FORM - A
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
PART - I
(To be filled up by User Agency)
A. General Details
A-1. Project Details
  (i). Proposal No. : FP/UK/ROAD/26662/2017   (ii). Name of Project for which Forest Land is required : SAN BAND TO BAJYUN MOTOR ROAD   (iii). Short narrative of the proposal and Project/scheme for which the forest land is required : THIS ROAD IS CONNECTING TOTAL 12 VILLAGES HAVING TOTAL POPULATION 3999.THIS IS THE ONLY ROAD CONNECTING THESE VILLAGES.AS THE LAND OF THESE VILLAGES IS GOOD FOR AGRICULTURE.AFTER THE CONSTRUCTION OF THIS ROAD VILLAGERS WILL BE BENEFITED FROM NEW GOVT SCHEMES.   (iv). State : Uttarakhand   (v). Category of the Proposal : Road   (vi). Shape of forest land proposed to be diverted : Linear   (vii). Estimated cost of the Project(Rupees in lacs) : 1346.5   (viii). Area of forest land proposed for diversion(in ha.): 7.094   (ix). Non-forest land required for this project(in ha.): 7.605   (x). Total period for which the forest land is proposed to be diverted(in years): 100
A-2. Details of User Agency
  (i). Name : PMGSY   (ii). Address1 : IRRIGATION DIVISION , PIU RUDRAPRAYAG   (iii). Address2 : NIL   (iv). State : Uttarakhand   (v). District : Rudraprayag   (vi). Pin : 246171   (vii). Landmark : NIL   (viii). Email address : eepmgsyrudraprayag@rediffmail.com   (ix). Landline Telephone No. : 1364-233981   (x). Fax No. : 1364-1364   (xi). Mobile No. : 9411143437   (xii). Website (if any) : NIL   (xiii). Legal status of User Agency : State Government
A-3. Details of Person Making Application
  (i). First Name: mohit   (ii). Middle Name: NIL   (iii). Last Name: uniyal   (iv). Gender: Male   (v). Designation: assistant engineer   (vi). Address 1: IRRIGATION DIVISION , PIU RUDRAPRAYAG   (vii). Address 2: NIL   (viii). State: Uttarakhand   (ix). District: Rudraprayag   (x). Tehsil: Rudraprayag   (xi). Pin: 246475   (xii). Landmark: NIL   (xiii). Email Address: eepmgsyrudraprayag@rediffmail.com   (xiv). Landline Telephone No.: 1364-233981   (xv). Fax No.: NIL   (xvi). Mobile No.: 8006504406   (xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B. Details of land required for the Project
B-1. Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
List of proposal submitted in Past
S.no Proposal Status. Proposal No. Moef File No. Area Proposed for Diversion(Ha.) Area Diverted(Ha.) Date of In-Principle Approval Date of Final Approval
NIL
B-2. Details of forest land proposed to be diverted
B-2.1 Details of Divisions involved
Details of Divisions involved
S.no Division Name Forest Land(ha.) Non-Forest Land(ha.)
1.Rudraprayag7.0947.605
Total7.0947.605
B-2.2 Details of Districts involved
District wise breakup
S.no District Name Forest Land(ha.) Non-Forest Land(ha.)
1.Rudraprayag7.0947.605
Total7.0947.605
B-2.3 Village wise breakup
Villages wise breakup
S.no Village Forest Land(ha.) Non-Forest Land(ha.)
1aamdala(kameda)0.3150.486
2chamak2.3962.214
3Goran1.2871.017
4Gadmil thapli0.6570
5Dungri0.2230.297
6Jakhni01.296
7Lodla01.161
8Bajyun2.2161.134
Total 7.094 7.605
B-2.4 Component wise breakup
Component wise breakup
S.no Component Forest Land(ha.) Non-Forest Land(ha.)
1one (road)6.1657.605
2two (muck)0.9290
Total 7.094 7.605
C. Maps of forest land proposed to be diverted
Division 1. : Rudraprayag
  (i). Area of forest land proposed to be diverted(in ha.) : 7.094   (ii). Nature of the Project: Linear   (b). No. of Segments : One
Segment wise details
Segments Segment Area(in ha.) Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.7.094    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D. Justification for locating the Project in forest land and details of alternatives examined:
  (i). Copy of note containing justification for locating the Project in forest land:   (ii). Whether a copy of map indicating location of alternative examine is required to be provided: Yes   (a). Copy of map indicating location of alternative examined:
E. Employment likely to be generated
  (i). Whether the Project is likely to generate employment ?: Yes   (ii). Permanent/Regular Employment(Number of persons): 0   (iii). Temporary Employment(Number of person-days): 58566
F. Displacement of People due to the Project, if any
  (i). Whether Project involves displacement?: No
G. Details of Cost-Benefit analysis for the Project
  (i). Whether the Project requires Cost-Benefit analysis?: Yes   (a). Copy of Cost-Benefit analysis:
H. Status of Environmental Clearance
  (i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? : No
I. Status of Wildelife Clearance
  (i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? : No
J. Applicability of special provisions governing Scheduled Areas
  (i).Whether the Project or a part thereof is located in a Scheduled Area? : No
K. Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
  (i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? : Yes   (a). Copy of documentry evidence in support of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted:
L. Details of land identified for Compensatory Afforestation
  (i). Whether non-forest or Revenue forest land is required to be provided by User Agency?: Yes   (ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?: No   (iii). No. of districts involved for raising Compensatory Afforestation: 1   (iv). No. of patches: One
District 1. : Rudraprayag
  (a). Village: Dharkot   (b). Area(in ha.): 14.188   (c). Copy of KML file of the patch:     View File   (d). Khasra details: 886   (e). Present owner: Others   (f). Copy of ownership proof:   (g). Copy of Mou/agreement executed between the Present owner and the User Agency:   (h). Copy of non encumberence certificate for the forest land:
  (v). Scanned copy of the map of the land identified for creation of Compensatory Afforestation prepared by using GPS ot Total Station:   (vi). Copy of Survey of India Toposheet in 1:50,000 scale indicating location of the land identified for creation of Compensatory Afforestation:
Additional information Details
Documents
S.No Documents
Remarks
1comperative of two alignment
2admin and financial approval
3joint inspection
4no suitable land by DM letter
5land schedule
6length width wise schedule
7Bar chart
8road side gap filling lrtter
9total oak trees letter
10dfo letter for felling trees
11report of falling trees in different land
12minimum trees falling
13cost estimation of affected trees
14arial distance certificate
15act 1980
16noc of grahm sabha
17work not started yet letter
18geologist report
19task force
20standard condition
21geologist recommendation
22no monument has been affected
23no fuel / wood certificte
24benefited villagers
25npv calculation
26npv certificate
27lease certificate
28no animal has been harmed certificate
29blasting certificate
30fact sheet
31rcc pillers
32muck disposal scheme
33eds reply on date 23/08/17
34part I
35recieving of part I,II,III
36cost estimate of falling trees
37CF letter regarding banz trees
38scientific names of affected trees
39receiving slip of hard copy submitted and eds reply
40eds reply dt 22-03-18
41plan of muck disposal scheme
42reclamation plan on muck disposal
43patwari letter on village Gadmil
44eds reply dt 30.06.18