A-1. Project Details
  (i). Proposal No. : FP/RJ/TRANS/45697/2020   (ii). Name of Project for which Forest Land is required : Bikaner(PG)-Khetri (S/S) 765 KV D/C Transmission Line   (iii). Short narrative of the proposal and Project/scheme for which the forest land is required : Line is Starting from Bikaner Power grid Substation at Bikaner & terminating at Khetri Power grid substation (Total Route Length 239.510 KM ) at Jhunjhunu District. Bikaner (PG)-Khetri (S/S) 765 KV D/C Transmission System is associated with LTA Application from Rajasthan SEZ Part D.The Project is   (iv). State : Rajasthan   (v). Category of the Proposal : Transmission Line   (vi). Shape of forest land proposed to be diverted : Linear   (vii). Estimated cost of the Project(Rupees in lacs) : 85509   (viii). Area of forest land proposed for diversion(in ha.): 5.9738   (ix). Non-forest land required for this project(in ha.): 1598.7432   (x). Total period for which the forest land is proposed to be diverted(in years): 36
A-2. Details of User Agency
  (i). Name : BIKANER KHETRI TRANSMISSION LIMITED   (ii). Address1 : 400 KV RRVPN GSS,RAISAR,BIKANER JAIPUR ROAD,BIKANER   (iii). Address2 : NIL   (iv). State : Rajasthan   (v). District : Bikaner   (vi). Pin : 334803   (vii). Landmark : 400 KV RRVPN GSS,RAISAR   (viii). Email address : bktl.bikaner@gmail.com   (ix). Landline Telephone No. : 151-2970035   (x). Fax No. : 151-   (xi). Mobile No. : 9935440595   (xii). Website (if any) : NIL   (xiii). Legal status of User Agency : Private
A-3. Details of Person Making Application
  (i). First Name: Ritesh   (ii). Middle Name: Kumar   (iii). Last Name: Varma   (iv). Gender: Male   (v). Designation: Associate General Manager   (vi). Address 1: Plot no 36,Road No3,Near Panchdev Mandir,Jhunjhunu   (vii). Address 2: NIL   (viii). State: Rajasthan   (ix). District: Jhunjhunu   (x). Tehsil: Jhunjhunun   (xi). Pin: 333001   (xii). Landmark: Near Panchdev Mandir   (xiii). Email Address: bktl.bikanerfc@gmail.com   (xiv). Landline Telephone No.: 151-2970035   (xv). Fax No.: NIL   (xvi). Mobile No.: 7581055569   (xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B. Details of land required for the Project
B-1. Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
List of proposal submitted in Past
S.no Proposal Status. Proposal No. Moef File No. Area Proposed for Diversion(Ha.) Area Diverted(Ha.) Date of In-Principle Approval Date of Final Approval
NIL
B-2. Details of forest land proposed to be diverted
B-2.1 Details of Divisions involved
Details of Divisions involved
S.no Division Name Forest Land(ha.) Non-Forest Land(ha.)
1.Bikaner Territorial1.2223636.073
2.Churu Territorial0423.9276
3.Sikar Territorial029.3581
4.Jhunjhunu Territorial4.7515509.3845
Total5.97381598.7432
B-2.2 Details of Districts involved
District wise breakup
S.no District Name Forest Land(ha.) Non-Forest Land(ha.)
1.Bikaner1.2223636.073
1.Jhunjhunu4.7515509.3845
3.Churu0423.9276
4.Sikar029.3581
Total5.97381598.7432
B-2.3 Village wise breakup
Villages wise breakup
S.no Village Forest Land(ha.) Non-Forest Land(ha.)
