Sno. | State Name | Proposal No. | RO/Ministry File Number | Proposal Name | Category | User Agency Name | Area (ha.) | Proposal Status | Important Dates | Allocation of Fresh forest land (Form-A) Part-I | View Report (Part-II to Part-V and Stage-I Clearances) | Stage-II Approval on |
1
|
Uttarakhand
|
FP/UK/ROAD/8880/2014
|
1(94)/15
|
Chinyalisaur to Kot-Bagi motor Road from Km. 7.00 to Km. 10.00 till kot village
|
Road
|
PMGSY ID UTTARKASHI
|
0.262
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
26 Dec 2014
|
Stage-I Approval on
|
:
|
17 Apr 2015
|
Compliance Report Submitted by User Agency on
|
:
|
23 Aug 2023
|
|
|
|
|
2
|
Uttarakhand
|
FP/UK/ROAD/8571/2014
|
1(96)/15
|
construction of chinyalisaur jogath motor road to Bagodi motor Road
|
Road
|
PMGSY ID UTTARKASHI
|
1.319
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
16 Dec 2014
|
Stage-I Approval on
|
:
|
21 Apr 2015
|
Compliance Report Submitted by User Agency on
|
:
|
26 Apr 2022
|
|
|
|
|
3
|
Uttarakhand
|
FP/UK/ROAD/9574/2015
|
1(114)/15
|
Nakuri Singot Motor Road To Paab Motor Road
|
Road
|
PMGSY ID UTTARKASHI
|
1.092
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
23 Jan 2015
|
Stage-I Approval on
|
:
|
02 May 2015
|
Compliance Report Submitted by User Agency on
|
:
|
12 Jul 2023
|
|
|
|
|
4
|
Uttarakhand
|
FP/UK/ROAD/10540/2015
|
8B/UCP/06/65/2015-FC
|
Const. of Remaining part Jasoli-Kanda Motor Road under State Sector
|
Road
|
PUBLIC WORK DEPARTMENT
|
0.665
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
27 Feb 2015
|
Stage-I Approval on
|
:
|
27 Oct 2015
|
Compliance Report Submitted by User Agency on
|
:
|
20 Jun 2024
|
|
|
|
|
5
|
Uttarakhand
|
FP/UK/ROAD/10294/2015
|
1(490)/2015
|
Manaldura to Nanankoti Motor Road
|
Road
|
PUBLIC WORKS DEPARTMENT
|
2.7
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
23 Feb 2015
|
Stage-I Approval on
|
:
|
03 Nov 2015
|
Compliance Report Submitted by User Agency on
|
:
|
29 Aug 2024
|
|
|
|
|
6
|
Uttarakhand
|
FP/UK/ROAD/10924/2015
|
8B/UCP/06/105/2015-FC
|
Construction of Motor Road from Km. 1 of Mahavidhyalaya Talwari to Government Inter Collage Talwari.
|
Road
|
PUBLIC WORK DEPARTMENT
|
0.708
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
15 Mar 2015
|
Stage-I Approval on
|
:
|
22 Feb 2016
|
Compliance Report Submitted by User Agency on
|
:
|
02 May 2024
|
|
|
|
|
7
|
Uttarakhand
|
FP/UK/ROAD/10168/2015
|
8B/UCP/06/170/2015
|
Sanglakoti - Bhedgoun - Gudinda Motor Road upto Tilkholi - Jajedi
|
Road
|
PUBLIC WORK DEPARTMENT
|
1.796
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
16 Feb 2015
|
Stage-I Approval on
|
:
|
21 Jun 2016
|
Compliance Report Submitted by User Agency on
|
:
|
26 Jun 2024
|
|
|
|
|
8
|
Uttarakhand
|
FP/UK/Others/13110/2015
|
1(118)/2016
|
THANA GHANSALI
|
Others
|
S.P OFFICE TEHRI
|
0.2
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
19 Jun 2015
|
Stage-I Approval on
|
:
|
20 Jul 2016
|
Compliance Report Submitted by User Agency on
|
:
|
13 Mar 2024
|
|
|
|
|
9
|
Uttarakhand
|
FP/UK/ROAD/14471/2015
|
8B/UCP/06/6/2016/FC/914
|
Basola-Bagdiyalgaoun-samaya motor road
|
Road
|
PWD
|
3.132
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
05 Aug 2015
|
Stage-I Approval on
|
:
|
06 Sep 2016
|
Compliance Report Submitted by User Agency on
|
:
