FORM - A
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
PART - I
(To be filled up by User Agency)
A. General Details
A-1. Project Details
  (i). Proposal No. : FP/UK/Others/18161/2016   (ii). Name of Project for which Forest Land is required : Establishment of Automative testing lane and certification center   (iii). Short narrative of the proposal and Project/scheme for which the forest land is required : Rishikesh is the enterance point of Chardham Yatra. Being hill root it is necessary to check fitness of vehicles and testing/training of driver on regular basis.   (iv). State : Uttarakhand   (v). Category of the Proposal : Others   (vi). Shape of forest land proposed to be diverted : Non Linear   (vii). Estimated cost of the Project(Rupees in lacs) : 120   (viii). Area of forest land proposed for diversion(in ha.): 1.22   (ix). Non-forest land required for this project(in ha.): 0   (x). Total period for which the forest land is proposed to be diverted(in years): 90
A-2. Details of User Agency
  (i). Name : ARTO RISHIKESH   (ii). Address1 : ARTO Office Haridwar by pass road B.D wala Rishikesh   (iii). Address2 : NIL   (iv). State : Uttarakhand   (v). District : Dehradun   (vi). Pin : 249201   (vii). Landmark : Near THDC   (viii). Email address : artorishikesh.uk@gmail.com   (ix). Landline Telephone No. : 135-2430623   (x). Fax No. : 135-2436623   (xi). Mobile No. : 9410355160   (xii). Website (if any) : NIL   (xiii). Legal status of User Agency : State Government
A-3. Details of Person Making Application
  (i). First Name: Janveer   (ii). Middle Name: Singh   (iii). Last Name: Rawat   (iv). Gender: Male   (v). Designation: Senior Assistant   (vi). Address 1: ARTO Office Haridwar by pass road B.D wala Rishikesh   (vii). Address 2: NIL   (viii). State: Uttarakhand   (ix). District: Dehradun   (x). Tehsil: Rishikesh   (xi). Pin: 249201   (xii). Landmark: Near THDC   (xiii). Email Address: artorishikesh.uk@gmail.com   (xiv). Landline Telephone No.: 135-2430623   (xv). Fax No.: 01352436623   (xvi). Mobile No.: 9410355160   (xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B. Details of land required for the Project
B-1. Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
List of proposal submitted in Past
S.no Proposal Status. Proposal No. Moef File No. Area Proposed for Diversion(Ha.) Area Diverted(Ha.) Date of In-Principle Approval Date of Final Approval
NIL
B-2. Details of forest land proposed to be diverted
B-2.1 Details of Divisions involved
Details of Divisions involved
S.no Division Name Forest Land(ha.) Non-Forest Land(ha.)
1.Dehradun1.220
Total1.220
B-2.2 Details of Districts involved
District wise breakup
S.no District Name Forest Land(ha.) Non-Forest Land(ha.)
1.Dehradun1.220
Total1.220
B-2.3 Village wise breakup
Villages wise breakup
S.no Village Forest Land(ha.) Non-Forest Land(ha.)
1Bibiwala forest block 31.220
Total 1.22 0
B-2.4 Component wise breakup
Component wise breakup
S.no Component Forest Land(ha.) Non-Forest Land(ha.)
1Road Construction0.89270
2Track lane0.250
3Ramp0.0160
4DG set and transfarmer0.040
5Green belt0.82130
Total 2.02 0
C. Maps of forest land proposed to be diverted
Division 1. : Dehradun
  (i). Area of forest land proposed to be diverted(in ha.) : 1.22   (ii). Nature of the Project: Non Linear   (a). No. of patches : One
Patch wise details
Patch No. Area of Patch(in ha.) Kml File of PatchesTo view KML file on google the same may be downloaded and then open if in google earth install in your computer.
1.1.22    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D. Justification for locating the Project in forest land and details of alternatives examined:
  (i). Copy of note containing justification for locating the Project in forest land:
E. Employment likely to be generated
  (i). Whether the Project is likely to generate employment ?: Yes   (ii). Permanent/Regular Employment(Number of persons): 10   (iii). Temporary Employment(Number of person-days): 900
F. Displacement of People due to the Project, if any
  (i). Whether Project involves displacement?: No
G. Details of Cost-Benefit analysis for the Project
  (i). Whether the Project requires Cost-Benefit analysis?: No
H. Status of Environmental Clearance
  (i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? : No
I. Status of Wildelife Clearance
  (i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? : No
J. Applicability of special provisions governing Scheduled Areas
  (i).Whether the Project or a part thereof is located in a Scheduled Area? : No
K. Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
  (i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? : Yes   (a). Copy of documentry evidence in support of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted:
L. Details of land identified for Compensatory Afforestation
  (i). Whether non-forest or Revenue forest land is required to be provided by User Agency?: Yes   (ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?: No   (iii). No. of districts involved for raising Compensatory Afforestation: 1   (iv). No. of patches: One
District 1. : Dehradun
  (a). Village: Gadur itharna civil   (b). Area(in ha.): 4.04   (c). Copy of KML file of the patch:     View File   (d). Khasra details: 86ga   (e). Present owner: Others   (f). Copy of ownership proof:   (g). Copy of Mou/agreement executed between the Present owner and the User Agency:   (h). Copy of non encumberence certificate for the forest land:
  (v). Scanned copy of the map of the land identified for creation of Compensatory Afforestation prepared by using GPS ot Total Station:   (vi). Copy of Survey of India Toposheet in 1:50,000 scale indicating location of the land identified for creation of Compensatory Afforestation:
Additional information Details
Documents
S.No Documents
Remarks
1Administrative and financial sanction
2Task Force Certificate
3Work not started Yet
4Muck Disposal
5NOC from Gram Panchayat
6Kerosine LPG certificate
7Forest Protection Act
8NPV
9Minimum Trees Felling Testimonial
10RCC demarcation
11NOC from Wildlife
12Benefited villages
13Geologist Recommendation Certificate
14Geologist Report
15CAKhasaraNo
16Ownership proof
17Ownership CAsuitability certi
18EDS dated 21-5-2016 Reply
19EDS prativedan
20Letter in suport of selected land for CA Proceedings.
21FRA Settlements proceedings
22DSS Analysis about elephant grid shown in adjoining area of proposed land
23Layout of proposal & related proceedings
24Component-wise breakup of concerned proposal
25Government Orders in response of previously Correspondence done regarding land transfer by user agency
26Amended Toposheet & Geo-referred map of concerned project site
27The process of CA Land is going on, A letter in this regard is attached. You are requested to forward our proposal to next level. The land identified for CA will be submitted as soon as possible.
28cheif wildelife certificate
29District profile dehradun
30Details of proposal submitted in past