1Jamsar02.6591
2Jalalsar03.9562
3Dandoosar1.222359.8729
4Malasar022.4443
5Molania027.4915
6Ladera010.1351
7Katriyasar012.471
8Dhirera010.5275
9Runiya Badabas044.9323
10Rupera09.1177
11Rajera030.6029
12Punrasar061.1594
13Manksar019.1483
14Gusainsar Bara088.4276
15Udrasar062.7434
16Thukariyasar014.7796
17Dhirsar Purohitan044.1575
18Aadsar Purohitan018.9744
19Lalasar015.1514
20Momasar077.3208
21Patlisar Bada019.725
22Bhanoda033.0674
23Singri024.053
24Pabusar040.1317
25Melusar026.155
26Kangar037.5
27Dheerasar021.5281
28Daudsar040.8624
29Sehla015.4032
30Satra015.0561
31Mallasar027.0965
32Hanumanpura Urf Chatusingh Ki Dhani05.0813
33Molisar Bada019.2193
34Juharpura08.2716
35Sahenali024.856
36Meghsar024.4287
37Nethwa01.6759
38Ratan Nagar012.7398
39Ramgarh027.6822
40Kherda Ki Dhani016.1575
41Thelasar012.5951
42Mahansar031.3693
43Bhikhamsar010.8654
44Sesu09.2228
45Tai020.879
46Pilani Khurd018.3453
47Khijrasar05.4103
48Birmi09.8598
49Hameerwas08.8588
50Dhani Charan07.9454
51Kolida011.8672
52Bas Bhim Saria018.065
53Daulatpura07.0105
54Hansasar024.5404
55Charanwas011.8226
56Hansasari01.8336
57Shri Kishanpura04.4647
58Kharkhari012.4708
59Bhurasar Ka Was07.6532
60Jeitpura07.3945
61Gopalpura07.2811
62Indrapura07.1083
63Hamiri Kalan08.0989
64Isharpura011.8741
65Budana01.1675
66Soti015.4873
67Desusar016.8742
68Charanwas Urf Sultanpur00.9603
69Bagad015.4898
70Jai Pahari015.4987
71Islampura053.8982
72Marot01.1997
73Malupura05.298
74Sultana012.1838
75Kerpura02.5983
76Shyampura014.5957
77Kithana021.9861
78Shri Amerpura05.996
79Arya Nagar010.8376
80Manota Jatan020.9996
81Jasrapur4.751530.0727
Total 5.9738 1598.7432
B-2.4 Component wise breakup
Component wise breakup
S.no Component Forest Land(ha.) Non-Forest Land(ha.)
1Tower Foundation Area0.0824.24
2Stringing Area2.5948691.6152
3Remaining ROW Area3.299882.888
Total 5.9738 1598.7432
C. Maps of forest land proposed to be diverted
Division 1. : Jhunjhunu Territorial
  (i). Area of forest land proposed to be diverted(in ha.) : 4.7515   (ii). Nature of the Project: Linear   (b). No. of Segments : Four
Segment wise details
Segments Segment Area(in ha.) Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.3.5398    View File
2.0.375    View File
3.0.3951    View File
4.0.4416    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
Division 2. : Bikaner Territorial
  (i). Area of forest land proposed to be diverted(in ha.) : 1.2223   (ii). Nature of the Project: Linear   (b). No. of Segments : Two
Segment wise details
Segments Segment Area(in ha.) Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.0.2152    View File
2.1.0071    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D. Justification for locating the Project in forest land and details of alternatives examined:
  (i). Copy of note containing justification for locating the Project in forest land:   (ii). Whether a copy of map indicating location of alternative examine is required to be provided: Yes   (a). Copy of map indicating location of alternative examined:
E. Employment likely to be generated
  (i). Whether the Project is likely to generate employment ?: Yes   (ii). Permanent/Regular Employment(Number of persons): 20   (iii). Temporary Employment(Number of person-days): 292000
F. Displacement of People due to the Project, if any
  (i). Whether Project involves displacement?: No
