FORM - A
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
PART - I
(To be filled up by User Agency)
A. General Details
A-1. Project Details
  (i). Proposal No. : FP/OR/IRRIG/32298/2018   (ii). Name of Project for which Forest Land is required : UPPER UDANTI BARRAGE(IRRIGATION) PROJECT, UNDER KHARIAR FOREST DIVISION , DISTRICT NUAPADA .   (iii). Short narrative of the proposal and Project/scheme for which the forest land is required : Proposal for Diversion of 29.939Ha of forest land for construction of Upper Udanti Barrage (Irrigation)project across river Udanti in Tel sub-basin of Mahanadi Basin near village Patialpara and construction of (i)Right main canal-9.75Km,(ii) Left main canal -8.81Km and(iii)Distribution systems in s   (iv). State : Orissa   (v). Category of the Proposal : Irrigation   (vi). Shape of forest land proposed to be diverted : Linear   (vii). Estimated cost of the Project(Rupees in lacs) : 19403.13   (viii). Area of forest land proposed for diversion(in ha.): 29.939   (ix). Non-forest land required for this project(in ha.): 614.411   (x). Total period for which the forest land is proposed to be diverted(in years): 99
A-2. Details of User Agency
  (i). Name : KALAHANDI INVESTIGATION DIVISION, WATER RESOURCE DEPARTMENT , ODISHA   (ii). Address1 : O/o EXECUTIVE ENGINEER, KALAHANDI INVESTIGATION DIVISION, BHAWANIPATNA.   (iii). Address2 : COLLEGE CHOWK,   (iv). State : Orissa   (v). District : Kalahandi   (vi). Pin : 766001   (vii). Landmark : NEAR KALAHANDI LAW COLLEGE   (viii). Email address : eekinvd@yahoo.in   (ix). Landline Telephone No. : 6672-234058   (x). Fax No. : 6672-234058   (xi). Mobile No. : 9437877776   (xii). Website (if any) : NIL   (xiii). Legal status of User Agency : State Government
A-3. Details of Person Making Application
  (i). First Name: SANTOSH   (ii). Middle Name: KUMAR   (iii). Last Name: PANIGRAHI   (iv). Gender: Male   (v). Designation: EXECUTIVEENGINEER   (vi). Address 1: O/o- EXECUTIVE ENGINEER, KALAHANDI INVESTIGATION DIVISION, BHAWANIPATNA.   (vii). Address 2: NIL   (viii). State: Orissa   (ix). District: Kalahandi   (x). Tehsil: Sadar   (xi). Pin: 766001   (xii). Landmark: NEAR KALAHANDI LAW COLLEGE   (xiii). Email Address: eekinvd@yahoo.in   (xiv). Landline Telephone No.: 6672-234058   (xv). Fax No.: 06672234058   (xvi). Mobile No.: 9438343100   (xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B. Details of land required for the Project
B-1. Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
List of proposal submitted in Past
S.no Proposal Status. Proposal No. Moef File No. Area Proposed for Diversion(Ha.) Area Diverted(Ha.) Date of In-Principle Approval Date of Final Approval
NIL
B-2. Details of forest land proposed to be diverted
B-2.1 Details of Divisions involved
Details of Divisions involved
S.no Division Name Forest Land(ha.) Non-Forest Land(ha.)
1.Khariar29.939614.411
Total29.939614.411
B-2.2 Details of Districts involved
District wise breakup
S.no District Name Forest Land(ha.) Non-Forest Land(ha.)
1.Nuapada29.939614.411
Total29.939614.411
B-2.3 Village wise breakup
Villages wise breakup
S.no Village Forest Land(ha.) Non-Forest Land(ha.)
1BAIJALPUR011.239
2GORLA3.4647.311
3KATHIBARI5.70246.319
4GODAL07.579
5KARNABAHALI0.1669.081
6KULIADUNGURI07.649
7KODABERA0.0044.839
8BADIBAHAL0.1245.571
9SINGJHAR2.14723.767
10PENDRABAN0.45811.86
11SONABARASA0.31210.935
12LOHARAPALI01.862
13JHARABANDHA0.0242.2
14MALAPARA01.83
15BRAHMANIGUDA1.0042.174
16DUNGURIGUDA0.2026.795
17KHAIRABADI6.03211.393
18DARLIPARA014.387
19KAITHAPADAR013.46
20GHUCHAGURA0.60619.409
21KHALNA07.838
22HALDIMUNDA09.033
23KANDULAKANA03.064
24KENDUMUNDA013.325
25KAPSI08.047
26JUGENPADAR08.129
27SINAPALI09.725
28PALASPADA04.828
29DANGARGAON03.68
30SARDHAPUR0.8214.1
31KARLAKHAMAR0.36414.41
32KHARSALA0.34116.077
33NILJI1.11826.209
34SAGUNBADI04.488
35GADARMAL07.571
36BAIGAPARA0.08915.202
37CHATIAGUDA016.242
38BATAPALI0.2144.19
39SALEKELA0.32814.436
40BARAGAON2.92431.461
41BARTANSIL0.95910.985
42KHAIRABHARI0.05311.947
43JAYABAHAL0.2839.709
44KARANGAMAL0.63612.477
45DOTO0.5313.261
46KULINGAMAL0.1428.937
47LESUNPALI0.6177.869
48BABEBIR0.27515.832
49DUMERPADAR03.031
50DHARANIMAL07.687
51KAMALAMAL00.813
52ROKALA05.119
Total 29.934 599.382
B-2.4 Component wise breakup
Component wise breakup
S.no Component Forest Land(ha.) Non-Forest Land(ha.)
