Sno. | State Name | Proposal No. | RO/Ministry File Number | Proposal Name | Category | User Agency Name | Area (ha.) | Proposal Status | Important Dates | Allocation of Fresh forest land (Form-A) Part-I | View Report (Part-II to Part-V and Stage-I Clearances) | Stage-II Approval on |
1
|
Rajasthan
|
FP/RJ/Approach/148689/2021
|
1(105)Forest/2023
|
Construction of Approach Road for Proposed Indian Oil Corporation Ltd. Retail Outlet on Bikaner-Sri Ganganagar Road (NH-62) between KM Stone No. 189 - 190 (Chainage: 189.692 to 189.727) RHS in Kila No 9 & 10 Murbba No 11, at Village - 17 STB, Tehsil-Suratgarh, District - Sri Ganganagar, Raj.
|
Approach Access
|
Indian Oil Corporation Limited
|
0.1817
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
03 Dec 2021
|
Stage-I Approval on
|
:
|
20 Dec 2023
|
Compliance Report Submitted by User Agency on
|
:
|
07 Jan 2025
|
|
|
|
06 Feb 2025
|
2
|
Rajasthan
|
FP/RJ/OFC/153375/2022
|
1(31)Forest/2023
|
Permission for laying underground OFC in ROW of existing PWD road from Nathdwara to Iswal from Lat/ Long 24°53' 51.08" N/ 73°42' 33.72" E to 24°53' 34.36" N/ 73°41' 55.73" E in Rajsamand District. Total length & area in Forest is 1.365 KM & 0.06143 ha in Rajsamand District, Rajasthan.
|
Optical Fibre Cable
|
JIO DIGITAL FIBER PVT LTD
|
0.06143
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
17 Mar 2022
|
Stage-I Approval on
|
:
|
23 May 2023
|
Compliance Report Submitted by User Agency on
|
:
|
06 Nov 2024
|
|
|
|
29 Nov 2024
|
3
|
Rajasthan
|
FP/RJ/OFC/44367/2020
|
1(101)forest/2021
|
laying underground OFC in ROW of existing road from Vijaipur - Ratangarh (MP Border) from Lat/long point 24.705416/75.519275 to 24.735003/75.339779 for total length of 21.252 KM and total area 0.956 ha. (Length and area in Forest are 8.844 KM & 0.398 ha & Length & area in Non -Forest are 12.408 KM & 0.558 ha) along PWD roads in Chittorgarh District
|
Optical Fibre Cable
|
JIO DIGITAL FIBER PVT LTD
|
0.398
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
04 Feb 2020
|
Stage-I Approval on
|
:
|
07 Jan 2022
|
Compliance Report Submitted by User Agency on
|
:
|
26 Nov 2024
|
|
|
|
28 Nov 2024
|
4
|
Rajasthan
|
FP/RJ/OFC/44109/2020
|
1(13)forest/2022
|
Laying of underground OFC within ROW of existing PWD road from Vijaipura-Ratangarh form Lat/long point 24.808472/75.718965° to 24.688055/75.605895° for length & area in forest is 23.222 KM & 1.045 ha and length & area in non-forest is 0.156 Km & 0.007 ha. Total length and area in forest is 23.222 KM & 1.045 ha and in non-forest is 0.156 Km & 0.007
|
Optical Fibre Cable
|
JIO DIGITAL FIBER PVT LTD
|
1.045
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
22 Jan 2020
|
Stage-I Approval on
|
:
|
22 Feb 2022
|
Compliance Report Submitted by User Agency on
|
:
|
26 Nov 2024
|
|
|
|
28 Nov 2024
|
5
|
Rajasthan
|
FP/RJ/OFC/144983/2021
|
1(15)Forest/2023
|
Permission for laying underground OFC in Forest area along road from Vijaipur - Rooppura from Lat/Long 24.791558/75.718341 to 24.765172/75.740787 for total length of 4.063 KM and total area 0.1828 ha in Chittorgarh District, Rajasthan
|
Optical Fibre Cable
|
JIO DIGITAL FIBER PVT LTD
|
0.1828
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
21 Jul 2021
|
Stage-I Approval on
|
:
|
28 Jun 2023
|
Compliance Report Submitted by User Agency on
|
:
|
08 Nov 2024
|
|
|
|
28 Nov 2024
|
6
|
Rajasthan
|
FP/RJ/OFC/150331/2021
|
1(60)Forest/2023
|
Permission for laying underground OFC in ROW of existing PWD road from Gerhi to Peeplekoot from Lat/ Long 23.845817/74.323689 (village Mundela) to 3.855166/74.448102 (Gangji Ka Khera) in Banswara District. Total length & area in Forest and non-Forest are 6.636 KM & 0.2986 ha and 13.407 & 0.6033 ha respectively in Banswara District, Rajasthan
|
Optical Fibre Cable
|
JIO DIGITAL FIBER PVT LTD
|
0.2986
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
20 Dec 2021
|
Stage-I Approval on
|
:
|
22 Aug 2023
|
Compliance Report Submitted by User Agency on
|
:
|
06 Nov 2024
|
|
|
|
27 Nov 2024
|
7
|
Rajasthan
|
FP/RJ/OFC/43686/2020
|
1(134)forest/2020
|
Laying of Underground Optical Fiber Cable along the road within the existing ROW from KMS - 0/0 to KMS 58.285 = 58.285 km (Gogunda - Kirat Road) District - Udaipur (Rajasthan)
|
Optical Fibre Cable
|
DINESH ENGINEERS LTD.
