Sno. | From | Status | To | EDS Date | EDS sought/Replied | EDS Letter |
1
|
DFO (Jannaram WLM)
|
EDS
|
User Agency (jarunkumar@tfiber.in)
|
06/10/2022
|
The Forest Divsional Officer Jannaram vide Rc.No.1420/2021/S5, Dt.17.02.2022 has reported that on field inspection noticed the UA has not demarcated field stretch of Optical Fiber Cable. Continuity of laying of Optical Fiber Cable is not shown in the toposheet map, wherever Mission Bhageeratha water lines passing through the Tiger Reserve. Hence requested the UA to submit the revised proposals through Nodal Officer and last reminded on 11.03.2022
|
|