Sno. | From | Status | To | EDS Date | EDS sought/Replied | EDS Letter |
1
|
CF (Central Forest Circle)
|
EDS
|
DFO (Thoubal Forest Division)
|
21/11/2016
|
Certificate from Dc for non availabity of non forest land
|
|
2
|
DFO (Thoubal Forest Division)
|
REPLY
|
CF (Central Forest Circle)
|
09/12/2016
|
Dear Sir,
The required certificate has been enclosed herewith.
|
|
3
|
Nodal Officer
|
EDS
|
CF (Central Forest Circle)
|
26/12/2016
|
Please resubmit after making the following correction 1.Map showing forest land for diversion needs to be drawn in scale of 150,000, 2.The hard copies of Form-A Part-II submitted by DFO,Thoubal Division should be computer typed copies, 3.Enumeration of trees may be indicated whether enumerated in random sample plot or total enumeration. If it is done by sample plot enumeration method please indicate the number of sample plot with geo-coordinates, 4The aerial distance of the project site from the nearest Wild life Sanctuary/National park in appropriate scaled map, 5.The CA scheme may be prepared at the wage rate of Rs. 225 per manday as the same has been approved by the Sate Cabinet. At least 4 photographs of the CA site from different side should be submitted
|
|
4
|
CF (Central Forest Circle)
|
EDS
|
DFO (Thoubal Forest Division)
|
27/12/2016
|
Please resubmit after making the following correction 1.Map showing forest land for diversion needs to be drawn in scale of 150,000, 2.The hard copies of Form-A Part-II submitted by DFO,Thoubal Division should be computer typed copies, 3.Enumeration of trees may be indicated whether enumerated in random sample plot or total enumeration. If it is done by sample plot enumeration method please indicate the number of sample plot with geo-coordinates, 4The aerial distance of the project site from the nearest Wild life Sanctuary/National park in appropriate scaled map, 5.The CA scheme may be prepared at the wage rate of Rs. 225 per manday as the same has been approved by the Sate Cabinet. At least 4 photographs of the CA site from different side should be submitted
|
|
5
|
DFO (Thoubal Forest Division)
|
REPLY
|
CF (Central Forest Circle)
|
02/01/2017
|
Sir all necessary documents have been resubmitted and uploaded.
|
|
6
|
CF (Central Forest Circle)
|
REPLY
|
Nodal Officer
|
03/01/2017
|
Proposal is resubmitted after correction vide letter No. 2/8/2016-17/CFC dt. 30.12.2016
|
|
7
|
Nodal Officer
|
EDS
|
CF (Central Forest Circle)
|
04/01/2017
|
Please resubmit after correction of information on crown density at Part-II 7 viand density for calculation of NPV
|
|
8
|
CF (Central Forest Circle)
|
EDS
|
DFO (Thoubal Forest Division)
|
13/01/2017
|
Please resubmit after correction of information on crown density at Part-II 7 viand density for calculation of NPV
|
|
9
|
DFO (Thoubal Forest Division)
|
REPLY
|
CF (Central Forest Circle)
|
24/01/2017
|
Crown density in part II corrected and correspondingly NPV also.
|
|
10
|
CF (Central Forest Circle)
|
REPLY
|
Nodal Officer
|
24/01/2017
|
Crown density in Part II corrected and accordingly NPV also.
|
|
11
|
Nodal Officer
|
EDS
|
CF (Central Forest Circle)
|
17/02/2017
|
Please submit the District profile like Geographical area, Forest area, RF, PF, Unclassed Forest, NP, WL Sanctuary, etc.
|
|
12
|
CF (Central Forest Circle)
|
EDS
|
DFO (Thoubal Forest Division)
|
17/02/2017
|
Please submit the District profile like Geographical area, Forest area, RF, PF, Unclassed Forest, NP, WL Sanctuary, etc.
|
|
13
|
DFO (Thoubal Forest Division)
|
REPLY
|
CF (Central Forest Circle)
|
09/03/2017
|
Submitted accordingly
|
|
14
|
CF (Central Forest Circle)
|
REPLY
|
Nodal Officer
|
17/03/2017
|
District profile of Thoubal district has been furnished.
|
|
15
|
Regional Office
|
EDS
|
State secretary
|
26/05/2017
|
1.GPS coordinate for the proposed Transmission line.
2.The 3D diagrammatic sketch of the proposed transmission line showing the nos of the tower and Right of Way.
|
|
16
|
State secretary
|
REPLY
|
Regional Office
|
07/11/2017
|
GPS coordinates of the Transmission Towers
The GPS coordinates of the starting and end point of the proposed transmission line passing through forest area
The Right of Way of the proposed transmission line
Hard copy of the SHP/KML file of the proposed area for diversion
The 3-D diagrammatic sketch of the proposed transmission line showing the nos. of the tower and Right of Way.
Undertaking of the UA for payment of Addl. NPV
Hard copy of the SHP/KML file of the proposed area for CA
Compartment number of the proposed diversion site
The photographs and GPS coordinates of the site inspection of the proposed diversion and CA sites conducted by the DFO/CF
Corrected soft copy of the SHP/KML file of the proposed area for diversion
Soft copy of the SHP/KML file of the proposed CA area
|
|
17
|
Regional Office
|
EDS
|
State secretary
|
09/11/2017
|
Lacking of following information
|
|
18
|
State secretary
|
REPLY
|
Regional Office
|
01/01/2018
|
GPS coordinates of the Transmission Towers
The GPS coordinates of the starting and end point of the proposed transmission line passing through forest area
The Right of Way of the proposed transmission line
Hard copy of the SHP/KML file of the proposed area for diversion
The 3-D diagrammatic sketch of the proposed transmission line showing the nos. of the tower and Right of Way.
Undertaking of the UA for payment of Addl. NPV
Hard copy of the SHP/KML file of the proposed area for CA
Compartment number of the proposed diversion site
The photographs and GPS coordinates of the site inspection of the proposed diversion and CA sites conducted by the DFO/CF
Corrected soft copy of the SHP/KML file of the proposed area for diversion
Soft copy of the SHP/KML file of the proposed CA area
|
|
19
|
Regional Office
|
EDS
|
State secretary
|
28/05/2018
|
soft copy of shape/kml file and CA has not been submitted
|
|