Sno. | From | Status | To | EDS Date | EDS sought/Replied | EDS Letter |
1
|
DFO (Bageshwar)
|
EDS
|
User Agency (cdpwdkapkot@gmail.com)
|
12/08/2015
|
please find enclosed
|
|
2
|
User Agency (cdpwdkapkot@gmail.com)
|
REPLY
|
DFO (Bageshwar)
|
17/08/2015
|
jopari shakri tree detail
|
|
3
|
CF (North Kumaun)
|
EDS
|
DFO (Bageshwar)
|
19/08/2015
|
As per latter no 612/12-1 dated 19-08-2015
|
|
4
|
DFO (Bageshwar)
|
EDS
|
User Agency (cdpwdkapkot@gmail.com)
|
20/08/2015
|
please revert it back after resolving concerned issues
|
|
5
|
User Agency (cdpwdkapkot@gmail.com)
|
REPLY
|
DFO (Bageshwar)
|
19/09/2015
|
IInd aligement tree detail (2)
|
|
6
|
DFO (Bageshwar)
|
EDS
|
User Agency (cdpwdkapkot@gmail.com)
|
19/09/2015
|
please provide compartment wise details of reserved forest.proposal contains 4.935 hectare of reserved land. and above all do revert entire content along decent covering letter,so that it can be forwarded for further processing.
|
|
7
|
User Agency (cdpwdkapkot@gmail.com)
|
REPLY
|
DFO (Bageshwar)
|
19/09/2015
|
LETTER REVISED
|
|
8
|
DFO (Bageshwar)
|
EDS
|
User Agency (cdpwdkapkot@gmail.com)
|
24/09/2015
|
please review initial point, further clarify discrepancy between figures of tress filled in part 1 seems quite different from the information filled in Part 2
|
|
9
|
User Agency (cdpwdkapkot@gmail.com)
|
REPLY
|
DFO (Bageshwar)
|
26/09/2015
|
tree dtail
|
|
10
|
DFO (Bageshwar)
|
REPLY
|
CF (North Kumaun)
|
02/10/2015
|
please find enclosed
|
|
11
|
CF (North Kumaun)
|
EDS
|
DFO (Bageshwar)
|
07/10/2015
|
plz attached II aliment detail
|
|
12
|
DFO (Bageshwar)
|
EDS
|
User Agency (cdpwdkapkot@gmail.com)
|
08/10/2015
|
plz attach II aliment detail with appropriate figure of trees
|
|
13
|
User Agency (cdpwdkapkot@gmail.com)
|
REPLY
|
DFO (Bageshwar)
|
08/10/2015
|
IInd aligement tree detail
|
|
14
|
DFO (Bageshwar)
|
REPLY
|
CF (North Kumaun)
|
12/10/2015
|
please find enclosed
|
|
15
|
Nodal Officer
|
EDS
|
CF (North Kumaun)
|
27/10/2015
|
1.DFO may enter details of working plan prescription in serial 5 of Part II.
2. The number of trees shown in SIR of CF differs from that entered by DFO. Clarify or make necessary corrections in entries in Form A Part II itself.
3. DFO may provide compartment wise area details of RF involved in this proposal, as an additional document file.
|
|
16
|
CF (North Kumaun)
|
EDS
|
DFO (Bageshwar)
|
31/10/2015
|
As per enclose letter no 1705/12-1 dated 30-10-2015
|
|
17
|
DFO (Bageshwar)
|
EDS
|
User Agency (cdpwdkapkot@gmail.com)
|
02/11/2015
|
please find enclosed
|
|
18
|
User Agency (cdpwdkapkot@gmail.com)
|
REPLY
|
DFO (Bageshwar)
|
04/11/2015
|
Compartment wise area detail
|
|
19
|
DFO (Bageshwar)
|
REPLY
|
CF (North Kumaun)
|
19/11/2015
|
please find enclosed
|
|
20
|
CF (North Kumaun)
|
REPLY
|
Nodal Officer
|
21/11/2015
|
The On line objections raised by Nodal officer/Reg. Officer on date 27.10.2015 has been clarified by DFO Bageshwar latter no 1668/12-1 dated 18-11-2015
|
|
21
|
Nodal Officer
|
EDS
|
CF (North Kumaun)
