Sno. | State Name | Proposal No. | RO/Ministry File Number | Proposal Name | Category | User Agency Name | Area (ha.) | Proposal Status | Important Dates | Allocation of Fresh forest land (Form-A) Part-I | View Report (Part-II to Part-V and Stage-I Clearances) | Stage-II Approval on |
1
|
West Bengal
|
FP/WB/RAIL/19711/2016
|
5-WBB109/2020-BHU
|
SIVOK RANGPO NEW BROAD GAUGE RAIL LINE
|
Railway
|
NORTH EAST FRONTIER RAILWAY
|
0.9294
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
02 Jul 2016
|
Stage-I Approval on
|
:
|
31 Jul 2020
|
Compliance Report Submitted by User Agency on
|
:
|
20 Jun 2022
|
|
|
|
06 Sep 2024
|
2
|
West Bengal
|
FP/WB/Others/32953/2018
|
IRO/KOL/FC/98/BSF/2022
|
KLP RADHABARI FOR ESTABLISHMENT OF BN HQ
|
Others
|
COMMANDANTKLP RADHABARI
|
12.5
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
06 Apr 2018
|
Stage-I Approval on
|
:
|
18 Jul 2022
|
Compliance Report Submitted by User Agency on
|
:
|
23 Jan 2024
|
|
|
|
25 Apr 2024
|
3
|
West Bengal
|
FP/WB/OFC/146241/2021
|
IRO/KOL/WB/OFC/146241/2021
|
Proposal of Diversion of 0.0348 Ha of forest land in favour of Reliance Jio Infocomm Ltd THROUGH KHARIARBANDAR FOREST COMPARTMENT ALONG NH-31(R o W ) AND VILLAGE ROAD UNDER JALPAIGURI FOREST DIVISION
|
Optical Fibre Cable
|
Jio Digital Fibre Private Limited
|
0.0348
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
20 Aug 2021
|
Stage-I Approval on
|
:
|
22 Aug 2022
|
Compliance Report Submitted by User Agency on
|
:
|
19 Dec 2023
|
|
|
|
23 Apr 2024
|
4
|
West Bengal
|
FP/WB/Others/7248/2014
|
5-WBC087/2014-BHU
|
Raniganj Coal Bed Methane Project
|
Others
|
ESSAR OIL AND GAS EXPLORATION AND PRODUCTION LIMITED
|
18.4321
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
20 Sep 2014
|
Stage-I Approval on
|
:
|
02 Feb 2016
|
Compliance Report Submitted by User Agency on
|
:
|
21 Nov 2023
|
|
|
|
01 Jan 2024
|
5
|
West Bengal
|
FP/WB/RAIL/40708/2019
|
5-WBC110/2020-BHU
|
SIVOK RANGPO NEW BG RAIL LINE PROJECT
|
Railway
|
NORTH EAST FRONTIER RAILWAY
|
12.3786
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
17 Jun 2019
|
Stage-I Approval on
|
:
|
07 Sep 2020
|
Compliance Report Submitted by User Agency on
|
:
|
20 Jun 2022
|
|
|
|
22 Nov 2023
|
6
|
West Bengal
|
FP/WB/RAIL/47649/2020
|
WB-SRBG-09/2021/FC
|
SIVOK-RANGPO NEW BG RAIL PROJECT
|
Railway
|
NORTH EAST FRONTIER RAILWAY
|
13.512
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
18 Jul 2020
|
Stage-I Approval on
|
:
|
13 Jul 2021
|
Compliance Report Submitted by User Agency on
|
:
|
20 Jun 2022
|
|
|
|
22 Sep 2023
|
7
|
West Bengal
|
FP/WB/Others/34346/2018
|
IRO/KOL/WB/Others/34346/2018
|
Installation of Mobile Tower at Dungdungia-2 Compartment, Lepchajagat Beat, Ghoomsimana Range of Reliance Jio Infocomm Limited
|
Others
|
Jio Digital Fibre Private Limited
|
0.01
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
19 Jul 2018
|
Stage-I Approval on
|
:
|
04 Nov 2022
|
Compliance Report Submitted by User Agency on
|
:
|
16 Mar 2023
|
|
|
|
19 Jun 2023
|
8
|
West Bengal
|
FP/WB/ROAD/32306/2018
|
For/O/L/10T-09/2014
|
Proposal for diversion of 1.997 hec. of forest land in favour of NHIDCL for Construction of 1000 mtr. length viaduct at Rangpo between Km 51.100 to Km 53.900 on Sevoke-Gangtok Road (NH-31A, new NH-10) under Kalimpong Forest Division.
