Sno. | State Name | Proposal No. | RO/Ministry File Number | Proposal Name | Category | User Agency Name | Area (ha.) | Proposal Status | Important Dates | Allocation of Fresh forest land (Form-A) Part-I | View Report (Part-II to Part-V and Stage-I Clearances) | Stage-II Approval on |
1
|
Tamil Nadu
|
FP/TN/ROAD/151930/2022
|
4-TNB118/2024-CHN
|
Construction of Road Over Bridge in lieu of LC No.32 inbetween Tambaram and Vandalur Railway stations near Perungalathur
|
Road
|
CHIEF ENGINEER, METRO, HIGHWAYS DEPARTMENT, HRS CAMPUS, GUINDY, CHENNAI 600 025.CHIEF ENGINEER, METRO, HIGHWAYS DEPARTMENT, HRS CAMPUS, GUINDY, CHENNAI 600 025.
|
0.95472
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
02 Feb 2022
|
Stage-I Approval on
|
:
|
27 Aug 2024
|
Compliance Report Submitted by User Agency on
|
:
|
01 Jan 2025
|
|
|
|
13 Mar 2025
|
2
|
Tamil Nadu
|
FP/TN/IND/34099/2018
|
4-TNB033/2019-CHN
|
TWAD 20 MGD CLOSED CONDUIT SCHEME
|
Industry
|
TWAD BOARD
|
0.08
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
11 Jun 2018
|
Stage-I Approval on
|
:
|
18 Aug 2020
|
Compliance Report Submitted by User Agency on
|
:
|
26 Dec 2024
|
|
|
|
26 Feb 2025
|
3
|
Tamil Nadu
|
FP/TN/ROAD/155502/2022
|
4-TNB117/2024-CHN
|
Construction of Grade Seperator connecting Medavakkam – Sholinganallur road junction, Medavakkam - Mambakkam road junction, Mount – Medavakkam Road junction in Marmalong Bridge – Irumbuliyur Road at M
|
Road
|
CHIEF ENGINEER, METRO, HIGHWAYS DEPARTMENT, HRS CAMPUS, GUINDY, CHENNAI 600 025.CHIEF ENGINEER, METRO, HIGHWAYS DEPARTMENT, HRS CAMPUS, GUINDY, CHENNAI 600 025.
|
0.536
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
20 May 2022
|
Stage-I Approval on
|
:
|
04 Apr 2024
|
Compliance Report Submitted by User Agency on
|
:
|
07 Oct 2024
|
|
|
|
21 Feb 2025
|
4
|
Tamil Nadu
|
FP/TN/TRANS/150320/2021
|
4-TNB100/2023-CHN
|
Erection of 230KV DC line on MC towers by making LILO of existing Ottiyambakkam to Omega feeder - II at the proposed Mambakkam 230/110KV Substation
|
Transmission Line
|
TAMIL NADU TRANSMISSION CORPORATION LIMITED
|
4.27
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
23 Dec 2021
|
Stage-I Approval on
|
:
|
06 Nov 2023
|
Compliance Report Submitted by User Agency on
|
:
|
15 Jul 2024
|
|
|
|
10 Jan 2025
|
5
|
Tamil Nadu
|
FP/TN/Others/30208/2017
|
4-TNB074/2021-CHN
|
Laying OFC in Anchetty to Denkanikottai route
|
Others
|
Jio Digital Fibre Private Limited
|
0.312
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
11 Nov 2017
|
Stage-I Approval on
|
:
|
23 Aug 2022
|
Compliance Report Submitted by User Agency on
|
:
|
19 Sep 2023
|
|
|
|
14 Aug 2024
|
6
|
Tamil Nadu
|
FP/TN/Others/36378/2018
|
4-TNB107/2023-CHN
|
Laying of OFC along road side of Thiruvannamalai to Thiyagadurgam road section from Pagandai Koot road to Thiagadurgam across Swamimalai R.F.
