Sno. | From | Status | To | EDS Date | EDS sought/Replied | EDS Letter |
1
|
DFO (Nowshera Forest Division)
|
EDS
|
User Agency (pwddivisionrajouri104@gmail.com)
|
21/06/2022
|
Kindly upload the documents as per the EDS raised.
|
|
2
|
User Agency (pwddivisionrajouri104@gmail.com)
|
REPLY
|
DFO (Nowshera Forest Division)
|
24/06/2022
|
The correction have been made as per the instruction received
|
|
3
|
DFO (Nowshera Forest Division)
|
EDS
|
User Agency (pwddivisionrajouri104@gmail.com)
|
25/06/2022
|
The following documents/information needs to be corrected as mentioned below
1. Scheme name is not mention in the project detail, length & width of the proposed road diversion in forest land should also mention in the project name.
2. The component wise breakup of forest land is not done in S.No. B 2.4 and there is mis match of non-forest land area, this needs to be corrected.
3. Govt. Sanction order of the project is not enclosed.
4. The documents uploaded in the additional information is specified by short name, write full name of the uploaded document.
|
|
4
|
User Agency (pwddivisionrajouri104@gmail.com)
|
REPLY
|
DFO (Nowshera Forest Division)
|
29/06/2022
|
The correction have been made as per the instruction received
|
|
5
|
DFO (Nowshera Forest Division)
|
EDS
|
User Agency (pwddivisionrajouri104@gmail.com)
|
30/06/2022
|
The following documents/informations needs to be corrected as mentioned below.
1. The Govt. Santion Order Copy is not authenticated. Upload the authenticated sanction order copy.
2. The layout plan upload twice in additional information. Delete the old format layout plan.
3. There is a mismatch of non-forest area at S.No. B 2.4, it should be corrected.
|
|
6
|
User Agency (pwddivisionrajouri104@gmail.com)
|
REPLY
|
DFO (Nowshera Forest Division)
|
20/07/2022
|
The correction have been made as per the instruction received
|
|