FORM - A
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
PART - I
(To be filled up by User Agency)
A. General Details
A-1. Project Details
  (i). Proposal No. : FP/RJ/TRANS/37434/2018   (ii). Name of Project for which Forest Land is required : Construction of Lilo From 220 KV S/C Jhalawar – Chhabra line at Proposed 220 kv GSS Aklera, District Jhalawar.   (iii). Short narrative of the proposal and Project/scheme for which the forest land is required : Construction of LILO of 220 KV S/C Jhalawar – Chhabra line at Proposed 220 kV GSS Aklera is required to meet the load growth of Aklera & adjoining area   (iv). State : Rajasthan   (v). Category of the Proposal : Transmission Line   (vi). Shape of forest land proposed to be diverted : Linear   (vii). Estimated cost of the Project(Rupees in lacs) : 2001.88   (viii). Area of forest land proposed for diversion(in ha.): 24.4888   (ix). Non-forest land required for this project(in ha.): 148.3937   (x). Total period for which the forest land is proposed to be diverted(in years): 50
A-2. Details of User Agency
  (i). Name : RAJASTHAN RAJYA VIDYUT PRASARAN NIGAM LTD KOTA   (ii). Address1 : SE(T&C), RVPN, SAKATPURA, KOTA   (iii). Address2 : NIL   (iv). State : Rajasthan   (v). District : Kota   (vi). Pin : 324006   (vii). Landmark : NIL   (viii). Email address : se.tnc.kota@rvpn.co.in   (ix). Landline Telephone No. : 744-2370084   (x). Fax No. : 744-   (xi). Mobile No. : 9413382702   (xii). Website (if any) : energy.rajasthan.gov.in/rvpnl   (xiii). Legal status of User Agency : State PSU
A-3. Details of Person Making Application
  (i). First Name: Rajeev   (ii). Middle Name: NIL   (iii). Last Name: Kumar   (iv). Gender: Male   (v). Designation: ExecutiveEngineer   (vi). Address 1: Executive Engineer T and C, RVPN, Sakatpura, Kota   (vii). Address 2: NIL   (viii). State: Rajasthan   (ix). District: Kota   (x). Tehsil: NIL   (xi). Pin: 324006   (xii). Landmark: NIL   (xiii). Email Address: xen.tnc.kota@rvpn.co.in   (xiv). Landline Telephone No.: 744-2370086   (xv). Fax No.: NIL   (xvi). Mobile No.: 9413711469   (xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B. Details of land required for the Project
B-1. Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
Proposal Submitted in Past
S.no Proposal Status. Proposal No. Moef File No. Area Proposed for Diversion(Ha.) Area Diverted(Ha.) Date of In-Principle Approval Date of Final Approval
1InprincipleFP/RAJ/TRANS/19845/20168B/RJ/04/03/2017/FC3.9423.94230 Mar 2017
2ApprovedFP/RJ/TRANS/18259/20168B/RAJ/04/7/2017/FC19.743219.743228 Jul 201715 Feb 2018
3ApprovedFP/RJ/TRANS/37434/20188B/RAJ/04/33/2019/FC24.488824.488830 Jan 202017 Jul 2020
4ApprovedFP/RJ/TRANS/35469/20188B/RAJ/04/19/2019/FC2.2412.24122 Jan 202006 Aug 2020
5InprincipleFP/RJ/TRANS/35024/20188B/RAJ/04/32/201926.94326.94310 Aug 2020
Total 77.358 77.358
B-2. Details of forest land proposed to be diverted
B-2.1 Details of Divisions involved
Details of Divisions involved
S.no Division Name Forest Land(ha.) Non-Forest Land(ha.)
1.Jhalawar Territorial24.4888148.3937
Total24.4888148.3937
B-2.2 Details of Districts involved
District wise breakup
S.no District Name Forest Land(ha.) Non-Forest Land(ha.)
1.Jhalawar24.4888148.3937
Total24.4888148.3937
B-2.3 Village wise breakup
Villages wise breakup
S.no Village Forest Land(ha.) Non-Forest Land(ha.)
1SAROLA KHURD02.5025
2SAROLA KALAN05.95
3CHAPA KHURD02.765
4CHITAWA04.585
5CHITAI02.345
6DADIYA06.58
7MALANWASA1.05493.5665
8BISLAI02.814
9KARANWAS04.242
10BALDEVPURA03.2795
11AMABALA05.53
12DAULATPURA04.2
13MIRZAPUR3.31.5715
14HANOTI0.1960
15NAINKOT1.4343.018
16KHOKHERA LALA04.977
17THARAWAD05.187
18POLI2.16116.895
19KOOKAL WARA04.305
20PATANUDA01.981
21REENCHHWA3.04814.2634
22KENWACHI KHURD3.14254.1655
23MORELI03.5175
24KENWACHI KALAN04.8755
25MANGTA04.417
26LUHARIYA02.73
27AKLERA03.787
28AMALWARA06.2125
29PATHRIYA03.1675
30SALAWAD03.871
31KHANPURIYA04.1545
32LAPASYA02.5725
33UGENI02.576
34UGENA02.66
35BEENDA02.38
36LUHARPURA02.7125
37DEVRI KALAN04.165
38DEVRI KHURD2.19091.9075
39TARANJ7.96134.4997
40KOTRA JAGIR03.465
Total 24.4888 148.3936
B-2.4 Component wise breakup
Component wise breakup
S.no Component Forest Land(ha.) Non-Forest Land(ha.)
