PART-II
(To be filled by the concerned Deputy Conservator of Forest)
State Serial No. of proposal : GJ-0228/2019
1. Location of the project/Scheme : Gujarat
 (i) State / Union Territory : Gujarat  (ii) District : Valsad  (iii) Forest Division : Valsad SF  (iv) Area of forest land proposed for diversion (in ha.) : 3.788  (v)

Category of the Proposal: Road
2. Legal status of forest land proposed for diversion
S. No. DivisionForest Land(ha.)Legal Status
1Valsad SF3.788Protected Forest
Total 3.788
Division 1. : Valsad SF
3. District wise area to be diverted in the division
S. No. DistrictArea(ha.)
1Valsad3.788
Total3.788
4. Details of Vegetation available in the forest land proposed for diversion
 (i) Density of vegetation
S. No. Area(in ha.)Density Eco-Class
13.7880.4Eco 4
Total. 3.788


(ii) Species-wise local/scientific names and girth-wise enumeration of trees at FRL
S. No. Scientific Name Local Name (0-30)cm. (31-60)cm. (61-90)cm. (91-120)cm. (121-150)cm. (>150)cm.
1Tamarindus IndicaKhati Amli001000
2Azadirachta IndicaLimdo000002
3OthersDudh Mogro 001110
4Mangifera IndicaAmba0142510
5OthersPeltophorum0213212433
6Acacia NiloticaDesi Bavad000367
7Ficus ReligiosaPipdo000001
8Moringa OliferaSargvo000010
9Ficus benghalensisVad000002
10OthersGoras Amli000011
11Bombax CeibaSimdo001000
12Ficus RacemosaUmro010100
13Acacia AuriculiformisBengali Bavad037360
14Albizzia lebbeckKilai001000
15Delonix RegiaGulmohor001000
16Prosophis JulifloraGando Baval000110
17OthersGoradiyo000010
18Samania SamanReintree001226
19Casurina EquisitifoliaSaru000100
20OthersAsan000100
21Eucalyptus sppNilgiri000410
Total 0 730 4049 62
Sub Total (No of Trees.) 188


5. Working plan prescription for the forest land proposed for diversion : NIL
6. Brief note on vulnerability of the forest area to erosion : Not Prone to Erosion
7. Approximate distance of the proposed site for diversion from boundary of forest(in km.) : 70
8. Significance of the forest land proposed for diversion from wildlife point of view
 (i). Details of wildlife present in and around the forest land proposed for diversion : No Data
 (ii). Whether forms part of national park, wildlife sanctuary, biosphere reserve,tiger reserve, elephant corridor, wildlife migration corridor etc. : No
 (iii). Whether the forest land proposed for diversion is located within eco-sensitive zone(ESZ) of the Protected Area notified under Wildlife(Protection) Act,1972 (Note: In case, ESZ of a Protected Area is not notified,then,10kms distance from boundary of the Protected Area should be treated as ESZ): No
 (iv). Whether any national park, wildlife sanctuary, biosphere reserve, tiger reserve, elephant corridor, wildlife migration corridor etc., is located within 1 Km. from boundary of the forest land proposed for diversion : No
 (v). Whether any rare/endangered/unique species of flora and fauna found in the area : No
9. Details of any protected archaeological/heritage site/defence establishment or any other important monument located in the area, if any
 (i). Whether any protected archaeological/heritage site/defence establishment or any other important monument is located in the area : No
10. Comment as to the reasonability of the extent of the forest land proposed for diversion
 (i). Whether the requirement of forest land as proposed by the user agency is unavoidable and bare minimum for the project : Yes
11. Details of violation(s), if any ,committed
 (i). Whether any work in violation of the Act or guidelines issued under the Act has been carried out : No
12. Whether work in violation is still in progres(Yes/No) : NIL
13. Details of compensatory afforestation scheme
Patch wise details for Degraded Area (To be earmarked by DFO)
(i). Total Financial Outlay for C.A(lacs): 2806368
Patch Wise Details
S.no Patch No.Area(ha.)Name of PF/RFRangeCompartment NoUploaded KML file of patch
118RFSanjan0    View file
(ii). Copy of CA scheme details: (iii). Scanned copy of the Geo-referenced map of the forest land proposed for C.A. prepared by using DGPS or Total Station: (iv). Copy of Survey of India Toposheet indicating boundary of forest land proposed for C.A.:
 (V). Copy of NOC from Competent Authority :

