PART-II
(To be filled by the concerned Deputy Conservator of Forest)
State Serial No. of proposal : RJ-0171/2019
1. Location of the project/Scheme : Rajasthan
 (i) State / Union Territory : Rajasthan  (ii) District : Jhunjhunu  (iii) Forest Division : Jhunjhunu Territorial  (iv) Area of forest land proposed for diversion (in ha.) : 35.1938  (v)

Category of the Proposal: Sub Station
2. Legal status of forest land proposed for diversion
S. No. DivisionForest Land(ha.)Legal Status
1Jhunjhunu Territorial35.1938chhote/bade jhar ka jungle
Total 35.1938
Division 1. : Jhunjhunu Territorial
3. District wise area to be diverted in the division
S. No. DistrictArea(ha.)
1Jhunjhunu35.1938
Total35.1938
4. Details of Vegetation available in the forest land proposed for diversion
 (i) Density of vegetation
S. No. Area(in ha.)Density Eco-Class
135.19380.2Eco 3
Total. 35.1938


(ii) Species-wise local/scientific names and girth-wise enumeration of trees at FRL
S. No. Scientific Name Local Name (0-30)cm. (31-60)cm. (61-90)cm. (91-120)cm. (121-150)cm. (>150)cm.
1Misc. SpeciesIsreali babool347442487820160
2Misc. Specieskumatha260197000
3Misc. Specieskhejadi010001
4Misc. SpeciesRohida010000
Total 3734 445885 2016 1
Sub Total (No of Trees.) 5272


5. Working plan prescription for the forest land proposed for diversion : NO
6. Brief note on vulnerability of the forest area to erosion : no
7. Approximate distance of the proposed site for diversion from boundary of forest(in km.) : 0
8. Significance of the forest land proposed for diversion from wildlife point of view
 (i). Details of wildlife present in and around the forest land proposed for diversion : Blue bulls, Jackal, Fox, Different varities of Birds and Reptiles, Peacocks
 (ii). Whether forms part of national park, wildlife sanctuary, biosphere reserve,tiger reserve, elephant corridor, wildlife migration corridor etc. : No
 (iii). Whether the forest land proposed for diversion is located within eco-sensitive zone(ESZ) of the Protected Area notified under Wildlife(Protection) Act,1972 (Note: In case, ESZ of a Protected Area is not notified,then,10kms distance from boundary of the Protected Area should be treated as ESZ): Yes
  Details of Protected Area and comments on the impact of Project on the ESZ : There are two Conservation reserve in the radius of 10 Kms. 1 Bansiyal-Khetri conservation reserve 2 Bansiyal-Khetri-Bagor conservation reserve. conservation area is minimum 6.5 Kms far from the proposed area. This project is Proposed for construction of Power grid sub station .
 (iv). Whether any national park, wildlife sanctuary, biosphere reserve, tiger reserve, elephant corridor, wildlife migration corridor etc., is located within 1 Km. from boundary of the forest land proposed for diversion : No
 (v). Whether any rare/endangered/unique species of flora and fauna found in the area : No
9. Details of any protected archaeological/heritage site/defence establishment or any other important monument located in the area, if any
 (i). Whether any protected archaeological/heritage site/defence establishment or any other important monument is located in the area : No
10. Comment as to the reasonability of the extent of the forest land proposed for diversion
 (i). Whether the requirement of forest land as proposed by the user agency is unavoidable and bare minimum for the project : Yes
11. Details of violation(s), if any ,committed
 (i). Whether any work in violation of the Act or guidelines issued under the Act has been carried out : No
12. Whether work in violation is still in progres(Yes/No) : NIL
13. Details of compensatory afforestation scheme
(i). Patch wise details for Degraded Area (To be earmarked by DFO) (i). Total Financial Outlay for C.A(lacs): 96.32
Patch Wise Details
S.no Patch No.Area(ha.)Name of PF/RFRangeCompartment NoUploaded KML file of patch
1170.3876Khetri 48 A KHETRI1    View file
(ii). Copy of CA scheme details: (iii). Scanned copy of the Geo-referenced map of the forest land proposed for C.A. prepared by using DGPS or Total Station: (iv). Copy of Survey of India Toposheet indicating boundary of forest land proposed for C.A.:
 (V). Copy of NOC from Competent Authority :

