Sno.State NameProposal No.RO/Ministry File NumberProposal NameCategoryUser Agency NameArea (ha.)Proposal StatusImportant DatesAllocation of Fresh forest land (Form-A) Part-IView Report (Part-II to Part-V and Stage-I Clearances)Stage-II Approval on
1 Dadar & Nagar Haveli FP/DN/Pipeline/44305/2020 7-5/3-FD/636 Gas Distribution Network in Dadra & Nagar Haveli Area (Maliba (HPCL) Petroleum Connectivity, Mahalaxmi Petroleum Connectivity & Khanvel Connectivity) Pipeline GUJARAT GAS LIMITED 0.5029 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Jan 2020
Stage-I Approval on : 12 Oct 2020
Compliance Report Submitted by User Agency on : 07 Jan 2021
19 Nov 2020
2 Dadar & Nagar Haveli FP/DN/Pipeline/151726/2022 7-5/3-FD/654 Gas Distribution Network in Dadra & Nagar Haveli Area (Kala – Karachgam – Velugam Industrial Area Connectivity & Near Namo Medical Collage Connectivity) Pipeline GUJARAT GAS LIMITED 0.3009 APPROVED
Proposal received(at Nodal Officer)electronically on : 29 Jan 2022
Stage-I Approval on : 20 Sep 2023
Compliance Report Submitted by User Agency on : 26 Oct 2023
23 Jan 2024
3 Dadar & Nagar Haveli FP/DN/Others/16736/2015 7-5/3-FD/562 Dadra and Nagar Haveli PNG Network : Planning 2015-16 Others GUJARAT GAS LIMITED 0.6969 APPROVED
Proposal received(at Nodal Officer)electronically on : 28 Nov 2015
Stage-I Approval on : 16 Sep 2016
Compliance Report Submitted by User Agency on : 25 May 2017
18 May 2017
4 Dadar & Nagar Haveli FP/DN/ROAD/35449/2018 7-5/3-FD/622 Diversion of Reserved forest land for Construction of an approach road from Chisda to Shelti Vanganpada Road EXECUTIVE ENGINEER PWD III IRRIGATION DISTRICT PANCHAYAT DADRA AND NAGAR HAVELI 0.798 APPROVED
Proposal received(at Nodal Officer)electronically on : 28 Aug 2018
Stage-I Approval on : 19 Aug 2019
Compliance Report Submitted by User Agency on : 03 Dec 2019
07 Feb 2020
5 Dadar & Nagar Haveli FP/DN/Others/29496/2017 7-5/3-FD/590 Shri Sai (IOCL) Petroleum Connectivity in DNH GA Others GUJARAT GAS LIMITED 0.0594 APPROVED
Proposal received(at Nodal Officer)electronically on : 27 Sep 2017
Stage-I Approval on : 16 Apr 2019
Compliance Report Submitted by User Agency on : 03 Jul 2019
05 Nov 2019
6 Dadar & Nagar Haveli FP/DN/Others/24636/2017 7-5/3-FD/575 Gas Distribution Network in Amli & Surrounding Area of Dadra & Nagar Haveli Others GUJARAT GAS LIMITED 0.3424 APPROVED
Proposal received(at Nodal Officer)electronically on : 27 Feb 2017
Stage-I Approval on : 03 Aug 2017
Compliance Report Submitted by User Agency on : 14 Mar 2018
13 Mar 2018
7 Dadar & Nagar Haveli FP/DN/ROAD/14983/2015 7-5/3-FD/560 Development of Vadodara -Mumbai Expressway (Phase-I ) from km 104+700 (km 390+864 of NH8) to Km 378+722 (km 80 of Ahmedabad Vadodara Expressway) in the State of Gujarat, Maharashtra & Union Territory of Dadra & Nagar Haveli (Total length 274.022 km) Road NATIONAL HIGHWAY AUTHORITY OF INDIA-PIU SURAT 0.54 APPROVED
