FORM - A
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
PART - I
(To be filled up by User Agency)
A. General Details
A-1. Project Details
  (i). Proposal No. : FP/UK/ROAD/10125/2015   (ii). Name of Project for which Forest Land is required : Jourashi to Ghanyal Motor Road   (iii). Short narrative of the proposal and Project/scheme for which the forest land is required : This road is starts from km 1(0.540m) of Jourashi-Jaikhal Motor Road. Jourasi to Ghanyal (Gwalbeena) motor road stage – I work is proposed in phase - XVIth. The all weather road connectivity project is to formulated for village, which are having population more than 250. The targeted village Gwalbe   (iv). State : Uttarakhand   (v). Category of the Proposal : Road   (vi). Shape of forest land proposed to be diverted : Linear   (vii). Estimated cost of the Project(Rupees in lacs) : 649   (viii). Area of forest land proposed for diversion(in ha.): 4.869   (ix). Non-forest land required for this project(in ha.): 2.475   (x). Total period for which the forest land is proposed to be diverted(in years): 99
A-2. Details of User Agency
  (i). Name : PUBLIC WORKS DEPARTMENT   (ii). Address1 : Executive Engineer construction Division P.W.D. Sult (Almora)   (iii). Address2 : NIL   (iv). State : Uttarakhand   (v). District : Almora   (vi). Pin : 263676   (vii). Landmark : PWD Salt (Jhimar)   (viii). Email address : eepmgsysalt@rediffmail.com   (ix). Landline Telephone No. : 5966-211126   (x). Fax No. : 5966-0   (xi). Mobile No. : 9412639254   (xii). Website (if any) : NIL   (xiii). Legal status of User Agency : State Government
A-3. Details of Person Making Application
  (i). First Name: Chandan   (ii). Middle Name: NIL   (iii). Last Name: Choudhary   (iv). Gender: Male   (v). Designation: Computer Operator   (vi). Address 1: Executive Engineer C.D.P.W.D. Salt (Almora)   (vii). Address 2: NIL   (viii). State: Uttarakhand   (ix). District: Almora   (x). Tehsil: Salt   (xi). Pin: 263676   (xii). Landmark: PWD Salt (Jhimar)   (xiii). Email Address: eepmgsysalt@rediffmail.com   (xiv). Landline Telephone No.: 5966-211126   (xv). Fax No.: NIL   (xvi). Mobile No.: 7055613643   (xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B. Details of land required for the Project
B-1. Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
List of proposal submitted in Past
S.no Proposal Status. Proposal No. Moef File No. Area Proposed for Diversion(Ha.) Area Diverted(Ha.) Date of In-Principle Approval Date of Final Approval
NIL
B-2. Details of forest land proposed to be diverted
B-2.1 Details of Divisions involved
Details of Divisions involved
S.no Division Name Forest Land(ha.) Non-Forest Land(ha.)
1.Almora4.8692.475
Total4.8692.475
B-2.2 Details of Districts involved
District wise breakup
S.no District Name Forest Land(ha.) Non-Forest Land(ha.)
1.Almora4.8692.475
Total4.8692.475
B-2.3 Village wise breakup
Villages wise breakup
S.no Village Forest Land(ha.) Non-Forest Land(ha.)
1Kafaltana2.260.9
2Gwalbeena2.1941.575
3Sogura0.4150
Total 4.869 2.475
B-2.4 Component wise breakup
Component wise breakup
S.no Component Forest Land(ha.) Non-Forest Land(ha.)
