  (i). Proposal No. : FP/RJ/ROAD/39767/2019   (ii). Name of Project for which Forest Land is required : Construction/Up-gradation of two lane with paved shoulder of NH from Raisinghnagar - Poogal (Design Ch. 101.00 to Design Ch. 263.460) section (Length 162.460 Km) under Phase-I of Bharatmala Pariyojana on EPC Mode in the State of Rajasthan (Package -2)   (iii). Short narrative of the proposal and Project/scheme for which the forest land is required : Construction/Up-gradation of two lane with paved shoulder of NH from Raisinghnagar - Poogal (Design Ch. 101.00 to Design Ch. 263.460) section (Length 162.460 Km) under Phase-I of Bharatmala Pariyojana on EPC Mode in the State of Rajasthan (Package -2) District- Bikaner (Rajasthan)   (iv). State : Rajasthan   (v). Category of the Proposal : Road   (vi). Shape of forest land proposed to be diverted : Linear   (vii). Estimated cost of the Project(Rupees in lacs) : 71676   (viii). Area of forest land proposed for diversion(in ha.): 50.2571   (ix). Non-forest land required for this project(in ha.): 387.9489   (x). Total period for which the forest land is proposed to be diverted(in years): 99
A-2. Details of User Agency
  (i). Name : NATIONAL HIGHWAYS AUTHORITY OF INDIA BIKANER   (ii). Address1 : C-38, Sadulganj, Bikaner   (iii). Address2 : NIL   (iv). State : Rajasthan   (v). District : Bikaner   (vi). Pin : 334001   (vii). Landmarks : Near Medical Circle   (viii). Email address : nhaibikaner@gmail.com   (ix). Landline Telephone No. : 2224077   (x). Fax No. : 2224077   (xi). Mobile No. : 8233652252   (xii). Website (if any) : nhai.org   (xiii). Details of Proposals seeking prior approval of Central Government under the Act for diversion of forest land submitted by the User Agency in the past  
Proposal Submitted in Past
S.no Proposal Status. Proposal No. Moef File No. Area Proposed for Diversion(Ha.) Area Diverted(Ha.) Date of In-Principle Approval Date of Final Approval
1Approved8B/RJ/05/972//92/FC10-23/2013-IA-III295.733295.73327 Oct 201501 Dec 2015
Total 295.733 295.733
  (xiv). Legal status of User Agency : Central Government
A-3. Details of Person Making Application
  (i). First Name: Subhas   (ii). Middle Name: NIL   (iii). Last Name: Janu   (iv). Gender: Male   (v). Designation: PD   (vi). Address 1: c-38, sadulganj, Bikaner   (vii). Address 2: PIU, NHAI, Bikaner   (viii). State: Rajasthan   (ix). District: Bikaner   (x). Tehsil: Bikaner   (xi). Pin: 334001   (xii). Landmarks: NIL   (xiii). Email Address: nhaibikaner@gmail.com   (xiv). Landline Telephone No.: 2224077   (xv). Fax No.: 1512224077   (xvi). Mobile No.: 8233652252   (xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
A-7. Details of the forest land returned back to the State Forest Department or any other Authority from the forest land diverted in favour of the user agency
A-9. Details of Transfer of Lease
Serial No Name of person Address of person Date of transfer MMDR File Transfer Deed Conservation MoEF_file No Date of approval MoEF file
NIL
B. Details of land required for the Project
B-1. Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
  (i). Whether any proposal seeking prior approval of Central Government under the Act for diversion of forest land required for the project has been submitted in the past?. : No
B-2. Details of forest land proposed to be diverted
B-2.1 Details of Divisions involved
Details of Divisions involved
S.no Division Name Forest Land(ha.) Non-Forest Land(ha.)
1.Chhatargarh Territorial6.547176.5986
2.DCF STII BIKANER41.03554.6644
3.Sriganganagar Territorial2.675256.6859
Total50.2571387.9489
B-2.2 Details of Districts involved
District wise breakup
S.no District Name Forest Land(ha.) Non-Forest Land(ha.)
