FORM - B
Form for seeking prior approval under Section-2 of the proposals by the State Governments and other authorities, in respect of renewal of leases,
which have been earlier granted clearance under Forest (Conservation) Act,1980
PART - I
(To be filled up by User Agency)
A. General Details
A-1. Project Details
  (i). Proposal No. : FP/RJ/IRRIG/35905/2018   (ii). Name of Project for which Forest Land is required : Navnera Barrage across River Kalisindh near village Abra Tehsil Digod Distt Kota (Rajasthan) under Estern Rajasthan Canal Project (ERCP) Phase - I (A)   (iii). Short narrative of the proposal and Project/scheme for which the forest land is required : Navnera Barrage across River Kalisindh near village Abra Tehsil Digod Distt Kota (Rajasthan) under Estern Rajasthan Canal Project (ERCP) Phase - I (A).For purpose of water harvesting and water supply scheme.   (iv). State : Rajasthan   (v). Category of the Proposal : Irrigation   (vi). Shape of forest land proposed to be diverted : Non Linear   (vii). Estimated cost of the Project(Rupees in lacs) : 159506   (viii). Area of forest land proposed for diversion(in ha.): 700.347   (ix). Non-forest land required for this project(in ha.): 1972.745   (x). Total period for which the forest land is proposed to be diverted(in years): 99
A-2. Details of User Agency
  (i). Name : EXECUTIVE ENGNEER WR DIV KOTA   (ii). Address1 : Office of the Executive Engineer WR Div nayapura kota   (iii). Address2 : NIL   (iv). State : Rajasthan   (v). District : Kota   (vi). Pin : 324001   (vii). Landmarks : Near mayour petrol pump   (viii). Email address : eewrdkota@gmail.com   (ix). Landline Telephone No. : 2325537   (x). Fax No. : 2325537   (xi). Mobile No. : 9414175748   (xii). Website (if any) : NIL   (xiii). Details of Proposals seeking prior approval of Central Government under the Act for diversion of forest land submitted by the User Agency in the past  
List of proposal submitted in Past
S.no Proposal Status. Proposal No. Moef File No. Area Proposed for Diversion(Ha.) Area Diverted(Ha.) Date of In-Principle Approval Date of Final Approval
NIL
  (xiv). Legal status of User Agency : State Government
A-3. Details of Person Making Application
  (i). First Name: rohetash   (ii). Middle Name: kumar   (iii). Last Name: jaiminy   (iv). Gender: Male   (v). Designation: ee   (vi). Address 1: Office of the Executive Engineer WR Div nayapura kota   (vii). Address 2: NIL   (viii). State: Rajasthan   (ix). District: Kota   (x). Tehsil: Ladpura   (xi). Pin: 324001   (xii). Landmarks: near mayour petrol pump   (xiii). Email Address: eewrdkota@gmail.com   (xiv). Landline Telephone No.: 2325537   (xv). Fax No.: 7442325537   (xvi). Mobile No.: 9414175748   (xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
A-7. Details of the forest land returned back to the State Forest Department or any other Authority from the forest land diverted in favour of the user agency
A-9. Details of Transfer of Lease
Serial No Name of person Address of person Date of transfer MMDR File Transfer Deed Conservation MoEF_file No Date of approval MoEF file
NIL
B. Details of land required for the Project
B-1. Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
  (i). Whether any proposal seeking prior approval of Central Government under the Act for diversion of forest land required for the project has been submitted in the past?. : No
B-2. Details of forest land proposed to be diverted
B-2.1 Details of Divisions involved
Details of Divisions involved
S.no Division Name Forest Land(ha.) Non-Forest Land(ha.)
1.Kota Territorial580.9381409.456
2.Baran Territorial119.409563.289
Total700.3471972.745
B-2.2 Details of Districts involved
District wise breakup
S.no District Name Forest Land(ha.) Non-Forest Land(ha.)
1.Kota580.9381409.456
2.Baran119.409563.289
Total700.3471972.745
B-2.3 Village wise breakup
Villages wise breakup
S.no Village Forest Land(ha.) Non-Forest Land(ha.)