|
23/11/2015
|
1. Serial no.5 entry shows Basti comp. no.5, whereas compartment wise details mention other compartments too.
2. CF in his SIR has mentioned lower number of trees. CF has not commented upon DFOs reply.
|
|
22
|
CF (North Kumaun)
|
EDS
|
DFO (Bageshwar)
|
28/11/2015
|
As per letter no 1983/12-1 dated 26-11-2015
|
|
23
|
DFO (Bageshwar)
|
REPLY
|
CF (North Kumaun)
|
03/12/2015
|
please find enclosed
|
|
24
|
CF (North Kumaun)
|
REPLY
|
Nodal Officer
|
16/12/2015
|
As per latter dated 16-12-2015
|
|
25
|
Nodal Officer
|
EDS
|
CF (North Kumaun)
|
05/01/2016
|
Plz reply to obj of RO-The online proposal is returned back since hard copy has not been submitted to this office simultaneously. State Govt. may resubmit the proposal online after hard copy has been provided in Regional Office. As a proof scanned copy of the receipt of hard copy from the Regional Office may also be uploaded along with online proposal. Attached Letter No. Misc./II/ROC/COP/1/2013/1846 Dated 06.11.2015 may also be referred in this regard.
|
|
26
|
CF (North Kumaun)
|
EDS
|
DFO (Bageshwar)
|
07/01/2016
|
As per letter no 2571/12-1 dated 7-1-2016
|
|
27
|
DFO (Bageshwar)
|
EDS
|
User Agency (cdpwdkapkot@gmail.com)
|
08/01/2016
|
please find enclosed
|
|
28
|
User Agency (cdpwdkapkot@gmail.com)
|
REPLY
|
DFO (Bageshwar)
|
29/04/2016
|
The correction have been made as per the instruction received
|
|
29
|
DFO (Bageshwar)
|
REPLY
|
CF (North Kumaun)
|
03/05/2016
|
please find enclosed
|
|
30
|
CF (North Kumaun)
|
REPLY
|
Nodal Officer
|
10/05/2016
|
The On line objections raised by Nodal officer/Reg. Officer on date 05-01-2016 has been clarified by Bageshwar letter no 3072/12-1 dated 02-05-2016.
|
|
31
|
Regional Office
|
EDS
|
State secretary
|
24/06/2016
|
find the letter attached.
|
|
32
|
State secretary
|
EDS
|
Nodal Officer
|
28/06/2016
|
Plz reply to obj of RO-find the letter attached.
|
|
33
|
Nodal Officer
|
EDS
|
CF (North Kumaun)
|
04/07/2016
|
Plz reply to obj of RO-find the letter attached.
|
|
34
|
CF (North Kumaun)
|
EDS
|
DFO (Bageshwar)
|
13/07/2016
|
Plz reply to obj of RO-find the letter attached.
|
|
35
|
DFO (Bageshwar)
|
EDS
|
User Agency (cdpwdkapkot@gmail.com)
|
13/07/2016
|
please find enclosed
|
|
36
|
User Agency (cdpwdkapkot@gmail.com)
|
REPLY
|
DFO (Bageshwar)
|
01/02/2017
|
The correction have been made as per the instruction received
|
|
37
|
DFO (Bageshwar)
|
REPLY
|
CF (North Kumaun)
|
09/02/2017
|
please find enclosed
|
|
38
|
DFO (Bageshwar)
|
REPLY
|
CF (North Kumaun)
|
09/02/2017
|
please find enclosed
|
|
39
|
CF (North Kumaun)
|
REPLY
|
Nodal Officer
|
20/02/2017
|
The On line objections raised by Reg. Office /Nodal officer on date 04-07-2017 has been clarified by DFO Bageshwar letter no 2031/12-1 dated 09-02-2017
|
|
40
|
CF (North Kumaun)
|
REPLY
|
Nodal Officer
|
20/02/2017
|
The On line objections raised by Reg. Office /Nodal officer on date 04-07-2017 has been clarified by DFO Bageshwar letter no 2031/12-1 dated 09-02-2017
|
|
41
|
Nodal Officer
|
EDS
|
CF (North Kumaun)
|
06/03/2017
|
The hard copy of the proposal containing original documents is not yet received in this office. The CF may provide original hard copy of the proposal to this office including authenticated copy of Part I to Part V as in online web portal.
