FORM - A
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
PART - I
(To be filled up by User Agency)
A. General Details
A-1. Project Details
  (i). Proposal No. : FP/AR/HYD/10118/2015   (ii). Name of Project for which Forest Land is required : Rego Hydro Project.   (iii). Short narrative of the proposal and Project/scheme for which the forest land is required : Central Electricity Authority and State Government of Arunachal Pradesh have identified a number of projects in Siang basin with cumulative power potential of about 17308 MW. Rego HEP is one of the self-identified projects in the Yargyap Chu River. A Memorandum of Agreement was executed between Gove   (iv). State : Arunachal Pradesh   (v). Category of the Proposal : Hydel   (vi). Shape of forest land proposed to be diverted : Non Linear   (vii). Estimated cost of the Project(Rupees in lacs) : 36360   (viii). Area of forest land proposed for diversion(in ha.): 17.31   (ix). Non-forest land required for this project(in ha.): 10   (x). Total period for which the forest land is proposed to be diverted(in years): 40
A-2. Details of User Agency
  (i). Name : GREENKO REGO HYDRO PROJECTS PVT LTD   (ii). Address1 : Regd Office: Plot No 1071, Road No 44, Jubilee Hills, Hyderabad-33   (iii). Address2 : NIL   (iv). State : Telangana   (v). District : Hyderabad   (vi). Pin : 500033   (vii). Landmark : NIL   (viii). Email address : inforegohep.forest@greenkogroup.com   (ix). Landline Telephone No. : 40-40301100   (x). Fax No. : 40-   (xi). Mobile No. : 9959666709   (xii). Website (if any) : NIL   (xiii). Legal status of User Agency : Private
A-3. Details of Person Making Application
  (i). First Name: Gopi   (ii). Middle Name: Krushna   (iii). Last Name: Nikku   (iv). Gender: Male   (v). Designation: AGM   (vi). Address 1: Plot No 1071, Road No 44, Jubilee Hills, Hyderabad-33   (vii). Address 2: NIL   (viii). State: Telangana   (ix). District: Hyderabad   (x). Tehsil: NIL   (xi). Pin: 500033   (xii). Landmark: NIL   (xiii). Email Address: inforegohep.forest@greenkogroup.com   (xiv). Landline Telephone No.: 40-40301100   (xv). Fax No.: NIL   (xvi). Mobile No.: 9959666709   (xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B. Details of land required for the Project
B-1. Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
List of proposal submitted in Past
S.no Proposal Status. Proposal No. Moef File No. Area Proposed for Diversion(Ha.) Area Diverted(Ha.) Date of In-Principle Approval Date of Final Approval
NIL
B-2. Details of forest land proposed to be diverted
B-2.1 Details of Divisions involved
Details of Divisions involved
S.no Division Name Forest Land(ha.) Non-Forest Land(ha.)
1.Aalo Forest Division, Aalo17.3110
Total17.3110
B-2.2 Details of Districts involved
District wise breakup
S.no District Name Forest Land(ha.) Non-Forest Land(ha.)
1.West Siang17.3110
Total17.3110
B-2.3 Village wise breakup
Villages wise breakup
S.no Village Forest Land(ha.) Non-Forest Land(ha.)
NIL
B-2.4 Component wise breakup
Component wise breakup
S.no Component Forest Land(ha.) Non-Forest Land(ha.)
1Project office, Permanent,Temporary, Contractors C2.30
2Muck Dumping Area-I2.750
3Muck Dumping Area-II1.750
4Muck Dumping Area-III0.50
5Material Storage Area0.50
6Workshop & Store0.50
7Batching Plant0.330
8Crushing Plant0.40
9Project Road area including Portals50
10Underground Works30
11Magazine Building0.040
12Switch Yard0.240
13Construction Material/borrow area010
Total 17.31 10
C. Maps of forest land proposed to be diverted
Division 1. : Aalo Forest Division, Aalo
  (i). Area of forest land proposed to be diverted(in ha.) : 17.31   (ii). Nature of the Project: Non Linear   (a). No. of patches : Twelve
Patch wise details
Patch No. Area of Patch(in ha.) Kml File of PatchesTo view KML file on google the same may be downloaded and then open if in google earth install in your computer.
1.2.3    View File
2.2.75    View File
3.1.75    View File
4.0.5    View File
5.0.5    View File
6.0.5    View File
7.0.33    View File
8.0.4    View File
9.5    View File
10.3    View File
11.0.04    View File
12.0.24    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D. Justification for locating the Project in forest land and details of alternatives examined:
  (i). Copy of note containing justification for locating the Project in forest land:
E. Employment likely to be generated
  (i). Whether the Project is likely to generate employment ?: Yes   (ii). Permanent/Regular Employment(Number of persons): 50   (iii). Temporary Employment(Number of person-days): 234000
F. Displacement of People due to the Project, if any
  (i). Whether Project involves displacement?: No
G. Details of Cost-Benefit analysis for the Project
  (i). Whether the Project requires Cost-Benefit analysis?: Yes   (a). Copy of Cost-Benefit analysis:
H. Status of Environmental Clearance
  (i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? : Yes   (a). Status of the Environmental Clearance to the Project: EC under process   (ii). Environmental Clearance File No.: NIL
I. Status of Wildelife Clearance
  (i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? : No
J. Applicability of special provisions governing Scheduled Areas
  (i).Whether the Project or a part thereof is located in a Scheduled Area? : No
K. Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
  (i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? : No
L. Details of land identified for Compensatory Afforestation
  (i). Whether non-forest or Revenue forest land is required to be provided by User Agency?: Yes   (ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?: No   (iii). No. of districts involved for raising Compensatory Afforestation: 1   (iv). No. of patches: One
District 1. : West Siang
  (a). Village: Tamjehala   (b). Area(in ha.): 34.62   (c). Copy of KML file of the patch:     View File   (d). Khasra details: Community land   (e). Present owner: Others   (f). Copy of ownership proof:   (g). Copy of Mou/agreement executed between the Present owner and the User Agency:   (h). Copy of non encumberence certificate for the forest land:
  (v). Scanned copy of the map of the land identified for creation of Compensatory Afforestation prepared by using GPS ot Total Station:   (vi). Copy of Survey of India Toposheet in 1:50,000 scale indicating location of the land identified for creation of Compensatory Afforestation:
M. Hydel/Irrigation/Multipurpose Project
  (i). Installed power generation capacity of the Project(in MW): 82.8   (ii). Total command area of the Project(in ha.): 0   (a). Copy of the approval of competent authority to the Catchment Area Treatment Plan (CAT Plan):   (b). Copy of the approved CAT plan:
Additional information Details
Documents
S.No Documents
Remarks
1Form A
2Annexure II NoC for Revised FRL
3Annexure III A (1;7000) map
4Annexure III A1 Quarry Area
5Annexure III B Toposheet showing boundary of forest
6Annexure-V-ToR
7Annexure-VII-SPV-Certificate
8Annexure-VIII-Acceptance of SPV-Rego from Govt of Arunachal Pradesh
9Annexure-IX-WRD NOC.
10Annexure-X-Rego - Authorisation letter
11Annexure-XI-Rego-Survey & Investigation
12Annexure-XII-Google Imaginary
13Annexure I MOA
14Annexure III (1;50000) map
15Annexure IV (A&B)-Cost Benefit analysis
16Annexure-V-Undertakings