Additional information Details
S. No. DocumentsRemarks
NIL

14. District Profile
S.no District NameGeographical area of the district (in ha.)Forest area of the district (in ha.)Total forest area diverted since 1980 (in ha.)No. of Approved CasesForest Land including penal C.A. (in ha.)Progress of compensatory afforestation as on(date)A) Forest land (in ha.)B) Non-forest land (in ha.)
1Valsad302900042.230414005/06/201900
15. Site inspection report of the DFO/CCF/Nodal Officer highlighting important facts pertaining to the forest land
Division NameCircleSite inspected ByWhether site inspectedNo. of times site visited Site inspection reportDate of visit
Valsad SFBharuch SF CircleDFOYesOne16/08/2019
 Bharuch SF CircleCFNoNo Data
 Nodal OfficerNoNo Data
(Specific recommendation of the DFO/CCF/Nodal Officer with(Part II,III & Part IV))
16. Specific recommendation of the DFO/CCF/Nodal Officer for acceptance or otherwise of the proposal with reason
DivisionCircleRecommendation ByRecommendationReasonLetter Whether CF agreed
Valsad SFBharuch SF CircleDFO RecommendedThis road is having Existing B.T Surface.In this Project upgrading this road from 0/000 to 11/400 from 7 meter to 10 meters carriageway by providing B.T Pavement on existing B.T Road on existing alignment having 15 meter Right of Way.Hence recommended.
Bharuch SF CircleCF RecommendedRecommended Yes
Nodal Officer RecommendedRecommended
Specific recommendation of the State Government(Part V)
17. Specific recommendation of the State Government for acceptance or otherwise of the proposal with reason ( Part V)
StateRecommendation ByRecommendationRecommendation DateRemarksSigning AuthorityNotificationRecommendation Letter
GujaratState SecretaryRecommended19/11/2019 State Govt. OfficerNo Data
17. Stage-I Clearance Report
Regional OfficeRecommendation ByMoEF File No.Date of Stage-I ClearanceClearance Letter
GandhinagarRegional Office6-GJB050/2019-BHO04/12/2019
18. Payment made by User Agency
Proposal No.Application No.Total Amount (Rs.)Recieved Amount (Rs.)Transaction DateTransaction IDBank NameMode of PaymentDemmand Generated By User AgencyDemmand Verified By Nodal OfficerUploaded Demand Letter
FP/GJ/ROAD/40301/2019ROAD4030120190676,421,616.006,421,616.0017/12/201916Corporation BankCorporation Bank (Challan)11/12/201911/12/2019
19. Uploaded Status of Land to be transferred to Forest Department under FCA (Mutation Details).
  (i). Whether CA Land is mandatorily required in this Proposal : Yes   (ii). Total Land identified for raising CA: 8   (iii). No. of Maintenance years: 10   (iv). Total No. of Patches/Parcel: 1
  No. of patches : 1
Patch wise details
Patch No. Shape of land identified for CA Area of Patch/Parcel(in ha.)
1Block(Polygon)8
  Status of CA Land so identified : Forest Area   Site Name : Anklas   Location Details : Village: Anklas, Range : Sanjan, Ta: Umargam, Di: Valsad   Uploaded GPS File :   Uploaded Scanned copy of Map :
Status of CA Land so identified
Name of Forest. Legal Status of Forest Land
AnklasRF
20. Mutation Details Verified By Nodal Officer
Proposal No.Verified DateMutation LetterRemarks
FP/GJ/ROAD/40301/201919 Dec 2019No Dataok
21. Compliance Details Submitted by User Agency
Proposal No.Compliance Details submitted on(Date)Uploaded Letter
FP/GJ/ROAD/40301/201919 Dec 2019
22. Compliance Details Verified by Nodal Officer
Proposal No.RemarksVerified DateUploaded Letter
FP/GJ/ROAD/40301/2019As per letter18 Aug 2020
23. Stage-II Clearance Details
Proposal No.Date of Stage-II ClearanceProposal StatusClearance Letter
FP/GJ/ROAD/40301/201918 Sep 2020APPROVED