1Motor Road4.860
2muck disposal00.757
Total 4.86 0.757
C. Maps of forest land proposed to be diverted
Division 1. : Almora
  (i). Area of forest land proposed to be diverted(in ha.) : 4.869   (ii). Nature of the Project: Linear   (b). No. of Segments : One
Segment wise details
Segments Segment Area(in ha.) Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.4.869    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D. Justification for locating the Project in forest land and details of alternatives examined:
  (i). Copy of note containing justification for locating the Project in forest land:   (ii). Whether a copy of map indicating location of alternative examine is required to be provided: Yes   (a). Copy of map indicating location of alternative examined:
E. Employment likely to be generated
  (i). Whether the Project is likely to generate employment ?: Yes   (ii). Permanent/Regular Employment(Number of persons): 0   (iii). Temporary Employment(Number of person-days): 12000
F. Displacement of People due to the Project, if any
  (i). Whether Project involves displacement?: No
G. Details of Cost-Benefit analysis for the Project
  (i). Whether the Project requires Cost-Benefit analysis?: No
H. Status of Environmental Clearance
  (i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? : No
I. Status of Wildelife Clearance
  (i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? : No
J. Applicability of special provisions governing Scheduled Areas
  (i).Whether the Project or a part thereof is located in a Scheduled Area? : No
K. Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
  (i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? : Yes   (a). Copy of documentry evidence in support of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted:
L. Details of land identified for Compensatory Afforestation
  (i). Whether non-forest or Revenue forest land is required to be provided by User Agency?: Yes   (ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?: No   (iii). No. of districts involved for raising Compensatory Afforestation: 1   (iv). No. of patches: Two
District 1. : Almora
  (a). Village: uprari   (b). Area(in ha.): 9.738   (c). Copy of KML file of the patch:     View File   (d). Khasra details: 57   (e). Present owner: Others   (f). Copy of ownership proof:   (g). Copy of Mou/agreement executed between the Present owner and the User Agency:   (h). Copy of non encumberence certificate for the forest land:
  (v). Scanned copy of the map of the land identified for creation of Compensatory Afforestation prepared by using GPS ot Total Station:   (vi). Copy of Survey of India Toposheet in 1:50,000 scale indicating location of the land identified for creation of Compensatory Afforestation:
Additional information Details
Documents
S.No Documents
Remarks
1objection removed EDS Dated 14.12.2017
2DFO OFFICE letter
3Authority of the persn making this application to make application on behalf of user agency
4Copy of agreement between the persent owner and user agency
5Colored copy of the google map for CA
6Survey of india toposheet for CA
7CompensatoryAfforestation scheme in civil soyam land
8Tree detail
9objection removed vide EDS dated 17.4.17
10Authority of the persn making this application to make application on behalf of user agency
11Ownership proof of land
12Colored copy of the google map for CA
13Survey of india toposheet for CA
14Tree detail
15NPV calculation certificate
16Proof of length of road given by user agency
17objection removed vide EDS dated 13.09.2017
18point no.2
19point no.3&4 revised FRA
20objection removed dfo office eds dated 30/6/17
21Objection removed vide DFO letter No. 3628/12-1(2) dated 20.01.2017
22Objection removed wide EDS dated 13.9.2017
23Proof of length of jouri-ghanyal
24Revised and corrent FRA jourasi ghanyal
25Comparative chart .
26Certificate from the DM.
27Land schedule.
28Category wise.
29Undertaking by the User Agency.
30Road side/gap filling plantation.
31Undertaking by the User Agency to bear.
32Details of the trees.
33Felling of Oak trees.
34Certificate of felling minimum trees.
35Muck disposal scheme.
36National Park .
37If the project area is within 10 Km.
38National Board of Wild Life.
39No violation.
40NOC from local Gram Sabhas.
41Approved general lay out plan.
42Certificate- work has not been started.
43Geologist Report.
44Task Force report.
45complying the condition imposed.
46condition imposed in geologist report.
47No historical.
48No animal will be effected.
49alternative fuelwood.
50Benefited villages.
51increases the rates of NPV.
52Cost of the forest land.
53Administrative and Financial sanction
54Preliminary Joint Inspection report.
55objection removed vide dfo letter no.memo/12-1(2) dated 19.7.2017
56objection point no.1
57objection point no.4
58objection removed vide dfo letter memo/12-1(1)/dated 10.8.17
59Pointno.1aboutCA
60Pointno.2abouttree
61demarcation work.
62Fact sheet.
63Revised NPV Calculation point no3
64aboutlength point no4
65Bar Chart.
66Certificate regarding suitability.
67NPV calculation certificate
68Certificate regarding suitability of indentifiend land for CA
69proof of length of road given by user agency