|
|
42
|
CF (North Kumaun)
|
EDS
|
DFO (Bageshwar)
|
06/03/2017
|
The hard copy of the proposal containing original documents is not yet received in this office. The DFO may provide original hard copy of the proposal to this office including authenticated copy of Part I to Part V as in online web portal.
|
|
43
|
DFO (Bageshwar)
|
EDS
|
User Agency (cdpwdkapkot@gmail.com)
|
08/03/2017
|
The hard copy of the proposal containing original documents is not yet received in this office. may provide original hard copy of the proposal to this office including authenticated copy of Part I to Part V as in online web port
|
|
44
|
User Agency (cdpwdkapkot@gmail.com)
|
REPLY
|
DFO (Bageshwar)
|
17/03/2017
|
The correction have been made as per the instruction received
|
|
45
|
DFO (Bageshwar)
|
EDS
|
User Agency (cdpwdkapkot@gmail.com)
|
23/03/2017
|
may provide original hard copy of the proposal to this office including authenticated copy of Part I to Part V as in online web portal.
|
|
46
|
User Agency (cdpwdkapkot@gmail.com)
|
REPLY
|
DFO (Bageshwar)
|
23/03/2017
|
The correction have been made as per the instruction received
|
|
47
|
DFO (Bageshwar)
|
EDS
|
User Agency (cdpwdkapkot@gmail.com)
|
31/03/2017
|
please submit original hard copy to the R.O. office..along with filled Part I to part V..instruction received from Nodal office
|
|
48
|
User Agency (cdpwdkapkot@gmail.com)
|
REPLY
|
DFO (Bageshwar)
|
17/04/2017
|
The correction have been made as per the instruction received
|
|
49
|
DFO (Bageshwar)
|
REPLY
|
CF (North Kumaun)
|
21/06/2017
|
please find enclosed
|
|
50
|
CF (North Kumaun)
|
REPLY
|
Nodal Officer
|
22/06/2017
|
The On line objections raised by Reg. Office /Nodal officer on date 06-03-2017 has been clarified by DFO Bageshwar letter no 2620/12-1 dated 11-04-2017
|
|
51
|
Nodal Officer
|
REPLY
|
State secretary
|
10/07/2017
|
Required documents uploaded for your further necessary action.
|
|
52
|
State secretary
|
REPLY
|
Regional Office
|
11/07/2017
|
Required documents uploaded for your further necessary action.
|
|
53
|
Regional Office
|
EDS
|
State secretary
|
03/08/2017
|
State Govt. may attend the shortcomings as per the attachment.
|
|
54
|
State secretary
|
EDS
|
Nodal Officer
|
08/08/2017
|
State Govt. may attend the shortcomings as per the attachment.
|
|
55
|
Nodal Officer
|
EDS
|
CF (North Kumaun)
|
08/08/2017
|
State Govt. may attend the shortcomings as per the attachment.
|
|
56
|
CF (North Kumaun)
|
EDS
|
DFO (Bageshwar)
|
09/08/2017
|
State Govt. may attend the shortcomings as per the attachment.
