai District under CWSS for Sivagangai District by TWAD Board Project Sub Division, Devakottai. Drinking Water TWAD BOARD PROJECT SUB DIVISION DEVAKOTTAI SIVAGANGAI DISTRICT 0.196 APPROVED
Proposal received(at Nodal Officer)electronically on : 29 Jan 2022
Stage-I Approval on : 05 Apr 2023
Compliance Report Submitted by User Agency on : 21 Aug 2023
07 Nov 2023
8 Tamil Nadu FP/TN/ROAD/37330/2018 4-TNB071/2021-CHN Natham - Thuvarankurichi (NH-785 Extension) Road National Highways Authority of India 3.708 APPROVED
Proposal received(at Nodal Officer)electronically on : 28 Nov 2018
Stage-I Approval on : 20 Apr 2022
Compliance Report Submitted by User Agency on : 18 Aug 2022
21 Sep 2022
9 Tamil Nadu FP/TN/Others/33885/2018 4-TNB089/2022-CHN Laying OFC from Madurai-Natham Main Road to Saranthangi village through forest area Others Jio Digital Fibre Private Limited 0.033 APPROVED
Proposal received(at Nodal Officer)electronically on : 28 May 2018
Stage-I Approval on : 24 Aug 2022
Compliance Report Submitted by User Agency on : 07 Aug 2023
06 Dec 2023
10 Tamil Nadu FP/TN/TRANS/32103/2018 4-TNB051/2020-CHN Providing electricity service for Agricultural purpose in survey field No.103 of Thoppampatti village, Sirumalai North West Slope RF in Sirumalai Range Transmission Line SUPERINTENDING ENGINEER 0.05632 APPROVED
Proposal received(at Nodal Officer)electronically on : 28 Feb 2018
Stage-I Approval on : 25 Feb 2020
Compliance Report Submitted by User Agency on : 01 Feb 2021
16 Jun 2021
11 Tamil Nadu FP/TN/Others/17714/2016 4-TNB018/2018-CHN Laying optical fiber cable through Mudumalai Tiger Reserve, Udhagamandalam. Others RELAINCE JIO INFORCOMM LIMITED 0.71595 APPROVED
Proposal received(at Nodal Officer)electronically on : 28 Apr 2016
Stage-I Approval on : 06 Mar 2019
Compliance Report Submitted by User Agency on : 05 Jul 2019
04 Oct 2019
12 Tamil Nadu FP/TN/WATER/27069/2017 TN090/2018 WATER SUPPLY SCHEME TO USILAMPATTY MUNICIPALITY IN MADURAI DISTRICT Drinking Water TWAD BOARD 0.15 APPROVED
Proposal received(at Nodal Officer)electronically on : 27 Oct 2017
Stage-I Approval on : 06 Jun 2022
Compliance Report Submitted by User Agency on : 08 Sep 2022
06 Jan 2023
13 Tamil Nadu FP/TN/ROAD/8238/2014 4-TNC043/2019-CHN Bangalore-Chennai Expressway Road NATIONAL HIGHWAY AUTHORITY OF INDIA PIU KRISHNAGIRI 5.42 APPROVED
Proposal received(at Nodal Officer)electronically on : 27 Nov 2014
Stage-I Approval on : 13 May 2021
Compliance Report Submitted by User Agency on : 17 Aug 2022
31 Oct 2022
14 Tamil Nadu FP/TN/WATER/32782/2018 TN 089 2018 Laying Pipeline from CWSS to Manmangalam and 71 other Habitations in Karur District Drinking Water EE TWAD RWS KARUR 0.0512 IN-PRINCIPLE
Proposal received(at Nodal Officer)electronically on : 27 Mar 2018
Stage-I Approval on : 23 Oct 2019
Compliance Report Submitted by User Agency on : 11 Dec 2023
15 Tamil Nadu FP/TN/Others/41287/2019 4-TNB079/2022-CHN Laying of OFC along the road side across the Paramasivan Kovil Karadu RL and Valkaradu RF in Theni District Others Jio Digital Fibre Private Limited 0.022 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 27 Jul 2019
Stage-I Approval on : 24 Feb 2022
Compliance Report Submitted by User Agency on : 12 May 2023