1mangyahedi4.5984.108
2kachnawda62.50444.504
3khedalii dhakan6.36610.348
4Khedi ghata08.48
5Abra26.04847.983
6Gawadi20.85119.667
7ralayatha19.54669.775
8Kotra deepsingh36.79187.7654
9pipalda biram38.10274.301
10bakya1.57551.398
11Jhakrod19.11391.936
12aton3.30911.876
13barana01.609
14Beeslai0.24613.814
15Dhansuri1.12616.728
16Kharrula0.56121.01
17Edalgarh6.89622.468
18Bhuden3.19115.147
19Khedli parasram1.95928.192
20Bagwada3.47746.203
21Barod53.416177.495
22Bambuliya rawtan0.3311.096
23khyawda5.4797.351
24Kishanwas9.872.68
25Bijawata97.11269.871
26Bambuliya ghat066.0578
27Khedi maharana50.70972.314
28Dhibari kalisindh21.48230.107
29Kolana43.28974.3698
30Nalawada42.993110.802
31Patonda12.81696.791
32Nagada072.135
33thikod31.72923.225
34Baldara060.852
35Ladwara021.081
36Canada1.39717.633
37Raipura072.278
38pipalda061.714
39Rampuriya14.2787.219
40Bhateri1.37531.74
41Sonwa071.997
42Shivpura57.81426.624
700.347 1972.745
B-2.4 Component wise breakup
Component wise breakup
S.no Component Forest Land(ha.) Non-Forest Land(ha.)
1Dam line15.42112.594
2Approch road0.2820
3Submergance684.6441960.151
Total 700.347 1972.745
C. Maps of forest land proposed to be diverted
Division 1. : Baran Territorial
  (i). Area of forest land proposed to be diverted(in ha.) : 119.409   (ii).Shape of forest land proposed to be diverted : Non Linear   (a). No. of patches : One
Patch wise details
Patch No. Area of Patch(in ha.) Kml File of Patches To view KML file on google the same may be downloaded and then open if in google earth install in your computer.
1.119.409    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using DGPS or Total Station:
Division 2. : Kota Territorial
  (i). Area of forest land proposed to be diverted(in ha.) : 580.938   (ii).Shape of forest land proposed to be diverted : Non Linear   (a). No. of patches : Three
Patch wise details
Patch No. Area of Patch(in ha.) Kml File of Patches To view KML file on google the same may be downloaded and then open if in google earth install in your computer.
1.15.421    View File
2.0.282    View File
3.565.235    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using DGPS or Total Station:
D. Justification for locating the Project in forest land and details of alternatives examined
  (i). Copy of note containing justification for locating the Project in forest land:
E. Employment likely to be generated
  (i). Whether the Project is likely to generate employment ?: Yes   (ii). Permanent/Regular Employment(Number of persons): 40   (iii). Temporary Employment(Number of person-days): 69000
F. Displacement of People due to the Project, if any
  (i). Whether Project involves displacement?: No
G. Details of Cost-Benefit analysis for the Project
  (i). Whether the Project requires Cost-Benefit analysis?: Yes   (a). Copy of Cost-Benefit analysis:
H. Status of Environmental Clearance
  (i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? : No
I. Status of Wildelife Clearance
  (i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? : No
J. Applicability of special provisions governing Scheduled Areas
  (i).Whether the Project or a part thereof is located in a Scheduled Area? : No
K. Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
  (i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? : Yes   (a). Copy of documentry evidence in support of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted:
L. Details of land identified for Compensatory Afforestation
  (i). Whether non-forest or Revenue forest land is required to be provided by User Agency?: Yes   (ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?: No   (iii). No. of districts involved for raising Compensatory Afforestation: 2   (iv). No. of patches: Two
District 1. : Kota
  (a). Village: vijaypur   (b). Area(in ha.): 91.44   (c). Copy of KML file of the patch:     View File   (d). Khasra details: 37,280,336,337,39,341,343,344   (e). Present owner: Others   (f). Copy of ownership proof:   (g). Copy of Mou/agreement executed between the Present owner and the User Agency:   (h). Copy of non encumberence certificate for the forest land:
District 2. : Kota
