A-1. Project Details
  (i). Proposal No. : FP/RJ/TRANS/34423/2018   (ii). Name of Project for which Forest Land is required : Construction of 132 KV D/C LILO from 132 KV S/C Bagidora - Mahi (PH-2) Line to 132 KV GSS Chordi, District- Banswara (Raj.)”   (iii). Short narrative of the proposal and Project/scheme for which the forest land is required : Construction of 132 KV D/C LILO from 132 KV S/C Bagidora - Mahi (PH-2) Line to 132 KV GSS Chordi, District- Banswara (Raj.)”   (iv). State : Rajasthan   (v). Category of the Proposal : Transmission Line   (vi). Shape of forest land proposed to be diverted : Linear   (vii). Estimated cost of the Project(Rupees in lacs) : 314.52   (viii). Area of forest land proposed for diversion(in ha.): 1.9003   (ix). Non-forest land required for this project(in ha.): 28.0376   (x). Total period for which the forest land is proposed to be diverted(in years): 50
A-2. Details of User Agency
  (i). Name : RAJASTHAN RAJYA VIDYUT PRASARAN NIGAM LTD CHITTORGARH   (ii). Address1 : Office of the Superintending Engineer (T&C) 220 KV GSS Premises, RRVPNL.   (iii). Address2 : Post-Cement Factory Chanderiya   (iv). State : Rajasthan   (v). District : chittorgarh   (vi). Pin : 312021   (vii). Landmark : Birla Cement Factory Chanderiya   (viii). Email address : se.tnc.chittorgarh@rvpn.co.in   (ix). Landline Telephone No. : 1472-256368   (x). Fax No. : 1472-256368   (xi). Mobile No. : 9414061490   (xii). Website (if any) : NIL   (xiii). Legal status of User Agency : State PSU
A-3. Details of Person Making Application
  (i). First Name: Sunil   (ii). Middle Name: Prasad   (iii). Last Name: Sarkar   (iv). Gender: Male   (v). Designation: Executive Engineer   (vi). Address 1: Office of the Executive Engineer, 220 KV GSS Premises, RRVPNL.   (vii). Address 2: Post- Cement Factory Chanderiya.   (viii). State: Rajasthan   (ix). District: chittorgarh   (x). Tehsil: NIL   (xi). Pin: 312021   (xii). Landmark: Cement Factory Chanderiya   (xiii). Email Address: xen.tnc.banswara@gmail.com   (xiv). Landline Telephone No.: 1472-256368   (xv). Fax No.: 1472256368   (xvi). Mobile No.: 9414082086   (xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B. Details of land required for the Project
B-1. Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
Proposal Submitted in Past
S.no Proposal Status. Proposal No. Moef File No. Area Proposed for Diversion(Ha.) Area Diverted(Ha.) Date of In-Principle Approval Date of Final Approval
1InprincipleFP/RJ/TRANS/34423/20188B/RAJ/04/16/2019/FC1.90031.900314 Jan 2020
2ApprovedFP/RJ/TRANS/17459/20168B/RAJ/04/05/2016/FC19.82419.82415 Feb 201718 Sep 2017
Total 21.7243 21.7243
B-2. Details of forest land proposed to be diverted
B-2.1 Details of Divisions involved
Details of Divisions involved
S.no Division Name Forest Land(ha.) Non-Forest Land(ha.)
1.Banswara Territorial1.900328.0376
Total1.900328.0376
B-2.2 Details of Districts involved
District wise breakup
S.no District Name Forest Land(ha.) Non-Forest Land(ha.)
1.Banswara1.900328.0376
Total1.900328.0376
B-2.3 Village wise breakup
Villages wise breakup
S.no Village Forest Land(ha.) Non-Forest Land(ha.)
1Lilwani1.49530
2Rupa Khera02.4765
3Patiya Kodar03.3636
4Saliya010.0891
5Bhaler Bhodar01.2166
6Chordi06.8368
7Moti Tandi04.055
8Bakaner0.4050
Total 1.9003 28.0376
B-2.4 Component wise breakup
Component wise breakup
S.no Component Forest Land(ha.) Non-Forest Land(ha.)