|
15 Jul 2024
|
|
|
|
|
10
|
Uttarakhand
|
FP/UK/ROAD/18222/2016
|
8B/UCP/06/73/2016/FC/926
|
Construction of Maalai to Bhatkwali Motor Road under PMGSY
|
Road
|
RES PMGSY KARANPERAYAG
|
3.376
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
01 Mar 2016
|
Stage-I Approval on
|
:
|
08 Sep 2016
|
Compliance Report Submitted by User Agency on
|
:
|
02 Mar 2024
|
|
|
|
|
11
|
Uttarakhand
|
FP/UK/ROAD/8986/2014
|
8B/UCP/06/118/2015-FC/934
|
Extension of Kunnigard Hiruli Bazar Motor Road Upto Rampur Chaukhutiya
|
Road
|
PUBLIC WORK DEPARTMENT
|
1.35
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 Dec 2014
|
Stage-I Approval on
|
:
|
09 Sep 2016
|
Compliance Report Submitted by User Agency on
|
:
|
20 May 2024
|
|
|
|
|
12
|
Uttarakhand
|
FP/UK/ROAD/8483/2014
|
8B/UCP/06/184/2015/ FC
|
Vinyak-Rikhar Kotiyag Motor Road
|
Road
|
PUBLIC WORK DEPARTMENT
|
2.7
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
08 Dec 2014
|
Stage-I Approval on
|
:
|
18 Oct 2016
|
Compliance Report Submitted by User Agency on
|
:
|
20 May 2024
|
|
|
|
|
13
|
Uttarakhand
|
FP/UK/ROAD/11292/2015
|
8B/UCP/06/222/2015
|
Construction of Farsali Palli To Kharkanatoli
|
Road
|
PMGSY
|
8.931
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
26 Mar 2015
|
Stage-I Approval on
|
:
|
14 Mar 2017
|
Compliance Report Submitted by User Agency on
|
:
|
07 Sep 2024
|
|
|
|
|
14
|
Uttarakhand
|
FP/UK/ROAD/9364/2015
|
8B/UCP/06/112/2015/FC
|
Construction of BAYELA NAD Motor Road
|
Road
|
PUBLIC WORK DEPARTMENT
|
4.417
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
16 Jan 2015
|
Stage-I Approval on
|
:
|
07 Sep 2017
|
Compliance Report Submitted by User Agency on
|
:
|
28 Dec 2023
|
|
|
|
|
15
|
Uttarakhand
|
FP/UK/ROAD/9783/2015
|
8B/UCP/06/119/2016/FC
|
Construction of Koti Band to Ghathora Motor Road and 2 R.C.C. Bridge in district Chamoli
|
Road
|
PUBLIC WORKS DEPARTMENT
|
1.099
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
31 Jan 2015
|
Stage-I Approval on
|
:
|
07 Sep 2017
|
Compliance Report Submitted by User Agency on
|
:
|
08 May 2024
|
|
|
|
|
16
|
Uttarakhand
|
FP/UK/ROAD/13374/2015
|
8B/UCp/06/226/2015/FC
|
Construction of Kapkot Karmi Motor Road to Toli Motor Road
|
Road
|
PMGSY
|
4.734
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
20 Jun 2015
|
Stage-I Approval on
|
:
|
22 Sep 2017
|
Compliance Report Submitted by User Agency on
|
:
|
13 Aug 2024
|
|
|
|
|
17
|
Uttarakhand
|
FP/UK/ROAD/12466/2015
|
8B/UCP/06/101/2015/FC
|
Wheel Kulwan to Juna State Missing link motor road in District Bageshwar
|
Road
|
PROVINCIAL DIVISION PWD BAGESHWAR
|
0.91
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
12 May 2015
|
Stage-I Approval on
|
:
|
22 Sep 2017
|
Compliance Report Submitted by User Agency on
|
:
|
05 Aug 2024
|
|
|
|
|
18
|
Uttarakhand
|
FP/UK/ROAD/10583/2015
|
8B/UCP/06/202/2015
|
construction of new motor road of name from baula to srikot
|
Road
|
PUBLIC WORKS DEPARTMENT GOPESHWAR UTTARAKHAND
|
0.32
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
01 Mar 2015
|
Stage-I Approval on
|
:
|
11 Oct 2017
|
Compliance Report Submitted by User Agency on
|
:
|
28 Jun 2024
|
|
|
|
|
19
|
Uttarakhand
|
FP/UK/ROAD/8636/2014
|
8B/UCP/06/08/2015/FC
|
BAURPUL_HANUMANDIR_CHHOTIHALDWANI_GANESH JOSHI ke khet tak Marg.