16 Tamil Nadu FP/TN/ROAD/152701/2022 TN 021 2022 WIDENING AND IMPROVEMENTS OF POLUR JAMUNAMARATHUR ALANGAYAM VANIYAMBADI ROAD AT Km.58/6 - 61/2 WITH PAVED SHOULDER SH 215 Road KARUPPUCHTTY LOGANATHAN 0.845 APPROVED
Proposal received(at Nodal Officer)electronically on : 27 Feb 2022
Stage-I Approval on : 13 Jun 2022
Compliance Report Submitted by User Agency on : 07 Oct 2022
14 Nov 2022
17 Tamil Nadu FP/TN/WATER/41577/2019 TN 099 2019 CWSS to Reddiarpatti and other 63 rural habitatons in Palayamkottai Union in Tirunelveli District Drinking Water TWAD BOARD 0.1196 APPROVED
Proposal received(at Nodal Officer)electronically on : 27 Aug 2019
Stage-I Approval on : 21 Jul 2020
Compliance Report Submitted by User Agency on : 04 Sep 2020
21 Nov 2020
18 Tamil Nadu FP/TN/ROAD/29470/2017 4-TNB077/2022-CHN MADURAI - NATHAM Road NATIONAL HIGHWAY AUTHORITY OF INDIA 2.3824 APPROVED
Proposal received(at Nodal Officer)electronically on : 26 Sep 2017
Stage-I Approval on : 15 Nov 2022
Compliance Report Submitted by User Agency on : 01 Feb 2023
28 Apr 2023
19 Tamil Nadu FP/TN/WATER/142613/2021 TN 038 2021 Creation of an Additional Source with Pump House to Combined Water Supply Scheme to 893 Habitations in Nagapattinam District - For Ayyanallur CW Drinking Water EE MAINTENANCE NAGAPATTINAM 0.1925 APPROVED
Proposal received(at Nodal Officer)electronically on : 26 May 2021
Stage-I Approval on : 24 Dec 2021
Compliance Report Submitted by User Agency on : 16 Apr 2022
24 Aug 2022
20 Tamil Nadu FP/TN/WATER/49039/2020 TN 053 2020 Providing 0.70 mld Water Supply To TNSCB Housing for All (HFA) Project Area for 1920 Tenements at Narimadu of Pudukkottai District Drinking Water TAMILNADU WATER SUPPLY AND DRAINAGE BOARD 0.12 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 26 Aug 2020
Stage-I Approval on : 05 Feb 2021
Compliance Report Submitted by User Agency on : 14 Mar 2022
21 Tamil Nadu FP/TN/WATER/142564/2021 TN 039 2021 Creation of an Additional Source with Pump House to Combined Water Supply Scheme to 893 Habitations in Nagapattinam District - For Kadabamkudi CW Drinking Water EE MAINTENANCE NAGAPATTINAM 0.0405 APPROVED
Proposal received(at Nodal Officer)electronically on : 25 May 2021
Stage-I Approval on : 29 Oct 2021
Compliance Report Submitted by User Agency on : 29 Dec 2021
24 Mar 2022
22 Tamil Nadu FP/TN/ROAD/148726/2021 TN 013 2022 Relaying and Periodical Maintenance of Mailai - Rayamangalam road Km. 0/910-1/610 Road DE H RR CHENGALPET 0.49 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 24 Oct 2021
Stage-I Approval on : 20 Jun 2022
Compliance Report Submitted by User Agency on : 15 Nov 2023
23 Tamil Nadu FP/TN/Pipeline/34620/2018 4-TNB037/2019-CHN Conveyor and Pipeline crossing Korampallam Canal Pipeline SEPC Power Private Limited 0.17688 APPROVED
Proposal received(at Nodal Officer)electronically on : 24 Jul 2018
Stage-I Approval on : 28 May 2019
Compliance Report Submitted by User Agency on : 03 Jul 2019
23 Aug 2019
24 Tamil Nadu FP/TN/ROAD/9818/2015 4-TNB011/2017-CHN Four laning of NH-47B Nagercoil to Kavalkinaru Road NATIONAL HIGHWAY AUTHORITY OF INDIA TIRUNELVELI 0.88 APPROVED
Proposal received(at Nodal Officer)electronically on : 24 Jul 2015
Stage-I Approval on : 09 May 2018
Compliance Report Submitted by User Agency on : 28 Sep 2018
30 Jul 2021
