A-1. Project Details
  (i). Proposal No. : FP/CG/TRANS/44321/2020   (ii). Name of Project for which Forest Land is required : 132KV D/C Gerwani to Korichhapar (TSS) Line by Chhattisgarh State Power Transmission Company Limited in District Raigarh of Chhattigarh State   (iii). Short narrative of the proposal and Project/scheme for which the forest land is required : 132KV D/C Gerwani to Karichhapar (TSS) Line by Chhattisgarh State Power Transmission Company Limited in Tehsil Raigarh, Tamnar & Ghorghoda in District Raigarh of Chhattisgarh State   (iv). State : Chhattisgarh   (v). Category of the Proposal : Transmission Line   (vi). Shape of forest land proposed to be diverted : Linear   (vii). Estimated cost of the Project(Rupees in lacs) : 4209   (viii). Area of forest land proposed for diversion(in ha.): 7.011   (ix). Non-forest land required for this project(in ha.): 102.663   (x). Total period for which the forest land is proposed to be diverted(in years): 35
A-2. Details of User Agency
  (i). Name : CSPTCL   (ii). Address1 : O/o Executive Engineer EHT Construction Division Bilaspur   (iii). Address2 : NIL   (iv). State : Chhattisgarh   (v). District : Bilaspur   (vi). Pin : 495223   (vii). Landmark : Near Tifra Overbridge   (viii). Email address : shyams.sharma@cseb.gov.in   (ix). Landline Telephone No. : 7752-427074   (x). Fax No. : 7752-427074   (xi). Mobile No. : 9826174365   (xii). Website (if any) : www.cspc.gov.in   (xiii). Legal status of User Agency : State PSU
A-3. Details of Person Making Application
  (i). First Name: RAJENDRA   (ii). Middle Name: KUMAR   (iii). Last Name: SHUKLA   (iv). Gender: Male   (v). Designation: EE   (vi). Address 1: TIFRA Bilaspur   (vii). Address 2: NIL   (viii). State: Chhattisgarh   (ix). District: Bilaspur   (x). Tehsil: NIL   (xi). Pin: 495001   (xii). Landmark: TIFRA OVERBRIDGE   (xiii). Email Address: ganeshjaiswal620@gmail.com   (xiv). Landline Telephone No.: 7752-427074   (xv). Fax No.: NIL   (xvi). Mobile No.: 1122334455   (xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B. Details of land required for the Project
B-1. Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
Proposal Submitted in Past
S.no Proposal Status. Proposal No. Moef File No. Area Proposed for Diversion(Ha.) Area Diverted(Ha.) Date of In-Principle Approval Date of Final Approval
1Under Processing at State GovernmentFP/CG/TRANS/39462/20199.5890
Total 9.589 0
B-2. Details of forest land proposed to be diverted
B-2.1 Details of Divisions involved
Details of Divisions involved
S.no Division Name Forest Land(ha.) Non-Forest Land(ha.)
1.Raigarh7.011102.663
Total7.011102.663
B-2.2 Details of Districts involved
District wise breakup
S.no District Name Forest Land(ha.) Non-Forest Land(ha.)
1.Raigarh7.011102.663
Total7.011102.663
B-2.3 Village wise breakup
Villages wise breakup
S.no Village Forest Land(ha.) Non-Forest Land(ha.)
1Shivpuri/Lakha1.5120.756
2Pali0.1155.706
3Delari0.0966.786
4Saraipali0.673.634
5Bhuikuri0.043.637
6Bagbuda01.917
7Binjkot0.9850
8Barpali05.001
9Rabo0.4050
10Harradih0.0224.177
11Gadgaon03.352
12Charratanagar1.83214.863
13Amlidih0.048.211
14Bhalumar02.904
15Baihamuda0.22714.21
16Bade Gumda07.05
17Bahirkela05.141
18Kanchanpur05.571
19Teram0.9035.28
20Karichhapar01.366
21Faguram0.1643.101
Total 7.011 102.663
B-2.4 Component wise breakup
Component wise breakup
S.no Component Forest Land(ha.) Non-Forest Land(ha.)
1Tower foundation0.30
2Transmission Line (Stinging Work)6.711102.663
Total 7.011 102.663
C. Maps of forest land proposed to be diverted
Division 1. : Raigarh
  (i). Area of forest land proposed to be diverted(in ha.) : 7.011   (ii). Nature of the Project: Linear   (b). No. of Segments : One
Segment wise details
Segments Segment Area(in ha.) Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.7.011    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D. Justification for locating the Project in forest land and details of alternatives examined:
  (i). Copy of note containing justification for locating the Project in forest land:   (ii). Whether a copy of map indicating location of alternative examine is required to be provided: Yes   (a). Copy of map indicating location of alternative examined:
E. Employment likely to be generated
  (i). Whether the Project is likely to generate employment ?: Yes   (ii). Permanent/Regular Employment(Number of persons): 10   (iii). Temporary Employment(Number of person-days): 36500
F. Displacement of People due to the Project, if any
  (i). Whether Project involves displacement?: No
G. Details of Cost-Benefit analysis for the Project
  (i). Whether the Project requires Cost-Benefit analysis?: No
H. Status of Environmental Clearance
  (i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? : No
I. Status of Wildelife Clearance
  (i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? : No
J. Applicability of special provisions governing Scheduled Areas
  (i).Whether the Project or a part thereof is located in a Scheduled Area? : No
K. Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
  (i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? : Yes   (a). Copy of documentry evidence in support of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted:
L. Details of land identified for Compensatory Afforestation
  (i). Whether non-forest or Revenue forest land is required to be provided by User Agency?: No   (ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?: Not Applicable   (iii) . Reason for not providing Non-Forest Land: For laying of transmission lines
Additional information Details
Documents
S.No Documents
Remarks
1Undertaking of Archaeological Importance
2Undertaking of Forest Rights Act
3Undertaking of Compensatory Afforestation
4Undertaking of Net Present Value
5Undertaking for Minimum Use of Forest Land
6Undertaking for Abide Any Additional Conditions
7Undertaking for transmission line not passing through any Sanctuary / wildlife area
8Geo-reference map for diverted area with segment and GPS Coordinates
9Line Corridor Guideline for Transmission Line by MOEFCC
10Compensatory afforestation for Transmission Line on Double Degraded forest land Guideline for Transmission Line by MOEFCC
11DGPS Survey Permission Letter
12Project estimate
13Registration Fee DD for Rs 6000 and processing fee DD for Rs 18000 attached
14No Obejection Certificate (NOC) from District Collector, Raigarh for each Tahsil for Revenue Forest in Raigarh District & Division.
15Forest Right Act (FRA) Certificate in Form 1 for Linear Project from District Collector, Raigarh for each Tahsil for Revenue/Protected/Reserve Forest in Raigarh District & Division.
16No Special Right/Allotment to Forest Tribal under Transmission Line route in Raigarh Forest Division
17FRA Certificate along with all Annexures i.e Gram level/SDM/District Level Comittee Report
18Forest Area Statment
19Reply of EDS Raised on dated 19.02.2020 by Nodal Officer
20Signed DGPS Report