FORM - A
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
PART - I
(To be filled up by User Agency)
A. General Details
A-1. Project Details
  (i). Proposal No. : FP/AR/TRANS/34226/2018   (ii). Name of Project for which Forest Land is required : Construction of 132KV transmission line from Chimpu to Holongi under comprehensive scheme for strengthening of T&D system in Arunachal Pradesh   (iii). Short narrative of the proposal and Project/scheme for which the forest land is required : The proposed 132 KV S/C on D/C transmission line from Chimpu to Holongi is a sub project which is conceived under the Govt. of India ambitious project namely"Comprehensive scheme for strengthening of T&D system in Arunachal Pradesh" (a Central sector project funded by GOI & being implemented by POWE   (iv). State : Arunachal Pradesh   (v). Category of the Proposal : Transmission Line   (vi). Shape of forest land proposed to be diverted : Linear   (vii). Estimated cost of the Project(Rupees in lacs) : 1600   (viii). Area of forest land proposed for diversion(in ha.): 39.468   (ix). Non-forest land required for this project(in ha.): 0   (x). Total period for which the forest land is proposed to be diverted(in years): 75
A-2. Details of User Agency
  (i). Name : DEPARTMENT OF POWER GOVT OF ARUNACHAL PRADESH   (ii). Address1 : BIDYUT BHAWAN, ZIRO POINT TINIALI,   (iii). Address2 : ITANAGAR, ARUNACHAL PRADESH   (iv). State : Arunachal Pradesh   (v). District : Papum Pare   (vi). Pin : 791111   (vii). Landmark : NEAR ZIRO POINT TINIALI   (viii). Email address : baishyasantana@gmail.com   (ix). Landline Telephone No. : 360-2257301   (x). Fax No. : 360-   (xi). Mobile No. : 9436255253   (xii). Website (if any) : NIL   (xiii). Legal status of User Agency : State Government
A-3. Details of Person Making Application
  (i). First Name: Ajay   (ii). Middle Name: NIL   (iii). Last Name: Murtem   (iv). Gender: Male   (v). Designation: EE   (vi). Address 1: Department of Power, Yupia   (vii). Address 2: NIL   (viii). State: Arunachal Pradesh   (ix). District: Papum Pare   (x). Tehsil: Doimukh Circle   (xi). Pin: 791109   (xii). Landmark: NIL   (xiii). Email Address: er.ajaymurtem@yahoo.com   (xiv). Landline Telephone No.: 360-2257301   (xv). Fax No.: NIL   (xvi). Mobile No.: 8292400560   (xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B. Details of land required for the Project
B-1. Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
List of proposal submitted in Past
S.no Proposal Status. Proposal No. Moef File No. Area Proposed for Diversion(Ha.) Area Diverted(Ha.) Date of In-Principle Approval Date of Final Approval
NIL
B-2. Details of forest land proposed to be diverted
B-2.1 Details of Divisions involved
Details of Divisions involved
S.no Division Name Forest Land(ha.) Non-Forest Land(ha.)
1.Banderdewa Forest Division,Banderdewa39.4680
Total39.4680
B-2.2 Details of Districts involved
District wise breakup
S.no District Name Forest Land(ha.) Non-Forest Land(ha.)
1.Papum Pare39.4680
Total39.4680
B-2.3 Village wise breakup
Villages wise breakup
S.no Village Forest Land(ha.) Non-Forest Land(ha.)
1Chimpu31.180
2Holongi8.2880
Total 39.468 0
B-2.4 Component wise breakup
Component wise breakup
S.no Component Forest Land(ha.) Non-Forest Land(ha.)
1RoW of 132 kV Line39.4680
Total 39.468 0
C. Maps of forest land proposed to be diverted
Division 1. : Banderdewa Forest Division,Banderdewa
  (i). Area of forest land proposed to be diverted(in ha.) : 39.468   (ii). Nature of the Project: Linear   (b). No. of Segments : One
Segment wise details
Segments Segment Area(in ha.) Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.39.468    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D. Justification for locating the Project in forest land and details of alternatives examined:
  (i). Copy of note containing justification for locating the Project in forest land:   (ii). Whether a copy of map indicating location of alternative examine is required to be provided: Yes   (a). Copy of map indicating location of alternative examined:
E. Employment likely to be generated
  (i). Whether the Project is likely to generate employment ?: Yes   (ii). Permanent/Regular Employment(Number of persons): 15   (iii). Temporary Employment(Number of person-days): 75000
F. Displacement of People due to the Project, if any
  (i). Whether Project involves displacement?: No
G. Details of Cost-Benefit analysis for the Project
  (i). Whether the Project requires Cost-Benefit analysis?: Yes   (a). Copy of Cost-Benefit analysis:
H. Status of Environmental Clearance
  (i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? : No
I. Status of Wildelife Clearance
  (i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? : No
J. Applicability of special provisions governing Scheduled Areas
  (i).Whether the Project or a part thereof is located in a Scheduled Area? : Yes
K. Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
  (i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? : No
L. Details of land identified for Compensatory Afforestation
  (i). Whether non-forest or Revenue forest land is required to be provided by User Agency?: No   (ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?: Not Applicable   (iii) . Reason for not providing Non-Forest Land: Central Govt. Project
Additional information Details
Documents
S.No Documents
Remarks
1Undertaking for Paymenmt of Compensatory Aforestation
2Undertaking for FRA
3Undertaking for Minimum use of Forest Land
4Undertaking for NPV and Additional NPV
5Undertaking for Survey by Total Station
6Statement of Forest Land proposed to be Diverted
7Statement of Village wise breakup of Forest Area
8Details of Towers in RF area
9MoU between Dept of Power and POWERGRID
10Govt of India Approval of the project
11Joint verification with DFO Banderdewa
12Route Allignment map of 132 kV Chimpu Holongi
13Diagram of Tower
14Basic Details of transmission Line Projects