|
Others
|
Jio Digital Fibre Private Limited
|
0.1137
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
06 Oct 2018
|
Stage-I Approval on
|
:
|
31 Jul 2023
|
Compliance Report Submitted by User Agency on
|
:
|
27 Dec 2023
|
|
|
|
15 Jul 2024
|
7
|
Tamil Nadu
|
FP/TN/Others/38127/2019
|
4-TNB104/2023-CHN
|
Laying of OFC along road side of Rishivandiyam to Poondi (Eraiyur) and Adhiyur to Eraiyur road sections road section in Rishivandiyam - Nemili Road across Seedevi R.F. in Sankarapuram Taluk of Villupu
|
Others
|
Jio Digital Fibre Private Limited
|
0.045
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
17 Jan 2019
|
Stage-I Approval on
|
:
|
31 Jul 2023
|
Compliance Report Submitted by User Agency on
|
:
|
27 Dec 2023
|
|
|
|
27 Jun 2024
|
8
|
Tamil Nadu
|
FP/TN/Others/36379/2018
|
4-TNB106/2023-CHN
|
Laying of OFC along road side of Sankarapuram to Arakandanallur road section from Kulathur to Nariyandhal across Kaduvanur R.F. and Swamimalai R.F.
|
Others
|
Jio Digital Fibre Private Limited
|
0.1266
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
06 Oct 2018
|
Stage-I Approval on
|
:
|
31 Jul 2023
|
Compliance Report Submitted by User Agency on
|
:
|
27 Dec 2023
|
|
|
|
27 Jun 2024
|
9
|
Tamil Nadu
|
FP/TN/Others/38126/2019
|
4-TNB105/2023-CHN
|
Laying of OFC along road side of Maiyanur to Thondananthal road section across Melpalangur R.F. in Villupuram District.
|
Others
|
Jio Digital Fibre Private Limited
|
0.054
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
12 Jan 2019
|
Stage-I Approval on
|
:
|
31 Jul 2023
|
Compliance Report Submitted by User Agency on
|
:
|
27 Dec 2023
|
|
|
|
13 Jun 2024
|
10
|
Tamil Nadu
|
FP/TN/Others/30207/2017
|
4-TNB076/2021-CHN
|
Laying OFC for Dharmapuri-Anchetty route Anchetty stretch
|
Others
|
Jio Digital Fibre Private Limited
|
0.258
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
11 Nov 2017
|
Stage-I Approval on
|
:
|
23 Aug 2022
|
Compliance Report Submitted by User Agency on
|
:
|
25 May 2023
|
|
|
|
06 May 2024
|
11
|
Tamil Nadu
|
FP/TN/OFC/118876/2021
|
4-TNB101/2023-CHN
|
Laying underground OFC along road of Vaiyampatti Konnaiyur MDR 729 ammapatti to Ammankuruchi through forest area
|
Optical Fibre Cable
|
JIO DIGITAL FIBRE PRIVATE LIMITED
|
0.0069
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
07 Jan 2021
|
Stage-I Approval on
|
:
|
11 May 2023
|
Compliance Report Submitted by User Agency on
|
:
|
09 Aug 2023
|
|
|
|
16 Jan 2024
|
12
|
Tamil Nadu
|
FP/TN/ROAD/53276/2020
|
4-TNC099/2022-CHN
|
Construction of 6 lane Highway, Greenfield corridor from Chittoor – Thatchur road (NH 716B)
|
Road
|
National Highways Authority of India
|
14.029
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
05 Nov 2020
|
Stage-I Approval on
|
:
|
21 Dec 2022
|
Compliance Report Submitted by User Agency on
|
:
|
04 Oct 2023
|
|
|
|
01 Jan 2024
|
13
|
Tamil Nadu
|
FP/TN/Others/33885/2018
|
4-TNB089/2022-CHN
|
Laying OFC from Madurai-Natham Main Road to Saranthangi village through forest area
|
Others
|
Jio Digital Fibre Private Limited
|
0.033
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
28 May 2018
|
Stage-I Approval on
|
:
|
24 Aug 2022
|
Compliance Report Submitted by User Agency on
|
:
|
07 Aug 2023
|
|
|
|
06 Dec 2023
|
14
|
Tamil Nadu
|
FP/TN/WATER/153702/2022