  (a). Village: bhilot   (b). Area(in ha.): 13.878   (c). Copy of KML file of the patch:     View File   (d). Khasra details: 162,159   (e). Present owner: Others   (f). Copy of ownership proof:   (g). Copy of Mou/agreement executed between the Present owner and the User Agency:   (h). Copy of non encumberence certificate for the forest land:
District 3. : Baran
  (a). Village: aklera sagar, nachana khera   (b). Area(in ha.): 119.409   (c). Copy of KML file of the patch:     View File   (d). Khasra details: 257,200,201,196,197,198,209,210,211   (e). Present owner: Others   (f). Copy of ownership proof:   (g). Copy of Mou/agreement executed between the Present owner and the User Agency:   (h). Copy of non encumberence certificate for the forest land:
District 4. : Kota
  (a). Village: guraytha   (b). Area(in ha.): 109.26   (c). Copy of KML file of the patch:     View File   (d). Khasra details: 8,17,33,47,117,130,131,133,134,171,175,176,177,187,190,210,212,214,264,322,323,324,325,326,327,328,357,359,360,361,365,366,314,473,475,471,472,52,53,84,105,191,211   (e). Present owner: Others   (f). Copy of ownership proof:   (g). Copy of Mou/agreement executed between the Present owner and the User Agency:   (h). Copy of non encumberence certificate for the forest land:
District 5. : Kota
  (a). Village: gopalpura   (b). Area(in ha.): 113.23   (c). Copy of KML file of the patch:     View File   (d). Khasra details: 443,450,452,460,514,517,518,519,522   (e). Present owner: Others   (f). Copy of ownership proof:   (g). Copy of Mou/agreement executed between the Present owner and the User Agency:   (h). Copy of non encumberence certificate for the forest land:
District 6. : Kota
  (a). Village: bara   (b). Area(in ha.): 66.12   (c). Copy of KML file of the patch:     View File   (d). Khasra details: 10,11,12,13,15,16,9,5,7,6,283,284,295,296,462,297/524,322   (e). Present owner: Others   (f). Copy of ownership proof:   (g). Copy of Mou/agreement executed between the Present owner and the User Agency:   (h). Copy of non encumberence certificate for the forest land:
District 7. : Kota
  (a). Village: borina khurd   (b). Area(in ha.): 91.79   (c). Copy of KML file of the patch:     View File   (d). Khasra details: 3,220,390   (e). Present owner: Others   (f). Copy of ownership proof:   (g). Copy of Mou/agreement executed between the Present owner and the User Agency:   (h). Copy of non encumberence certificate for the forest land:
District 8. : Kota
  (a). Village: singhpura   (b). Area(in ha.): 95.22   (c). Copy of KML file of the patch:     View File   (d). Khasra details: 350,351,355,356   (e). Present owner: Others   (f). Copy of ownership proof:   (g). Copy of Mou/agreement executed between the Present owner and the User Agency:   (h). Copy of non encumberence certificate for the forest land:
  (v). Scanned copy of the map of the land identified for creation of Compensatory Afforestation prepared by using DGPS ot Total Station:   (vi). Copy of Survey of India Toposheet in 1:50,000 scale indicating location of the land identified for creation of Compensatory Afforestation:
Additional information Details
Documents
S.No Documents
Remarks
1technical report
2Sanctioned
3Undertaking for flora and funa
4gt sheet alternate contour
5DGPS Map Sheet 2/9
6DGPS Map Sheet 3/9
7DGPS Map Sheet 6/9
8brief about project
9reply of eds 4 2 19
10undertaking for any other cost
11undertaking for use of forest land
12undertaking for no material use
13undertaking for NPV
14Technical Estimate Complete
15undertaking for Payment for afforestation
16Digod Forest Jamabandi
17EDS Reply
18Piipalda Forest Jamabandi
19Permanent Employees Details
20Baran Dist Forest Jamabandi
21Revenue Map of Forest Land
22MUK DISPOSAL
23SALIENT FEATURE
24REPLY OF EDS 17 5 19
25FRA Kota
26FRA Baran
27reply 20 8 19
28EDS Reply 27 11 19
29alternate capacity map
30DGPS map sheet 1/9
31DGPS map sheet 4/9
32DGPS map sheet 5/9
33DGPS map sheet 7/9
34Undertaking for minimum use of forest land
35Undertaking for Justification of location
36bar chart
37area calculation kota district
38area calculation baran district
39undertaking bc ratio
40DFO lettee to DM kota reg CA land suitebity
41reply of eds 15 2 2021
42undertaking cat plan
43additional plantation DGPS
44additional plantation GT SHEET