|
Road
|
MORTH (NHIDCL)
|
1.997
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
27 Feb 2018
|
Stage-I Approval on
|
:
|
05 Jul 2018
|
Compliance Report Submitted by User Agency on
|
:
|
09 Dec 2021
|
|
|
|
08 Jun 2023
|
9
|
West Bengal
|
FP/WB/Others/32874/2018
|
IRO/KOL/WB/Others/32874/2018
|
Roll Out of 4th Generation (4G) Broadband Services in West Bengal in Hanuman Jhora
|
Others
|
Jio Digital Fibre Private Limited
|
0.0225
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
06 Apr 2018
|
Stage-I Approval on
|
:
|
20 Sep 2022
|
Compliance Report Submitted by User Agency on
|
:
|
24 Feb 2023
|
|
|
|
07 Jun 2023
|
10
|
West Bengal
|
FP/WB/OFC/141578/2021
|
IRO/KOL/WB/OFC/141578/2021
|
Optical fiber cable laying
|
Optical Fibre Cable
|
TELESONIC NETWORK LTD.
|
0.4278
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
02 Aug 2021
|
Stage-I Approval on
|
:
|
17 Jan 2023
|
Compliance Report Submitted by User Agency on
|
:
|
14 Mar 2023
|
|
|
|
20 Apr 2023
|
11
|
West Bengal
|
FP/WB/Others/22966/2016
|
5-WBC094/2017-BHU
|
"Mega Tourism Project" at Tarapith
|
Others
|
DISTRICT COLLECTOR BIRBHUM
|
14.682
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
04 Jan 2017
|
Stage-I Approval on
|
:
|
22 Mar 2018
|
Compliance Report Submitted by User Agency on
|
:
|
27 Jan 2023
|
|
|
|
10 Mar 2023
|
12
|
West Bengal
|
FP/WB/WATER/152151/2022
|
IRO/KOL/WB/Water/152151/2022
|
Construction of water reservoir for water supply project within Darjeeling Municipality Under AMRUT.
|
Drinking Water
|
DARJEELING MUNICIPALITY
|
0.0378
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
09 Feb 2022
|
Stage-I Approval on
|
:
|
28 Jul 2022
|
Compliance Report Submitted by User Agency on
|
:
|
07 Feb 2023
|
|
|
|
06 Mar 2023
|
13
|
West Bengal
|
FP/WB/TRANS/51250/2020
|
WB/TRANS-86/2021/FC
|
Construction of 220 KV Double Circuit Transmission Line from Parulia Substation to Burdwan substation of Damodar Valley Corporation
|
Transmission Line
|
DAMODAR VALLEY CORPORATION
|
2.131
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
20 Oct 2020
|
Stage-I Approval on
|
:
|
04 Feb 2022
|
Compliance Report Submitted by User Agency on
|
:
|
07 Nov 2022
|
|
|
|
03 Mar 2023
|
14
|
West Bengal
|
FP/WB/Pipeline/150496/2021
|
IRO/KOL/WB/Pipeline/150496/2021
|
Haldia Durgapur underground LPG Pipeline Project
|
Pipeline
|
Indian Oil Corporation Limited (Pipelines Division)
|
0.0262
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
27 Dec 2021
|
Stage-I Approval on
|
:
|
23 Jun 2022
|
Compliance Report Submitted by User Agency on
|
:
|
06 Feb 2023
|
|
|
|
02 Mar 2023
|
15
|
West Bengal
|
FP/WB/Pipeline/141208/2021
|
WB/PFO-81/2021/FC
|
CGS Jamshedpur, WB Pipeline Project, JHBDPL
|
Pipeline
|
GAIL INDIA LIMITED
|
5.7333
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
20 Apr 2021
|