|
|
57
|
DFO (Bageshwar)
|
EDS
|
User Agency (cdpwdkapkot@gmail.com)
|
23/08/2017
|
please find enclosed
|
|
58
|
User Agency (cdpwdkapkot@gmail.com)
|
REPLY
|
DFO (Bageshwar)
|
18/09/2017
|
The correction have been made as per the instruction received
|
|
59
|
DFO (Bageshwar)
|
REPLY
|
CF (North Kumaun)
|
12/10/2017
|
please find enclosed
|
|
60
|
CF (North Kumaun)
|
REPLY
|
Nodal Officer
|
13/10/2017
|
The On line objections raised by Reg. Office /Nodal officer on date 08-08-2017 has been clarified by DFO Bageshwar letter no 803/12-1 dated 11-10-2017
|
|
61
|
Nodal Officer
|
EDS
|
CF (North Kumaun)
|
25/10/2017
|
find the letter attached
|
|
62
|
CF (North Kumaun)
|
EDS
|
DFO (Bageshwar)
|
27/10/2017
|
find the letter attached
|
|
63
|
DFO (Bageshwar)
|
EDS
|
User Agency (cdpwdkapkot@gmail.com)
|
28/10/2017
|
please find enclosed
|
|
64
|
User Agency (cdpwdkapkot@gmail.com)
|
REPLY
|
DFO (Bageshwar)
|
29/11/2017
|
The correction have been made as per the instruction received
|
|
65
|
DFO (Bageshwar)
|
REPLY
|
CF (North Kumaun)
|
08/12/2017
|
please find enclosed
|
|
66
|
CF (North Kumaun)
|
REPLY
|
Nodal Officer
|
11/12/2017
|
The On line objections raised by Reg. Office /Nodal officer on date 25-10-2017 has been clarified by DFO Bageshwar letter no 1300/12-1 dated 08-12-2017
|
|
67
|
Nodal Officer
|
EDS
|
CF (North Kumaun)
|
27/12/2017
|
find the letter attached
|
|
68
|
CF (North Kumaun)
|
EDS
|
DFO (Bageshwar)
|
28/12/2017
|
find the letter attached
|
|
69
|
DFO (Bageshwar)
|
EDS
|
User Agency (cdpwdkapkot@gmail.com)
|
28/12/2017
|
please find enclosed
|
|
70
|
User Agency (cdpwdkapkot@gmail.com)
|
REPLY
|
DFO (Bageshwar)
|
16/01/2018
|
The correction have been made as per the instruction received
|
|
71
|
DFO (Bageshwar)
|
REPLY
|
CF (North Kumaun)
|
19/03/2018
|
please find enclosed
|
|
72
|
CF (North Kumaun)
|
REPLY
|
Nodal Officer
|
20/03/2018
|
The On line objections raised by Reg. Office /Nodal officer on date 27-12-2017 has been clarified by DFO Bageshwar letter no 2170/12-1 dated 17-03-2018
|
|
73
|
Nodal Officer
|
EDS
|
CF (North Kumaun)
|
28/03/2018
|
find the letter attached
|
|
74
|
CF (North Kumaun)
|
EDS
|
DFO (Bageshwar)
|
02/04/2018
|
find the letter attached
|
|
75
|
DFO (Bageshwar)
|
EDS
|
User Agency (cdpwdkapkot@gmail.com)
|
02/04/2018
|
please find enclosed
|
|
76
|
User Agency (cdpwdkapkot@gmail.com)
|
REPLY
|
DFO (Bageshwar)
|
01/01/2019
|
The correction have been made as per the instruction received
|
|
77
|
DFO (Bageshwar)
|
EDS
|
User Agency (cdpwdkapkot@gmail.com)
|
30/01/2019
|
plz upload justification certificate.
|
|
78
|
User Agency (cdpwdkapkot@gmail.com)
|
REPLY
|
DFO (Bageshwar)
|
30/01/2019
|
The correction have been made as per the instruction received
|
|
79
|
DFO (Bageshwar)
|
EDS
|
User Agency (cdpwdkapkot@gmail.com)
|
30/01/2019
|
plz upload justification certificate.