|
0.3648
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
02 Jan 2020
|
Stage-I Approval on
|
:
|
09 Mar 2021
|
Compliance Report Submitted by User Agency on
|
:
|
06 Nov 2024
|
|
|
|
27 Nov 2024
|
8
|
Rajasthan
|
FP/RJ/Approach/154227/2022
|
1(149)forest2022
|
“Construction of Approach Access for Proposed Hindustan Petroleum Corporation Retail Outlet on Shiv-Nimbla Road NH-68 (Old NH-15) LHS on Chainage 114+570.00 to 114+605.00 on Khasra No 822/506 At Village-Nimbla, Tehsil -Shiv & District – Barmer(Rajasthan)”
|
Approach Access
|
HINDUSTAN PETROLEUM CORPORATION LIMITED
|
0.1801
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
07 Apr 2022
|
Stage-I Approval on
|
:
|
09 Jan 2023
|
Compliance Report Submitted by User Agency on
|
:
|
21 Oct 2024
|
|
|
|
06 Nov 2024
|
9
|
Rajasthan
|
FP/RJ/ROAD/49638/2020
|
1(103)forest/2021
|
Construction of Approach Road for Proposed Indian Oil Corporation Ltd. Retail Outlet on Jaipur - Bikaner Road (NH-11) between KM Stone No. 450-451 (Chainage: 450.394 - 450.439) LHS in Khasra No. 486, At Village - Rajaldesar, Tehsil - Ratangarh, District - Churu, Raj
|
Road
|
Indian Oil Corporation Limited
|
0.0712
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
18 Sep 2020
|
Stage-I Approval on
|
:
|
07 Jan 2022
|
Compliance Report Submitted by User Agency on
|
:
|
11 Jul 2024
|
|
|
|
12 Sep 2024
|
10
|
Rajasthan
|
FP/RJ/ROAD/38372/2019
|
1(73)forest/2022
|
Construction of sawantkhera to kadagpura road
|
Road
|
PUBLIC WORKS DEPARTMENT JHALAWAR
|
0.52
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
22 Jan 2019
|
Stage-I Approval on
|
:
|
21 Jul 2022
|
Compliance Report Submitted by User Agency on
|
:
|
28 Apr 2024
|
|
|
|
23 Aug 2024
|
11
|
Rajasthan
|
FP/RJ/ROAD/38150/2019
|
1(30)forest/2020
|
Construction of Approach road jhalra patan railway station
|
Road
|
PUBLIC WORKS DEPARTMENT JHALAWAR
|
0.9
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
16 Jan 2019
|
Stage-I Approval on
|
:
|
04 Oct 2021
|
Compliance Report Submitted by User Agency on
|
:
|
03 May 2023
|
|
|
|
23 Aug 2024
|
12
|
Rajasthan
|
FP/RJ/TRANS/142545/2021
|
1(106)FOREST/2023
|
Construction of 765 KV D/C Bhadla-II to Sikar-II Transmission line ,District- Jodhpur, Bikaner, Nagaur, Churu & Sikar (Rajasthan)
|
Transmission Line
|
SIKAR NEW TRANSMISSION LIMITED
|
0.5428
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
01 Jun 2021