Additional information Details
S. No. DocumentsRemarks
1 NPV
2 FORWARDING LETTER
3 DIGITAL MAP
4 TOPOSHEET MAP
5

14. District Profile
S.no District NameGeographical area of the district (in ha.)Forest area of the district (in ha.)Total forest area diverted since 1980 (in ha.)No. of Approved CasesForest Land including penal C.A. (in ha.)Progress of compensatory afforestation as on(date)A) Forest land (in ha.)B) Non-forest land (in ha.)
1Jhunjhunu59280040535.621498.19122180.1124/12/20192176.143.8
15. Site inspection report of the DFO/CCF/Nodal Officer highlighting important facts pertaining to the forest land
Division NameCircleSite inspected ByWhether site inspectedNo. of times site visited Site inspection reportDate of visit
Jhunjhunu TerritorialJaipurDFOYesOne24/12/2019
(Specific recommendation of the DFO/CCF/Nodal Officer with(Part II,III & Part IV))
16. Specific recommendation of the DFO/CCF/Nodal Officer for acceptance or otherwise of the proposal with reason
DivisionCircleRecommendation ByRecommendationReasonLetter Whether CF agreed
Jhunjhunu TerritorialJaipurDFO RecommendedRECOMMENDED IN PUBLIC INTEREST
JaipurCF Recommendedthe project is for public utility.Yes
Nodal Officer RecommendedThe proposal is recommended in public interest.
Specific recommendation of the State Government(Part V)
17. Specific recommendation of the State Government for acceptance or otherwise of the proposal with reason ( Part V)
StateRecommendation ByRecommendationRecommendation DateRemarksSigning AuthorityNotificationRecommendation Letter
RajasthanState SecretaryRecommended20/01/2020 Recommended as per comments of Nodal Officer State Govt. OfficerNo Data
17. Stage-I Clearance Report
Regional OfficeRecommendation ByMoEF File No.Date of Stage-I ClearanceClearance Letter
LucknowRegional Office8B/Raj/04/4/2020/FC20/02/2020
18. Payment made by User Agency
Proposal No.Application No.Total Amount (Rs.)Transaction DateTransaction IDBank NameMode of PaymentUploaded Demand Letter
FP/RJ/SubStation/42955/2019SUBSTATION4295520197373311103203 Dec 2020SBINR12020031200001935Corporation BankNEFT/RTGS (Challan)
19. Uploaded Status of Land to be transferred to Forest Department under FCA (Mutation Details).
  (i). Whether CA Land is mandatorily required in this Proposal : Yes   (ii). Total Land identified for raising CA: 70.3876   (iii). No. of Maintenance years: 12   (iv). Total No. of Patches/Parcel: 1
  No. of patches : 1
Patch wise details
Patch No. Shape of land identified for CA Area of Patch/Parcel(in ha.)
1Block(Polygon)70.3876
  Status of CA Land so identified : Forest Area
Status of CA Land so identified
Name of Forest. Legal Status of Forest Land
Forest Block Khetri 48A, Range-KhetriPF
  (v). Site Name : Forest Block Khetri 48A, Range-Khetri   (vi). Location Details : Village- Pratibha Nagar (Gadarata) Tehsil-Khetri Dist-Jhunjhunu   (vii). Uploaded GPS File :   (viii). Uploaded Scanned copy of Map :
20. Mutation Details Verified By Nodal Officer
Proposal No.Verified DateMutation LetterRemarks
FP/RJ/SubStation/42955/201917 Mar 2020No DataLand details are verified.
21. Compliance Details Submitted by User Agency
Proposal No.Compliance Details submitted on(Date)Uploaded Letter
FP/RJ/SubStation/42955/201917 Mar 2020
24. Stage-II Clearance Details
Proposal No.Date of Stage-II ClearanceProposal StatusClearance Letter
FP/RJ/SubStation/42955/2019Approved In-PrincipleNo Data