PART-II
(To be filled by the concerned Deputy Conservator of Forest)
State Serial No. of proposal : RJ-025/2017
1. Location of the project/Scheme : Rajasthan
 (i) State / Union Territory : Rajasthan  (ii) District : Sawai Madhopur  (iii) Forest Division : RTR Core Sawaimadhopur Wildlife  (iv) Area of forest land proposed for diversion (in ha.) : 6.86  (v)

Category of the Proposal: Road
2. Legal status of forest land proposed for diversion
S. No. DivisionForest Land(ha.)Legal Status
1RTR Core Sawaimadhopur Wildlife6.86Reserved Forest
Total 6.86
Division 1. : RTR Core Sawaimadhopur Wildlife
3. District wise area to be diverted in the division
S. No. DistrictArea(ha.)
1Sawai Madhopur6.86
Total6.86
4. Details of Vegetation available in the forest land proposed for diversion
 (i) Density of vegetation
S. No. Area(in ha.)Density Eco-Class
16.860.3Eco 3
Total. 6.86


(ii) Species-wise local/scientific names and girth-wise enumeration of trees at FRL
S. No. Scientific Name Local Name (0-30)cm. (31-60)cm. (61-90)cm. (91-120)cm. (121-150)cm. (>150)cm.
1OthersDhok01221642
2Acacia leucophloeaRaunj013141154
3Diasporus MelanoxylonTendu000002
4Butea MonospermaChilla02812727
5OthersKhajoor003400
6Holoptelia integrifoliaChurel012101
7Zizyphus JujubaBer000010
8Acacia CatechuKhair030000
Total 0 3148 3417 36
Sub Total (No of Trees.) 166


5. Working plan prescription for the forest land proposed for diversion : Widening of exiting road may be done as per instruction of NTCA.
6. Brief note on vulnerability of the forest area to erosion : This widening of road will not cause any erosion to forest areas.
7. Approximate distance of the proposed site for diversion from boundary of forest(in km.) : 0
8. Significance of the forest land proposed for diversion from wildlife point of view
 (i). Details of wildlife present in and around the forest land proposed for diversion : Tiger, Leopard, Sloth Bear, Chittal, Samber etc
 (ii). Whether forms part of national park, wildlife sanctuary, biosphere reserve,tiger reserve, elephant corridor, wildlife migration corridor etc. : Yes
  Details and comments on the impact of Project on such areas : NBWL has cleared the project.
 (iii). Whether the forest land proposed for diversion is located within eco-sensitive zone(ESZ) of the Protected Area notified under Wildlife(Protection) Act,1972 (Note: In case, ESZ of a Protected Area is not notified,then,10kms distance from boundary of the Protected Area should be treated as ESZ): No
 (iv). Whether any national park, wildlife sanctuary, biosphere reserve, tiger reserve, elephant corridor, wildlife migration corridor etc., is located within 1 Km. from boundary of the forest land proposed for diversion : Yes
  Details and comments on the impact of Project on such areas : The design of the proposed road keeping in the view of wildlife protection measures. NTCA suggestions has been incorporated in the proposal with some
 (v). Whether any rare/endangered/unique species of flora and fauna found in the area : Yes
9. Details of any protected archaeological/heritage site/defence establishment or any other important monument located in the area, if any
 (i). Whether any protected archaeological/heritage site/defence establishment or any other important monument is located in the area : No
10. Comment as to the reasonability of the extent of the forest land proposed for diversion
 (i). Whether the requirement of forest land as proposed by the user agency is unavoidable and bare minimum for the project : Yes
11. Details of violation(s), if any ,committed
 (i). Whether any work in violation of the Act or guidelines issued under the Act has been carried out : No
12. Whether work in violation is still in progres(Yes/No) : NIL
13. Details of compensatory afforestation scheme
(i). Patch wise details of non-forest or Revenue forest land to be provided by User Agency for CA
Patch Wise Details
S.no District Name VillageArea(in ha.)khasraKML filePresent Owner file
1Sawai MadhopurAwand6.86758/1147 and 809
(ii). Upload a scanned copy of the Geo-referenced map of the forest land proposed for C.A. prepared by using DGPS or Total Station: (iii). Upload a copy of Survey of India Toposheet indicating boundary of forest land proposed for C.A: (iv). Copy of CA scheme details: (iv). Copy of CA scheme details: NA
Additional information Details
S. No. DocumentsRemarks
1 Land suitability as per performa
2 CA plan as per performa
3 NPV details
4
5 CA for forest land 13.72 ha
6
7
8 Suitability Certificate
9 area calculation
10 NPV detail revised