|
Stage-I Approval on
|
:
|
06 Dec 2023
|
Compliance Report Submitted by User Agency on
|
:
|
24 Jan 2024
|
|
|
|
20 May 2024
|
13
|
Rajasthan
|
FP/RJ/Approach/149575/2021
|
1(65)forest/2022
|
“Construction of Approach Access for Proposed Hindustan Petroleum Corporation Retail Outlet on NH -11 (New-NH-21) LHS on Khasra No 476, Chainage 75/776 to 75/824, At Village – Sewla, Tehsil -Nadabai,
|
Approach Access
|
HINDUSTAN PETROLIUM CORPORATION LIMITED
|
0.1409
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
04 Jan 2022
|
Stage-I Approval on
|
:
|
09 Jun 2022
|
Compliance Report Submitted by User Agency on
|
:
|
20 Mar 2024
|
|
|
|
30 Apr 2024
|
14
|
Rajasthan
|
FP/RJ/OFC/150256/2021
|
1(67)forest/2022
|
Loying of OFC CABLE BLOWING WORK FOR TELESONIC CONNECTIVITY in Samoli, Near Sei Nadi,Tin Sara, Kagwas, Subra Subri, Sawan ka kyara to near Guda and Mamer to Bhoori Dheber Gujrat Border in Udaipur Nort
|
Optical Fibre Cable
|
TELESONIC NETWORKS LIMITED
|
0.606
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
21 Dec 2021
|
Stage-I Approval on
|
:
|
24 Jun 2022
|
Compliance Report Submitted by User Agency on
|
:
|
21 Mar 2024
|
|
|
|
25 Apr 2024
|
15
|
Rajasthan
|
FP/RJ/OFC/44409/2020
|
1(83)forest/2020
|
Loying of OFC CABLE BLOWING WORK FOR TELESONIC CONNECTIVITY From Near Shastri Nagar, Vishveshwar Mahadev, Lohagal Road To Lohagal Panchsheel Road, Nr. Kabir Nagar, Ajmer of total length 1500 mtr.
|
Optical Fibre Cable
|
TELESONIC NETWORKS LIMITED
|
0.0585
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
06 Feb 2020
|
Stage-I Approval on
|
:
|
06 Jan 2021
|
Compliance Report Submitted by User Agency on
|
:
|
11 Mar 2024
|
|
|
|
26 Mar 2024
|
16
|
Rajasthan
|
FP/RJ/ROAD/35614/2018
|
1(19)forest/2020
|
Renewal of Road from Chouth ka Barwara to Nayagaon (0/0 to 4/750 km), District- Sawai Madhopur, Raj.
|
Road
|
PUBLIC WORKS DEPARTMENT RAJASTHAN JAIPUR
|
0.2
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
05 Sep 2018
|
Stage-I Approval on
|
:
|
03 Jun 2020
|
Compliance Report Submitted by User Agency on
|
:
|
08 Sep 2023
|
|
|
|
19 Mar 2024
|
17
|
Rajasthan
|
FP/RJ/OFC/45721/2020
|
1(85)forest/2021
|
Laying of Underground Optical Fiber Cable along the road within the existing ROW from KMS - 0/0 to KMS 56.262 = 56.262 km (Badi Sadri - Tekan Road) District – Chittorgarh & Udaipur, Rajasthan
|
Optical Fibre Cable
|
DINESH ENGINEERS LTD.