Proposal received(at Nodal Officer)electronically on : 27 Aug 2015
Stage-I Approval on : 29 Nov 2016
Compliance Report Submitted by User Agency on : 13 Aug 2019
30 Oct 2018
8 Dadar & Nagar Haveli FP/DN/ROAD/148752/2021 FC-6/GJB-48/2022-GNR Diversion of Forest land for Widening and Strengthening of road stretch from Tinoda to Bindrabin (Ch. 15/8 to 17/4) under State Highway Road EXECUTIVE ENGINEER ROAD DIVISION 2.4813 APPROVED
Proposal received(at Nodal Officer)electronically on : 26 Oct 2021
Stage-I Approval on : 21 Dec 2022
Compliance Report Submitted by User Agency on : 28 Feb 2024
10 Oct 2024
9 Dadar & Nagar Haveli FP/DN/Pipeline/124427/2021 7-5/3-FD/644 Silvassa Spur Pipeline Pipeline PIPELINE INFRASTRUCTURE LIMITED 0.1278 APPROVED
Proposal received(at Nodal Officer)electronically on : 26 Feb 2021
Stage-I Approval on : 20 Sep 2021
Compliance Report Submitted by User Agency on : 24 Dec 2021
15 Nov 2021
10 Dadar & Nagar Haveli FP/DN/ROAD/43020/2019 7-5/3-FD/633 Construction of Bypass road from Dudhani-Ghodbari Junction to the newly constructed Dudhnai - Kauncha HIgh Level Bridge Road EXECUTIVE ENGINEER ROAD DIVISION 0.99 APPROVED
Proposal received(at Nodal Officer)electronically on : 25 Nov 2019
Stage-I Approval on : 27 Apr 2020
Compliance Report Submitted by User Agency on : 20 Mar 2023
08 Jan 2020
11 Dadar & Nagar Haveli FP/DN/Pipeline/44749/2020 7-5/3-FD/635 Gas Distribution Network in Dadra & Nagar Haveli Area (KLJ Plasticizers Ltd. (Sili) CA-1 Connectivity) Pipeline GUJARAT GAS LIMITED 0.2446 APPROVED
Proposal received(at Nodal Officer)electronically on : 25 Feb 2020
Stage-I Approval on : 12 Oct 2020
Compliance Report Submitted by User Agency on : 07 Jan 2021
19 Nov 2020
12 Dadar & Nagar Haveli FP/DN/Pipeline/147607/2021 7-2/3-FD/650 Gas Distribution Network in Dadra & Nagar Haveli Area (Surangi – Velugam Road, Surangi Connectivity, River crossing at Surangi – Velugam Road, Surangi Connectivity & River crossing at Udhawa – Khanvel Pipeline GUJARAT GAS LIMITED 0.0735 APPROVED
Proposal received(at Nodal Officer)electronically on : 23 Sep 2021
Stage-I Approval on : 05 Dec 2022
Compliance Report Submitted by User Agency on : 31 Dec 2022
06 Apr 2023
13 Dadar & Nagar Haveli FP/DN/WATER/19445/2016 7-5/3-FD/565 Providing drinking water supply scheme for Gunsa and Bildhari Drinking Water EXECUTIVE ENGINEER PWD III IRRIGATION DISTRICT PANCHAYAT DADRA AND NAGAR HAVELI 0.4125 APPROVED
Proposal received(at Nodal Officer)electronically on : 19 May 2016
Stage-I Approval on : 30 Nov 2017
Compliance Report Submitted by User Agency on : 08 Feb 2018
08 Apr 2020
14 Dadar & Nagar Haveli FP/DN/Pipeline/148523/2021 7-5/3-FD/652/ Gas Distribution Network in Dadra & Nagar Haveli Area (Anklas – Nagvas village & Looping DNH (PE) Connectivity) Pipeline GUJARAT GAS LIMITED 0.0418 APPROVED
Proposal received(at Nodal Officer)electronically on : 18 Oct 2021
