PART-II
(To be filled by the concerned Deputy Conservator of Forest)
State Serial No. of proposal : HP-097/2019
1. Location of the project/Scheme : Himachal Pradesh
 (i) State / Union Territory : Himachal Pradesh  (ii) District : Chamba  (iii) Forest Division : Churah  (iv) Area of forest land proposed for diversion (in ha.) : 7.72  (v)

Category of the Proposal: Road
2. Legal status of forest land proposed for diversion
S. No. DivisionForest Land(ha.)Legal Status
1Churah7.72Protected Forest
Total 7.72
Division 1. : Churah
3. District wise area to be diverted in the division
S. No. DistrictArea(ha.)
1Chamba7.72
Total7.72
4. Details of Vegetation available in the forest land proposed for diversion
 (i) Density of vegetation
S. No. Area(in ha.)Density Eco-Class
17.720.1Eco 6
Total. 7.72


(ii) Species-wise local/scientific names and girth-wise enumeration of trees at FRL
S. No. Scientific Name Local Name (0-30)cm. (31-60)cm. (61-90)cm. (91-120)cm. (121-150)cm. (>150)cm.
1OthersKail135566000
2OthersFir/Spruce209695000
3OthersBan200000
4OthersJammu130000
5OthersKarindu410000
6OthersMaharu600000
7OthersDeodar 100242000
Total 457 15313 00 0
Sub Total (No of Trees.) 623


5. Working plan prescription for the forest land proposed for diversion : Protection working circle.
6. Brief note on vulnerability of the forest area to erosion : Strata is quite stable and is not vulnerable to erosion
7. Approximate distance of the proposed site for diversion from boundary of forest(in km.) : 1.00
8. Significance of the forest land proposed for diversion from wildlife point of view
 (i). Details of wildlife present in and around the forest land proposed for diversion : Languor,Monkey and Patriot etc.
 (ii). Whether forms part of national park, wildlife sanctuary, biosphere reserve,tiger reserve, elephant corridor, wildlife migration corridor etc. : No
 (iii). Whether the forest land proposed for diversion is located within eco-sensitive zone(ESZ) of the Protected Area notified under Wildlife(Protection) Act,1972 (Note: In case, ESZ of a Protected Area is not notified,then,10kms distance from boundary of the Protected Area should be treated as ESZ): No
 (iv). Whether any national park, wildlife sanctuary, biosphere reserve, tiger reserve, elephant corridor, wildlife migration corridor etc., is located within 1 Km. from boundary of the forest land proposed for diversion : No
 (v). Whether any rare/endangered/unique species of flora and fauna found in the area : No
9. Details of any protected archaeological/heritage site/defence establishment or any other important monument located in the area, if any
 (i). Whether any protected archaeological/heritage site/defence establishment or any other important monument is located in the area : No
10. Comment as to the reasonability of the extent of the forest land proposed for diversion
 (i). Whether the requirement of forest land as proposed by the user agency is unavoidable and bare minimum for the project : Yes
11. Details of violation(s), if any ,committed
 (i). Whether any work in violation of the Act or guidelines issued under the Act has been carried out : No
12. Whether work in violation is still in progres(Yes/No) : NIL
13. Details of compensatory afforestation scheme
Patch wise details for Degraded Area (To be earmarked by DFO)
(i). Total Financial Outlay for C.A(lacs): 21.928
Patch Wise Details
S.no Patch No.Area(ha.)Name of PF/RFRangeCompartment NoUploaded KML file of patch
1115.44Chamdeu DPFChakoliSalooni Block    View file
(ii). Copy of CA scheme details: (iii). Scanned copy of the Geo-referenced map of the forest land proposed for C.A. prepared by using DGPS or Total Station: (iv). Copy of Survey of India Toposheet indicating boundary of forest land proposed for C.A.:
 (V). Copy of NOC from Competent Authority :

Additional information Details
S. No. DocumentsRemarks
1 Bill of NPV
2 PART-II with recommendation
3 Detail of village benefitted by proposed road
4 Certificate of distance from protected area by DFO
5 Revised site inspection report by DFO
6 Joint Inspection dated 01.09.2020 and 09.09.2020 as desired by REC.
7 Trees Abstract with correct trees botanical name.
8 Revised CA Scheme based on the latest plantation norms.