|
Road
|
EXECUTIVE ENGINEER CD PWD HALDWANI
|
0.8888
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
16 Dec 2014
|
Stage-I Approval on
|
:
|
12 Jan 2018
|
Compliance Report Submitted by User Agency on
|
:
|
19 Jul 2024
|
|
|
|
|
20
|
Uttarakhand
|
FP/UK/ROAD/10762/2015
|
8B/UCP/06/40/2016
|
Construction of Bungidhar Mehalchauri Bachhuwaban MR, km-25 to Syuni Talli Motor Road under PMGSY
|
Road
|
RES PMGSY KARANPERAYAG
|
2.73
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
01 May 2015
|
Stage-I Approval on
|
:
|
22 Jan 2018
|
Compliance Report Submitted by User Agency on
|
:
|
25 May 2024
|
|
|
|
|
21
|
Uttarakhand
|
FP/UK/ROAD/16103/2015
|
8B/UCP/06/91/2016/FC
|
Extension of Ganiadoli Tana Vishalkote motor road via Taraswar, Kothiya and Doni.
|
Road
|
EXECUTIVE ENGINEER
|
0.9
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
11 Feb 2016
|
Stage-I Approval on
|
:
|
22 Jan 2018
|
Compliance Report Submitted by User Agency on
|
:
|
01 May 2024
|
|
|
|
|
22
|
Uttarakhand
|
FP/UK/ROAD/28731/2017
|
1(26)/2018
|
new construction of Harethi-Jineth to Patara-Syalna motor road.
|
Road
|
EXECUTIVE ENGINEER PD PWD UTTARKASHI
|
0.874
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
26 Aug 2017
|
Stage-I Approval on
|
:
|
23 Feb 2018
|
Compliance Report Submitted by User Agency on
|
:
|
20 Jul 2024
|
|
|
|
|
23
|
Uttarakhand
|
FP/UK/ROAD/11434/2015
|
8B/UCP/06/262/2015/FC
|
Construction of Banlekh Maudiyar Gwatoli Motor road (12.00 km) under SCP
|
Road
|
PWDKAPKOT
|
4.41
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
01 Apr 2015
|
Stage-I Approval on
|
:
|
02 Aug 2018
|
Compliance Report Submitted by User Agency on
|
:
|
07 May 2024
|
|
|
|
|
24
|
Uttarakhand
|
FP/UK/ROAD/20189/2016
|
8B/UCP/06/15/2018
|
Construction of Sarkot-Devsari Motor Road.
|
Road
|
PUBLIC WORK DEPARTMENT
|
5.964
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
24 Jun 2016
|
Stage-I Approval on
|
:
|
21 Aug 2018
|
Compliance Report Submitted by User Agency on
|
:
|
29 Sep 2023
|
|
|
|
|
25
|
Uttarakhand
|
FP/UK/ROAD/9917/2015
|
8B/UCP/06/277/2015/FC
|
Construction of Leti-Riyasi to Tarkuli M/R under PMGSY.
|
Road
|
PMGSY
|
4.98
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
06 Feb 2015
|
Stage-I Approval on
|
:
|
03 Oct 2018
|
Compliance Report Submitted by User Agency on
|
:
|
01 Aug 2024
|
|
|
|
|
26
|
Uttarakhand
|
FP/UK/ROAD/10925/2015
|
8B/UCP/06/229/2015/FC
|
sonala kandara to kanchula gain M/R
|
Road
|
PUBLIC WORKS DEPARTMENT GOPESHWAR UTTARAKHAND
|
4
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
15 Mar 2015
|
Stage-I Approval on
|
:
|
12 Oct 2018
|
Compliance Report Submitted by User Agency on
|
:
|
29 Jun 2024
|
|
|
|
|
27
|
Uttarakhand
|
FP/UK/ROAD/13205/2015
|
8B/UCP/06/292/2015/FC
|
Sauda Dwara to Chamoli Chawk Motar Road
|
Road
|
PUBLIC WORK DEPARTMENT
|
3.01
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
12 Jun 2015
|
Stage-I Approval on
|
:
|
29 Oct 2018
|
Compliance Report Submitted by User Agency on
|
:
|
26 Apr 2024
|
|
|
|
|
28
|
Uttarakhand
|
FP/UK/ROAD/10146/2015
|
8B/UCP/06/263/2015/FC
|
Bhandeli Bend (Thalisain) To Jakhola Motor Road, KM 9.500 Under PMGSY
|
Road
|
PMGSY BAIJRO
|
4.75
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
15 Feb 2015
|
Stage-I Approval on
|
:
|
07 Jan 2019
|
Compliance Report Submitted by User Agency on
|
:
|
11 Apr 2024
|
|
|
|
|
29
|
Uttarakhand
|
FP/UK/ROAD/20937/2016
|
1(225)
|
Construction of Road in village Rainapur Girdhari Lal Farm to Turanmajra in District Dehradun.