Stage-I Approval on : 30 Dec 2022
Compliance Report Submitted by User Agency on : 27 Jan 2023
06 Apr 2023
15 Dadar & Nagar Haveli FP/DN/WATER/30602/2017 DN-034/2017 Diversion of protected forest area for the Integrated Water Management Plan WD-II for Dapada , Moti Pati , Vasona & Chikhali village Drinking Water EXECUTIVE ENGINEER PWD III IRRIGATION DISTRICT PANCHAYAT DADRA AND NAGAR HAVELI 0.93 APPROVED
Proposal received(at Nodal Officer)electronically on : 18 Dec 2017
Stage-I Approval on : 18 Apr 2018
Compliance Report Submitted by User Agency on : 03 Dec 2019
05 Nov 2019
16 Dadar & Nagar Haveli FP/DN/Others/18995/2016 7-5/3-FD/567 Dadra & Nagar Haveli PNG Network Others GUJARAT GAS LIMITED 0.9756 APPROVED
Proposal received(at Nodal Officer)electronically on : 18 Apr 2016
Stage-I Approval on : 30 Nov 2017
Compliance Report Submitted by User Agency on : 18 Jan 2018
01 Mar 2018
17 Dadar & Nagar Haveli FP/DN/ROAD/25039/2017 7-5/3-FD/576 Construction of High Level Bridge connecting Dudhani & Kauncha village across river Damanganga in U.T of Dadra & Nagar Haveli Road EXECUTIVE ENGINEER ROAD DIVISION 0.6 APPROVED
Proposal received(at Nodal Officer)electronically on : 17 Mar 2017
Stage-I Approval on : 15 Feb 2018
Compliance Report Submitted by User Agency on : 20 Aug 2020
20 Aug 2018
18 Dadar & Nagar Haveli FP/DN/SCH/19388/2016 FP/DN/SCH/19388/2016 Construction of PRE-FAB School in Kauncha Ranpada School EXECUTIVE ENGINEER PWD III IRRIGATION DISTRICT PANCHAYAT DADRA AND NAGAR HAVELI 0.056 APPROVED
Proposal received(at Nodal Officer)electronically on : 16 May 2016
Stage-I Approval on : 13 Dec 2016
Compliance Report Submitted by User Agency on : 22 Mar 2018
18 Apr 2018
19 Dadar & Nagar Haveli FP/DN/Others/26693/2017 7-5/3-FD/583/20 DRS Spurlines (Steel line) - DNH GA Others GUJARAT GAS LIMITED 0.3387 APPROVED
Proposal received(at Nodal Officer)electronically on : 16 Jun 2017
Stage-I Approval on : 15 Feb 2018
Compliance Report Submitted by User Agency on : 18 Apr 2018
03 May 2018
20 Dadar & Nagar Haveli FP/DN/ROAD/34240/2018 7-5/3-FD/612/ Diversion of Reserved forest land for Construction of road from Vasda Devipada to Navapada . Road EXECUTIVE ENGINEER PWD III IRRIGATION DISTRICT PANCHAYAT DADRA AND NAGAR HAVELI 0.21 APPROVED
Proposal received(at Nodal Officer)electronically on : 15 Jun 2018
Stage-I Approval on : 01 Apr 2019
Compliance Report Submitted by User Agency on : 03 Dec 2019
05 Nov 2019
21 Dadar & Nagar Haveli FP/DN/ROAD/34241/2018 7-5/3-FD/613 Diversion of Reserved forest land for the Construction of road from Bildhari Patelpada to Ruimal Road EXECUTIVE ENGINEER PWD III IRRIGATION DISTRICT PANCHAYAT DADRA AND NAGAR HAVELI 0.87 APPROVED
Proposal received(at Nodal Officer)electronically on : 15 Jun 2018
Stage-I Approval on : 05 Dec 2019
Compliance Report Submitted by User Agency on : 30 Jun 2020
19 Mar 2020