25 Tamil Nadu FP/TN/ROAD/151511/2022 4-TNB094/2022-CHN Widening and Improvement of existing carriage way to 4-laning of Poondiyankuppam-Sathanathapuram section of NH-45A in the state of TN under NHDP Phase IV (Pkg-3) Road NATIONAL HIGHWAY AUTHORITY 2.5553 APPROVED
Proposal received(at Nodal Officer)electronically on : 24 Jan 2022
Stage-I Approval on : 22 Sep 2022
Compliance Report Submitted by User Agency on : 24 Jan 2023
03 Mar 2023
26 Tamil Nadu FP/TN/VELEC/36455/2018 TN 09 2020 Laying 11KV Transmission Line along right of way in Veppanapalli Reserved Forest for the Benefit of Patta Holders (Enclosure in RF) of Krishnagiri Division Village Electricity EXECUTIVE ENGINEER TANGEDCO KRISHNAGIRI 0.81 APPROVED
Proposal received(at Nodal Officer)electronically on : 23 Oct 2018
Stage-I Approval on : 21 Jan 2022
Compliance Report Submitted by User Agency on : 27 May 2022
26 Aug 2022
27 Tamil Nadu FP/TN/WATER/143706/2021 TN 049 2021 CWSS to Tittakudi, Pennadam, Mangalampettai, Gangaikondan, Vadalur and Kurinjipadi TP and 625 Rural Habitation in Virudhachalam , NAllur, Mangalore union n Cuddalore District with NLC mine water as so Drinking Water TWAD BOARD PROJECT CUDDALORE 0.12 APPROVED
Proposal received(at Nodal Officer)electronically on : 23 Jun 2021
Stage-I Approval on : 07 Mar 2022
Compliance Report Submitted by User Agency on : 17 Nov 2022
17 Mar 2023
28 Tamil Nadu FP/TN/ROAD/44088/2020 TN 057 2020 Construction of retaining wall at various places of Polur - Jamunamarathur - Alangayam - Vaniyambadi road Km. 37/2-50/8 Road DE H TIRUVANNAMALAI 0.54 APPROVED
Proposal received(at Nodal Officer)electronically on : 23 Jan 2020
Stage-I Approval on : 17 Nov 2021
Compliance Report Submitted by User Agency on : 09 Feb 2022
25 Apr 2022
29 Tamil Nadu FP/TN/ROAD/44090/2020 TN 047 2020 GNT road to New Erumaivettipalayam Km. 2/350 - 4/150 Road DE H TIRUVALLUR 0.93 APPROVED
Proposal received(at Nodal Officer)electronically on : 23 Jan 2020
Stage-I Approval on : 09 Feb 2022
Compliance Report Submitted by User Agency on : 03 Jun 2022
22 Aug 2022
30 Tamil Nadu FP/TN/ROAD/44087/2020 TN 056 2020 Construction of Retaining wall in various places of Polur - Jamunamarathur - Alangayam - Vaniyambadi road Km. 33/2-36/10 Road DE H TIRUVANNAMALAI 0.42 APPROVED
Proposal received(at Nodal Officer)electronically on : 23 Jan 2020
Stage-I Approval on : 20 Sep 2021
Compliance Report Submitted by User Agency on : 28 Dec 2021
25 Apr 2022
31 Tamil Nadu FP/TN/Others/38131/2019 4-TNB073/2021-CHN Laying of OFC along road side of Andipatti - Usilampatti road section (Andipatti Ghat) in Madurai - Kochin NH49 via Sasthakovil, Thimmarasanaickanur village in across Andipati South R.F. in Andipatti Others Jio Digital Fibre Private Limited 0.039 APPROVED
Proposal received(at Nodal Officer)electronically on : 23 Jan 2019
Stage-I Approval on : 31 Aug 2021
Compliance Report Submitted by User Agency on : 03 Jan 2022
31 May 2022
32 Tamil Nadu FP/TN/ROAD/29107/2017 TN 071 2019 Proposal for Formation of Road Road ASSISTANT ENGINEER RURAL DEVELOPMENT PANCHAYAT UNION KOLLIDAM 0.48 IN-PRINCIPLE
Proposal received(at Nodal Officer)electronically on : 23 Apr 2018
Stage-I Approval on : 29 Jan 2021
Compliance Report Submitted by User Agency on : 14 Mar 2024