|
0.1325
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
07 Jun 2020
|
Stage-I Approval on
|
:
|
15 Nov 2021
|
Compliance Report Submitted by User Agency on
|
:
|
12 Jan 2024
|
|
|
|
12 Feb 2024
|
18
|
Rajasthan
|
FP/RJ/OFC/150733/2022
|
1(43)forest2022
|
Laying Underground Optical Fiber Cable along side road by Open Trench method within existing ROW from Rangama Talaab, Bichipur to Harnagar and Harnagar to Khoobnagar District Karouli
|
Optical Fibre Cable
|
TELESONIC NETWORKS LIMITED
|
0.477
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
27 Jan 2022
|
Stage-I Approval on
|
:
|
29 Nov 2022
|
Compliance Report Submitted by User Agency on
|
:
|
07 Feb 2024
|
|
|
|
12 Feb 2024
|
19
|
Rajasthan
|
FP/RJ/ROAD/43002/2019
|
1(107) Van/2020
|
Rehabilitation of jhalrapatan ,Gindor,Railway station Jhikriya, Kishanpura Durgpura Gagron (MDR-227)
|
Road
|
PUBLIC WORKS DEPARTMENT JHALAWAR
|
0.999
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
02 Dec 2019
|
Stage-I Approval on
|
:
|
22 Oct 2020
|
Compliance Report Submitted by User Agency on
|
:
|
10 Oct 2023
|
|
|
|
15 Jan 2024
|
20
|
Rajasthan
|
FP/RJ/ROAD/57309/2020
|
1(95)Forest/2021
|
Construction of Approach Road for Proposed Hindustan Petroleum Corp. Ltd. Retail Outlet on Nagaur - Bikaner Road NH-89 between KM Stone No. 180-181 (Chainage: 180/949 - 180/994) LHS in Khasra No. 525
|
Road
|
HINDUSTAN PETROLEUM CORPORATION LTD JODHPUR
|
0.1845
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
08 Dec 2020
|
Stage-I Approval on
|
:
|
10 Apr 2023
|
Compliance Report Submitted by User Agency on
|
:
|
28 Dec 2023
|
|
|
|
09 Jan 2024
|
21
|
Rajasthan
|
FP/RJ/ROAD/150326/2021
|
1(28)Forest/2023
|
Development of Economic Corridors, Inter Corridors and Feeder Routes to improve the efficiency of freight movement in India under Bharatmala Pariyojana (Lot-6/Package-4) - Paniyala-Alwar-Barodameo.
|
Road
|
NATIONAL HIGHWAY AUTHORITY OF INDIA PIU SOHNA
|
0.76
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
05 Feb 2022
|
Stage-I Approval on
|
:
|
19 May 2023
|
Compliance Report Submitted by User Agency on
|
:
|
18 Aug 2023
|
|
|
|
09 Jan 2024
|
22
|
Rajasthan
|
FP/RJ/OFC/122165/2021
|
1(24)Forest/2023
|
Permission for laying underground OFC in ROW of existing PWD road from Ajmer to Harsore from Lat/long point 26.6671/74.704598 to 26.666798/74.715323 for total and area in forest are 1.071 KM & 0.0482 ha
|
Optical Fibre Cable
|
JIO DIGITAL FIBER PVT LTD
|
0.0482
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
10 Feb 2021
|
Stage-I Approval on
|
:
|
28 Jun 2023
|
Compliance Report Submitted by User Agency on
|
:
|
01 Nov 2023
|
|
|
|
09 Nov 2023
|
23
|
Rajasthan
|
FP/RJ/TRANS/145262/2021
|
1(156)Forest/2022
|
Construction of 132 KV S/C Badisid-Bap TSS Transmission line on D/C Tower from 220 KV GSS Badisid to Railway TSS Bap (Total Length 9644 Meters)
|
Transmission Line
|
RAJASTHAN RAJYA VIDYUT PRASARAN NIGAM LIMITED
|
0.1004
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 Jul 2021
|
Stage-I Approval on
|
:
|
09 Jan 2023
|
Compliance Report Submitted by User Agency on
|
:
|
11 Aug 2023
|
|
|
|
31 Oct 2023
|
24
|
Rajasthan
|
FP/RJ/OFC/44022/2020
|
1(46)Forest/2023
|
Permission for Laying underground OFC in ROW of existing road from Gudla to Karauli from Lat/long point 26° 33' 34.235" N 77° 1' 25.772" E to 26° 31' 29.409" N77° 1' 3.304" E , total length of 5.62 KM and total area 0.2531 ha. (Length and area in Forest is 03.32 . KM & 0.1494 ha & Length & area in Non -Forest is 2.30 KM & 0.1037 ha) along PWD r
|
Optical Fibre Cable
|
JIO DIGITAL FIBER PVT LTD
|
0.1494
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
20 Jan 2020
|
Stage-I Approval on
|
:
|
13 Jul 2023
|
Compliance Report Submitted by User Agency on
|
:
|
25 Sep 2023
|
|
|
|
31 Oct 2023
|
25
|
Rajasthan
|
FP/RJ/ROAD/35959/2018
|
1(2)forest/2021
|
“Construction of CC.Road from Triveni road to Brahmani Mata Temple ”
|
Road
|
PUBLIC WORK DEPARTMENT
|
0.5004
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
15 Sep 2018
|
Stage-I Approval on
|
:
|
27 Jan 2021
|
Compliance Report Submitted by User Agency on
|
:
|
10 Jul 2023
|
|
|
|
26 Sep 2023
|
26
|
Rajasthan
|
FP/RJ/OFC/44201/2020
|
1(54)forest/2022
|
Permission for laying underground OFC in ROW of existing PWD road from Paluna - Dhaul Ji Ka Ghura from Lat/long point 24.308667/73.847714 to 24.316406/73.860933 for total length 1.904 Km and area 0.0857 ha in forest in Udaipur District, Rajasthan.
