State Serial No. of proposal : RJ-0113/2018
1. Location of the project/Scheme : Rajasthan
 (i) State / Union Territory : Rajasthan  (ii) District : Banswara  (iii) Forest Division : Banswara Territorial  (iv) Area of forest land proposed for diversion (in ha.) : 1.9003  (v)

Category of the Proposal: Transmission Line
2. Legal status of forest land proposed for diversion
S. No. DivisionForest Land(ha.)Legal Status
1Banswara Territorial1.9003Protected Forest
Total 1.9003
Division 1. : Banswara Territorial
3. District wise area to be diverted in the division
S. No. DistrictArea(ha.)
1Banswara1.9003
Total1.9003
4. Details of Vegetation available in the forest land proposed for diversion
 (i) Density of vegetation
S. No. Area(in ha.)Density Eco-Class
11.90030.2Eco 3
Total. 1.9003


(ii) Species-wise local/scientific names and girth-wise enumeration of trees at FRL
S. No. Scientific Name Local Name (0-30)cm. (31-60)cm. (61-90)cm. (91-120)cm. (121-150)cm. (>150)cm.
1Butea MonospermaKhakhra0412300
2Acacia leucophloeaRonjh010000
3Azadirachta IndicaNeem020000
4Ficus ReligiosaPipal010000
5Wrigtria TingtoriaKhirni010000
6OthersKhajur001700
7Prosophis JulifloraVilayati babool010000
8Acacia NiloticaDeshi Babool000100
Total 0 1013 110 0
Sub Total (No of Trees.) 34


5. Working plan prescription for the forest land proposed for diversion : Loose stone wall and Ditch fencing, Cut-Back operation and singling operation , Doodhi, tamath/ harsingar, Lentana,Juliflora etc. shoud be eradicated. Soil and water conservation works, LSCD, Gabions, Pucca check dams and other structures suitable for the site will constructed across nalla/water stream flow. Plantation of teak,bamboo,amla, baheda, arjun,etc. will be done. Notching of seed of suitable species will be carried out.
6. Brief note on vulnerability of the forest area to erosion : Not vulnerable to erosion
7. Approximate distance of the proposed site for diversion from boundary of forest(in km.) : 0.2
8. Significance of the forest land proposed for diversion from wildlife point of view
 (i). Details of wildlife present in and around the forest land proposed for diversion : No any wild present in and around the forest land proposed for diversion.
 (ii). Whether forms part of national park, wildlife sanctuary, biosphere reserve,tiger reserve, elephant corridor, wildlife migration corridor etc. : No
 (iii). Whether the forest land proposed for diversion is located within eco-sensitive zone(ESZ) of the Protected Area notified under Wildlife(Protection) Act,1972 (Note: In case, ESZ of a Protected Area is not notified,then,10kms distance from boundary of the Protected Area should be treated as ESZ): No
 (iv). Whether any national park, wildlife sanctuary, biosphere reserve, tiger reserve, elephant corridor, wildlife migration corridor etc., is located within 1 Km. from boundary of the forest land proposed for diversion : No
 (v). Whether any rare/endangered/unique species of flora and fauna found in the area : No
9. Details of any protected archaeological/heritage site/defence establishment or any other important monument located in the area, if any
 (i). Whether any protected archaeological/heritage site/defence establishment or any other important monument is located in the area : No
10. Comment as to the reasonability of the extent of the forest land proposed for diversion
 (i). Whether the requirement of forest land as proposed by the user agency is unavoidable and bare minimum for the project : Yes
11. Details of violation(s), if any ,committed
 (i). Whether any work in violation of the Act or guidelines issued under the Act has been carried out : No
12. Whether work in violation is still in progres(Yes/No) : NIL
13. Details of compensatory afforestation scheme
(i). Patch wise details for Degraded Area (To be earmarked by DFO) (i). Total Financial Outlay for C.A(lacs): 6.70870
Patch Wise Details
S.no Patch No.Area(ha.)Name of PF/RFRangeCompartment NoUploaded KML file of patch
113.8006PFBAGIDORA3    View file
(ii). Copy of CA scheme details: (iii). Scanned copy of the Geo-referenced map of the forest land proposed for C.A. prepared by using DGPS or Total Station: (iv). Copy of Survey of India Toposheet indicating boundary of forest land proposed for C.A.:
 (V). Copy of NOC from Competent Authority :