33 Tamil Nadu FP/TN/TRANS/30358/2017 4-TNB063/2020-CHN conversion of existing 11 kv line into 33 kv line for establishement of 33/11 kv new sub station Transmission Line TANGEDCO PUDURNADU 4.47 APPROVED
Proposal received(at Nodal Officer)electronically on : 22 Nov 2017
Stage-I Approval on : 13 May 2021
Compliance Report Submitted by User Agency on : 08 Apr 2022
24 Jun 2022
34 Tamil Nadu FP/TN/ROAD/44086/2020 TN 048 2020 Construction of retaining wall in various places of Polur - Jamunamarathur - Alangayam - Vaniyambadi road Km.18/4-26/10 Road DE H TIRUVANNAMALAI 0.32 APPROVED
Proposal received(at Nodal Officer)electronically on : 22 Jan 2020
Stage-I Approval on : 16 Aug 2021
Compliance Report Submitted by User Agency on : 04 Dec 2021
28 Feb 2022
35 Tamil Nadu FP/TN/ROAD/44115/2020 TN 049 2020 Construction of retaining wall in various places of Polur - Jamunamarathur - Alangayam - Vaniyambadi road Km. 27/4 - 32/10 (SH215) Road DE H TIRUVANNAMALAI 0.48 APPROVED
Proposal received(at Nodal Officer)electronically on : 22 Jan 2020
Stage-I Approval on : 27 Aug 2021
Compliance Report Submitted by User Agency on : 04 Dec 2021
02 Mar 2022
36 Tamil Nadu FP/TN/ROAD/21074/2016 4-TNB019/2018-CHN Upgradation of the road from erumapalayam panangadu to jarugumalai Road Block Developement Officer 4.8 APPROVED
Proposal received(at Nodal Officer)electronically on : 22 Aug 2016
Stage-I Approval on : 18 Apr 2018
Compliance Report Submitted by User Agency on : 08 Oct 2018
20 Nov 2018
37 Tamil Nadu FP/TN/ROAD/21076/2016 4-TNB026/2018-CHN Upgradation of the road from kannamoochi pirivu to Kemmampatti Road BLOCK DEVELOPMENT OFFICER 4.2 APPROVED
Proposal received(at Nodal Officer)electronically on : 22 Aug 2016
Stage-I Approval on : 22 Sep 2021
Compliance Report Submitted by User Agency on : 26 Dec 2022
03 Mar 2023
38 Tamil Nadu FP/TN/Others/20994/2016 4-TNB030/2019-CHN TANTEA SALES PROMOTION Others THE TAMILNADU TEA PLANTATION CORPORATION LIMITED 0.0048768 APPROVED
Proposal received(at Nodal Officer)electronically on : 21 Nov 2016
Stage-I Approval on : 25 Mar 2019
Compliance Report Submitted by User Agency on : 28 Sep 2020
18 Feb 2022
39 Tamil Nadu FP/TN/TRANS/23761/2017 4-TNC044/2019-CHN Erection of 230 KV DC Transmission line from Cuddalore to Veerapuram (S.P.Koil) via Neyveli. Transmission Line Tamil Nadu Generation and Distribution Corporation 6.026 APPROVED
Proposal received(at Nodal Officer)electronically on : 21 Mar 2017
Stage-I Approval on : 02 Dec 2019
Compliance Report Submitted by User Agency on : 06 Mar 2020
03 Aug 2020
40 Tamil Nadu FP/TN/RAIL/141594/2021 4-TNB080/2022-CHN CMRL Phase II C5 - 06 Madhavaram to Sholinganallur- Nanmangalam Forest land required for Elevated metro station Railway CMRL CHENNAI 1.569 APPROVED
Proposal received(at Nodal Officer)electronically on : 21 Apr 2021
Stage-I Approval on : 13 Jul 2022
Compliance Report Submitted by User Agency on : 07 Feb 2023
02 Mar 2023
41 Tamil Nadu FP/TN/TRANS/25759/2017 4-TNB022/2018-CHN Construction of 800kV HVDC Transmission line from Raigarh to Pugalur Transmission Line POWERGRID CORPORATION OF INDIA LIMITED 9.12 APPROVED
Proposal received(at Nodal Officer)electronically on : 20 Apr 2017
Stage-I Approval on : 07 Jun 2018
Compliance Report Submitted by User Agency on : 09 Jul 2019
30 Jan 2020