|
4-TNB103/2023-CHN
|
CWSS to 8 TPs, 2452 Rural habitations in 11 unions with bulk provision to 3 Municipalities in Sivagangai District with river Cauvery as source
|
Drinking Water
|
EE TWAD PROJECT DN KULITHALAI
|
0.874
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
29 Mar 2022
|
Stage-I Approval on
|
:
|
13 Jun 2023
|
Compliance Report Submitted by User Agency on
|
:
|
19 Jun 2023
|
|
|
|
16 Aug 2023
|
15
|
Tamil Nadu
|
FP/TN/ROAD/32148/2018
|
4-TNB091/CHN-2022
|
Madurai Ring Road
|
Road
|
NATIONAL HIGHWAY AUTHORITY OF INDIA
|
1.28
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
19 Feb 2018
|
Stage-I Approval on
|
:
|
28 Mar 2023
|
Compliance Report Submitted by User Agency on
|
:
|
22 May 2023
|
|
|
|
16 Aug 2023
|
16
|
Tamil Nadu
|
FP/TN/Others/149812/2021
|
4-TNB090/2022-CHN
|
Expansion works of Government Arts and Science College, Jayankondam across Periyavalayam R.F. in Ariyalur District
|
Others
|
GOVT. ARTS & SCIENCE COLLEGE, JAYANKODAM, ARIYALUR DISTRICT
|
0.95
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
03 Dec 2021
|
Stage-I Approval on
|
:
|
16 Jan 2023
|
Compliance Report Submitted by User Agency on
|
:
|
26 Apr 2023
|
|
|
|
07 Jun 2023
|
17
|
Tamil Nadu
|
FP/TN/ROAD/29470/2017
|
4-TNB077/2022-CHN
|
MADURAI - NATHAM
|
Road
|
NATIONAL HIGHWAY AUTHORITY OF INDIA
|
2.3824
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
26 Sep 2017
|
Stage-I Approval on
|
:
|
15 Nov 2022
|
Compliance Report Submitted by User Agency on
|
:
|
01 Feb 2023
|
|
|
|
28 Apr 2023
|
18
|
Tamil Nadu
|
FP/TN/ROAD/151511/2022
|
4-TNB094/2022-CHN
|
Widening and Improvement of existing carriage way to 4-laning of Poondiyankuppam-Sathanathapuram section of NH-45A in the state of TN under NHDP Phase IV (Pkg-3)
|
Road
|
NATIONAL HIGHWAY AUTHORITY
|
2.5553
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
24 Jan 2022
|
Stage-I Approval on
|
:
|
22 Sep 2022
|
Compliance Report Submitted by User Agency on
|
:
|
24 Jan 2023
|
|
|
|
03 Mar 2023
|
19
|
Tamil Nadu
|
FP/TN/ROAD/21076/2016
|
4-TNB026/2018-CHN
|
Upgradation of the road from kannamoochi pirivu to Kemmampatti
|
Road
|
BLOCK DEVELOPMENT OFFICER
|
4.2
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
22 Aug 2016
|
Stage-I Approval on
|
:
|
22 Sep 2021
|
Compliance Report Submitted by User Agency on
|
:
|
26 Dec 2022
|
|
|
|
03 Mar 2023
|
20
|
Tamil Nadu
|
FP/TN/RAIL/141594/2021
|
4-TNB080/2022-CHN
|
CMRL Phase II C5 - 06 Madhavaram to Sholinganallur- Nanmangalam Forest land required for Elevated metro station
|
Railway
|
CMRL CHENNAI
|
1.569
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
21 Apr 2021
|
Stage-I Approval on
|
:
|
13 Jul 2022
|
Compliance Report Submitted by User Agency on
|
:
|
07 Feb 2023
|
|
|
|
02 Mar 2023
|
21
|
Tamil Nadu
|
FP/TN/Others/10333/2015
|
4-TNB060/2020-CHN
|
SIVANESH BAGERATHI ENTERPRISES
|
Others
|
SIVANESH BAGERATHI ENTERPRISES
|
0.288
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
06 Mar 2015
|
Stage-I Approval on
|
:
|
27 Jan 2022
|
Compliance Report Submitted by User Agency on
|
:
|
08 Sep 2022
|
|
|
|
16 Feb 2023
|
22
|
Tamil Nadu
|
FP/TN/Others/38130/2019
|
4-TNB088/ 2022-CHN
|
Laying of OFC along road side of Vadakkanandhal - Thumbal road section via Parigam, Kondiyanantham across Parigam RF in Villupuram District.