1.Sri Ganganagar2.675256.6859
2.Bikaner47.5821131.263
Total47.5821131.263
B-2.3 Village wise breakup
Villages wise breakup
S.no Village Forest Land(ha.) Non-Forest Land(ha.)
1Thakri A01.1235
2Amarsar01.0473
342NP03.1344
443NP04.4441
544NP07.2435
6Bhompura Barani02.1157
752 NP02.1092
853 NP08.7692
971 NP05.3558
1073 NP07.2446
1174 NP06.7682
1214 PTD01.3806
1315 PTD A05.0344
1415 PTD B01.6647
1517 PTD01.2695
1618 PTD A01.1772
1718 PTD B02.556
1820 PTD01.771
1921 PTD01.178
2023 PTD A03.7769
214 SPS02.4013
2217 SJMB0.04391.5006
2318 SJM0.04392.0352
244 KSM02.5035
253 LSM03.6588
261 LSM0.07521.2466
2724 APD0.07522.1376
287 APM01.1677
2977 GB A00.35
3087 GB02.5368
317 PGM0.07371.5555
3279 GB01.5553
3380 GB01.9743
341 MSR03.2378
3516 A0.0152.8535
3615 AB0.05491.5472
3717 AA0.07261.5617
385 K0.027.2748
394 K B0.077.8576
405 K A0.0695.4152
416P02.5508
428P0.10533.416
439P0.10556.4187
4411P02.5644
452H02.507
465 MD B01.6675
475 MD A05.5426
487 MD01.1674
4910 MD01.5562
5012 MD A03.6221
5112 MD B0.044.7441
5214 MD0.111.1542
531STR02.7166
542 STR01.2916
551STY07.3681
564 STR0.04953.4998
573 STR0.04952.5948
582 GD A0.04027.758
591 GD A0.14454.349
601 GD B0.30821.8585
612 MLD A0.32332.1175
622 MLDB07.7314
633 MLDB0.11511.2776
644 MLDA0.03511.2715
655 MLDA0.0751.0906
661 MLKA03.1564
671 MLK B05.492
681 MLK C02.8689
693 MLK A01.7626
703 MLK B01.9397
715 MLK with cad07.3778
722-3 RJM02.9417
733-4 RSM0.00542.2145
742 RSM0.05991.9216
758 RJM0.34518.1025
763 MGM03.3527
7710 RJD02.9716
781 RJM0.0751.4852
7911 RJD0.0754.2837
801RJM01.4442
815 ARM03.1835
824 ARM A09.1819
834 ARM0.0757.9942
847 CHTM0.07722.2743
855 CHD0.17514.5736
864 CHD01.9674
874 CHD A06.1983
882 CHM02.7311
891 CHM07.189
902 AWM08.1878
913 AWM03.6936
921 AWM without Cad0.0751.2027
933 DOL0.453.1284
94583-800 RD0.453.8899
95Satasar Barani2.82762.0864
96593-800 RD02.6248
97604-760 RD1.8812.3468
98610-200 RD0.53634.1449
99629-750 RD5.63288.9121
100636 RD1.76396.536
101655-500 RD18.84845.2045
102676-800 RD (OLD)1.34862.7248
103676-800 RD7.08024.1757
104Siasar Punchkosa6.3614.9367
1051 SSM02.5996
1064 SSM02.283
1074 JWM05.6219
1084 DLM B03.5273
1097 MM05.6762
1108 MM02.4666
50.2571 387.9489
B-2.4 Component wise breakup
Component wise breakup
S.no Component Forest Land(ha.) Non-Forest Land(ha.)