42 Tamil Nadu FP/TN/ROAD/148552/2021 11932/FR 10/2022-1 Upgradation of Mahaniyam to Padappai road Km. 0/188-1/200 of Mahaniyam Reserve Forest Road DE H RR CHENGALPET 0.678 APPROVED
Proposal received(at Nodal Officer)electronically on : 19 Oct 2021
Stage-I Approval on : 10 Aug 2022
Compliance Report Submitted by User Agency on : 15 Nov 2023
27 Feb 2024
43 Tamil Nadu FP/TN/SubStation/149440/2021 4-TNB113/2023-CHN Improvement of 230kV Substation into 400kV Substation at Parali. Sub Station TRANSMISSION LINE CONSTRUCTION(TANTRANSCO) 4.85 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 19 Nov 2021
Stage-I Approval on : 24 Nov 2023
Compliance Report Submitted by User Agency on : 20 Mar 2024
44 Tamil Nadu FP/TN/Others/38130/2019 4-TNB088/ 2022-CHN Laying of OFC along road side of Vadakkanandhal - Thumbal road section via Parigam, Kondiyanantham across Parigam RF in Villupuram District. Others Jio Digital Fibre Private Limited 0.54 APPROVED
Proposal received(at Nodal Officer)electronically on : 19 Jan 2019
Stage-I Approval on : 12 Jul 2022
Compliance Report Submitted by User Agency on : 21 Oct 2022
16 Dec 2022
45 Tamil Nadu FP/TN/ROAD/32148/2018 4-TNB091/CHN-2022 Madurai Ring Road Road NATIONAL HIGHWAY AUTHORITY OF INDIA 1.28 APPROVED
Proposal received(at Nodal Officer)electronically on : 19 Feb 2018
Stage-I Approval on : 28 Mar 2023
Compliance Report Submitted by User Agency on : 22 May 2023
16 Aug 2023
46 Tamil Nadu FP/TN/Pipeline/114004/2020 TN 017 2021 CWSS to 138 Rural habitations in Thottiyam Union of Trichy District Pipeline ASSISTANT EXECUTIVE ENGINEER, TWAD BOARD, URBAN DIVISION, TRICHY 0.127 APPROVED
Proposal received(at Nodal Officer)electronically on : 19 Dec 2020
Stage-I Approval on : 17 Nov 2021
Compliance Report Submitted by User Agency on : 20 Jan 2022
11 Mar 2022
47 Tamil Nadu FP/TN/Others/42494/2019 4-TNC050/2019-CHN Establishment of New Government Medical College Others HEALTH AND FAMILY WELFARE DEPARTMENT 10.12 APPROVED
Proposal received(at Nodal Officer)electronically on : 18 Oct 2019
Stage-I Approval on : 22 Apr 2020
Compliance Report Submitted by User Agency on : 08 May 2020
27 May 2020
48 Tamil Nadu FP/TN/Others/24406/2017 4-TNB095/2022-CHN Laying Optical Fiber Cable from Theppakkadu to Moyar via Masinagudi in Mudumalai Tiger Reserve Others Jio Digital Fibre Private Limited 0.426 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 18 Feb 2017
Stage-I Approval on : 31 Oct 2022
Compliance Report Submitted by User Agency on : 19 Sep 2023
49 Tamil Nadu FP/TN/Others/38127/2019 4-TNB104/2023-CHN Laying of OFC along road side of Rishivandiyam to Poondi (Eraiyur) and Adhiyur to Eraiyur road sections road section in Rishivandiyam - Nemili Road across Seedevi R.F. in Sankarapuram Taluk of Villupu Others Jio Digital Fibre Private Limited 0.045 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 17 Jan 2019
Stage-I Approval on : 31 Jul 2023
Compliance Report Submitted by User Agency on : 27 Dec 2023
50 Tamil Nadu FP/TN/Others/29282/2017 4-TNB083/2022-CHN Laying OFC for Coimbatore Goundampalayam to Udagamandalam route Others Jio Digital Fibre Private Limited 0.9 APPROVED
Proposal received(at Nodal Officer)electronically on : 16 Sep 2017
Stage-I Approval on : 11 Mar 2022
Compliance Report Submitted by User Agency on : 24 Aug 2022
29 Nov 2022