|
Optical Fibre Cable
|
JIO DIGITAL FIBER PVT LTD
|
0.0857
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
25 Jan 2020
|
Stage-I Approval on
|
:
|
01 Jun 2022
|
Compliance Report Submitted by User Agency on
|
:
|
28 Aug 2023
|
|
|
|
26 Sep 2023
|
27
|
Rajasthan
|
FP/RJ/Approach/147692/2021
|
1(76)Forest/2022
|
Construction of Approach Road for Proposed Hindustan Petroleum Corporation Ltd. Retail Outlet on Barmer City - Dhorimanna Road (NH-68) between KM Stone No. 179-180 (Chainage: 179/458 - 179/493) LHS in Khasra No. 618/402, At Village - Chaharon Ki Basti, Tehsil and District - Barmer, Rajasthan.
|
Approach Access
|
HINDUSTAN PETROLEUM CORPORATION LTD JODHPUR
|
0.1662
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
05 Oct 2021
|
Stage-I Approval on
|
:
|
17 Aug 2022
|
Compliance Report Submitted by User Agency on
|
:
|
13 Jun 2023
|
|
|
|
14 Sep 2023
|
28
|
Rajasthan
|
FP/RJ/OFC/49989/2020
|
1(32)forest/2021
|
Laying of Underground Optical Fiber Cable along the Khairwara - Jhadol road within the existing ROW from KMS - 0/0 to KMS 80.000 Km, District - Udaipur (Raj.)
|
Optical Fibre Cable
|
DINESH ENGINEERS LTD.
|
0.6275
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
22 Sep 2020
|
Stage-I Approval on
|
:
|
23 Mar 2021
|
Compliance Report Submitted by User Agency on
|
:
|
17 Jul 2023
|
|
|
|
10 Aug 2023
|
29
|
Rajasthan
|
FP/RJ/Approach/148278/2021
|
1(5)Forest/2023
|
Construction of Approach Access for Indian Oil Corporation Limited Retail Outlet ,KM Stone 338 to KM Stone 341 Chainage No. - 338+923 to 338+958 on NH-52(old NH-11) RHS: While Going From Jaipur to Bikaner in New Khasra No. 546/157 & 632/544 (Old Khasra 544/157 & 546/157) At Village-Malkeda , Tehsil & District – Sikar (Rajasthan)
|
Approach Access
|
Indian Oil Corporation Limited
|
0.1649
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
13 Oct 2021
|
Stage-I Approval on
|
:
|
28 Feb 2023
|
Compliance Report Submitted by User Agency on
|
:
|
08 Jul 2023
|
|
|
|
02 Aug 2023
|
30
|
Rajasthan
|
FP/RJ/Approach/156636/2022
|
1(6)Forest/2023
|
“Construction of Approach Access for Proposed Bharat Petroleum Corporation Limited Retail Outlet on Fatehpur to Bikaner Road NH-11 (New NH-52, LHS), At Chainage No. - 409+072.70 to 409+107.70 on Old Khasra No. 42 & New Khasra No. 313/312, At Village -Rohal ,Tehsil– Ramgarh Shekhawati , District - Sikar (Rajasthan)”
|
Approach Access
|
BHARAT PETROLEUM CORPORATLTD
|
0.1695
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
09 Jun 2022
|
Stage-I Approval on
|
:
|
28 Feb 2023
|
Compliance Report Submitted by User Agency on
|
:
|
08 Jul 2023
|
|
|
|
02 Aug 2023
|
31
|
Rajasthan
|
FP/RJ/OFC/150737/2022
|
1(13) Forest/2023
|
Laying of Underground Optical Fiber Cable Along the Road Within the Existing Row from Roneeja-Kumaharla to Bundi-Tonk District Border to Dhadrola -Dooni M/s Telesonic Networks Limited (Rajasthan)”
|
Optical Fibre Cable
|
TELESONIC NETWORKS LIMITED
|
0.4143
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
01 Feb 2022
|
Stage-I Approval on
|
:
|
03 Mar 2023
|
Compliance Report Submitted by User Agency on
|
:
|
25 Jul 2023
|
|
|
|
28 Jul 2023
|
32
|
Rajasthan
|
FP/RJ/Approach/146453/2021
|
1(20)forest/2022
|
Construction of Approach Access for Proposed Hindustan Petroleum Corporation Retail Outlet on Barmer- Sanchor Road NH-68 (RHS) on Khasra No-2684/2195 & 3147/2195 (Patta No F-8/90A/2013/15164) Chainage 157/766 to157/786, At Village – Barmer Gadan Tehsil & District – Barmer(Rajasthan)