1Construction of Road50.2571387.9489
Total 50.2571 387.9489
C. Maps of forest land proposed to be diverted
Division 1. : Chhatargarh Territorial
  (i). Area of forest land proposed to be diverted(in ha.) : 6.5471   (ii).Shape of forest land proposed to be diverted : Linear   (b). No. of Segments : One
Segments wise details
Segmenst Segment Area(in ha.) Kml File of SegmentsTo view KML file on google the same may be downloaded and then open if in google earth install in your computer.
1.6.5471    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using DGPS or Total Station:
Division 2. : DCF STII BIKANER
  (i). Area of forest land proposed to be diverted(in ha.) : 41.035   (ii).Shape of forest land proposed to be diverted : Linear   (b). No. of Segments : One
Segments wise details
Segmenst Segment Area(in ha.) Kml File of SegmentsTo view KML file on google the same may be downloaded and then open if in google earth install in your computer.
1.41.035    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using DGPS or Total Station:
Division 3. : Sriganganagar Territorial
  (i). Area of forest land proposed to be diverted(in ha.) : 2.675   (ii).Shape of forest land proposed to be diverted : Linear   (b). No. of Segments : One
Segments wise details
Segmenst Segment Area(in ha.) Kml File of SegmentsTo view KML file on google the same may be downloaded and then open if in google earth install in your computer.
1.2.675    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using DGPS or Total Station:
D. Justification for locating the Project in forest land and details of alternatives examined
  (i). Copy of note containing justification for locating the Project in forest land:   (ii). Whether a copy of map indicating location of alternative examine is required to be provided: No   (a). Reason for not providing such map: Existing Road Upgradation and construction
E. Employment likely to be generated
  (i). Whether the Project is likely to generate employment ?: Yes   (ii). Permanent/Regular Employment(Number of persons): 0   (iii). Temporary Employment(Number of person-days): 5500
F. Displacement of People due to the Project, if any
  (i). Whether Project involves displacement?: No
G. Details of Cost-Benefit analysis for the Project
  (i). Whether the Project requires Cost-Benefit analysis?: Yes   (a). Copy of Cost-Benefit analysis:
H. Status of Environmental Clearance
  (i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? : No
I. Status of Wildelife Clearance
  (i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? : No
J. Applicability of special provisions governing Scheduled Areas
  (i).Whether the Project or a part thereof is located in a Scheduled Area? : No
K. Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
  (i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? : Yes   (a). Copy of documentry evidence in support of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted:
L. Details of land identified for Compensatory Afforestation
  (i). Whether non-forest or Revenue forest land is required to be provided by User Agency?: NIL   (ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?: NIL   (iii) . Reason for not providing Non-Forest Land: NIL
Additional information Details
Documents
S.No Documents
Remarks
1Project Report.
2Typical Cross Sections.
3Morth Circular 26_05_2016.
4Administration and Financial sanctions.
5EDS reply Letter dated 24_6_18.
6Chhatargarh Territorial Letter dated 18_12_19 EDS Reply Letter.
7DCF ST II Bikaner Letter Dated 03_12_19 EDS Reply Letter.
8Anupgarh Gazette Notification.
9Gazzete notification Chhatargarh.
10Gazzete notification Pugal.
11Digital Map Zoom view Segment 14 to 26 DCF ST II Bikaner.
12Digital Map Zoom View Segment 1 to 30 Sri Ganganagar Territorial.
13Geo referenced Digital map 50000 scale Bikaner District.
14Geo referenced Digital map 50000 scale Sriganganagar District.
15Geo referenced Toposheet map 50000 scale Bikaner District.
16Geo referenced Toposheet map 50000 scale Sriganganagar District.
17Segment wise Area Calculation sheet.
18Village Wise Area Calculation Sheet.
19Division wise Area Calculation sheet Bikaner District.
20Division wise Area Calculation sheet Sriganganagar District.
21Khasra Map Sriganganagar Division.
22Khasra Map with forest area Marking Sriganganagar Division.
23Jamabandi Sriganganagar Division.
24Khasra Map Chhatargarh Territorial Bikaner Division.