|
|
80
|
User Agency (cdpwdkapkot@gmail.com)
|
REPLY
|
DFO (Bageshwar)
|
30/01/2019
|
The correction have been made as per the instruction received
|
|
81
|
DFO (Bageshwar)
|
REPLY
|
CF (North Kumaun)
|
01/02/2019
|
plz find enclosed
|
|
82
|
CF (North Kumaun)
|
REPLY
|
Nodal Officer
|
02/02/2019
|
The On line objections raised by Reg. Office /Nodal officer on date 28-03.2018 has been clarified by DFO Bageshwar letter no 1943/12-1 dated 29-01-2019
|
|
83
|
Nodal Officer
|
REPLY
|
State secretary
|
27/02/2019
|
Required documents uploaded for your further necessary action.
|
|
84
|
State secretary
|
EDS
|
Nodal Officer
|
28/02/2019
|
Required documents uploaded for your further necessary action.
|
|
85
|
Nodal Officer
|
REPLY
|
State secretary
|
28/02/2019
|
user agency may attend the shortcomings mentioned in attached document.
|
|
86
|
State secretary
|
REPLY
|
Regional Office
|
05/03/2019
|
user agency may attend the shortcomings mentioned in attached document.
|
|
87
|
Regional Office
|
EDS
|
State secretary
|
15/03/2019
|
State Govt. may attend the shortcoming as per attachment.
|
|
88
|
State secretary
|
EDS
|
Nodal Officer
|
26/03/2019
|
State Govt. may attend the shortcoming as per attachment.
|
|
89
|
Nodal Officer
|
EDS
|
CF (North Kumaun)
|
26/03/2019
|
State Govt. may attend the shortcoming as per attachment.
|
|
90
|
CF (North Kumaun)
|
EDS
|
DFO (Bageshwar)
|
26/03/2019
|
State Govt. may attend the shortcoming as per attachment.
|
|
91
|
DFO (Bageshwar)
|
EDS
|
User Agency (cdpwdkapkot@gmail.com)
|
27/03/2019
|
find the letter attached
|
|
92
|
User Agency (cdpwdkapkot@gmail.com)
|
REPLY
|
DFO (Bageshwar)
|
16/05/2019
|
The correction have been made as per the instruction received
|
|
93
|
DFO (Bageshwar)
|
REPLY
|
CF (North Kumaun)
|
28/05/2019
|
plz find enclosed
|
|
94
|
CF (North Kumaun)
|
REPLY
|
Nodal Officer
|
31/05/2019
|
The On line objections raised by Reg. Office /Nodal officer on date 26-03-2019 has been clarified by DFO Bageshwar letter no 1334/12-1 dated 27-05-2019.
|
|
95
|
Nodal Officer
|
EDS
|
CF (North Kumaun)
|
19/06/2019
|
find the letter attached
|
|
96
|
CF (North Kumaun)
|
EDS
|
DFO (Bageshwar)
|
21/06/2019
|
find the letter attached
|
|
97
|
DFO (Bageshwar)
|
EDS
|
User Agency (cdpwdkapkot@gmail.com)
|
24/06/2019
|
find the letter attached
|
|
98
|
User Agency (cdpwdkapkot@gmail.com)
|
REPLY
|
DFO (Bageshwar)
|
03/08/2019
|
The correction have been made as per the instruction received
|
|
99
|
DFO (Bageshwar)
|
REPLY
|
CF (North Kumaun)
|
29/08/2019
|
plz find enclosed
|
|
100
|
CF (North Kumaun)
|
REPLY
|
Nodal Officer
|
07/09/2019
|
The On line objections raised by Reg. Office /Nodal officer on date 19-06-2019 has been clarified by Dfo Bageswar letter no 706/12-1 dated 29-08-2019
|
|
101
|
Nodal Officer
|
EDS
|
CF (North Kumaun)
|
16/09/2019
|
find the letter attached
