FORM - A
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
PART - I
(To be filled up by User Agency)
A. General Details
A-1. Project Details
  (i). Proposal No. : FP/JH/RAIL/18720/2016   (ii). Name of Project for which Forest Land is required : Dedicated Freight Corridor   (iii). Short narrative of the proposal and Project/scheme for which the forest land is required : Dedicated Freight Corridor Corporation of India Limited (DFCCIL) is a Special Purpose Vehicle set up under the administrative control of Ministry of Railways to undertake planning & development, mobilization of financial resources and construction, maintenance and operation of the Dedicated Freight   (iv). State : Jharkhand   (v). Category of the Proposal : Railway   (vi). Shape of forest land proposed to be diverted : Linear   (vii). Estimated cost of the Project(Rupees in lacs) : 612200   (viii). Area of forest land proposed for diversion(in ha.): 203.803   (ix). Non-forest land required for this project(in ha.): 5.2407   (x). Total period for which the forest land is proposed to be diverted(in years): NIL
A-2. Details of User Agency
  (i). Name : DFCCIL   (ii). Address1 : Dedicated Freight Corridor Corporation of India Limited 3rd Floor, DCOS Building E-W Metro, Central Park Depot, Sector-1, Bidhannagar, Salt Lake, Kolkata, West Bengal 700064   (iii). Address2 : NIL   (iv). State : West Bengal   (v). District : Kolkata   (vi). Pin : 700064   (vii). Landmark : Opposite ILS hospital   (viii). Email address : dfcc.kolkata@gmail.com   (ix). Landline Telephone No. : 33-23973938   (x). Fax No. : 33-23973938   (xi). Mobile No. : 9330026661   (xii). Website (if any) : www.dfccil.org   (xiii). Legal status of User Agency : Central Government
A-3. Details of Person Making Application
  (i). First Name: Ajay   (ii). Middle Name: NIL   (iii). Last Name: Kumar   (iv). Gender: Male   (v). Designation: General Manager/Coordination   (vi). Address 1: Dedicated Freight Corridor Corporation of India Limited 3rd Floor, DCOS Building E-W Metro, Central Park Depot, Sector-1, Bidhannagar, Salt Lake, Kolkata, West Bengal 700064   (vii). Address 2: NIL   (viii). State: West Bengal   (ix). District: Kolkata   (x). Tehsil: kolkata   (xi). Pin: 700064   (xii). Landmark: Opposite ILS hospital   (xiii). Email Address: dfcc.kolkata@gmail.com   (xiv). Landline Telephone No.: 33-23973938   (xv). Fax No.: NIL   (xvi). Mobile No.: 9330026661   (xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B. Details of land required for the Project
B-1. Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
List of proposal submitted in Past
S.no Proposal Status. Proposal No. Moef File No. Area Proposed for Diversion(Ha.) Area Diverted(Ha.) Date of In-Principle Approval Date of Final Approval
NIL
B-2. Details of forest land proposed to be diverted
B-2.1 Details of Divisions involved
Details of Divisions involved
S.no Division Name Forest Land(ha.) Non-Forest Land(ha.)
1.Hazaribagh West121.0035.2407
2.Hazaribagh Wildlife82.80
Total203.8035.2407
B-2.2 Details of Districts involved
District wise breakup
S.no District Name Forest Land(ha.) Non-Forest Land(ha.)
1.Hazaribag203.8035.2407
Total203.8035.2407
B-2.3 Village wise breakup
Villages wise breakup
S.no Village Forest Land(ha.) Non-Forest Land(ha.)
1Chaube1.1820.7761
2Bariaon0.4340.6023
3Naraina1.1620.7413
4Brinda19.8290
5Mahuas13.4810
6Kanti15.7070
7Ghaghrait6.2690
8Maishkhar6.9170
9Mainukhar6.4120
10Kharatanr8.540
11Sardhwatanr6.5070
12Gharmorwa12.1470
13Bukar55.7010
14Jagodih27.690.28
15Ambatari12.3432.538
16Phulwaria9.4820.303
Total 203.803 5.2407
B-2.4 Component wise breakup
Component wise breakup
S.no Component Forest Land(ha.) Non-Forest Land(ha.)
