FORM - A
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
PART - I
(To be filled up by User Agency)
A. General Details
A-1. Project Details
  (i). Proposal No. : FP/RJ/TRANS/18689/2016   (ii). Name of Project for which Forest Land is required : 400 KV Ajmer (New)-Ajmer(RVPN) Power Transmission line   (iii). Short narrative of the proposal and Project/scheme for which the forest land is required : The requirement of transmission strengthening beyond Bhuj Pooling station due to integration of Generation from Mundra UMPP and Adani Mundra in Kutch (Gujrat) complex as well as above envisaged renewable capacity in Gujrat and Rajasthan a comprehensive Inter-State Transmission System (ISTS) strength   (iv). State : Rajasthan   (v). Category of the Proposal : Transmission Line   (vi). Shape of forest land proposed to be diverted : Linear   (vii). Estimated cost of the Project(Rupees in lacs) : 11350   (viii). Area of forest land proposed for diversion(in ha.): 6.35   (ix). Non-forest land required for this project(in ha.): 274.25   (x). Total period for which the forest land is proposed to be diverted(in years): 50
A-2. Details of User Agency
  (i). Name : POWERGRID CORPORATION OF INDIA LIMITED   (ii). Address1 : 703 Avashiya Yojna Pragati Nagar Kotra Ajmer Rajasthan 305004   (iii). Address2 : NIL   (iv). State : Rajasthan   (v). District : Ajmer   (vi). Pin : 305004   (vii). Landmark : NIL   (viii). Email address : pgcilajmer@gmail.com   (ix). Landline Telephone No. : 145-2310112   (x). Fax No. : 145-   (xi). Mobile No. : 9001890336   (xii). Website (if any) : NIL   (xiii). Legal status of User Agency : Central PSU
A-3. Details of Person Making Application
  (i). First Name: Brahma   (ii). Middle Name: NIL   (iii). Last Name: Shankar   (iv). Gender: Male   (v). Designation: Dy.Manager   (vi). Address 1: 703 Avashiya Yojna Pragati Nagar Kotra Ajmer Rajasthan 305004   (vii). Address 2: NIL   (viii). State: Rajasthan   (ix). District: Ajmer   (x). Tehsil: Ajmer   (xi). Pin: 305004   (xii). Landmark: NIL   (xiii). Email Address: braham11512@gmail.com   (xiv). Landline Telephone No.: 145-2310112   (xv). Fax No.: NIL   (xvi). Mobile No.: 9001894229   (xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B. Details of land required for the Project
B-1. Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
List of proposal submitted in Past
S.no Proposal Status. Proposal No. Moef File No. Area Proposed for Diversion(Ha.) Area Diverted(Ha.) Date of In-Principle Approval Date of Final Approval
NIL
B-2. Details of forest land proposed to be diverted
B-2.1 Details of Divisions involved
Details of Divisions involved
S.no Division Name Forest Land(ha.) Non-Forest Land(ha.)
1.Ajmer Territorial6.35274.25
Total6.35274.25
B-2.2 Details of Districts involved
District wise breakup
S.no District Name Forest Land(ha.) Non-Forest Land(ha.)
1.Ajmer6.35274.25
Total6.35274.25
B-2.3 Village wise breakup
Villages wise breakup
S.no Village Forest Land(ha.) Non-Forest Land(ha.)
1Devnagar3.460512.696
2Kanas2.889512.1164
3Jethana07.1438
4Dantra031.0132
5Budhwara015.1846
6Piicholiya08.9424
7Bhagwanpura032.5818
8Nand010.8928
9Kishanpura013.8644
10Chawandiya06.2698
11Tilora024.4858
12Honkra016.0954
13Makadwali023.6992
14Kayad021.643
15Chhatri017.6272
16Gegal019.9862
Total 6.35 274.242
B-2.4 Component wise breakup
Component wise breakup
S.no Component Forest Land(ha.) Non-Forest Land(ha.)
1Devnagar Component3.460512.696
2Kanas Village Component2.889512.1164
Total 6.35 24.8124
C. Maps of forest land proposed to be diverted
Division 1. : Ajmer Territorial
  (i). Area of forest land proposed to be diverted(in ha.) : 6.35   (ii). Nature of the Project: Linear   (b). No. of Segments : Two
Segment wise details
Segments Segment Area(in ha.) Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.3.4605    View File
2.2.8895    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D. Justification for locating the Project in forest land and details of alternatives examined:
  (i). Copy of note containing justification for locating the Project in forest land:   (ii). Whether a copy of map indicating location of alternative examine is required to be provided: Yes   (a). Copy of map indicating location of alternative examined:
E. Employment likely to be generated
  (i). Whether the Project is likely to generate employment ?: Yes   (ii). Permanent/Regular Employment(Number of persons): 0   (iii). Temporary Employment(Number of person-days): 30000
F. Displacement of People due to the Project, if any
  (i). Whether Project involves displacement?: No
G. Details of Cost-Benefit analysis for the Project
  (i). Whether the Project requires Cost-Benefit analysis?: No
H. Status of Environmental Clearance
  (i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? : No
I. Status of Wildelife Clearance
  (i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? : No
J. Applicability of special provisions governing Scheduled Areas
  (i).Whether the Project or a part thereof is located in a Scheduled Area? : No
K. Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
  (i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? : Yes   (a). Copy of documentry evidence in support of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted:
L. Details of land identified for Compensatory Afforestation
  (i). Whether non-forest or Revenue forest land is required to be provided by User Agency?: Not Applicable   (ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?: Not Applicable   (iii) . Reason for not providing Non-Forest Land: Not Applicable
Additional information Details
Documents
S.No Documents
Remarks
1Undertaking for Two Time Payment for CA Land.
2Village List and tower location.
3CA Scheme.
4Area Calculation Sheet.
5Alternative Route Details.
6Bar Chart.
7Alternative Route Map 400 KV line revised.
8Digital Map zoom view.
9Digital Map.
10Google Image zoom view.
11Google Image.
12Toposheet Map zoom view..
13Toposheet Map.
14Undertaking for Past Proposal.
15Undertaking for Two Time Payment for CA Land
16PWD NOC
17Undertaking for PWD NOC.
18Compliance report.
19Technical and Financial Sanction.
20UNDERTAKING FOR CONSERVATION OF FLORA FAUNA DURING TRANSMISSION LINE.
21UNDERTAKING FOR NO CHANGES IN STATUTORY POSITION OF DIVERTED FOREST LAND..
22UNDERTAKING FOR NO OTHER FEASIBLE ALTERNATIVE AND DIVERSION OF MINIMUM FOREST LAND.
23UNDERTAKING FOR PAYMENT OF ANY OTHER COST AND CONDITION.
24UNDERTAKING FOR USE OF FOREST LAND.
25Undertaking for Waste Management.
26PFR
27Project Details.
28Complete Alignment Tower Location Coordinates.
29FRA COLLECTOR, SDO PUSHKAR AND MEETING DEVNAGAR AND KANAS VILLAGE
30DIGITAL MAP FOR CA LAND
31TOPOSHEET
32UNDERTAKING FOR PAYMENT OF NET PRESENT VALUE OF FOREST AREA.
33UNDERTAKING FOR USE OF ANY MATERIALS FROM SORROUNDED FOREST LAND DURING CONSTRUCTION
34Khasra Map and Jamabandi.