Sno. | From | Status | To | EDS Date | EDS sought/Replied | EDS Letter |
1
|
DFO (Kasargode)
|
EDS
|
User Agency (eerdksd@gmail.com)
|
03/11/2021
|
Proposed forest area to be demarcated in the field and provide sketch. The proposed area need to be shown to Range Forest Officer, Kasaragod and staff for enumeration of trees need to be felled.
|
|
2
|
User Agency (eerdksd@gmail.com)
|
REPLY
|
DFO (Kasargode)
|
17/05/2023
|
The correction have been made as per the instruction received
|
|
3
|
CF (CCF Northern Circle)
|
EDS
|
DFO (Kasargode)
|
30/06/2023
|
District Profile not entered.
KML file, Geo Referenced map, toposheet, site suitability cerificate, CA scheme are also to be uploaded
|
|
4
|
DFO (Kasargode)
|
EDS
|
User Agency (eerdksd@gmail.com)
|
03/07/2023
|
KML file, Geo Referenced map, toposheet of CA land Kammadamkavu and Mallampara to be uploaded urgently.Details on MallamparaCA may be obtained from this office.
|
|
5
|
User Agency (eerdksd@gmail.com)
|
REPLY
|
DFO (Kasargode)
|
11/07/2023
|
The correction have been made as per the instruction received
|
|
6
|
DFO (Kasargode)
|
REPLY
|
CF (CCF Northern Circle)
|
12/07/2023
|
The correction have been made as per the instruction received
|
|
7
|
CF (CCF Northern Circle)
|
EDS
|
DFO (Kasargode)
|
19/07/2023
|
Site suitability certificate not found
|
|
8
|
DFO (Kasargode)
|
REPLY
|
CF (CCF Northern Circle)
|
20/07/2023
|
The correction have been made as per the instruction received
|
|
9
|
CF (CCF Northern Circle)
|
EDS
|
DFO (Kasargode)
|
20/07/2023
|
correct the density of vegetation
|
|
10
|
DFO (Kasargode)
|
REPLY
|
CF (CCF Northern Circle)
|
20/07/2023
|
The correction have been made as per the instruction received
|
|
11
|
Regional Office
|
EDS
|
State secretary
|
03/11/2023
|
State Government has been requested vide letter dated 03.11.2023 to clarify whether the road proposed for widening is pre-1980 or road formed after 1980 with supporting documents and exact details of CA land proposed for this proposal, since the CA land identified is overlaps with already diverted proposal earlier.
|
|
12
|
State secretary
|
EDS
|
Nodal Officer
|
14/11/2023
|
for furnishing the details sought by MoEF&CC
|
|
13
|
Nodal Officer
|
EDS
|
CF (CCF Northern Circle)
|
16/11/2023
|
The required details sought from GoI may be uploaded
|
|
14
|
CF (CCF Northern Circle)
|
EDS
|
DFO (Kasargode)
|
20/11/2023
|
The required details sought from GoI is attached herewith. Furnish the same.
|
|
15
|
DFO (Kasargode)
|
REPLY
|
CF (CCF Northern Circle)
|
13/12/2023
|
1. As per the notification of Adur RF, the above road is found existing before 1980s and the working plan of Kasargod Forest Dvsn( 2013-14 to 2022-23) is having the name of above road in two reaches.
2. Regarding CA land for UKTL(17.073 Ha) stage 1 approval was obtained but no Govt order received for transferring the land at Kammadam Kavu to Forest department. For Edaparambu- Kolichal Hill High way, 4.333 ha was transferred by revenue department at Kammadam kavu. The issues are already presented to revenue authorities and expecting that the issues will be solved. The CA land for Edaparambu- Kolichal hill High Way will be found out in another area shortly...
|
|
16
|
CF (CCF Northern Circle)
|
EDS
|
DFO (Kasargode)
|
18/12/2023
|
submit the report in a signed letter form in Parivesh Portal as per the letter attached herewith.
|
|
17
|
DFO (Kasargode)
|
REPLY
|
CF (CCF Northern Circle)
|
11/01/2024
|
The details are attached
|
|
18
|
CF (CCF Northern Circle)
|
EDS
|
DFO (Kasargode)
|
18/01/2024
|
Submit report as per the letter dt 18/12/23
|
|
19
|
DFO (Kasargode)
|
REPLY
|
CF (CCF Northern Circle)
|
23/01/2024
|
Written details are submitted for the EDS raised..
|
|
20
|
CF (CCF Northern Circle)
|
EDS
|
DFO (Kasargode)
|
29/01/2024
|
In your letter dt 11/1/24 and telephone conversation with you it is understood that the a portion of the same land - kammadamkavu - is proposed as CA land for UKTLP-and also for Edapatamba Kolichal road. Hence a shortage of labd is noted for meeting the CA land requirements. So you are shall give necessary direction to user agency to identify requisite CA land for the proposal Edaparamba Kolichal road and submit the proposal urgently for further necessary action.
|
|
21
|
DFO (Kasargode)
|
REPLY
|
CF (CCF Northern Circle)
|
05/02/2024
|
Sir, We have submitted letter to Ex. Engineer, KRFB-PMU Division Kasargod for taking up the issue with District Collect orate and find out the CA land for the Edaparambu-Kolichal Hill High Way Project. The letter is attached here with..
|
|
22
|
CF (CCF Northern Circle)
|
EDS
|
DFO (Kasargode)
|
08/02/2024
|
The above proposal should be forwarded to the user agency and necessary steps should be taken.
|
|
23
|
DFO (Kasargode)
|
EDS
|
User Agency (eerdksd@gmail.com)
|
14/02/2024
|
hghghjhgj
|
|