|
Road
|
PUBLIC WORK DEPARTMENT
|
0.6
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
28 Jul 2018
|
Stage-I Approval on
|
:
|
02 Jan 2019
|
Compliance Report Submitted by User Agency on
|
:
|
20 Jun 2024
|
|
|
|
|
30
|
Uttarakhand
|
FP/UK/ROAD/12309/2015
|
8B/UCP/06/224/2015/FC
|
DHANKRI KHAL TOK TWO CHOKI KHAL VIA KASANA VICHALA M/R
|
Road
|
PWD
|
1.08
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 Apr 2015
|
Stage-I Approval on
|
:
|
21 Jan 2019
|
Compliance Report Submitted by User Agency on
|
:
|
14 May 2024
|
|
|
|
|
31
|
Uttarakhand
|
FP/UK/ROAD/16778/2015
|
8B/UCP/06/13/2018/FC
|
Devinagar (Dhampur)-Tusrera-Thanga motor road in District-Bageshwar
|
Road
|
PROVINCIAL DIVISION PWD BAGESHWAR
|
4.4905
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
02 Dec 2015
|
Stage-I Approval on
|
:
|
18 Feb 2019
|
Compliance Report Submitted by User Agency on
|
:
|
02 Aug 2024
|
|
|
|
|
32
|
Uttarakhand
|
FP/UK/ROAD/27734/2017
|
8B/UCP/06/54/2019/FC
|
Construction of Tharali to Paingarh Motor Road under PMGSY.
|
Road
|
RES PMGSY KARANPERAYAG
|
4.812
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
07 Feb 2019
|
Stage-I Approval on
|
:
|
02 Jul 2019
|
Compliance Report Submitted by User Agency on
|
:
|
17 Feb 2024
|
|
|
|
|
33
|
Uttarakhand
|
FP/UK/ROAD/27732/2017
|
8B/UCP/06/64/2019/FC
|
Construction of Tharali Kurar Motor Road, km-15 to Gummar Lagga Gerur Link Motor Road under PMGSY in phase-XVI
|
Road
|
RES PMGSY KARANPERAYAG
|
1.825
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
18 Dec 2018
|
Stage-I Approval on
|
:
|
17 Dec 2019
|
Compliance Report Submitted by User Agency on
|
:
|
12 Sep 2024
|
|
|
|
|
34
|
Uttarakhand
|
FP/UK/ROAD/28915/2017
|
8B/UCP/06/114/2018/FC
|
Bageshwar Kapkot Tejam MR Km 57 to Badhi Panyali MR
|
Road
|
PMGSY
|
3.42
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
27 Aug 2017
|
Stage-I Approval on
|
:
|
09 Jun 2020
|
Compliance Report Submitted by User Agency on
|
:
|
25 Sep 2024
|
|
|
|
|
35
|
Uttarakhand
|
FP/UK/ROAD/38079/2019
|
8B/UCP/06/111/2019/FC
|
Construction of Dhurmakudi km.2.00 to Mokhmalla Motor Road
|
Road
|
PMGSY
|
3.275
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
18 Feb 2019
|
Stage-I Approval on
|
:
|
07 Aug 2020
|
Compliance Report Submitted by User Agency on
|
:
|
05 Oct 2024
|
|
|
|
|
36
|
Uttarakhand
|
FP/UK/ROAD/41895/2019
|
1(116)/2020
|
Construction of Chopta to Dadugad Motor Road.