Additional information Details
S. No. DocumentsRemarks
1 Chordi Specific Recommendation For acceptance of the proposal.
2 Chordi NPV Calculation
3 Chordi DFL Suitability Certificate
4 Chordi Forwarding Letter
5 Chordi Bare minimum Certificate
6 Chordi Site Inspection Report
7 CA scheme for plantation on double degraded forest land 3.8006 ha. with estimate.
8 Chordi DFL Zamabandi
9 Chordi Tree List Detailed
10 site inspection image
11 Letter regarding reply of EDS as raised on dated 05.03.2019 by Apccf FP & FCA Rajasthan , Jaipur
12 Copy of consent by the UA regarding no felling of any tree coming under the proposed transmission line.
13 Copy of Gazette Notification of Forest Blocks Coming under the proposal.
14 Copy of consent of user agency regarding no need of felling and pruning of any tree coming under the transmission line.
15 CA scheme for Dwarf /Medicinal tree plantation under the transmission line 1.9003 ha. with estimate.
16 Letter regarding reply of EDS as raised on dated 14.05.2019 by Apccf FP & FCA Rajasthan , Jaipur

14. District Profile
S.no District NameGeographical area of the district (in ha.)Forest area of the district (in ha.)Total forest area diverted since 1980 (in ha.)No. of Approved CasesForest Land including penal C.A. (in ha.)Progress of compensatory afforestation as on(date)A) Forest land (in ha.)B) Non-forest land (in ha.)
1Banswara4536128100699.508305.180925187.027624/01/2019354247.42
15. Site inspection report of the DFO/CCF/Nodal Officer highlighting important facts pertaining to the forest land
Division NameCircleSite inspected ByWhether site inspectedNo. of times site visited Site inspection reportDate of visit
Banswara TerritorialUdaipurDFOYesOne16/11/2018
(Specific recommendation of the DFO/CCF/Nodal Officer with(Part II,III & Part IV))
16. Specific recommendation of the DFO/CCF/Nodal Officer for acceptance or otherwise of the proposal with reason
DivisionCircleRecommendation ByRecommendationReasonLetter Whether CF agreed
Banswara TerritorialUdaipurDFO RecommendedThere is no any other alternative alignment is available for construction of the Transmission line hence In view of larger public interest, 1.9003 Ha. of Forest land is Recommended for diversion.
UdaipurCF RecommendedPart III and letter has been attachedYes
Nodal Officer RecommendedProposal is accepted and recommended for approval.
Specific recommendation of the State Government(Part V)
17. Specific recommendation of the State Government for acceptance or otherwise of the proposal with reason ( Part V)
StateRecommendation ByRecommendationRecommendation DateRemarksSigning AuthorityNotificationRecommendation Letter
RajasthanState SecretaryRecommended26/06/2019 as per nodal officer comments State Govt. OfficerNo Data
17. Stage-I Clearance Report
Regional OfficeRecommendation ByMoEF File No.Date of Stage-I ClearanceClearance Letter
LucknowRegional Office8B/Raj/04/16/2019/FC14/01/2020
18. Payment made by User Agency
Proposal No.Application No.Total Amount (Rs.)Transaction DateTransaction IDBank NameMode of PaymentUploaded Demand Letter
FP/RJ/TRANS/34423/2018TRANS344232018171293120107 Feb 2020SBIN520038960305Corporation BankNEFT/RTGS (Challan)
19. Uploaded Status of Land to be transferred to Forest Department under FCA (Mutation Details).
  (i). Whether CA Land is mandatorily required in this Proposal : Yes   (ii). Total Land identified for raising CA: 3.8006   (iii). No. of Maintenance years: 12   (iv). Total No. of Patches/Parcel: 1
  No. of patches : 1
Patch wise details
Patch No. Shape of land identified for CA Area of Patch/Parcel(in ha.)
1Block(Polygon)3.8006
  Status of CA Land so identified : Forest Area
Status of CA Land so identified
Name of Forest. Legal Status of Forest Land
Distt.:Banswara, Range: BagidoraPF
  (v). Site Name : Forest Block:Rakhodevi Lilwani B   (vi). Location Details : Distt.: Banswara, Tehsil: Bagidora, Village: Lilwani   (vii). Uploaded GPS File :   (viii). Uploaded Scanned copy of Map :
20. Mutation Details Verified By Nodal Officer
Proposal No.Verified DateMutation LetterRemarks
FP/RJ/TRANS/34423/201811 Feb 2020No DataLand details are verified,
21. Compliance Details Submitted by User Agency
Proposal No.Compliance Details submitted on(Date)Uploaded Letter
FP/RJ/TRANS/34423/201825 Feb 2020
23. Compliance Details Verified by Nodal Officer
Proposal No.RemarksVerified DateUploaded Letter
FP/RJ/TRANS/34423/2018Compliance of In principle approval has been done.04 Mar 2020No DataFP/RJ/TRANS/34423/2018Compliance of In principle approval has been done.04 Mar 2020
24. Stage-II Clearance Details
Proposal No.Date of Stage-II ClearanceProposal StatusClearance Letter
FP/RJ/TRANS/34423/2018Approved In-PrincipleNo Data