1Tower Foundation Area0.14720.864
2Stringing Area6.849641.5342
3Remaining Row Area17.492105.995475
Total 24.4888 148.393675
C. Maps of forest land proposed to be diverted
Division 1. : Jhalawar Territorial
  (i). Area of forest land proposed to be diverted(in ha.) : 24.4888   (ii). Nature of the Project: Linear   (b). No. of Segments : Eight
Segment wise details
Segments Segment Area(in ha.) Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.1.0549    View File
2.3.4603    View File
3.6.9505    View File
4.2.4805    View File
5.2.1611    View File
6.5.533    View File
7.0.6576    View File
8.2.1909    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D. Justification for locating the Project in forest land and details of alternatives examined:
  (i). Copy of note containing justification for locating the Project in forest land:   (ii). Whether a copy of map indicating location of alternative examine is required to be provided: Yes   (a). Copy of map indicating location of alternative examined:
E. Employment likely to be generated
  (i). Whether the Project is likely to generate employment ?: Yes   (ii). Permanent/Regular Employment(Number of persons): 17   (iii). Temporary Employment(Number of person-days): 25000
F. Displacement of People due to the Project, if any
  (i). Whether Project involves displacement?: No
G. Details of Cost-Benefit analysis for the Project
  (i). Whether the Project requires Cost-Benefit analysis?: Yes   (a). Copy of Cost-Benefit analysis:
H. Status of Environmental Clearance
  (i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? : No
I. Status of Wildelife Clearance
  (i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? : No
J. Applicability of special provisions governing Scheduled Areas
  (i).Whether the Project or a part thereof is located in a Scheduled Area? : No
K. Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
  (i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? : Yes   (a). Copy of documentry evidence in support of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted:
L. Details of land identified for Compensatory Afforestation
  (i). Whether non-forest or Revenue forest land is required to be provided by User Agency?: No   (ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?: Not Applicable   (iii) . Reason for not providing Non-Forest Land: For laying of transmission lines
Additional information Details
Documents
S.No Documents
Remarks
1UNDERTAKING FOR CONSERVATION OF FLORA-FAUNA DURING CONSTRUCTION OF TRANSMISSION LINE
2UNDERTAKING FOR MEDICIANAL PLANTS
3UNDERTAKING FOR MUCK DISPOSAL
4UNDERTAKING FOR NO CHANGE S IN STATUTORY POSITION OF DIVERTED FOREST LAND
5UNDERTAKING FOR PAYMENT OF ANY OTHER COST & CONDITION
6UNDERTAKING FOR TWO TIME DEGRADED FOREST LAND
7UNDERTAKING FOR USE OF ANY MATERIAL FROM SURROUNDED FOREST LAND DURING CONSTRUCTION OF TRANSMISSION LINE
8UNDERTAKING FOR USE OF FOREST LAND
9DIGITAL MAP SEGMENT-1 SCALE 1:4000
10DIGITAL MAP SEGMENT-2 & 3 SCALE 1:4000
11DIGITAL MAP SEGMENT- 5 SCALE 1:4000
12DIGITAL MAP SEGMENT- 6 & 7 SCALE 1:4000
13DIGITAL MAP SEGMENT- 8 SCALE 1:4000
14ADMINISTRATIVE AND FINANCIAL SANCTION
15GAZZATTE NOTIFICATION BY CE
16220 KV TOWER DRAWING
17UNDERTAKING FOR PAYMENT OF COST OF COMPENSATORY AFFORESTATION
18EDS REPLY LETTER-11-01-2019
19JAMABANDI ALL VILLAGE INVOLVE PROPOSAL
20EDS REPLY LETTER-11-02-2019
21EDS reply 18-02-2019
22EDS reply letter No 3337
23BAR CHART
24CERTIFICATE FOR MINIMUM USE OF FOREST LAND.pdf
25COMPARATIVE STATEMENT OF ALTERNATIVE ROUTE.pdf
26Component Wise Area Calculation Sheet.pdf
27Segment Wise Area Calculation Sheet.pdf
28STATEMENT SHOWING DETAILS OF FOREST AREA INVOLVED IN THE PROPOSAL.pdf
29Tower Location Coordinates.pdf
30UNDERTAKING FOR PAYMENT OF NET PRESENT VALUE OF FOREST AREA.pdf
31Village Wise area calculation sheet
32DIGITAL MAP SEGMENT-4.pdf
33MAP SHOWING FOR GEO-REFERENCED SURVEY OF INDIA TOPOSHEET WITH FOREST BOUNDARY AND PROPOSED 220 KV TRANSMISSION LINE ROUTE ALIGNMENT SCALE 1: 50000
34DIGITAL MAP SHOWING FOR TOTAL ROUTE REQUIRED FOREST LAND COORDINATES AND PROPOSED TOTAL ROUTE ALIGNMENT
35GOOGLE IMAGERY MAP SHOWING FOR REQUIRED FOREST LAND AND PROPOSED TOTAL ROUTE 220 KV TRANSMISSION LINE ALIGNMENT
36ALTERNATIVE SURVEY OF INDIA TOPOSHEET SCALE 1:50000
37ALTERNATIVE DIGITAL MAP SHOWING FOR TREE ALTERNAITVE ROUTE ALIGNMENT
38ALTERNATIVE GOOGLE MAP
39Reply letter 15.5.19-.pdf
40Justification Strnegth 220 KV EMPLOYMENT.pdf
41SDM LEVEL MEETING FOR FRA
42GRAM SABHA MEETING COPY
43Agreement letter Tawor no 48
44EDS REPLY 20.08.19
45EDS Reply 15.11.2019
46Explanation letter
47PWD Letter for NOC
48Undertaking for Penal CA