Stage-I Approval on
|
:
|
25 Apr 2022
|
Compliance Report Submitted by User Agency on
|
:
|
08 Dec 2022
|
|
|
|
13 Feb 2023
|
16
|
West Bengal
|
FP/WB/Pipeline/141208/2021
|
WB/PFO-81/2021/FC
|
CGS Jamshedpur, WB Pipeline Project, JHBDPL
|
Pipeline
|
GAIL INDIA LIMITED
|
5.7333
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
20 Apr 2021
|
Stage-I Approval on
|
:
|
25 Apr 2022
|
Compliance Report Submitted by User Agency on
|
:
|
08 Dec 2022
|
|
|
|
13 Feb 2023
|
17
|
West Bengal
|
FP/WB/HYD/8214/2014
|
8-51/2017-FC
|
1000 MW TURGA PUMPED STORAGE PROJECT
|
Hydel
|
WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED
|
234
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
25 Feb 2017
|
Stage-I Approval on
|
:
|
12 Apr 2018
|
Compliance Report Submitted by User Agency on
|
:
|
23 May 2022
|
|
|
|
13 Oct 2022
|
18
|
West Bengal
|
FP/WB/Others/43857/2020
|
WB/PFD-49/2021/FC
|
Development of a Tourism Complex in Murguma
|
Others
|
DISTRICT MAGISTRATE, PURULIA
|
0.99
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
10 Jan 2020
|
Stage-I Approval on
|
:
|
04 Feb 2022
|
Compliance Report Submitted by User Agency on
|
:
|
23 Mar 2022
|
|
|
|
27 Apr 2022
|
19
|
West Bengal
|
FP/WB/ROAD/30060/2017
|
5-WBC101/2018-BHU
|
Construction of twin 2-lane ROB and its approaches in replacement of existing Level Crossing Gate No.KA-38 (Railway Km.165/21-165/23) between Chandrakona Road and Garbeta Station in Kadamdiha at Km. 159.448 of NH-60 in the State of West Bengal.
|
Road
|
NH WING OF PUBLIC WORKS ROADS DIRECTORATE GOVT OF WEST BENGAL
|
9.533
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
27 Nov 2017
|
Stage-I Approval on
|
:
|
25 Jun 2018
|
Compliance Report Submitted by User Agency on
|
:
|
23 Feb 2022
|
|
|
|
26 Apr 2022
|
20
|
West Bengal
|
FP/WB/Others/42866/2019
|
5-WBB111/2020-BHU
|
Jagdishpur-Haldia-Bokaro-Dhamra Pipeline (JHBDPL) Underground Project of GAIL-
|
Others
|
GAIL INDIA LIMITED
|
0.645
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
23 Nov 2019
|
Stage-I Approval on
|
:
|
07 Sep 2020
|
Compliance Report Submitted by User Agency on
|
:
|
13 Sep 2021
|
|
|
|
13 Apr 2022
|
21
|
West Bengal
|
FP/WB/VELEC/34640/2018
|
FR//O/L/10T-06/2019
|
DDUGJY
|
Village Electricity
|
JALPAIGURI RE PROJECT WBSEDCL
|
0.9
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
11 Jul 2018
|
Stage-I Approval on
|
:
|
19 Mar 2021
|
Compliance Report Submitted by User Agency on
|
:
|
03 Sep 2021
|
|
|
|
02 Sep 2021
|
22
|
West Bengal
|
FP/WB/ROAD/37617/2018
|
FR/O/L/10T-02/2019
|
Realignment, Rehabilitation and Upgrading to 2 lane with paved shoulders configuration of Bagrakot to Kafer (Length of Project Km 0+000 to Km 40+000) & Kafer to Reshi border (Length Km 40+000 to Km 61+250 & Km 76+600 to Km 98+595) of NH-717A in West Bengal State Under Package-IV & Package-V Programme.