|
|
102
|
CF (North Kumaun)
|
EDS
|
DFO (Bageshwar)
|
18/09/2019
|
find the letter attached
|
|
103
|
DFO (Bageshwar)
|
EDS
|
User Agency (cdpwdkapkot@gmail.com)
|
18/09/2019
|
find the letter attached
|
|
104
|
User Agency (cdpwdkapkot@gmail.com)
|
REPLY
|
DFO (Bageshwar)
|
06/12/2019
|
The correction have been made as per the instruction received
|
|
105
|
DFO (Bageshwar)
|
REPLY
|
CF (North Kumaun)
|
20/12/2019
|
plz find enclosed
|
|
106
|
CF (North Kumaun)
|
REPLY
|
Nodal Officer
|
30/12/2019
|
The On line objections raised by Reg. Office /Nodal officer on date 16-09-2019 has been clarified by Dfo Bageshwar letter no 1820/12-1 dated 18-12-2019
|
|
107
|
Nodal Officer
|
EDS
|
CF (North Kumaun)
|
13/01/2020
|
find the letter attached
|
|
108
|
CF (North Kumaun)
|
EDS
|
DFO (Bageshwar)
|
14/01/2020
|
find the letter attached
|
|
109
|
DFO (Bageshwar)
|
EDS
|
User Agency (cdpwdkapkot@gmail.com)
|
14/01/2020
|
find the letter attached
|
|
110
|
User Agency (cdpwdkapkot@gmail.com)
|
REPLY
|
DFO (Bageshwar)
|
18/08/2020
|
The correction have been made as per the instruction received
|
|
111
|
DFO (Bageshwar)
|
REPLY
|
CF (North Kumaun)
|
28/08/2020
|
plz find enclosed
|
|
112
|
CF (North Kumaun)
|
REPLY
|
Nodal Officer
|
29/08/2020
|
The On line objections raised by Reg. Office /Nodal officer on date 13-01-2020 has been clarified by Dfo Bageshwar letter no 566/12-1 dated 24-08-2020
|
|
113
|
Nodal Officer
|
REPLY
|
State secretary
|
31/08/2020
|
The correction have been made as per the instruction received
|
|
114
|
State secretary
|
REPLY
|
Regional Office
|
31/08/2020
|
The correction have been made as per the instruction received
|
|
115
|
Regional Office
|
EDS
|
State secretary
|
10/09/2020
|
state govt. may attend the following shortcomings as per the attachment here
|
|
116
|
State secretary
|
EDS
|
Nodal Officer
|
10/09/2020
|
state govt. may attend the following shortcomings as per the attachment here
|
|
117
|
Nodal Officer
|
EDS
|
CF (North Kumaun)
|
10/09/2020
|
state govt. may attend the following shortcomings as per the attachment here
|
|
118
|
CF (North Kumaun)
|
EDS
|
DFO (Bageshwar)
|
18/09/2020
|
state govt. may attend the following shortcomings as per the attachment here
|
|
119
|
DFO (Bageshwar)
|
EDS
|
User Agency (cdpwdkapkot@gmail.com)
|
19/09/2020
|
find the letter attached.
|
|
120
|
User Agency (cdpwdkapkot@gmail.com)
|
REPLY
|
DFO (Bageshwar)
|
30/09/2020
|
The correction have been made as per the instruction received
|
|
121
|
DFO (Bageshwar)
|
EDS
|
User Agency (cdpwdkapkot@gmail.com)
|
12/10/2020
|
find the letter attached.
|
|
122
|
User Agency (cdpwdkapkot@gmail.com)
|
REPLY
|
DFO (Bageshwar)
|
27/10/2020
|
The correction have been made as per the instruction received
|
|
123
|
DFO (Bageshwar)
|
EDS
|
User Agency (cdpwdkapkot@gmail.com)
|
29/10/2020
|
find the letter attached..