22 Dadar & Nagar Haveli FP/DN/ROAD/26670/2017 DN-014/2017 Construction of approach road from Ghodbari Main road to Uplapada Road EXECUTIVE ENGINEER PWD III IRRIGATION DISTRICT PANCHAYAT DADRA AND NAGAR HAVELI 0.36 APPROVED
Proposal received(at Nodal Officer)electronically on : 15 Jun 2017
Stage-I Approval on : 03 May 2018
Compliance Report Submitted by User Agency on : 03 Dec 2019
30 Oct 2018
23 Dadar & Nagar Haveli FP/DN/ROAD/26674/2017 7-5/3-FD/585/44 Construction of approach road from Dudhani Ruipada main road to Tokerpada Road EXECUTIVE ENGINEER PWD III IRRIGATION DISTRICT PANCHAYAT DADRA AND NAGAR HAVELI 0.237 APPROVED
Proposal received(at Nodal Officer)electronically on : 15 Jun 2017
Stage-I Approval on : 03 May 2018
Compliance Report Submitted by User Agency on : 03 Dec 2019
20 Dec 2018
24 Dadar & Nagar Haveli FP/DN/ROAD/26672/2017 7-5/3-FD/584/61 Construction of approach road from Karchond Vansda Main road to Umarmatha Road EXECUTIVE ENGINEER PWD III IRRIGATION DISTRICT PANCHAYAT DADRA AND NAGAR HAVELI 0.684 APPROVED
Proposal received(at Nodal Officer)electronically on : 15 Jun 2017
Stage-I Approval on : 30 Nov 2017
Compliance Report Submitted by User Agency on : 03 Dec 2019
20 Dec 2018
25 Dadar & Nagar Haveli FP/DN/TRANS/108286/2020 6-DNB089/2021-BHO Construction of 220 kV D/C Vapi-II – Sayali Transmission Line Transmission Line VAPI II-NORTH LAKHIMPUR TRANSMISSION LIMITED 4.6135 APPROVED
Proposal received(at Nodal Officer)electronically on : 15 Dec 2020
Stage-I Approval on : 07 Dec 2021
Compliance Report Submitted by User Agency on : 02 Nov 2022
20 Mar 2024
26 Dadar & Nagar Haveli FP/DN/WATER/30820/2017 DN-035/2017 Diversion of protected forest area for the Integrated Water Management Plan WD-II for Falandi , Galonda and Umarkui village. Drinking Water EXECUTIVE ENGINEER PWD III IRRIGATION DISTRICT PANCHAYAT DADRA AND NAGAR HAVELI 0.82 APPROVED
Proposal received(at Nodal Officer)electronically on : 15 Dec 2017
Stage-I Approval on : 18 Apr 2018
Compliance Report Submitted by User Agency on : 03 Dec 2019
01 Jan 2019
27 Dadar & Nagar Haveli FP/DN/Pipeline/40212/2019 7-5/3-FD/632/ Bhilosa Industries Connectivity Pipeline GUJARAT GAS LIMITED 0.323 APPROVED
Proposal received(at Nodal Officer)electronically on : 14 May 2019
Stage-I Approval on : 22 Jan 2020
Compliance Report Submitted by User Agency on : 07 Jan 2021
12 Mar 2020
28 Dadar & Nagar Haveli FP/DN/WATER/30803/2017 DN-037/2017 Diversion of protected forest area for the Integrated Water Management Plan WD-II for Mota Randha, Nana Randha and Bonta village Drinking Water EXECUTIVE ENGINEER PWD III IRRIGATION DISTRICT PANCHAYAT DADRA AND NAGAR HAVELI 0.89 APPROVED
Proposal received(at Nodal Officer)electronically on : 14 Dec 2017
Stage-I Approval on : 18 Apr 2018
Compliance Report Submitted by User Agency on : 03 Dec 2019
08 May 2020