|
Road
|
MORTH (NHIDCL)
|
116.001
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
12 Dec 2018
|
Stage-I Approval on
|
:
|
20 Feb 2019
|
Compliance Report Submitted by User Agency on
|
:
|
14 Mar 2020
|
|
|
|
19 Feb 2021
|
23
|
West Bengal
|
FP/WB/Others/40606/2019
|
5-WBB105/2019-BHU
|
Jagdishpur-Haldia-Bokaro-Dhamra Pipeline (JHBDPL) Underground Project of GAIL
|
Others
|
GAIL INDIA LIMITED
|
2.7279
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
11 Jun 2019
|
Stage-I Approval on
|
:
|
01 Jan 2020
|
Compliance Report Submitted by User Agency on
|
:
|
18 Sep 2020
|
|
|
|
24 Dec 2020
|
24
|
West Bengal
|
FP/WB/Others/26270/2017
|
FR/O/L/10T-5/2019
|
KARMATHIRTHA
|
Others
|
BDO RAJGANJ
|
0.03339
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
18 Jul 2018
|
Stage-I Approval on
|
:
|
23 Dec 2019
|
Compliance Report Submitted by User Agency on
|
:
|
12 Jun 2020
|
|
|
|
08 Sep 2020
|
25
|
West Bengal
|
FP/WB/TRANS/34435/2018
|
FR/O/L/10T-9/2018
|
765kV D/C (Hexa) Ranchi- Medinipur Transmission Line (WB)
|
Transmission Line
|
POWERGRID MEDINIPUR JEERAT TRANSMISSION LIMITED
|
17.876
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 Jun 2018
|
Stage-I Approval on
|
:
|
18 Jan 2019
|
Compliance Report Submitted by User Agency on
|
:
|
21 Aug 2019
|
|
|
|
26 Aug 2020
|
26
|
West Bengal
|
FP/WB/TRANS/34478/2018
|
FR/O/L/10T-8/2018
|
LOOP OUT OF 400KV D/C CHANDITALA KHARAGPUR TRANSMISSION LINE AT 765/400KV MEDINIPUR SUBSTATION (WB)
|
Transmission Line
|
POWERGRID MEDINIPUR JEERAT TRANSMISSION LIMITED
|
0.497
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
02 Jul 2018
|
Stage-I Approval on
|
:
|
18 Jan 2019
|
Compliance Report Submitted by User Agency on
|
:
|
21 Aug 2019
|
|
|
|
26 Aug 2020
|
27
|
West Bengal
|
FP/WB/Others/26946/2017
|
5-WBB102/2018-BHU
|
Augmentation of Paradip-Haldia-Durgapur LPG Pipeline and its extension up to Patna and Muzaffarpur
|
Others
|
Indian Oil Corporation Limited (Pipelines Division)
|
0.562
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
04 Jul 2017
|
Stage-I Approval on
|
:
|
05 Nov 2018
|
Compliance Report Submitted by User Agency on
|
:
|
29 Mar 2019
|
|
|
|
07 Jun 2019
|
28
|
West Bengal
|
FP/WB/MIN/17602/2016
|
8-45/2018-FC
|
Gangaramchak & Gangaramchak-Bhadulia Coal Mine ( Open cast )
|
Mining
|
THE WEST BENGAL POWER DEVELOPMENT CORPORATION LIMITED
|
101.77
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
15 May 2017
|
Stage-I Approval on
|
:
|
29 Oct 2018
|
Compliance Report Submitted by User Agency on
|
:
|
20 Feb 2019
|
|
|
|
10 Apr 2019
|
29
|
West Bengal
|
FP/WB/ROAD/26127/2017
|
5-WBB096/2017-BHU
|
Construction of twins 2-lane ROB and its approaches in replacement of level crossing at Km. 652.600 on NH-31 (Railway Km. 20/7-8) between Neora & Lataguri at Lataguri in the state of West Bengal.
|
Road
|
NH WING OF PUBLIC WORKS ROADS DIRECTORATE GOVT OF WEST BENGAL
|
4.031
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
11 May 2017
|
Stage-I Approval on
|
:
|
20 Sep 2017
|
Compliance Report Submitted by User Agency on
|
:
|
26 Jun 2018
|
|
|
|
21 Dec 2018
|
30
|
West Bengal
|
FP/WB/TRANS/16943/2015
|
5-WBC093/2016-BHU
|
400kV D/C PURULIA-RANCHI TRANSMISSION LINE (PURULIA & KHARAGPUR TRANSMISSION COMPANY LIMITED)
|
Transmission Line
|
PURULIA KHARAGPUR TRANSMISSION COMPANY LIMITED
|
12.288
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
16 Dec 2015
|
Stage-I Approval on
|
:
|
22 Sep 2016
|
Compliance Report Submitted by User Agency on
|
:
|
16 Jul 2018
|
|
|
|
28 Sep 2018
|
31
|
West Bengal
|
FP/WB/TRANS/9287/2015
|
5-WBC092/2016-BHU
|
Construction of 400kv Punatsangchu Alipurduaraar transmission line
|
Transmission Line
|
POWERGRID CORPORATION OF INDIA LTD
|
16.39
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
13 Jan 2015
|
Stage-I Approval on
|
:
|
22 Jun 2016
|
Compliance Report Submitted by User Agency on
|
:
|
16 Oct 2017
|
|
|
|
22 Nov 2017
|