1Laying of Railway track for Dedicated Freight Corr203.8035.2407
Total 203.803 5.2407
C. Maps of forest land proposed to be diverted
Division 1. : Hazaribagh Wildlife
  (i). Area of forest land proposed to be diverted(in ha.) : 82.8   (ii). Nature of the Project: Linear   (b). No. of Segments : One
Segment wise details
Segments Segment Area(in ha.) Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.82.8    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
Division 2. : Hazaribagh West
  (i). Area of forest land proposed to be diverted(in ha.) : 121.003   (ii). Nature of the Project: Linear   (b). No. of Segments : One
Segment wise details
Segments Segment Area(in ha.) Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.121.003    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D. Justification for locating the Project in forest land and details of alternatives examined:
  (i). Copy of note containing justification for locating the Project in forest land:   (ii). Whether a copy of map indicating location of alternative examine is required to be provided: Yes   (a). Copy of map indicating location of alternative examined:
E. Employment likely to be generated
  (i). Whether the Project is likely to generate employment ?: Yes   (ii). Permanent/Regular Employment(Number of persons): 932   (iii). Temporary Employment(Number of person-days): 1000000
F. Displacement of People due to the Project, if any
  (i). Whether Project involves displacement?: No
G. Details of Cost-Benefit analysis for the Project
  (i). Whether the Project requires Cost-Benefit analysis?: Yes   (a). Copy of Cost-Benefit analysis:
H. Status of Environmental Clearance
  (i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? : No
I. Status of Wildelife Clearance
  (i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? : Yes   (a). Whether Project or a part thereof is located within a Protected Area ? : Yes   (b). Status of approval of the Supreme Court : Application yet to b   (ii). Status of approval of the Standing Committee of National Board for the Wildlife(NBWL) to the Project : Approval obtained   (a). MoEF File No : 6-111/2018WL   (b). Copy of approval of Standing of the NBWL:   (c). Date of Approval : 07 Sep 2018
J. Applicability of special provisions governing Scheduled Areas
  (i).Whether the Project or a part thereof is located in a Scheduled Area? : No
K. Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
  (i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? : Yes   (a). Copy of documentry evidence in support of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted:
L. Details of land identified for Compensatory Afforestation
  (i). Whether non-forest or Revenue forest land is required to be provided by User Agency?: Not Applicable   (ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?: Not Applicable   (iii) . Reason for not providing Non-Forest Land: Not Applicable
Additional information Details
Documents
S.No Documents
Remarks
1GPS Coordinates
2Tree Enumeration
3Chaube Land Plan
4Naraina Land Plan
5Bariaon Land Plan
6Ghaghait Land Plan
7Mainukhar Land Plan
8Gharmorwa Land Plan
9Khairatanr Land Plan
10Bukar1 Land Plan
11Bukar2 Land Plan
12Bukar3 Land Plan
13Bukar 4 Land Plan
14Jagodih 1 Land Plan
15Jagodih 2 Land Plan
16Jagodih 3 Land Plan
17Ambatari Land Plan
18Kanti land plan
19Phoolwaria land plan
20Maishkhar1 land plan
21Maishkhar sheet 2 land plan
22Mahusas land plan
23Sardhwatanr land plan
24Land Schedule Wildlife
25Letter to DC for FRA
26Compliance of DFO HZB WEST dated 18-05-2016
27Compliance of DFO HZB West dated 06-02-2018
28FRA certificate of Naraina village plot no. 568/2122 & 16/2093
29Complete tree enumeration of 05 villages
30Sample tree enumeration of 07 villages
31DFC alignment in the mouza map of Bariyon sheet1 village
32DFC alignment in the mouza map of Bariyon sheet 2 village
33DFC alignment in the mouza map of Brinda village
34DFC alignment in the mouza map of Chaube village
35DFC alignment in the mouza map of Ghaghrait village
36DFC alignment in the mouza map of Jagodih sheet 1 village
37DFC alignment in the mouza map of Jagodih sheet 3 village
38DFC alignment in the mouza map of Kanti village
39DFC alignment in the mouza map of Mahuaas village
40DFC alignment in the mouza map of Mainukhar village
41DFC alignment in the mouza map of Maishekher village
42DFC alignment in the mouza map of Nariana village
43DFC alignment in the mouza map of Phulwariya village
44DFC alignment in the mouza map of Sadhwatanr village
45FRA for balance 50.429 hectare with proceedings
46Compliance of DFO HZB WEST on 29/03/2018
47Naraina village Land Schedule
48Naraina Sheet 1 Land Plan
49Naraina Sheet 2 Land Plan
50DFC alignment on Jagodih Sheet 2 Mouza Map
51Compliance of DFO/HZB/West dated 28/04/2018
52Land schedule as Annexure A
53Jagodih Sheet 1 as Annexure A1
54Jagodih Sheet 2 as Annexure A2
55Summary of Tree Enumeration as Annexure B1-B12
56NOC as Annexure C
57Compliance of DFO/HZB/West dated 26/07/2018
58Revised land Schedule and other annexure of forwarding letter dated 02/08/2018
59Annexure B- Marking of DFCC alignment on Phulwaria village map
60Annexure D- FRA/NOC of HZB WEST Forest proposal
61Annexure I,II,III & IV of forwarding letter dated 02/08/2018
62Compliance of DFO/HZB/West dated 31/08/2018
63Compliance of DFO/HZB/West dated 15/09/2018
64Forwarding letter dated 12/12/2018 for FRA submission
65FRA certificate of Balance Area