|
Approach Access
|
Hindustan Petroleum Corporation Limited
|
0.0435
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
31 Aug 2021
|
Stage-I Approval on
|
:
|
07 Mar 2022
|
Compliance Report Submitted by User Agency on
|
:
|
09 Jun 2023
|
|
|
|
10 Jul 2023
|
33
|
Rajasthan
|
FP/RJ/IRRIG/122392/2021
|
1(6)forest/2022
|
Laying of Pipe Line From STP to Along SH_8 and Soti Road in Beed Jhunjhunu used by Agricultural Proposes Near by Villages at District-Jhunjhunu (Rajasthan)
|
Irrigation
|
MUNICIPAL COUNCIL JHUNJHUNU
|
0.6926
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
12 Feb 2021
|
Stage-I Approval on
|
:
|
22 Feb 2022
|
Compliance Report Submitted by User Agency on
|
:
|
08 Jun 2023
|
|
|
|
28 Jun 2023
|
34
|
Rajasthan
|
FP/RJ/Approach/147079/2021
|
1(64)forest/2022
|
Construction of Approach Road for Proposed Indian Oil Corporation Ltd. Retail Outlet on Nagaur - Jayal Road (SH-60) Between KM Stone No. 47-48 (Chainage: 47+662 to 47+697) LHS in Khasra 3268/3077, At Village-Jayal, Tehsil-Jayal, District-Nagaur, Rajasthan
|
Approach Access
|
Indian Oil Corporation Limited (IOCL)
|
0.1925
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
01 Oct 2021
|
Stage-I Approval on
|
:
|
09 Jun 2022
|
Compliance Report Submitted by User Agency on
|
:
|
03 May 2023
|
|
|
|
16 Jun 2023
|
35
|
Rajasthan
|
FP/RJ/TRANS/44263/2020
|
1(67)forest/2021
|
Construction of from 132 KV GSS Chandan to Proposed 132kv GSS Mohangarh of 132KV S/C Chandan-Mohangarh Transmission Line” District Jaisalmer (Rajasthan)
|
Transmission Line
|
RAJASTHAN RAJYA VIDYUT PRASARAN NIGAM LIMITED
|
0.122
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
29 Jan 2020
|
Stage-I Approval on
|
:
|
01 Nov 2021
|
Compliance Report Submitted by User Agency on
|
:
|
20 Mar 2023
|
|
|
|
15 Jun 2023
|
36
|
Rajasthan
|
FP/RJ/OFC/46084/2020
|
1(7)forest/2021
|
Laying Underground OFC in Row OF exiting road from Karauli to Mandrayal (Rajasthan)
|
Optical Fibre Cable
|
JIO DIGITAL FIBER PVT LTD
|
0.9272
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
12 Jun 2020
|
Stage-I Approval on
|
:
|
25 Jan 2022
|
Compliance Report Submitted by User Agency on
|
:
|
26 Apr 2023
|
|
|
|
26 May 2023
|
37
|
Rajasthan
|
FP/RJ/ROAD/45878/2020
|
1(91)Forest/2021
|
Construction of Approach Road for Proposed Indian Oil Corporation Ltd. Retail Outlet on Jaisalmer to Barmer/Sanchor Road (NH-68) between KM Stone No. 120-121 (Chainage: 120.657 - 120.692) RHS in Khasra No. 13, At Village - Jasotaniyon ki Dhani, Tehsil - Barmer, District - Barmer, Raj
|
Road
|
Indian Oil Corporation Limited
|
0.1885
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
15 Aug 2020
|
Stage-I Approval on
|
:
|
14 Dec 2021
|
Compliance Report Submitted by User Agency on
|
:
|
23 Mar 2023
|
|
|
|
25 May 2023
|
38
|
Rajasthan
|
FP/RJ/Approach/153859/2022
|
1(42)forest/2022
|
Construction of Approach Road for Proposed Hindustan Petroleum Corporation Ltd. Retail Outlet on Jaipur - Agra Road NH-21 (RHS) between KM Stone No. 187-188 (Chainage No. 187+710 TO 187+745)on Old Khasra No. 507/1705 & 507/1721 (New Khasra No. 1920/507 & 1922/507) at Village- Bhandana, Tehsil & District - Dausa, Rajasthan
|
Approach Access
|
HINDUSTAN PETROLEUM CORPORATION LTD.