|
Others
|
Jio Digital Fibre Private Limited
|
0.54
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
19 Jan 2019
|
Stage-I Approval on
|
:
|
12 Jul 2022
|
Compliance Report Submitted by User Agency on
|
:
|
21 Oct 2022
|
|
|
|
16 Dec 2022
|
23
|
Tamil Nadu
|
FP/TN/ROAD/19576/2016
|
4-TNB029/2019-CHN
|
Bodhamalai - Kappukadu - Pudupatti - Kedamalai Road (Km 0/0 - 11/375)
|
Road
|
DRDA NAMAKKAL
|
2.71
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
10 Mar 2017
|
Stage-I Approval on
|
:
|
07 Feb 2019
|
Compliance Report Submitted by User Agency on
|
:
|
25 Aug 2022
|
|
|
|
30 Nov 2022
|
24
|
Tamil Nadu
|
FP/TN/Others/29282/2017
|
4-TNB083/2022-CHN
|
Laying OFC for Coimbatore Goundampalayam to Udagamandalam route
|
Others
|
Jio Digital Fibre Private Limited
|
0.9
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
16 Sep 2017
|
Stage-I Approval on
|
:
|
11 Mar 2022
|
Compliance Report Submitted by User Agency on
|
:
|
24 Aug 2022
|
|
|
|
29 Nov 2022
|
25
|
Tamil Nadu
|
FP/TN/ROAD/19579/2016
|
4-TNC027/2018-CHN
|
Keelur - Vadugammelur Km 0/0 - 23/625
|
Road
|
DRDA NAMAKKAL
|
5.96
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
10 Mar 2017
|
Stage-I Approval on
|
:
|
03 Jan 2019
|
Compliance Report Submitted by User Agency on
|
:
|
25 Aug 2022
|
|
|
|
25 Nov 2022
|
26
|
Tamil Nadu
|
FP/TN/ROAD/8238/2014
|
4-TNC043/2019-CHN
|
Bangalore-Chennai Expressway
|
Road
|
NATIONAL HIGHWAY AUTHORITY OF INDIA PIU KRISHNAGIRI
|
5.42
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
27 Nov 2014
|
Stage-I Approval on
|
:
|
13 May 2021
|
Compliance Report Submitted by User Agency on
|
:
|
17 Aug 2022
|
|
|
|
31 Oct 2022
|
27
|
Tamil Nadu
|
FP/TN/TRANS/15163/2015
|
4-TNB052/2020-CHN
|
Erection of 230 KV DC Transmission line from Ottiyambakkam 400 KV SS to Omega 230 KV SS
|
Transmission Line
|
Tamil Nadu Generation and Distribution Corporation
|
3.256295
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
07 Sep 2015
|
Stage-I Approval on
|
:
|
06 May 2021
|
Compliance Report Submitted by User Agency on
|
:
|
18 Jul 2022
|
|
|
|
31 Oct 2022
|
28
|
Tamil Nadu
|
FP/TN/ROAD/37330/2018
|
4-TNB071/2021-CHN
|
Natham - Thuvarankurichi (NH-785 Extension)
|
Road
|
National Highways Authority of India
|
3.708
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
28 Nov 2018
|
Stage-I Approval on
|
:
|
20 Apr 2022
|
Compliance Report Submitted by User Agency on
|
:
|
18 Aug 2022
|
|
|
|
21 Sep 2022
|
29
|
Tamil Nadu
|
FP/TN/Others/38125/2019
|
4-TNB078/2022-CHN
|
Laying of OFC along road side of Nainarpalayam to Chinnasalem road section Road across Thottapadi R.F. in Villupuram District.