14. District Profile
S.no District NameGeographical area of the district (in ha.)Forest area of the district (in ha.)Total forest area diverted since 1980 (in ha.)No. of Approved CasesForest Land including penal C.A. (in ha.)Progress of compensatory afforestation as on(date)A) Forest land (in ha.)B) Non-forest land (in ha.)
1Sawai Madhopur4498008112814.8953002/05/201700
15. Site inspection report of the DFO/CCF/Nodal Officer highlighting important facts pertaining to the forest land
Division NameCircleSite inspected ByWhether site inspectedNo. of times site visited Site inspection reportDate of visit
RTR Core Sawaimadhopur WildlifeBharatpur WildlifeDFOYesOne03/09/2017
 Bharatpur WildlifeCFYesOne03/09/2017
(Specific recommendation of the DFO/CCF/Nodal Officer with(Part II,III & Part IV))
16. Specific recommendation of the DFO/CCF/Nodal Officer for acceptance or otherwise of the proposal with reason
DivisionCircleRecommendation ByRecommendationReasonLetter Whether CF agreed
RTR Core Sawaimadhopur WildlifeBharatpur WildlifeDFO RecommendedProposal is accepted in interest of public interest.
Bharatpur WildlifeCF RecommendedRecommended in public interest.Yes
Nodal Officer RecommendedAgreed with comments of DCF and CCF. Proposal is accepted and recommended for approval.
Specific recommendation of the State Government(Part V)
17. Specific recommendation of the State Government for acceptance or otherwise of the proposal with reason ( Part V)
StateRecommendation ByRecommendationRecommendation DateRemarksSigning AuthorityNotificationRecommendation Letter
RajasthanState SecretaryRecommended18/05/2017 Recommended as per Nodal Officer FCA comState Govt. OfficerNo Data
17. Stage-I Clearance Report
Regional OfficeRecommendation ByMoEF File No.Date of Stage-I ClearanceClearance Letter
JaipurRegional Office8B/RAJ/06/10/2017/FC18/10/2017
18. Payment made by User Agency
Proposal No.Application No.Total Amount (Rs.)Recieved Amount (Rs.)Transaction DateTransaction IDBank NameMode of PaymentDemmand Generated By User AgencyDemmand Verified By Nodal OfficerUploaded Demand Letter
FP/RJ/ROAD/16889/2015ROAD16889201535026,009,369.0026,009,369.0030/12/2017P17122962550639Corporation BankNEFT/RTGS (Challan)19/12/201719/12/2017
19. Uploaded Status of Land to be transferred to Forest Department under FCA (Mutation Details).
  (i). Whether CA Land is mandatorily required in this Proposal : Yes   (ii). Total Land identified for raising CA: 6.86   (iii). No. of Maintenance years: 10   (iv). Total No. of Patches/Parcel: 2
  No. of patches : 1
Patch wise details
Patch No. Shape of land identified for CA Area of Patch/Parcel(in ha.)
1Block(Polygon)2.35
  Status of CA Land so identified : Non Forest Area   Site Name : Awand   Location Details : Awand   Uploaded GPS File :   Uploaded Scanned copy of Map :   Mutation Status : Mutated
Mutation Status
Circle Name. Name of Division. Name of Range. Mutation Order No. Mutation Date How Much Area of Mutated Land Received Mutation Letter
BharatpurSawaimadhopur TerritorialSWM34212 Apr 20172.35
  No. of patches : 2
Patch wise details
Patch No. Shape of land identified for CA Area of Patch/Parcel(in ha.)
2Block(Polygon)4.51
  Status of CA Land so identified : Non Forest Area   Site Name : Awand   Location Details : Awand   Uploaded GPS File :   Uploaded Scanned copy of Map :   Mutation Status : Mutated
Mutation Status
Circle Name. Name of Division. Name of Range. Mutation Order No. Mutation Date How Much Area of Mutated Land Received Mutation Letter
BharatpurSawaimadhopur TerritorialSWM34212 Apr 20174.51
20. Mutation Details Verified By Nodal Officer
Proposal No.Verified DateMutation LetterRemarks
FP/RJ/ROAD/16889/201528 Oct 2021No DataLand details are verified.
21. Compliance Details Submitted by User Agency
Proposal No.Compliance Details submitted on(Date)Uploaded Letter
FP/RJ/ROAD/16889/201501 Nov 2021
22. Compliance Details Verified by Nodal Officer
Proposal No.RemarksVerified DateUploaded Letter
FP/RJ/ROAD/16889/2015The final sanction is already accorded by MoEF and state govt.27 Apr 2022
23. Stage-II Clearance Details
Proposal No.Date of Stage-II ClearanceProposal StatusClearance Letter
FP/RJ/ROAD/16889/201502 Apr 2019APPROVED