Wild Life Report
Form for seeking recommendation of Standing Committee of NBWL/SBWL.
PART - I & II
(To be filled up by User Agency)
A. General Details
A-1. Project Details
  (i). Forest Clearance Required?: Yes   (a).Forests Clearance Type : Fresh   (ii). Proposal No. : FP/GA/RAIL/22041/2016   (iii). Name of Project: Castlerock - Kulem Railway Doubling   (iv). Short narrative of the Project : Railway network plays an important role in the economic development of the region. Railways are considered to be the most effective mode of transport of bulk commodities like Iron Ore, Coal, Fertilizers, Timber, Food grains etc. Over the years, Railway network has played a vital link between Ports/H   (v). State : Goa   (vi). Category of the Project : Railway   (vii). Shape of project land : Linear   (viii). Distance of the project from the boundary of the Protected Area (in km.): 0   (ix). Estimated cost of the Project(Rupees in lacs) : 9000   (x). Total period for which clearance is required (in year): NIL   (xi). Total Project Area(in ha.): 120.875   (xii). Area of Forest Land required for this Project(in ha.): 120.875   (xiii). Non-Forest Land required for this Project (in ha.): 0   (xiv). Forest Land within Protected Area(in ha.): 113.857   (xv). Non-forest Land within Protected Area (in ha.): 0   (xvi). Project Area under Protected Area(in ha.): 113.857   (xvii). Project Area under Non-Protected Area (in ha.): 7.018   (xviii). Project Area inside Wildlife Sanctuaries(in ha.): 113.302   (xiv). Project Area outside Wildlife Sanctuaries(in ha.): 0   (xv). Project Area inside Conservation Reserve(in ha.): 0   (xvi). Project Area outside Conservation Reserve(in ha.): 0   (xvii). Project Area inside National Park(in ha.): 0   (xviii). Project Area outside National Park(in ha.): 0   (xix). Project Area inside Ecologically Sensitive Zone(in ha.): 0   (xx). Project Area outside Ecologically Sensitive Zone(in ha.): 0
A-2. Details of User Agency
  (i). Name : SOUTH WESTERN RAILWAY   (ii). Address1 : RAIL VIKAS NIGAM LIMITED   (iii). Address2 : OPP RAILWAY HIGH SCHOOL (EM), GADAG ROAD, HUBLI   (iv). State : Karnataka   (v). District : Dharwad   (vi). Pin : 580020   (vii). Landmark : NIL   (viii). Email address : gmprojectsrvnl@gmail.com   (ix). Landline Telephone No. : 2282025   (x). Fax No. : 2282025   (xi). Mobile No. : 9902855220   (xii). Website (if any) : NIL   (xiii). Legal status of User Agency : Central PSU
A-3. Details of Person Making Application
  (i). First Name: Dy Chief Engineer   (ii). Middle Name: Construction   (iii). Last Name: South Western Railway   (iv). Gender: Male   (v). Designation: Dy Cheif Engineer/CN   (vi). Address 1: South Western Railway   (vii). Address 2: Office of the Chief Engineer (Construction), Club Road, Keshwapur   (viii). State: Karnataka   (ix). District: Dharwad   (x). Pin: 580020   (xi). Landmark: NIL   (xii). Email Address: gmprojectsrvnl@gmail.com   (xiii). Landline Telephone No.: 2282025   (xiv). Fax No.: 08362282025   (xv). Mobile No.: 9902855220   (xvi). Upload a copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency: Annexure copy of documents in support of the competence
B. Details of Land required for the Project
B-1. Details of Protected Area
B-1.1 No. of Divisions involved in Protected Area
Division wise details of land
S.no Division Name Protected Area Name Project Area under Protected Area
1.Wildlife - NorthBHAGWAN MAHAVIR WILDLIFE SANCTUERY113.857
B-1.2 Details of Districts involved
District wise breakup
S.no District Name Project Area under Protected Area(ha.) Project Area under Non-Protected Area(ha.)
1.South Goa113.8577.018
B-1.3 Component wise breakup
Component wise breakup
S.no Component Project Area under Protected Area(ha.) Project Area under Non-Protected Area(ha.)
1TOTAL LAND REQUIRED FOR RAILWAY DOUBLING113.8577.018
C. Maps of protected area
Division 1. : Wildlife - North
  (i). Project Area under Protected Area (in ha.) : 113.857   (ii). Nature of the Project : Linear   (iii). No. of Segments : One
Patch/Segment wise details
Segments Protected Area of segment(in ha.) KML file of protected area of segment
1.113.857    View File
  (iv). copy of Survey of India Toposheet indicating boundary of protected area: Annexure Survey of India Toposheet   (v). scanned copy of the Geo-referenced map of the protected area prepared by using DGPS or Total Station: Annexure scanned copy of the Geo-referenced map
D. Justification for locating the Project in protected area and details of alternates examined :
  (i). copy of note containing justification for locating the Project in protected area: Annexure Justification   (ii). Whether a copy of map indicating location of alternative examined is required to be provided: Yes   (a). copy of map indicating location of alternative examined: Annexure alternative examined
E. Employment likely to be generated
  (i). Whether project is likely to generate employment ?: Yes   (a). Permanent/Regular Employment(Number of persons): 81   (b). Temporary Employment(Number of person-days): 146000
F. Displacement of People due to the project, if any
  (i). Whether project involve displacement?: No
G. Status of Environmental clearance
  (i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? : Yes   (a). Status of the Environmental Clearance to the Project : EC application yet to be submitted
H. Whether proposal is for investigation/survey
(H-1). Whether proposal is for investigation/survey? : No
(H-2). Details of the Bio diversity Impact Assessment report in case the proposal involves use of more than 50 ha. NP/WLS.
  (a).Copy of the Bio diversity Impact Assessment report: Annexure Copy of Bio diversity Impact Assessment report
(H-3). Information on the projects undertaken by the proponent agency in the past in Protected Areas
  (a).Upload file: Annexure Information on the projects undertaken by the proponent agency in the past in Protected Areas
(H-4). Details regarding compliance of the conditions on each proposal
  (a).Upload file: Annexure Details regarding compliance of the conditions on each proposal   (H-5).Whether any matter related to the project is sub judice in any court of law?: No
Documents
S.No Uploaded Additional Info. Files
Remarks
1Additional Info.Pdf containing reply letter and general design for all four animal underpasses
2Additional Info.area statement
3Additional Info.min. use of forest land
4Additional Info.survey no wise details
5Additional Info.Payment of NPV for wildlife
6Additional Info.Non violation of Forest Act
7Additional Info.No Affect on Monument Certificate
8Additional Info.Form I&XIV for involved survey no
9Additional Info.Undertaking for payment of compensatory afforestation
10Additional Info.Geo refrenced village map
11Additional Info.Location of underpass
12Additional Info.Topo sheet
13Additional Info.MOU Copy
14Additional Info.EIA copy
15Additional Info.Alignment report
16Additional Info.Tree enumeration report part I
17Additional Info.Tree enumeration report part II
18Additional Info.Tree enumeration report part III
19Additional Info.REPLY TOWARDS LETTER DATED 17/09/2019
20Additional Info.Map showing location of project site and protected wildlife are
Communication of Sought coming to User Agency
Close(X)
Close(X)