|
Others
|
Jio Digital Fibre Private Limited
|
0.057
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
11 Jan 2019
|
Stage-I Approval on
|
:
|
24 Feb 2022
|
Compliance Report Submitted by User Agency on
|
:
|
20 May 2022
|
|
|
|
21 Sep 2022
|
30
|
Tamil Nadu
|
FP/TN/RAIL/9372/2015
|
4-TNB035/2019-CHN
|
New Broad gauge line between Tindivanam and Nagari in Southern Railway
|
Railway
|
DY CHIEF ENGINEER CONSTRUCTION TAMBARAM
|
4.832
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
06 Aug 2015
|
Stage-I Approval on
|
:
|
15 Jun 2022
|
Compliance Report Submitted by User Agency on
|
:
|
24 Jun 2022
|
|
|
|
28 Jun 2022
|
31
|
Tamil Nadu
|
FP/TN/TRANS/30358/2017
|
4-TNB063/2020-CHN
|
conversion of existing 11 kv line into 33 kv line for establishement of 33/11 kv new sub station
|
Transmission Line
|
TANGEDCO PUDURNADU
|
4.47
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
22 Nov 2017
|
Stage-I Approval on
|
:
|
13 May 2021
|
Compliance Report Submitted by User Agency on
|
:
|
08 Apr 2022
|
|
|
|
24 Jun 2022
|
32
|
Tamil Nadu
|
FP/TN/Others/38131/2019
|
4-TNB073/2021-CHN
|
Laying of OFC along road side of Andipatti - Usilampatti road section (Andipatti Ghat) in Madurai - Kochin NH49 via Sasthakovil, Thimmarasanaickanur village in across Andipati South R.F. in Andipatti
|
Others
|
Jio Digital Fibre Private Limited
|
0.039
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
23 Jan 2019
|
Stage-I Approval on
|
:
|
31 Aug 2021
|
Compliance Report Submitted by User Agency on
|
:
|
03 Jan 2022
|
|
|
|
31 May 2022
|
33
|
Tamil Nadu
|
FP/TN/TRANS/31606/2018
|
4-TNC046/2019-CHN
|
400kV EHT line from Thervaikandigai 400kV SS to Common Point of Tharvaikandigai 400kV SS, Manali 400kV SS & Korattur 400kV SS in Chennai Region
|
Transmission Line
|
TNEB CHENNAI
|
11.8726
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
01 Feb 2018
|
Stage-I Approval on
|
:
|
02 Dec 2019
|
Compliance Report Submitted by User Agency on
|
:
|
10 Mar 2021
|
|
|
|
30 Mar 2022
|
34
|
Tamil Nadu
|
FP/TN/Others/20994/2016
|
4-TNB030/2019-CHN
|
TANTEA SALES PROMOTION
|
Others
|
THE TAMILNADU TEA PLANTATION CORPORATION LIMITED
|
0.0048768
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
21 Nov 2016
|
Stage-I Approval on
|
:
|
25 Mar 2019
|
Compliance Report Submitted by User Agency on
|
:
|
28 Sep 2020
|
|
|
|
18 Feb 2022
|
35
|
Tamil Nadu
|
FP/TN/ROAD/32737/2018
|
4-TNB048/2019-CHN
|
BEEMARAPATTI ROAD TO KILVALASAI
|
Road
|
BLOCK DEVELOPMENT OFFICER THANDARAMPET
|
3.5
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
03 Apr 2018
|
Stage-I Approval on
|
:
|
09 Mar 2020
|
Compliance Report Submitted by User Agency on
|
:
|
29 Sep 2020
|
|
|
|
29 Dec 2021
|
36
|
Tamil Nadu
|
FP/TN/ROAD/7969/2014
|
4-TNB023/2018-CHN
|
widening and strengthening Thirukalukundram bypass (MDR – km 4/350 to 4/690 km) of State Highway No.58 connecting Sadras to Chengalpattu