G. Details of Cost-Benefit analysis for the Project
  (i). Whether the Project requires Cost-Benefit analysis?: No
H. Status of Environmental Clearance
  (i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? : No
I. Status of Wildelife Clearance
  (i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? : No
J. Applicability of special provisions governing Scheduled Areas
  (i).Whether the Project or a part thereof is located in a Scheduled Area? : No
K. Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
  (i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? : Yes   (a). Copy of documentry evidence in support of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted:
L. Details of land identified for Compensatory Afforestation
  (i). Whether non-forest or Revenue forest land is required to be provided by User Agency?: No   (ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?: No   (iii) . Reason for not providing Non-Forest Land: For laying of transmission lines
Additional information Details
Documents
S.No Documents
Remarks
1Village Map of Dandoosar Village
2DFO Bikaner Letter
3DFO Churu Letter
4NH Notification
5EDS Reply 22-06-2020
6Canal Notifications
7JUSTIFICATION FOR EMPLOYMENT
8PROJECT REPORT
9UNDERTAKING FOR MEDICIANAL PLANTS
10UNDERTAKING FOR PAYMENT OF COST OF COMPENSATORY AFFORESTATION
11UNDERTAKING OF FRA CERTIFICATE
12GEO-REFERENCED GOOGLE IMAGERY MAP REQUIRED FOREST LAND
13GEO-REFERENCED DIGITAL MAP SEGMENT-1
14GEO-REFERENCED DIGITAL MAP SEGMENT-2
15Alternative Google Imagery Map
16EDS REPLY LETTER-26-06-2020
17JAMABANDI DANDOOSAR NH-15
18JAMABANDI Village- Jasrapur
19Undertaking to Pay Cost of Tree Fellings
20Undertaking for Archaeological Importance
21ENVIRONMENTAL CLEARANCE CERTIFICATE
22Estimated Project Cost
23No Violation of forest conservation Act 1980-Guideline under it
24CROSS SECTION KANWAR SAIN LIFT CANAL
25CROSS SECTION OF NH-15 CROSSING
26UNDERTAKING FOR NO CHANGE S IN STATUTORY POSITION OF DIVERTED FOREST LAND
27UNDERTAKING FOR PAYMENT OF ANY OTHER COST & CONDITION
28UNDERTAKING FOR TWO TIME DEGRADED FOREST LAND
29UNDERTAKING FOR USE OF ANY MATERIAL FROM SURROUNDED FOREST LAND DURING CONSTRUCTION OF TRANSMISSION LINE
30UNDERTAKING FOR USE OF FOREST LAND
31AUTHORIZATION LETTER
32EDS BY JHUNJHUNU DCCF REPLY LETTER FROM BKTL 21-07-2020
33GEO-REFERENCED SURVEY OF INDIA TOPOSHEET WITH 765KV TRANSMISSION LINE ROUTE ALIGNMENT SCALE 1 : 50000
34Alternative Digital Map
35Alternative Toposheet Map
36GEO-REFERENCED DIGITAL MAP REQUIRED FOREST LAND WITH COORDINATE AND PROPOSED ROUTE ALIGNMENT
37CERTIFICATE FOR MINIMUM USE OF FOREST LAND
38COMPARATIVE STATEMENT OF ALTERNATIVE ROUTE
39Component Wise Area Calculation Sheet
40JUSTIFICATION FOR LOCATING THE PROJECT
41Khasra Map Jasrapur
42SEGMENT WISE AREA CALCULATION SHEET
43TOTAL TOWER COORDINATES
44UNDERTAKING FOR FOR NO OTHER ALTERNATIVE
45UNDERTAKING FOR PAYMENT OF NET PRESENT VALUE OF FOREST AREA
46Village Wise Area calculation Sheet Forest and Non-Forest Land
47BAR CHART
48GEO-REFERENCED DIGITAL MAP SEGMENT- 3 to 6
49EDS REPLY 765 KV BIKANER-KHETRI-31-08-2020
50STATEMENT SHOWING DETAILS OF FORESTAREA PROPOSED FOR DIVERSION
51Gazette Notification issued from Energy Department
52NOC from Canal
53NOC from NH
54NOC from PGCIL for Rediversion
55NOC from Railway
56Trees required to fell
57EDS REPLY-03-11-2020