25Jamabandi Chhatargarh Territorial Bikaner Division.
26Khasra Map Division DCF ST II Bikaner.
27Jamabandi Division DCF ST II Bikaner.
28EDS Reply Letter DFO DCF ST II Bikaner dated 10_02_2020.
29EDS Reply Letter IGNP ST II dated 10_02_2020.
30CERTIFICATE FOR MINIMUM USE OF FOREST LAND Chhatargarh.
31UNDERTAKING FOR CONSERVATION OF FLORA FAUNA DURING CONSTRUCTION Chhatargarh.
32UNDERTAKING FOR NO CHANGES IN STATUTORY POSITION OF DIVERTED FOREST LAND Chhatargarh.
33UNDERTAKING FOR NO OTHER FEASIBLE ALTERNATIVE MINIMUM FOREST LAND Chhatargarh.
34UNDERTAKING FOR PAYMENT OF ANY OTHER COST AND CONDITION Chhatargarh.
35UNDERTAKING FOR PAYMENT OF COST OF COMPENSATORY AFFORESTATION Chhatargarh.
36UNDERTAKING FOR PAYMENT OF NET PRESENT VALUE OF FOREST AREA Chhatargarh.
37Undertaking for use of any Material from surrounded Forest land during construction Chhatargarh.
38UNDERTAKING FOR USE OF FOREST LAND Chhatargarh.
39Undertaking for Waste Management during construction activity Chhatargarh.
40CERTIFICATE FOR MINIMUM USE OF FOREST LAND DCF ST II Bikaner.
41UNDERTAKING FOR CONSERVATION OF FLORA FAUNA DURING CONSTRUCTION DCF ST II Bikaner.
42UNDERTAKING FOR FRA CERTIFICATE Bikaner.
43UNDERTAKING FOR NO CHANGES IN STATUTORY POSITION OF DIVERTED FOREST LAND DCF ST II Bikaner.
44UNDERTAKING FOR NO OTHER FEASIBLE ALTERNATIVE MINIMUM FOREST LAND DCF ST II Bikaner.
45UNDERTAKING FOR PAYMENT OF ANY OTHER COST AND CONDITION DCF ST II Bikaner.
46UNDERTAKING FOR PAYMENT OF COST OF COMPENSATORY AFFORESTATION DCF ST II Bikaner.
47UNDERTAKING FOR PAYMENT OF NET PRESENT VALUE OF FOREST AREA DCF ST II Bikaner.
48Undertaking for Use of Any Material From Forest Land DCF ST II Bikaner.
49UNDERTAKING FOR USE OF FOREST LAND DCF ST II Bikaner.
50Undertaking for Waste Management DCF ST II Bikaner.
51Certificate for Minimum use of Forest Land Sri Ganganagar.
52Undertaking for Conservation of Flora Fauna during construction Sri Ganganagar.
53Undertaking for No changes in Statutory position of diverted forest land Sri Ganganagar.
54Undertaking for No changes in Statutory position of diverted forest land Sri Ganganagar.
55Undertaking for No other Feasibility Alternative and Diver sion of minimum forest land Sri Ganganagar.
56Undertaking for Payment of any other Cost and Condition Sri Ganganagar.
57Gharsana Gazette Notification.
58EDS Reply Letter Dated 24_9_2019 Bharatmala
59Forest Notification 100 m.
60Undertaking for Payment of Cost of Compensatory Afforestation Sri Ganganagar.
61Undertaking for Payment of Net Present Value of Forest area Sri Ganganagar.
62Undertaking for use of any Material from surrounded Forest land during construction Sri Ganganagar.
63Undertaking for Use of Forest land Sri Ganganagar.
64Undertaking for Waste Management during construction activity Sri Ganganagar.
65Undertaking of FRA Certificate Sri Ganganagar.
66Bar Chart Status.
67Digital map Segament 1 to 13 Chhatargarh Territorial.