|
Road
|
TAMILNADU ROAD SECTOR PROJECT
|
0.782
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
03 Feb 2015
|
Stage-I Approval on
|
:
|
18 Jul 2018
|
Compliance Report Submitted by User Agency on
|
:
|
10 Dec 2018
|
|
|
|
04 Oct 2021
|
37
|
Tamil Nadu
|
FP/TN/Others/31029/2017
|
4-TNB049/2019-CHN
|
Installation of Solar Powered Aviation Obstruction Lights at the peak of Vallanadu Hills Vagaikulam, Thoothukudi
|
Others
|
Airports Authority of India
|
0.01
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
08 Feb 2018
|
Stage-I Approval on
|
:
|
18 May 2021
|
Compliance Report Submitted by User Agency on
|
:
|
02 Jul 2021
|
|
|
|
17 Aug 2021
|
38
|
Tamil Nadu
|
FP/TN/OFC/39018/2019
|
4-TNB069/2020-CHN
|
laying optical fiber cable
|
Optical Fibre Cable
|
DGM STP CHENNAI
|
0.0126
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
02 Mar 2019
|
Stage-I Approval on
|
:
|
06 Jan 2021
|
Compliance Report Submitted by User Agency on
|
:
|
05 Mar 2021
|
|
|
|
17 Aug 2021
|
39
|
Tamil Nadu
|
FP/TN/ROAD/9818/2015
|
4-TNB011/2017-CHN
|
Four laning of NH-47B Nagercoil to Kavalkinaru
|
Road
|
NATIONAL HIGHWAY AUTHORITY OF INDIA TIRUNELVELI
|
0.88
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
24 Jul 2015
|
Stage-I Approval on
|
:
|
09 May 2018
|
Compliance Report Submitted by User Agency on
|
:
|
28 Sep 2018
|
|
|
|
30 Jul 2021
|
40
|
Tamil Nadu
|
FP/TN/TRANS/32103/2018
|
4-TNB051/2020-CHN
|
Providing electricity service for Agricultural purpose in survey field No.103 of Thoppampatti village, Sirumalai North West Slope RF in Sirumalai Range
|
Transmission Line
|
SUPERINTENDING ENGINEER
|
0.05632
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
28 Feb 2018
|
Stage-I Approval on
|
:
|
25 Feb 2020
|
Compliance Report Submitted by User Agency on
|
:
|
01 Feb 2021
|
|
|
|
16 Jun 2021
|
41
|
Tamil Nadu
|
FP/TN/TRANS/32353/2018
|
4-TNC042/2019-CHN
|
400kV D/C Pugalur Thiruvalam Transmission line
|
Transmission Line
|
POWERGRID CORPORATION OF INDIA LIMITED
|
5.382
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
13 Mar 2018
|
Stage-I Approval on
|
:
|
02 Dec 2019
|
Compliance Report Submitted by User Agency on
|
:
|
28 Oct 2020
|
|
|
|
21 Jan 2021
|
42
|
Tamil Nadu
|
FP/TN/TRANS/36296/2018
|
4-TNB058/2020-CHN
|
Erection of 110kV DC line on DC Tower by Making LILO in Achrapakkam - Murukkeri 110kV feeder at Proposed Marakkanam 110/33kV SS
|
Transmission Line
|
CDC TANGEDCO
|
1.65
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
01 Nov 2018
|
Stage-I Approval on
|
:
|
27 May 2020
|
Compliance Report Submitted by User Agency on
|
:
|
27 Jul 2020
|
|
|
|
08 Dec 2020
|
43
|
Tamil Nadu
|
FP/TN/TRANS/23761/2017
|
4-TNC044/2019-CHN
|
Erection of 230 KV DC Transmission line from Cuddalore to Veerapuram (S.P.Koil) via Neyveli.