29 Dadar & Nagar Haveli FP/DN/WATER/30806/2017 DN-036/2017 Diversion of protected forest area for the Integrated Water Management Plan WD-II for Silli , Kilvani & Galonda village Drinking Water EXECUTIVE ENGINEER PWD III IRRIGATION DISTRICT PANCHAYAT DADRA AND NAGAR HAVELI 0.81 APPROVED
Proposal received(at Nodal Officer)electronically on : 14 Dec 2017
Stage-I Approval on : 18 Apr 2018
Compliance Report Submitted by User Agency on : 03 Dec 2019
05 Nov 2019
30 Dadar & Nagar Haveli FP/DN/Others/35331/2018 7-5/3-FD/623 Dapada & Chinchpada Village Connectivity in DNH GA Others GUJARAT GAS LIMITED 0.244 APPROVED
Proposal received(at Nodal Officer)electronically on : 14 Aug 2018
Stage-I Approval on : 06 Aug 2019
Compliance Report Submitted by User Agency on : 26 Jul 2023
22 Oct 2019
31 Dadar & Nagar Haveli FP/DN/Others/21886/2016 FP/DN/Others/21886/2016 Gas Distribution Network in Naroli & Surrounding Area of Dadra & Nagar Haveli Others GUJARAT GAS LIMITED 0.8819 APPROVED
Proposal received(at Nodal Officer)electronically on : 13 Oct 2016
Stage-I Approval on : 16 Jan 2018
Compliance Report Submitted by User Agency on : 14 Mar 2018
13 Mar 2018
32 Dadar & Nagar Haveli FP/DN/Others/21865/2016 7-5/3-FD/570 Gas Distribution Network in Dadra & Surrounding Area of Dadra & Nagar Haveli Others GUJARAT GAS LIMITED 0.3824 APPROVED
Proposal received(at Nodal Officer)electronically on : 12 Oct 2016
Stage-I Approval on : 20 Jul 2017
Compliance Report Submitted by User Agency on : 18 Jan 2018
01 Mar 2018
33 Dadar & Nagar Haveli FP/DN/Pipeline/149192/2021 F.No. 7-2/3-FD/651 Gas Distribution Network in Dadra & Nagar Haveli Area (Mandoni Connectivity) Pipeline GUJARAT GAS LIMITED 0.426 APPROVED
Proposal received(at Nodal Officer)electronically on : 11 Nov 2021
Stage-I Approval on : 19 May 2022
Compliance Report Submitted by User Agency on : 13 Sep 2022
14 Sep 2022
34 Dadar & Nagar Haveli FP/DN/TRANS/145817/2021 7-5/3-FD/645/ Erection of underground 11 KV transmission line of M/s Jai Corp Ltd Transmission Line JAI CORP LTD 0.135 APPROVED
Proposal received(at Nodal Officer)electronically on : 10 Aug 2021
Stage-I Approval on : 24 Dec 2021
Compliance Report Submitted by User Agency on : 25 Jan 2022
06 Apr 2023
35 Dadar & Nagar Haveli FP/DN/ROAD/33515/2018 7-5/3-FD/609 Diversion of Reserved forest land for the Construction of approach road from Bedpa Kalsemal to Maharasthra Border Road EXECUTIVE ENGINEER PWD III IRRIGATION DISTRICT PANCHAYAT DADRA AND NAGAR HAVELI 0.618 APPROVED
Proposal received(at Nodal Officer)electronically on : 08 May 2018
Stage-I Approval on : 11 Jun 2019
Compliance Report Submitted by User Agency on : 03 Dec 2019
07 Feb 2020
36 Dadar & Nagar Haveli FP/DN/ROAD/33510/2018 7-5/3-FD/610 Diversion of Reserved forest land for the Construction of an approach road from Sindoni Loharmal Tetmal to Tornachimal Road EXECUTIVE ENGINEER PWD III IRRIGATION DISTRICT PANCHAYAT DADRA AND NAGAR HAVELI 0.294 APPROVED
Proposal received(at Nodal Officer)electronically on : 08 May 2018