1Tower Foundation0.02450.2009
2Stringing Area0.48637.7071
3Remaining ROW1.389520.1296
Total 1.9003 28.0376
C. Maps of forest land proposed to be diverted
Division 1. : Banswara Territorial
  (i). Area of forest land proposed to be diverted(in ha.) : 1.9003   (ii). Nature of the Project: Linear   (b). No. of Segments : One
Segment wise details
Segments Segment Area(in ha.) Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.1.9003    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D. Justification for locating the Project in forest land and details of alternatives examined:
  (i). Copy of note containing justification for locating the Project in forest land:   (ii). Whether a copy of map indicating location of alternative examine is required to be provided: Yes   (a). Copy of map indicating location of alternative examined:
E. Employment likely to be generated
  (i). Whether the Project is likely to generate employment ?: Yes   (ii). Permanent/Regular Employment(Number of persons): 12   (iii). Temporary Employment(Number of person-days): 680
F. Displacement of People due to the Project, if any
  (i). Whether Project involves displacement?: No
G. Details of Cost-Benefit analysis for the Project
  (i). Whether the Project requires Cost-Benefit analysis?: No
H. Status of Environmental Clearance
  (i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? : No
I. Status of Wildelife Clearance
  (i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? : No
J. Applicability of special provisions governing Scheduled Areas
  (i).Whether the Project or a part thereof is located in a Scheduled Area? : No
K. Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
  (i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? : Yes   (a). Copy of documentry evidence in support of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted:
L. Details of land identified for Compensatory Afforestation
  (i). Whether non-forest or Revenue forest land is required to be provided by User Agency?: No   (ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?: No   (iii) . Reason for not providing Non-Forest Land: For laying of transmission lines
Additional information Details
Documents
S.No Documents
Remarks
1Undertaking for Use of Any Material From Forest Land.
2UNDERTAKING FOR CONSERVATION OF FLORA FAUNA DURING TRANSMISSION LINE.
3UNDERTAKING FOR NO CHANGES IN STATUTORY POSITION OF DIVERTED FOREST LAND.
4UNDERTAKING FOR NO OTHER FEASIBLE ALTERNATIVE.
5UNDERTAKING FOR PAYMENT OF ANY OTHER COST AND CONDITION.
6UNDERTAKING FOR USE OF FOREST LAND.
7Undertaking for Muck Disposal Plan.
8UNDERTAKING FOR PAYMENT OF NET PRESENT VALUE OF FOREST AREA.
9UNDERTAKING FOR PAYMENT OF COST OF COMPENSATORY AFFORESTATION.
10CERTIFICATE FOR MINIMUM USE OF FOREST LAND.
11STATEMENT SHOWING DETAILS OF NON FOREST AREA.
12Details of Permanent Employment to be generated.
13Segment Wise Area Calculation Sheet.
14Component Wise Area Calculation Sheet.
15TWO TIME DEGRADED FOREST LAND UNDERTAKING.
16Undertaking for Payment of Cost of Medicinal Plant under Transmission line.
17UNDERTAKING FOR SUBMISSION OF MISSING OR REQUIRED ADDITIONAL DOCUMENTS IN LIEU OF FOREST DIVERSION PROPOSAL
18Undertaking to Pay the Cost of Plantation.
19COMPARATIVE STATEMENT OF ALTERNATIVE ROUTES.
20Complete Toposheet 46 I3 .
21Digital Map Zoom View.
22Digital Map.
23Toposheet Map.
24Alternative Route Map.
25Administrative and Financial Approval.
26Tower Drawing.
27Complete Alignment Tower Coordinates.
28Reply Letter of 29.10.2018 EDS Letter.
29Area Calculation Sheet.
30Khasra Map and Jamabandi Nakal.
31EDS Reply of 5th March 2019.
32Gazette Notification 132KV GSS Chordi Line.
33Reply of EDS raised by MOEFC Regional office Lucknow on dated 18.07.2019