|
0.1369
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
31 Mar 2022
|
Stage-I Approval on
|
:
|
24 Nov 2022
|
Compliance Report Submitted by User Agency on
|
:
|
23 Mar 2023
|
|
|
|
12 May 2023
|
39
|
Rajasthan
|
FP/RJ/TRANS/149957/2021
|
1(71)forest/2022
|
“Construction of 400 KV D/C Quad Bikaner(PG) to Bikaner II (PS) Transmission line
|
Transmission Line
|
POWER GRID CORPORATION OF INDIA LTD ,BIKANER
|
0.8142
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
15 Dec 2021
|
Stage-I Approval on
|
:
|
01 Mar 2023
|
Compliance Report Submitted by User Agency on
|
:
|
03 May 2023
|
|
|
|
11 May 2023
|
40
|
Rajasthan
|
FP/RJ/ROAD/7609/2014
|
1(44)forest/2015
|
A/R to Sanwalda
|
Road
|
EXECUTIVE ENGINEER
|
0.996
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
29 Oct 2014
|
Stage-I Approval on
|
:
|
04 Mar 2015
|
Compliance Report Submitted by User Agency on
|
:
|
25 Jul 2024
|
|
|
|
10 Apr 2023
|
41
|
Rajasthan
|
FP/RJ/Approach/151284/2022
|
1(135)forest2022
|
Construction of Approach Road for Proposed Bharat Petroleum Corp. Ltd. Retail Outlet on Merta to Gotan Road (SH-86) between KM Stone No. 2-3 (Chainage: 2/947.80 - 2/982.80) LHS in Old Khasra No. 6267/2783 & New Khasra No 6408/6267, At Village - Merta, Tehsil - Merta, District - Nagaur, Raj.
|
Approach Access
|
Bharat Petroleum Corporation Ltd.
|
0.0632
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
28 Feb 2022
|
Stage-I Approval on
|
:
|
29 Nov 2022
|
Compliance Report Submitted by User Agency on
|
:
|
27 Jan 2023
|
|
|
|
10 Apr 2023
|
42
|
Rajasthan
|
FP/RJ/OFC/149705/2021
|
1(56)forest/2022
|
Loying of OFC CABLE BLOWING WORK FOR TELESONIC CONNECTIVITY from Forest Naka, near Camel Farm, Kotri Road to Surdhana in Bikaner of total length 9000 mtr.
|
Optical Fibre Cable
|
TELESONIC NETWORKS LIMITED
|
0.4185
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
17 Dec 2021
|
Stage-I Approval on
|
:
|
01 Jun 2022
|
Compliance Report Submitted by User Agency on
|
:
|
21 Mar 2023
|
|
|
|
31 Mar 2023
|
43
|
Rajasthan
|
FP/RJ/ROAD/52178/2020
|
1(76)forest/2021
|
PROPOSED FOREST LAND 0.85 Ha. FOR DIVERSION FOR CONSTRUCTION OF ROAD NEAR VILLAGE- KOLIDA TO KRISHAN NAGAR ,FOREST BLOCK - POSHANI P.F.,RANGE - SIKAR , TEHSIL- SIKAR, DISTT.- SIKAR (RAJ.)