Stage-I Approval on : 03 Jan 2019
Compliance Report Submitted by User Agency on : 03 Dec 2019
08 Jun 2019
37 Dadar & Nagar Haveli FP/DN/ROAD/33504/2018 7-5/3-FD/611 Construction of approach road from Sindoni Patelpada to Samashan Road EXECUTIVE ENGINEER PWD III IRRIGATION DISTRICT PANCHAYAT DADRA AND NAGAR HAVELI 0.15 APPROVED
Proposal received(at Nodal Officer)electronically on : 08 May 2018
Stage-I Approval on : 01 Jan 2019
Compliance Report Submitted by User Agency on : 03 Dec 2019
05 Dec 2019
38 Dadar & Nagar Haveli FP/DN/Pipeline/47191/2020 7-5/3-FD/637 Gas Distribution Network in Dadra & Nagar Haveli Area (Rockwool India Ltd. Connectivity) Pipeline GUJARAT GAS LIMITED 0.167 APPROVED
Proposal received(at Nodal Officer)electronically on : 08 Jul 2020
Stage-I Approval on : 25 May 2022
Compliance Report Submitted by User Agency on : 13 Sep 2022
14 Sep 2022
39 Dadar & Nagar Haveli FP/DN/VELEC/30058/2017 DN-027/2017 Erection of 100KVA Transformer center with HT line at village Sindoni-Loharmal Village Electricity DNHPDCL 0.91 APPROVED
Proposal received(at Nodal Officer)electronically on : 07 Nov 2017
Stage-I Approval on : 26 Jul 2018
Compliance Report Submitted by User Agency on : 25 Jun 2024
08 Aug 2024
40 Dadar & Nagar Haveli FP/DN/VELEC/30117/2017 6-DNC051/2018-BHO Extension of 11kV HT line express feeder from 66/11kV Khanvel Sub-station to Dudhani Char Rasta (under Sansad Adarsh Gram Yojana) Village Electricity DNHPDCL 5.8275 APPROVED
Proposal received(at Nodal Officer)electronically on : 07 Nov 2017
Stage-I Approval on : 31 Aug 2020
Compliance Report Submitted by User Agency on : 29 Aug 2023
26 Oct 2023
41 Dadar & Nagar Haveli FP/DN/ROAD/35775/2018 6-DNC053/2021-BHO Diversion of roadside protected forest land for Widening of road from Khanvel Chowk upto Khedpa Border (Ch 19/6 to 40/8) Road EXECUTIVE ENGINEER ROAD DIVISION 23.32 APPROVED
Proposal received(at Nodal Officer)electronically on : 06 Sep 2018
Stage-I Approval on : 20 Apr 2022
Compliance Report Submitted by User Agency on : 19 Aug 2023
25 Oct 2023
42 Dadar & Nagar Haveli FP/DN/Others/35702/2018 7-5/3-FD/624/ Gas Distribution network for Chikhli, Surangi, Khadoli, Khanvel, Kala & Kherdi Village Surrounding Area Dadra and Nagar Haveli Others GUJARAT GAS LIMITED 0.7608 APPROVED
Proposal received(at Nodal Officer)electronically on : 05 Sep 2018
Stage-I Approval on : 08 Aug 2019
Compliance Report Submitted by User Agency on : 27 Dec 2019
07 Jan 2020
43 Dadar & Nagar Haveli FP/DN/ROAD/26018/2017 7-5/3-FD/579 Construction of approach road from Chisda Akharmal to Murdulpada and Khokharpada Road EXECUTIVE ENGINEER PWD III IRRIGATION DISTRICT PANCHAYAT DADRA AND NAGAR HAVELI 0.78 APPROVED
Proposal received(at Nodal Officer)electronically on : 05 May 2017
Stage-I Approval on : 15 Feb 2018
Compliance Report Submitted by User Agency on : 03 Dec 2019
30 Oct 2018
