PART-II
(To be filled by the concerned Deputy Conservator of Forest)
State Serial No. of proposal : UK-037/2020
1. Location of the project/Scheme : Uttarakhand
 (i) State / Union Territory : Uttarakhand  (ii) District : Dehradun,Tehri Garhwal  (iii) Forest Division : Mussoorie  (iv) Area of forest land proposed for diversion (in ha.) : 2.323  (v)

Category of the Proposal: Drinking Water
2. Legal status of forest land proposed for diversion
S. No. DivisionForest Land(ha.)Legal Status
1Mussoorie0.845Private Forest
2Mussoorie0.36Reserved Forest
3Mussoorie1.118Civil Soyam land
Total 2.323
Division 1. : Mussoorie
3. District wise area to be diverted in the division
S. No. DistrictArea(ha.)
1Dehradun0.845
2Tehri Garhwal0.36
3Tehri Garhwal1.118
Total2.323
4. Details of Vegetation available in the forest land proposed for diversion
 (i) Density of vegetation
S. No. Area(in ha.)Density Eco-Class
12.3230.4Eco 5
Total. 2.323


(ii) Species-wise local/scientific names and girth-wise enumeration of trees at FRL
S. No. Scientific Name Local Name (0-30)cm. (31-60)cm. (61-90)cm. (91-120)cm. (121-150)cm. (>150)cm.
1OthersJhigan220000
2Terminalia bellericaBahera210000
3Emblica OfficinalisAnwala100000
4OthersMaljhan200000
5Melotus PhilippensisRohini610000
6BambooBans400000
7OthersBelpatri110000
8Albezzia LabbeckSiras001000
9OthersSilver Oak010000
10Bauhinia ParvifloraKachnar430000
11Melia AzadirachtaBaken210000
12OthersGenthi200000
13Quercus leucotricophoraBanj (Notifid Private Forest)355020
14Bauhinia ParvifloraKachnar(in Civil land)6107510
15OthersKarik340000
16Grewia optovaBhimal002000
17Terminalia bellericaBahera100000
18Ficus ReligiosaPipal000010
Total 39 2915 54 0
Sub Total (No of Trees.) 92


5. Working plan prescription for the forest land proposed for diversion : Kairagad Block lies in conservation Protection working circle.
6. Brief note on vulnerability of the forest area to erosion : The report of Joit Director Geologist is attached in proposal prapatra 46-48. The proposed forest land is not vulnerable to soil erosion therefor geographically stable.
7. Approximate distance of the proposed site for diversion from boundary of forest(in km.) : 0.10
8. Significance of the forest land proposed for diversion from wildlife point of view
 (i). Details of wildlife present in and around the forest land proposed for diversion : Panthera pardus,Muntiacus muntjak,Nemorhaedus goral,Hystix indica Macaca mulataetc.
 (ii). Whether forms part of national park, wildlife sanctuary, biosphere reserve,tiger reserve, elephant corridor, wildlife migration corridor etc. : No
 (iii). Whether the forest land proposed for diversion is located within eco-sensitive zone(ESZ) of the Protected Area notified under Wildlife(Protection) Act,1972 (Note: In case, ESZ of a Protected Area is not notified,then,10kms distance from boundary of the Protected Area should be treated as ESZ): No
 (iv). Whether any national park, wildlife sanctuary, biosphere reserve, tiger reserve, elephant corridor, wildlife migration corridor etc., is located within 1 Km. from boundary of the forest land proposed for diversion : No
 (v). Whether any rare/endangered/unique species of flora and fauna found in the area : No
9. Details of any protected archaeological/heritage site/defence establishment or any other important monument located in the area, if any
 (i). Whether any protected archaeological/heritage site/defence establishment or any other important monument is located in the area : No
10. Comment as to the reasonability of the extent of the forest land proposed for diversion
 (i). Whether the requirement of forest land as proposed by the user agency is unavoidable and bare minimum for the project : Yes
11. Details of violation(s), if any ,committed
 (i). Whether any work in violation of the Act or guidelines issued under the Act has been carried out : No
12. Whether work in violation is still in progres(Yes/No) : NIL
13. Details of compensatory afforestation scheme
(i). Patch wise details of non-forest or Revenue forest land to be provided by User Agency for CA
Patch Wise Details
S.no District Name VillageArea(in ha.)khasraKML filePresent Owner file
1Tehri GarhwalNear Gaon khet4.464110
(ii). Upload a scanned copy of the Geo-referenced map of the forest land proposed for C.A. prepared by using DGPS or Total Station: (iii). Upload a copy of Survey of India Toposheet indicating boundary of forest land proposed for C.A:
Additional information Details
S. No. DocumentsRemarks
1 Bar chart
2 Digital map of Project
3 EDS Letter by UA
4 Geo refrence map of Project
5 NPV Certificate
6 digital map of CA
7 Geo refrence map of CA
8 Part -II

14. District Profile
S.no District NameGeographical area of the district (in ha.)Forest area of the district (in ha.)Total forest area diverted since 1980 (in ha.)No. of Approved CasesForest Land including penal C.A. (in ha.)Progress of compensatory afforestation as on(date)A) Forest land (in ha.)B) Non-forest land (in ha.)
1Tehri Garhwal442100405890986.007398236.961231/07/2019231.750
15. Site inspection report of the DFO/CCF/Nodal Officer highlighting important facts pertaining to the forest land
Division NameCircleSite inspected ByWhether site inspectedNo. of times site visited Site inspection reportDate of visit
MussoorieYamunaDFOYesOne27/02/2020
(Specific recommendation of the DFO/CCF/Nodal Officer with(Part II,III & Part IV))
16. Specific recommendation of the DFO/CCF/Nodal Officer for acceptance or otherwise of the proposal with reason
DivisionCircleRecommendation ByRecommendationReasonLetter Whether CF agreed
MussoorieYamunaDFO RecommendedThe land is proposed to be used for construction of Intak bell, M.P.S/W.T.P, I.P.S, C.W.R in Water Supply Scheme for Mussoorie Town in Uttrakhand. Proposed work site in 104 tree.