FORM - A
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
PART - I
(To be filled up by User Agency)
A. General Details
A-1. Project Details
  (i). Proposal No. : FP/RJ/ROAD/33988/2018   (ii). Name of Project for which Forest Land is required : Widening, Strengthening and Improvement of Geometrics of Saint to Nonera Road upto UP Border, Via Konthera (UP Border)- Bahaz-Deeg-Khoh-Adi Badri- Baroli Dhau- Kedarnathji Temple-Luhesar- Bhojan Thali (Brij Chorasi Kos Parikarma Marg) Km 0/00 to 82/290 (MDR-211), Bharatpur Rajasthan   (iii). Short narrative of the proposal and Project/scheme for which the forest land is required : Widening, Strengthening and Improvement of Geometrics of Saint to Nonera Road upto UP Border, Via Konthera (UP Border)- Bahaz-Deeg-Khoh-Adi Badri- Baroli Dhau- Kedarnathji Temple-Luhesar- Bhojan Thali (Brij Chorasi Kos Parikarma Marg) Laxman Jhula and including Approach Road Km 0/00 to 82/290 (MDR   (iv). State : Rajasthan   (v). Category of the Proposal : Road   (vi). Shape of forest land proposed to be diverted : Linear   (vii). Estimated cost of the Project(Rupees in lacs) : 19951   (viii). Area of forest land proposed for diversion(in ha.): 2.7135   (ix). Non-forest land required for this project(in ha.): 120.7215   (x). Total period for which the forest land is proposed to be diverted(in years): 99
A-2. Details of User Agency
  (i). Name : PROJECT DIRECTOR PWD POONCHHARI DEEG   (ii). Address1 : p d ,brij chaurasi project,hq. poonchhari(deeg)   (iii). Address2 : NIL   (iv). State : Rajasthan   (v). District : Bharatpur   (vi). Pin : 321203   (vii). Landmark : poonchhari lotha temple   (viii). Email address : pdbrij84@gmail.com   (ix). Landline Telephone No. : 5641-224044   (x). Fax No. : 5641-   (xi). Mobile No. : 9461484049   (xii). Website (if any) : NIL   (xiii). Legal status of User Agency : State Government
A-3. Details of Person Making Application
  (i). First Name: KAMAL   (ii). Middle Name: SINGH   (iii). Last Name: MEENA   (iv). Gender: Male   (v). Designation: PROJECT DIRECTOR   (vi). Address 1: PROJECT DIRECTOR ,Brij Chaurasi Project, HQ. Poonchhari Deeg, District Bharatpur   (vii). Address 2: NIL   (viii). State: Rajasthan   (ix). District: Bharatpur   (x). Tehsil: Deeg   (xi). Pin: 321203   (xii). Landmark: poonchhari lotha temple   (xiii). Email Address: pdbrij84@gmail.com   (xiv). Landline Telephone No.: 5641-224044   (xv). Fax No.: NIL   (xvi). Mobile No.: 9079922667   (xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B. Details of land required for the Project
B-1. Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
List of proposal submitted in Past
S.no Proposal Status. Proposal No. Moef File No. Area Proposed for Diversion(Ha.) Area Diverted(Ha.) Date of In-Principle Approval Date of Final Approval
NIL
B-2. Details of forest land proposed to be diverted
B-2.1 Details of Divisions involved
Details of Divisions involved
S.no Division Name Forest Land(ha.) Non-Forest Land(ha.)
1.Bharatpur Territorial2.7135120.7215
Total2.7135120.7215
B-2.2 Details of Districts involved
District wise breakup
S.no District Name Forest Land(ha.) Non-Forest Land(ha.)
1.Bharatpur2.7135120.7215
Total2.7135120.7215
B-2.3 Village wise breakup
Villages wise breakup
S.no Village Forest Land(ha.) Non-Forest Land(ha.)
1SAINT02.7
2TOMRER03.825
3KARENWA03.675
4GARHI04.05
5JOTALI02.25
6KORNAR05.31
7KHERA05.118
8SANWARA02.79
9NANGLA DODU02.8575
10BHOHAJ03.9
11DEEG07.725
12DEDWALI04.158
13TANKOLI03.6975
14NANGLA MEHRANIHYA03.6015
15MEHRASAR06.795
16KHOH03.63
17KHOLI02.265
18GADRBA01.83
19BHIYARI KARMUKA0.5853.6525
20ALIPUR2.12856.051
21PASABA05.625
22BARALI DHAU01.77
23KHUNTPURI01.05
24BILONA03.045
25BADRI02.0715
26LOHASAR03.33
27AGRAWALI02.07
28NANDERA BAS02.145
29SATWAS02.625
30AMACHWARA01.9875
31PATHWARI02.445
32LOHAGARH02.91
33KIRWATA01.485
34BHATTKI02.19
35NANGLA BALDU01.515
36BAMBARI02.04
37NAUNERA02.5365
Total 2.7135 120.7215
B-2.4 Component wise breakup
Component wise breakup
S.no Component Forest Land(ha.) Non-Forest Land(ha.)