44 Dadar & Nagar Haveli FP/DN/WATER/30609/2017 DN-038/2017 Diversion of protected forest area for the Integrated Water Management Plan WD-II for Umarkui , Saily and Rakholi village. Drinking Water EXECUTIVE ENGINEER PWD III IRRIGATION DISTRICT PANCHAYAT DADRA AND NAGAR HAVELI 0.74 APPROVED
Proposal received(at Nodal Officer)electronically on : 05 Dec 2017
Stage-I Approval on : 18 Apr 2018
Compliance Report Submitted by User Agency on : 03 Dec 2019
08 Apr 2020
45 Dadar & Nagar Haveli FP/DN/WATER/30601/2017 DN-033/2017 Diversion of protected forest area for the Integrated Water Management Plan WD-II for Morkhal and Kilvani village Drinking Water EXECUTIVE ENGINEER PWD III IRRIGATION DISTRICT PANCHAYAT DADRA AND NAGAR HAVELI 0.78 APPROVED
Proposal received(at Nodal Officer)electronically on : 05 Dec 2017
Stage-I Approval on : 18 Apr 2018
Compliance Report Submitted by User Agency on : 03 Dec 2019
05 Nov 2019
46 Dadar & Nagar Haveli FP/DN/Others/32949/2018 7-5/3-FD/630 Proposal for laying OFC for Reliance Jio Infocomm Limited 4G Dadra Nagar Haveli District Others RELIANCE JIO INFOCOMM LTD 4.23 APPROVED
Proposal received(at Nodal Officer)electronically on : 05 Apr 2018
Stage-I Approval on : 06 Mar 2020
Compliance Report Submitted by User Agency on : 31 Aug 2020
14 Jan 2020
47 Dadar & Nagar Haveli FP/DN/Others/30063/2017 7-5/3-FD/596 Athola Connectivity - DNH GA 2017-18 Others GUJARAT GAS LIMITED 0.202 APPROVED
Proposal received(at Nodal Officer)electronically on : 04 Nov 2017
Stage-I Approval on : 16 Apr 2019
Compliance Report Submitted by User Agency on : 03 Jul 2019
05 Nov 2019
48 Dadar & Nagar Haveli FP/DN/Others/149878/2021 7-2/3-FD/653 Bhilosa Private Limited Pipeline Others GUJARAT STATE PETRONET LTD 0.4098 APPROVED
Proposal received(at Nodal Officer)electronically on : 04 Dec 2021
Stage-I Approval on : 31 May 2022
Compliance Report Submitted by User Agency on : 02 Jul 2024
07 Nov 2023
49 Dadar & Nagar Haveli FP/DN/ROAD/36313/2018 7-5/3-FD/629 Diversion of protected forest land for the widening of existing 4 lane to 6 lane road stretch on Silvassa - Naroli road under Beautification & strenghthening of road including up gradation of storm wa Road EXECUTIVE ENGINEER ROAD DIVISION 0.772 APPROVED
Proposal received(at Nodal Officer)electronically on : 03 Oct 2018
Stage-I Approval on : 24 Dec 2019
Compliance Report Submitted by User Agency on : 06 Apr 2023
06 Apr 2023
50 Dadar & Nagar Haveli FP/DN/WATER/30019/2017 7-5/3-FD/595 Diversion of protected forest area for the Integrated Water Management Plan WD-III for Amboli , Kala, Karachgam , Kherdi , Parzai & Dolara village Drinking Water EXECUTIVE ENGINEER PWD III IRRIGATION DISTRICT PANCHAYAT DADRA AND NAGAR HAVELI 0.997 APPROVED
Proposal received(at Nodal Officer)electronically on : 03 Nov 2017
Stage-I Approval on : 05 Dec 2019
Compliance Report Submitted by User Agency on : 31 Jul 2023
23 Oct 2020
12