|
|
124
|
User Agency (cdpwdkapkot@gmail.com)
|
REPLY
|
DFO (Bageshwar)
|
11/11/2020
|
The correction have been made as per the instruction received
|
|
125
|
DFO (Bageshwar)
|
EDS
|
User Agency (cdpwdkapkot@gmail.com)
|
20/11/2020
|
find the letter attached.
|
|
126
|
User Agency (cdpwdkapkot@gmail.com)
|
REPLY
|
DFO (Bageshwar)
|
29/12/2021
|
The correction have been made as per the instruction received
|
|
127
|
DFO (Bageshwar)
|
EDS
|
User Agency (cdpwdkapkot@gmail.com)
|
12/01/2022
|
find the letter attached..
|
|
128
|
User Agency (cdpwdkapkot@gmail.com)
|
REPLY
|
DFO (Bageshwar)
|
15/01/2022
|
The correction have been made as per the instruction received
|
|
129
|
DFO (Bageshwar)
|
REPLY
|
CF (North Kumaun)
|
01/02/2022
|
plz find enclosed
|
|
130
|
CF (North Kumaun)
|
EDS
|
DFO (Bageshwar)
|
07/02/2022
|
As per letter no 3829/12-1 dated 07-02-2022
|
|
131
|
DFO (Bageshwar)
|
EDS
|
User Agency (cdpwdkapkot@gmail.com)
|
08/02/2022
|
As per letter no 3829/12-1 dated 07-02-2022
|
|
132
|
User Agency (cdpwdkapkot@gmail.com)
|
REPLY
|
DFO (Bageshwar)
|
28/02/2022
|
The correction have been made as per the instruction received
|
|
133
|
DFO (Bageshwar)
|
REPLY
|
CF (North Kumaun)
|
28/02/2022
|
plz find enclosed.
|
|
134
|
CF (North Kumaun)
|
REPLY
|
Nodal Officer
|
11/03/2022
|
As per letter no 4086/12-1 dated 28-02-2022
|
|
135
|
Nodal Officer
|
REPLY
|
State secretary
|
25/03/2022
|
The correction have been made as per the instruction received
|
|
136
|
State secretary
|
REPLY
|
Regional Office
|
25/03/2022
|
The correction have been made as per the instruction received
|
|
137
|
Regional Office
|
EDS
|
State secretary
|
12/04/2022
|
state Govt. may attend the following shortcomings as per the attachment here
|
|
138
|
State secretary
|
EDS
|
Nodal Officer
|
12/04/2022
|
state Govt. may attend the following shortcomings as per the attachment here
|
|
139
|
Nodal Officer
|
EDS
|
CF (North Kumaun)
|
12/04/2022
|
state Govt. may attend the following shortcomings as per the attachment here
|
|
140
|
CF (North Kumaun)
|
EDS
|
DFO (Bageshwar)
|
22/04/2022
|
state Govt. may attend the following shortcomings as per the attachment here
|
|
141
|
DFO (Bageshwar)
|
EDS
|
User Agency (cdpwdkapkot@gmail.com)
|
02/05/2022
|
find the letter attached..
|
|
142
|
User Agency (cdpwdkapkot@gmail.com)
|
REPLY
|
DFO (Bageshwar)
|
26/05/2022
|
The correction have been made as per the instruction received
|
|
143
|
DFO (Bageshwar)
|
REPLY
|
CF (North Kumaun)
|
20/06/2022
|
plz find enclosed
|
|
144
|
CF (North Kumaun)
|
REPLY
|
Nodal Officer
|
04/07/2022
|
As per letter no 5759/12-1 dated 25-06-2022
|
|
145
|
Nodal Officer
|
EDS
|
CF (North Kumaun)
|
19/07/2022
|
find the letter attached
|
|
146
|
CF (North Kumaun)
|
EDS
|
DFO (Bageshwar)
|
27/07/2022
|
find the letter attached
|
|
147
|
DFO (Bageshwar)
|
EDS
|
User Agency (cdpwdkapkot@gmail.com)
|
29/07/2022
|
find the letter attached
|
|