14. District Profile
S.no District NameGeographical area of the district (in ha.)Forest area of the district (in ha.)Total forest area diverted since 1980 (in ha.)No. of Approved CasesForest Land including penal C.A. (in ha.)Progress of compensatory afforestation as on(date)A) Forest land (in ha.)B) Non-forest land (in ha.)
1Chamba652200243700119.420832238.841631/08/2019238.84160
15. Site inspection report of the DFO/CCF/Nodal Officer highlighting important facts pertaining to the forest land
Division NameCircleSite inspected ByWhether site inspectedNo. of times site visited Site inspection reportDate of visit
ChurahChambaDFOYesOne03/08/2019
 Nodal OfficerNoNo Data
(Specific recommendation of the DFO/CCF/Nodal Officer with(Part II,III & Part IV))
16. Specific recommendation of the DFO/CCF/Nodal Officer for acceptance or otherwise of the proposal with reason
DivisionCircleRecommendation ByRecommendationReasonLetter Whether CF agreed
ChurahChambaDFO RecommendedSince all the beneficiry villages are surrounded by forest.Hence there is no escape from using the forest land.
ChambaCF RecommendedRecommended as per the justification report of User Agency and DFO Churah.Yes
Nodal Officer RecommendedRecommendation
Specific recommendation of the State Government(Part V)
17. Specific recommendation of the State Government for acceptance or otherwise of the proposal with reason ( Part V)
StateRecommendation ByRecommendationRecommendation DateRemarksSigning AuthorityNotificationRecommendation Letter
Himachal PradeshState SecretaryRecommended28/02/2020 Recommended State Govt. OfficerNo Data
17. Stage-I Clearance Report
Regional OfficeRecommendation ByMoEF File No.Date of Stage-I ClearanceClearance Letter
ShimlaRegional Office8B/HP/06/19/2020/FC29/09/2020
18. Payment made by User Agency
Proposal No.Application No.Total Amount (Rs.)Recieved Amount (Rs.)Transaction DateTransaction IDBank NameMode of PaymentUploaded Demand Letter
FP/HP/ROAD/22033/2016ROAD2203320165188416721841672115 Jan 2021SBIN221015828155Corporation BankNEFT/RTGS (Challan)
FP/HP/ROAD/22033/2016ROAD2203320166824Union Bank Of IndiaNEFT/RTGS (Challan)
19. Uploaded Status of Land to be transferred to Forest Department under FCA (Mutation Details).
  (i). Whether CA Land is mandatorily required in this Proposal : Yes   (ii). Total Land identified for raising CA: 15.44   (iii). No. of Maintenance years: 10   (iv). Total No. of Patches/Parcel: 1
  No. of patches : 1
Patch wise details
Patch No. Shape of land identified for CA Area of Patch/Parcel(in ha.)
1Block(Polygon)15.44
  Status of CA Land so identified : Forest Area   Site Name : Chamdeu DPF   Location Details : Forest name Chamdeu DPF Range Chakoli   Uploaded GPS File :   Uploaded Scanned copy of Map :
Status of CA Land so identified
Name of Forest. Legal Status of Forest Land
ChamdeuOthers
20. Mutation Details Verified By Nodal Officer
Proposal No.Verified DateMutation LetterRemarks
FP/HP/ROAD/22033/201623 Jan 2021No DataCA has been proposed over degraded forest land, hence mutation is not required.
21. Compliance Details Submitted by User Agency
Proposal No.Compliance Details submitted on(Date)Uploaded Letter
FP/HP/ROAD/22033/201623 Jul 2022
Compliance Details Submitted by User Agency(old)
Proposal No.Compliance Details submitted on(Date)Reject RemarksReject DateUploaded Letter
FP/HP/ROAD/22033/201629 Jan 2021EDS: EDS20 Apr 2022
22. Compliance Details Verified by Nodal Officer
Proposal No.RemarksVerified DateUploaded Letter
FP/HP/ROAD/22033/2016Compliance reported to GoI02 Apr 2022
23. Stage-II Clearance Details
Proposal No.Date of Stage-II ClearanceProposal StatusClearance Letter
FP/HP/ROAD/22033/2016Approved In-PrincipleNo Data