|
Road
|
PUBLIC WORK DEPARTMENT
|
0.404
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
05 Sep 2019
|
Stage-I Approval on
|
:
|
02 Sep 2020
|
Compliance Report Submitted by User Agency on
|
:
|
12 Jul 2024
|
|
|
|
|
37
|
Uttarakhand
|
FP/UK/ROAD/15129/2015
|
8B/UCP/06/202/2016/FC
|
Jamrani bend to belwal gaon motor road and 18 mtr span R.C.C Motor Bridge
|
Road
|
CONSTRUCTION DIVISION PWD ALMORA
|
0.972
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
26 Nov 2015
|
Stage-I Approval on
|
:
|
10 Sep 2020
|
Compliance Report Submitted by User Agency on
|
:
|
23 Jul 2024
|
|
|
|
|
38
|
Uttarakhand
|
FP/UK/ROAD/45667/2020
|
8B/UCP/06/101/2020/FC
|
Kalimati Chittor Ghaishen to Upper talai
|
Road
|
PUBLIC WORK DEPARTMENT
|
1.5225
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
02 Jun 2020
|
Stage-I Approval on
|
:
|
30 Sep 2020
|
Compliance Report Submitted by User Agency on
|
:
|
05 Apr 2024
|
|
|
|
|
39
|
Uttarakhand
|
FP/UK/ROAD/38048/2019
|
8B/UCP/06/42/2020/FC
|
C/o Naugaon to Kanarichhina Motor road distt almora
|
Road
|
CONSTRUCTION DIVISION PWD ALMORA
|
1.377
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
04 Jan 2019
|
Stage-I Approval on
|
:
|
30 Sep 2020
|
Compliance Report Submitted by User Agency on
|
:
|
23 Jul 2024
|
|
|
|
|
40
|
Uttarakhand
|
FP/UK/ROAD/34286/2018
|
8B/UCP/06/31/2020/FC
|
Gangani To Bhangeli Motor Road.
|
Road
|
PMGSY ID UTTARKASHI
|
1.316
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
20 Jun 2018
|
Stage-I Approval on
|
:
|
09 Oct 2020
|
Compliance Report Submitted by User Agency on
|
:
|
27 Aug 2024
|
|
|
|
|
41
|
Uttarakhand
|
FP/UK/ROAD/43073/2019
|
1(128)/2020
|
Dhundsir Shivalya Link Motor road
|
Road
|
PWD
|
0.566
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
07 Dec 2019
|
Stage-I Approval on
|
:
|
13 Oct 2020
|
Compliance Report Submitted by User Agency on
|
:
|
03 May 2023
|
|
|
|
|
42
|
Uttarakhand
|
FP/UK/ROAD/39862/2019
|
1(150)/2020
|
Construction of Gwaldam to Center School Motor Road.
|
Road
|
PUBLIC WORK DEPARTMENT
|
0.981
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
15 Apr 2019
|
Stage-I Approval on
|
:
|
13 Oct 2020
|
Compliance Report Submitted by User Agency on
|
:
|
18 Jul 2024
|
|
|
|
|
43
|
Uttarakhand
|
FP/UK/ROAD/18882/2016
|
1(153)/2020
|
Timiltona Aarusari Virot Bhemitola Talayi Motor Road.
|
Road
|
EXECUTIVE ENGINEER
|
0.945
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
02 May 2016
|
Stage-I Approval on
|
:
|
22 Dec 2020
|
Compliance Report Submitted by User Agency on
|
:
|
19 Jan 2024
|
|
|
|
|
44
|
Uttarakhand
|
FP/UK/ROAD/50755/2020
|
1(216)/2020
|
Gaumukh to Village Dobh (Patiyon) Motor road
|
Road
|
PWD
|
0.095
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
22 Oct 2020
|
Stage-I Approval on
|
:
|
31 Jan 2021
|
Compliance Report Submitted by User Agency on
|
:
|
21 Dec 2023
|
|
|
|
|
45
|
Uttarakhand
|
FP/UK/WATER/40701/2019
|
8-16/2020-FC
|
SONG DAM DRINKING WATER PROJECT
|
Drinking Water
|
INFRASTRUCTURE (REHAB)DIVISION RISHIKESH, DEHRADUN
|
127.6712
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
24 Jun 2019
|
Stage-I Approval on
|
:
|
05 Jan 2021
|
Compliance Report Submitted by User Agency on
|
:
|
08 May 2024
|
|
|
|
|