1ROAD (Brij Chorasi Kos Parikarma) Km 0/00 -82/2902.7135120.7215
Total 2.7135 120.7215
C. Maps of forest land proposed to be diverted
Division 1. : Bharatpur Territorial
  (i). Area of forest land proposed to be diverted(in ha.) : 2.7135   (ii). Nature of the Project: Linear   (b). No. of Segments : Five
Segment wise details
Segments Segment Area(in ha.) Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.0.9495    View File
2.0.606    View File
3.0.5955    View File
4.0.075    View File
5.0.4875    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D. Justification for locating the Project in forest land and details of alternatives examined:
  (i). Copy of note containing justification for locating the Project in forest land:   (ii). Whether a copy of map indicating location of alternative examine is required to be provided: Yes   (a). Copy of map indicating location of alternative examined:
E. Employment likely to be generated
  (i). Whether the Project is likely to generate employment ?: Yes   (ii). Permanent/Regular Employment(Number of persons): 0   (iii). Temporary Employment(Number of person-days): 12990
F. Displacement of People due to the Project, if any
  (i). Whether Project involves displacement?: No
G. Details of Cost-Benefit analysis for the Project
  (i). Whether the Project requires Cost-Benefit analysis?: No
H. Status of Environmental Clearance
  (i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? : No
I. Status of Wildelife Clearance
  (i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? : No
J. Applicability of special provisions governing Scheduled Areas
  (i).Whether the Project or a part thereof is located in a Scheduled Area? : No
K. Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
  (i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? : Yes   (a). Copy of documentry evidence in support of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted:
L. Details of land identified for Compensatory Afforestation
  (i). Whether non-forest or Revenue forest land is required to be provided by User Agency?: Yes   (ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?: No   (iii). No. of districts involved for raising Compensatory Afforestation: 1   (iv). No. of patches: One
District 1. : Bharatpur
  (a). Village: ALIPUR   (b). Area(in ha.): 2.7135   (c). Copy of KML file of the patch:     View File   (d). Khasra details: 1   (e). Present owner: Others   (f). Copy of ownership proof:   (g). Copy of Mou/agreement executed between the Present owner and the User Agency:   (h). Copy of non encumberence certificate for the forest land:
  (v). Scanned copy of the map of the land identified for creation of Compensatory Afforestation prepared by using GPS ot Total Station:   (vi). Copy of Survey of India Toposheet in 1:50,000 scale indicating location of the land identified for creation of Compensatory Afforestation:
Additional information Details
Documents
S.No Documents
Remarks
1ADMINISTRATIVE AND FINANCIAL SANCTION
2TECHNICAL SANCTION
3PROJECT REPORT
4CROSS SECTION
5Eds reply Letter Sait to Nonera Road 15-02-2019
6EDS REPLY LETTER -04-06-2020
7BAR CHART
8CERTIFICATE FOR MINIMUM USE OF FOREST LAND
9JUSTIFICATION FOR LOCATING THE PROJECT IN FOREST AREA
10COMPARATIVE STATEMENT OF ALTERNATIVE ROUTE
11UNDERTAKING FOR GAI VAN BHUMI KI
12UNDERTAKING FOR CONSERVATION OF FLORAFAUNA AND WILDLIFE ANIMALS DURING CONSTRUCTION OF ROAD
13UNDERTAKING FOR FRA CERTIFICATE
14UNDERTAKING FOR MUCK DISPOSAL DURING CONSTRUCTION OF ROAD
15UNDERTAKING FOR NO CHANGES IN STATUTORY POSITION OF DIVERTED
16UNDERTAKING FOR PAYMENT OF COST OF COMPENSATORY AFFORESTATION
17UNDERTAKING FOR PAYMENT OF NET PRESENT VALUE OF FOREST AREA
18UNDERTAKING FOR USE OF ANY MATERIAL FROM SURROUNDED FOREST
19UNDERTAKING FOR WASTE MANAGEMENT DURING CONSTRUCTION
20Village Wise area calculation sheet
21Segment Wise Area Calculation Sheet
22GEO-REFERENCED SURVEY OF INDIA TOPO SHEET WITH FOREST LAND AND PROPOSED ROAD ALIGNMETN SCALE 1: 50000
23GEO-REFERENCED DIGITAL MAP REQUIRED FOREST LAND & PROPOSED ROAD ALIGNMENT
24DIGITAL MAP OF TOTAL ROUTE ALIGNMENT
25GOOGLE IMAGERY MAP OF REQUIRED FOREST LAND AND PROPOSED ROAD ALIGNMENT
26Alternative Geo-Referenced Survey of India topo sheet Map
27Alternative Digital Map
28Alternative Google Map
29JAMABANDI COPY
30STATEMENT SHOWING DETAILS OF FOREST AREA PROPOSED FOR DIVERSION
31REVENUE KHASRA MAP SHOWING FOR REQUIRED FOREST LAND AND PROPOSED ROAD ALIGNMENT SCALE 1 : 4000
32EDS REPLY LETTER-10-06-2020
33EDS REPLY LETTER -09-05-2019.pdf
34EDS REPLY Brij Chorasi Kos Parikarma Marg, Bharatpur 29-05-2020
35AUTHORIZATION LETTER REVISED-29-05-2020
36EDS Reply Brij Chorasi Kos Parikarma Marg, Bharatpur 19.07.2019
37AUTHORIZATION LETTER
38JAMABNDI BHIYARI KARMUKA
39FRA REGARDING APPLICATION TO DISTRICT COLLECTOR