|
Road
|
PUBLIC WORKS DEPATMENT SIKAR
|
0.85
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
02 Nov 2020
|
Stage-I Approval on
|
:
|
27 Oct 2021
|
Compliance Report Submitted by User Agency on
|
:
|
02 Dec 2022
|
|
|
|
24 Mar 2023
|
44
|
Rajasthan
|
FP/RJ/Approach/156506/2022
|
1(134)Forest/2022
|
Construction of Approach Access for Indian Oil Corporation Limited Retail Outlet on Didwana-Ladnun Road SH-7-D (LHS), At KM Stone Chainage No. - 144+438 to 144+458 in Khasra No. 111/19 (New Khasra 116/111) At Village-Natas Tehsil– Ladnun , District – Nagaur (Rajasthan)
|
Approach Access
|
INDIAN OIL CORPORATION LTD
|
0.0536
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
09 Jun 2022
|
Stage-I Approval on
|
:
|
22 Nov 2022
|
Compliance Report Submitted by User Agency on
|
:
|
19 Jan 2023
|
|
|
|
03 Mar 2023
|
45
|
Rajasthan
|
FP/RJ/ROAD/145183/2021
|
1(25)forest/2022
|
Widening of Existing road from Neem Ka Thana - Cheeplata Road (ODR-17) to Deepawas village Tehsil -Neem Ka Thana District Sikar Rajasthan
|
Road
|
MISSING LINK ROAD ,PWD NEEM KA THANA ,SIKAR
|
0.9737
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
28 Jul 2021
|
Stage-I Approval on
|
:
|
08 Apr 2022
|
Compliance Report Submitted by User Agency on
|
:
|
22 Dec 2022
|
|
|
|
03 Mar 2023
|
46
|
Rajasthan
|
FP/RJ/TRANS/148624/2021
|
1(25)forest/2022
|
Construction for LILO of 132kV S/C Sikar-Laxmangarh Line at 132 KV GSS Rasidpura , District -Sikar(Rajasthan)
|
Transmission Line
|
RAJASTHAN RAJYA VIDYUT PRASARAN NIGAM LIMITED
|
0.1026
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
26 Oct 2021
|
Stage-I Approval on
|
:
|
13 Apr 2022
|
Compliance Report Submitted by User Agency on
|
:
|
27 Jan 2023
|
|
|
|
24 Feb 2023
|
47
|
Rajasthan
|
FP/RJ/TRANS/146976/2021
|
1(15)forest/2022
|
“Construction for LILO of 132kV S/C Beawar-Jethana line at Peeplaj , District -Ajmer (Rajasthan)”
|
Transmission Line
|
RVPNL AJMER
|
0.0918
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
09 Sep 2021
|
Stage-I Approval on
|
:
|
22 Feb 2022
|
Compliance Report Submitted by User Agency on
|
:
|
17 Aug 2022
|
|
|
|
08 Feb 2023
|
48
|
Rajasthan
|
FP/RJ/TRANS/141834/2021
|
1(86)Forest/2021
|
“Construction of 400 KV D/C Ramgarh-II to Fatehgarh-II Transmission line, Total Route length 44.150 km District- Jaisalmer (Rajasthan)”
|
Transmission Line
|
POWERGRID RAMGARH TRANSMISSION LIMITED
|
0.1794
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
28 Apr 2021
|
Stage-I Approval on
|
:
|
18 Nov 2021
|
Compliance Report Submitted by User Agency on
|
:
|
03 Jun 2022
|
|
|
|
20 Jan 2023
|
49
|
Rajasthan
|
FP/RJ/ROAD/41639/2019
|
1(7)forest/2021
|
Rectification of Black Spot ID No. RJ-032/Jalore ; reg. Construction of 6 lane VUP with service road at km 268.620 of NH-15 (Jaisalmer - Barmer-Sanchore Section) in the state of Rajasthan
|
Road
|
PUBLIC WORKS DEPARTMENT NH DIVISION BARMER
|
0.99
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
24 Aug 2019
|
Stage-I Approval on
|
:
|
23 Feb 2021
|
Compliance Report Submitted by User Agency on
|
:
|
22 Oct 2021
|
|
|
|
02 Jan 2023
|
50
|
Rajasthan
|
FP/RJ/Approach/147151/2021
|
1(21)forest/2022
|
Construction of Approach Road for Proposed Indian Oil Corporation Ltd. Retail Outlet on Bikaner – Nagaur Road (NH-89) between KM Stone No. 178 - 179 (Chainage: 178+212 to 178+247) RHS in Khasra No. 943/781 (After Conversion Khasra No. 979/943 ), at Village - Badani, Tehsil & District - Nagaur, Raj.
|
Approach Access
|
Indian Oil Corporation Limited (IOCL)
|
0.1447
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
13 Sep 2021
|
Stage-I Approval on
|
:
|
04 Mar 2022
|
Compliance Report Submitted by User Agency on
|
:
|
19 Oct 2022
|
|
|
|
27 Dec 2022
|
|