1POND AREA9.162109.948
2LEFT MAIN CANAL8.877263.125
3RIGHT MAIN CANAL11.9231.498
Total 29.939 604.571
C. Maps of forest land proposed to be diverted
Division 1. : Khariar
  (i). Area of forest land proposed to be diverted(in ha.) : 29.939   (ii). Nature of the Project: Linear   (b). No. of Segments : Two
Segment wise details
Segments Segment Area(in ha.) Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.11.9    View File
2.18.039    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D. Justification for locating the Project in forest land and details of alternatives examined:
  (i). Copy of note containing justification for locating the Project in forest land:   (ii). Whether a copy of map indicating location of alternative examine is required to be provided: Yes   (a). Copy of map indicating location of alternative examined:
E. Employment likely to be generated
  (i). Whether the Project is likely to generate employment ?: Yes   (ii). Permanent/Regular Employment(Number of persons): 30   (iii). Temporary Employment(Number of person-days): 960000
F. Displacement of People due to the Project, if any
  (i). Whether Project involves displacement?: No
G. Details of Cost-Benefit analysis for the Project
  (i). Whether the Project requires Cost-Benefit analysis?: Yes   (a). Copy of Cost-Benefit analysis:
H. Status of Environmental Clearance
  (i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? : No
I. Status of Wildelife Clearance
  (i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? : No
J. Applicability of special provisions governing Scheduled Areas
  (i).Whether the Project or a part thereof is located in a Scheduled Area? : No
K. Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
  (i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? : No
L. Details of land identified for Compensatory Afforestation
  (i). Whether non-forest or Revenue forest land is required to be provided by User Agency?: Yes   (ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?: No   (iii). No. of districts involved for raising Compensatory Afforestation: 1   (iv). No. of patches: Nine
District 1. : Nuapada  
  (a). Village: Ranimunda   (b). Area(in ha.): 2.219   (c). Copy of KML file of the patch:     View File   (d). Khasra details: Rakhit   (e). Present owner: Others   (f). Copy of ownership proof:   (g). Copy of Mou/agreement executed between the Present owner and the User Agency:   (h). Copy of non encumberence certificate for the forest land:
District 2. : Nuapada  
  (a). Village: Ranimunda   (b). Area(in ha.): 3.408   (c). Copy of KML file of the patch:     View File   (d). Khasra details: Rakhit   (e). Present owner: Others   (f). Copy of ownership proof:   (g). Copy of Mou/agreement executed between the Present owner and the User Agency:   (h). Copy of non encumberence certificate for the forest land:
District 3. : Nuapada  
  (a). Village: Ranimunda   (b). Area(in ha.): 8.498   (c). Copy of KML file of the patch:     View File   (d). Khasra details: Rakhit   (e). Present owner: Others   (f). Copy of ownership proof:   (g). Copy of Mou/agreement executed between the Present owner and the User Agency:   (h). Copy of non encumberence certificate for the forest land:
District 4. : Nuapada  
  (a). Village: Ranimunda   (b). Area(in ha.): 6.637   (c). Copy of KML file of the patch:     View File   (d). Khasra details: Rakhit   (e). Present owner: Others   (f). Copy of ownership proof:   (g). Copy of Mou/agreement executed between the Present owner and the User Agency:   (h). Copy of non encumberence certificate for the forest land:
District 5. : Nuapada  
  (a). Village: Ranimunda   (b). Area(in ha.): 0.405   (c). Copy of KML file of the patch:     View File   (d). Khasra details: Rakhit   (e). Present owner: Others   (f). Copy of ownership proof:   (g). Copy of Mou/agreement executed between the Present owner and the User Agency:   (h). Copy of non encumberence certificate for the forest land:
District 6. : Nuapada  
  (a). Village: Ranimunda   (b). Area(in ha.): 0.219   (c). Copy of KML file of the patch:     View File   (d). Khasra details: Rakhit   (e). Present owner: Others   (f). Copy of ownership proof:   (g). Copy of Mou/agreement executed between the Present owner and the User Agency:   (h). Copy of non encumberence certificate for the forest land:
District 7. : Nuapada  
  (a). Village: Ranimunda   (b). Area(in ha.): 1.036   (c). Copy of KML file of the patch:     View File   (d). Khasra details: Rakhit   (e). Present owner: Others   (f). Copy of ownership proof:   (g). Copy of Mou/agreement executed between the Present owner and the User Agency:   (h). Copy of non encumberence certificate for the forest land:
District 8. : Nuapada  
  (a). Village: Ranimunda   (b). Area(in ha.): 5.014   (c). Copy of KML file of the patch:     View File   (d). Khasra details: Rakhit   (e). Present owner: Others   (f). Copy of ownership proof:   (g). Copy of Mou/agreement executed between the Present owner and the User Agency:   (h). Copy of non encumberence certificate for the forest land:
District 9. : Nuapada  
  (a). Village: Ranimunda   (b). Area(in ha.): 3.1215   (c). Copy of KML file of the patch:     View File   (d). Khasra details: Rakhit   (e). Present owner: Others   (f). Copy of ownership proof:   (g). Copy of Mou/agreement executed between the Present owner and the User Agency:   (h). Copy of non encumberence certificate for the forest land:
  (v). Scanned copy of the map of the land identified for creation of Compensatory Afforestation prepared by using GPS ot Total Station:   (vi). Copy of Survey of India Toposheet in 1:50,000 scale indicating location of the land identified for creation of Compensatory Afforestation:
M. Hydel/Irrigation/Multipurpose Project
  (i). Installed power generation capacity of the Project(in MW): 00   (ii). Total command area of the Project(in ha.): 8000   (a). Copy of the approval of competent authority to the Catchment Area Treatment Plan (CAT Plan):   (b). Copy of the approved CAT plan:
Additional information Details
Documents
S.No Documents
Remarks
NIL