|
Transmission Line
|
Tamil Nadu Generation and Distribution Corporation
|
6.026
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
21 Mar 2017
|
Stage-I Approval on
|
:
|
02 Dec 2019
|
Compliance Report Submitted by User Agency on
|
:
|
06 Mar 2020
|
|
|
|
03 Aug 2020
|
44
|
Tamil Nadu
|
FP/TN/Others/42494/2019
|
4-TNC050/2019-CHN
|
Establishment of New Government Medical College
|
Others
|
HEALTH AND FAMILY WELFARE DEPARTMENT
|
10.12
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
18 Oct 2019
|
Stage-I Approval on
|
:
|
22 Apr 2020
|
Compliance Report Submitted by User Agency on
|
:
|
08 May 2020
|
|
|
|
27 May 2020
|
45
|
Tamil Nadu
|
FP/TN/TRANS/25759/2017
|
4-TNB022/2018-CHN
|
Construction of 800kV HVDC Transmission line from Raigarh to Pugalur
|
Transmission Line
|
POWERGRID CORPORATION OF INDIA LIMITED
|
9.12
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
20 Apr 2017
|
Stage-I Approval on
|
:
|
07 Jun 2018
|
Compliance Report Submitted by User Agency on
|
:
|
09 Jul 2019
|
|
|
|
30 Jan 2020
|
46
|
Tamil Nadu
|
FP/TN/Others/17714/2016
|
4-TNB018/2018-CHN
|
Laying optical fiber cable through Mudumalai Tiger Reserve, Udhagamandalam.
|
Others
|
RELAINCE JIO INFORCOMM LIMITED
|
0.71595
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
28 Apr 2016
|
Stage-I Approval on
|
:
|
06 Mar 2019
|
Compliance Report Submitted by User Agency on
|
:
|
05 Jul 2019
|
|
|
|
04 Oct 2019
|
47
|
Tamil Nadu
|
FP/TN/Pipeline/34620/2018
|
4-TNB037/2019-CHN
|
Conveyor and Pipeline crossing Korampallam Canal
|
Pipeline
|
SEPC Power Private Limited
|
0.17688
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
24 Jul 2018
|
Stage-I Approval on
|
:
|
28 May 2019
|
Compliance Report Submitted by User Agency on
|
:
|
03 Jul 2019
|
|
|
|
23 Aug 2019
|
48
|
Tamil Nadu
|
FP/TN/Approach/36237/2018
|
4-TNB032/2019-CHN
|
Construction and improvement works of steps leading to Mahalingeswarar Temple in Mettupatti RF, Nilakottai TK, Dindigul District
|
Approach Access
|
BLOCK DEVELOPMENT OFFICE
|
0.1896
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
29 Sep 2018
|
Stage-I Approval on
|
:
|
12 Apr 2019
|
Compliance Report Submitted by User Agency on
|
:
|
14 Jun 2019
|
|
|
|
06 Aug 2019
|
49
|
Tamil Nadu
|
FP/TN/THE/36924/2018
|
4-TNB028/2019-CHN
|
Uppur Thermal Power Project (2 x 800 MW)
|
Thermal
|
TNEB HEADQUARTERS EM CELL
|
0.57
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
05 Nov 2018
|
Stage-I Approval on
|
:
|
30 Jan 2019
|
Compliance Report Submitted by User Agency on
|
:
|
01 Mar 2019
|
|
|
|
09 Apr 2019
|
50
|
Tamil Nadu
|
FP/TN/Others/21809/2016
|
4-TNB017/2017-CHN
|
Fish landing Centre at Annamalaichery village
|
Others
|
FISHERIES DEPARTMENT
|
0.335
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
07 Oct 2016
|
Stage-I Approval on
|
:
|
05 Apr 2018
|
Compliance Report Submitted by User Agency on
|
:
|
28 Nov 2018
|
|
|
|
06 Feb 2019
|
|