FORM - A
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
PART - I
(To be filled up by User Agency)
A. General Details
A-1. Project Details
  (i). Proposal No. : FP/MN/ROAD/34066/2018   (ii). Name of Project for which Forest Land is required : Widening and improvement of Yaingangpokpi-Nagaland Road Section of NH-202 into two laning with paved shoulder of 0.000km from Laikot to Hungpung of 48.273 km in the State of Manipur on EPC Mode by NHIDCL   (iii). Short narrative of the proposal and Project/scheme for which the forest land is required : The proposed project road is located in three districts namely: Imphal East, Kamjong, Kangpokpi and Ukhrul. The project corridor takes off from Laikot near Yaingangpokpi to Hungpung. This road has an approximate length of 43.129 km from Laikot at existing chainage of 0.000 km of NH-202 to 48.273 km   (iv). State : Manipur   (v). Category of the Proposal : Road   (vi). Shape of forest land proposed to be diverted : Linear   (vii). Estimated cost of the Project(Rupees in lacs) : 88365   (viii). Area of forest land proposed for diversion(in ha.): 149.708   (ix). Non-forest land required for this project(in ha.): 0   (x). Total period for which the forest land is proposed to be diverted(in years): 100
A-2. Details of User Agency
  (i). Name : NHIDCL BO IMPHAL   (ii). Address1 : DR.RAIKHAN,NILLAI HOUSE,OPP.1ST M.R. GROUND,BABUPARA   (iii). Address2 : NIL   (iv). State : Manipur   (v). District : Imphal West   (vi). Pin : 795001   (vii). Landmark : NEAR OPP.1ST M.R GROUND.   (viii). Email address : nhidclimphal@gmail.com   (ix). Landline Telephone No. : 385-2440920   (x). Fax No. : 385-   (xi). Mobile No. : 8413960799   (xii). Website (if any) : www.nhidcl.com   (xiii). Legal status of User Agency : Central PSU
A-3. Details of Person Making Application
  (i). First Name: Rajeev   (ii). Middle Name: NIL   (iii). Last Name: Sood   (iv). Gender: Male   (v). Designation: Executive Director (PROJECT)   (vi). Address 1: Transit Hostel (2nd Floor), Officer's Club, Lamphelpat, Imphal, Manipur-795001   (vii). Address 2: NIL   (viii). State: Manipur   (ix). District: Imphal West   (x). Tehsil: Lamphelpat Sub-Division   (xi). Pin: 795001   (xii). Landmark: Officer's Club near RIMS   (xiii). Email Address: nhidclimphal@gmail.com   (xiv). Landline Telephone No.: 385-2416303   (xv). Fax No.: NIL   (xvi). Mobile No.: 7030377221   (xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B. Details of land required for the Project
B-1. Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
List of proposal submitted in Past
S.no Proposal Status. Proposal No. Moef File No. Area Proposed for Diversion(Ha.) Area Diverted(Ha.) Date of In-Principle Approval Date of Final Approval
NIL
B-2. Details of forest land proposed to be diverted
B-2.1 Details of Divisions involved
Details of Divisions involved
S.no Division Name Forest Land(ha.) Non-Forest Land(ha.)
1.Central Forest Division,Imphal12.69070
2.Eastern Forest Division,Ukhrul128.84710
3.Thoubal Forest Division8.17020
Total149.7080
B-2.2 Details of Districts involved
District wise breakup
S.no District Name Forest Land(ha.) Non-Forest Land(ha.)
1.Imphal East0.4630
1.Ukhrul135.0860
3.Senapati14.1590
Total149.7080
B-2.3 Village wise breakup
Villages wise breakup
S.no Village Forest Land(ha.) Non-Forest Land(ha.)
1LAIKOT0.4630
2THAWAI13.1210
3ZELENBUNG6.5670
4SHANGKAI1.8870
5LAMLAI CHINGPHEI3.8920
6MONGKOT3.3970
7LITAN SAREIKHONG3.830
8LEINGANGCHING1.0380
9TM KASOM4.5910
10SHAKVAO47.1980
11LAMBUI (RAMVA)11.4620
12SHANGSHAK KHUNOU2.8480
13SHANGSHAK KHULLEN13.270
14HATHA & LUNGSHANG1.3160
15HATHA0.3880
16HUNGPUNG34.440
Total 149.708 0
B-2.4 Component wise breakup
Component wise breakup
S.no Component Forest Land(ha.) Non-Forest Land(ha.)
1Road149.7080
Total 149.708 0
C. Maps of forest land proposed to be diverted
Division 1. : Thoubal Forest Division
  (i). Area of forest land proposed to be diverted(in ha.) : 8.1702   (ii). Nature of the Project: Linear   (b). No. of Segments : One
Segment wise details
Segments Segment Area(in ha.) Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.8.1702    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
Division 2. : Eastern Forest Division,Ukhrul
  (i). Area of forest land proposed to be diverted(in ha.) : 128.8471   (ii). Nature of the Project: Linear   (b). No. of Segments : One
Segment wise details
Segments Segment Area(in ha.) Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.128.8471    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
Division 3. : Central Forest Division,Imphal
  (i). Area of forest land proposed to be diverted(in ha.) : 12.6907   (ii). Nature of the Project: Linear   (b). No. of Segments : One
Segment wise details
Segments Segment Area(in ha.) Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.12.6907    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D. Justification for locating the Project in forest land and details of alternatives examined:
  (i). Copy of note containing justification for locating the Project in forest land:   (ii). Whether a copy of map indicating location of alternative examine is required to be provided: No   (a). Reason for not providing such map: The proposed project is widening of existing road.
E. Employment likely to be generated
  (i). Whether the Project is likely to generate employment ?: Yes   (ii). Permanent/Regular Employment(Number of persons): 0   (iii). Temporary Employment(Number of person-days): 1095000
F. Displacement of People due to the Project, if any
  (i). Whether Project involves displacement?: No
G. Details of Cost-Benefit analysis for the Project
  (i). Whether the Project requires Cost-Benefit analysis?: Yes   (a). Copy of Cost-Benefit analysis:
H. Status of Environmental Clearance
  (i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? : No
I. Status of Wildelife Clearance
  (i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? : No
J. Applicability of special provisions governing Scheduled Areas
  (i).Whether the Project or a part thereof is located in a Scheduled Area? : Yes
K. Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
  (i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? : No
L. Details of land identified for Compensatory Afforestation
  (i). Whether non-forest or Revenue forest land is required to be provided by User Agency?: Not Applicable   (ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?: Not Applicable   (iii) . Reason for not providing Non-Forest Land: Not Applicable
Additional information Details
Documents
S.No Documents
Remarks
1Justification
2DFO_Central
3DFO_Thoubal
4DFO_Ukhrul
5CA
6NPV
7Request for FRA Form-I (DC_Imphal East)
8Request for FRA Form-I (DC_Kamjong)
9Request for FRA Form-I (DC_Ukhrul)
10Reply of EDS for muck disposal site to DFO(Central Forest Division)
11Reply of EDS for muck disposal site to DFO(Thoubal Forest Division)
12Reply of EDS for muck disposal site to DFO(Ukhrul Forest Division)
13Muck Disposal Plan
14"Certificate for minimum use of forest land" issued by NHIDCL as asked by DFO, Ukhrul.