1. Location of the project/Scheme : Assam
 (i) State / Union Territory : Assam  (ii) District : Biswanath  (iii) Forest Division : Sonitpur East  (iv) Area of forest land proposed for diversion (in ha.) : 19.791  (v)

Category of the Proposal: Transmission Line
2. Legal status of forest land proposed for diversion
S. No. DivisionForest Land(ha.)Legal Status
1Sonitpur East19.791Reserved Forest
Total 19.791
Division 1. : Sonitpur East
3. District wise area to be diverted in the division
S. No. DistrictArea(ha.)
1Biswanath19.791
Total19.791
4. Details of Vegetation available in the forest land proposed for diversion
 (i) Density of vegetation
S. No. Area(in ha.)Density Eco-Class
119.7910.1Eco 1
Total. 19.791


(ii) Species-wise local/scientific names and girth-wise enumeration of trees at FRL
S. No. Scientific Name Local Name (0-30)cm. (31-60)cm. (61-90)cm. (91-120)cm. (121-150)cm. (>150)cm.
1Azadirachta IndicaNEEM0628000
2Mangifera IndicaMANGO012140120
3Artocarpus HeterophyllusJACK FRUIT0145030
4Syzigium CuminiJAMUN0276000
5Tamarindus IndicaTETELI001000
6OthersLICHI020010
7OthersTAMUL06745117706730
8OthersOWTENGA0450110
9OthersBHELKOR05120070
10OthersAHJAR041010
11Gmelin ArboreaGOMARI07711200
12OthersAMARI070000
13OthersORANGE0460000
14OthersATLAS031000
15OthersJALUK(BLACK PEPPER)0280000
16OthersANARAS032900000
17OthersKOROI0718151
18OthersCOCONUT0153020
19OthersPOMA053100
20Alberia Lebbac (Dirshanam)SIRIS0100100
21OthersSAM0193100
22Garcinia CombogiaBORTENGA052000
23Shorea RobustaSHAL0137000
24OthersBHER0150100
25OthersGOHORA002000
26Prosophis SpicigeraPOJA073100
27Pterospermum AcerifoliaHATIPOLIA040000
28OthersAMLOKHII002000
29OthersJALPAI010010
30OthersBANANA03270000
31Chukrasia TabularisBOGIPOMA01150000
32Michelia ChampakaSOPA0260000
33Terminalia ArjunaARJUN012000
34OthersPAN040000
35OthersMODAR001100
36OthersTITSOPA070000
37OthersAMORA002000
38OthersLETEKU010000
39OthersKOROM011000
40Bombox CeibaSIMUL015715520
41Sweitinia MahagonyMEHGONI0300000
42Tectona GrandisSEGUN03620000
43OthersBORPAT03231000
44OthersPONIOL010000
45Alstonia ScholarisSATIONA060201
46OthersAGAR000000
47OthersCHANDAN010000
48OthersTOKO(FAN TREE)020000
49OthersKUHIR050000
50OthersKESERU010000
51OthersBHATGHILLA030000
52OthersRUBBER0680000
53OthersGONSORAI0200000
54OthersGUNA010000
55Artocarpus HeterophyllusSAMKOTHAL018000
56BambooBamboo0810000
57OthersAGAR05215000
58Mesua FerraNAHOR001000
59Anthocephalus CadambaKADAM060000
60OthersUDAL083200
61OthersMOJ061000
62OthersBAGNOLA020000
63Dalburgia SisooSISOO0106000
64Morus LaevigataBOLA000100
65Duabanga SonneratioidesKHOKAN020000
66OthersBAGARI071010
67OthersKORDOI020000
68Psidium GuajavaGUAVA0100000
69OthersNEMU0380000
70OthersTEA0235660000
Total 0 354001369 19719 2
Sub Total (No of Trees.) 37509


5. Working plan prescription for the forest land proposed for diversion : The proposed diversion of forest land for this project falls under 4(four) nos. of compartments of Gohpur Reserve Forest namely - SER5C6, SER5C7, SER5C8. SER5C9. The Working Plan has prescribed Community & Forest Rights Working Circle in the above mentioned compartments of Gohpur RF.
6. Brief note on vulnerability of the forest area to erosion : RF in the proposed area of diversion is stable and is not prone to erosion. Further the proposed project is a Linear Project, hence the vulnerability due to project does not arise
7. Approximate distance of the proposed site for diversion from boundary of forest(in km.) : 0.0
8. Significance of the forest land proposed for diversion from wildlife point of view
 (i). Details of wildlife present in and around the forest land proposed for diversion : The incidences of wild elephant depredation in this and nearby area has been observed
 (ii). Whether forms part of national park, wildlife sanctuary, biosphere reserve,tiger reserve, elephant corridor, wildlife migration corridor etc. : Yes
  Details and comments on the impact of Project on such areas : The proposed forest area for diversion falls inside Gohpur RF which is a part of the Sonitpur Elephant Reserve notified vide No.FRW-44/2002/46. The entire Gohpur RF is encroached and it is devoid of wildlife except for elephant movement observed during the migration of elephant between Forest area in Arunachal Pradesh and 6th Addition of Kaziranga National Park.
 (iii). Whether the forest land proposed for diversion is located within eco-sensitive zone(ESZ) of the Protected Area notified under Wildlife(Protection) Act,1972 (Note: In case, ESZ of a Protected Area is not notified,then,10kms distance from boundary of the Protected Area should be treated as ESZ): No
 (iv). Whether any national park, wildlife sanctuary, biosphere reserve, tiger reserve, elephant corridor, wildlife migration corridor etc., is located within 1 Km. from boundary of the forest land proposed for diversion : Yes
  Details and comments on the impact of Project on such areas : The proposed forest area for diversion falls inside Gohpur RF which is a part of the Sonitpur Elephant Reserve notified vide No.FRW-44/2002/46. The entire Gohpur RF is encroached and it is devoid of wildlife except for elephant movement observed during the migration of elephant between Forest area in Arunachal Pradesh and 6th Addition of Kaziranga National Park.
 (v). Whether any rare/endangered/unique species of flora and fauna found in the area : No
9. Details of any protected archaeological/heritage site/defence establishment or any other important monument located in the area, if any
 (i). Whether any protected archaeological/heritage site/defence establishment or any other important monument is located in the area : No
10. Comment as to the reasonability of the extent of the forest land proposed for diversion
 (i). Whether the requirement of forest land as proposed by the user agency is unavoidable and bare minimum for the project : Yes
11. Details of violation(s), if any ,committed
 (i). Whether any work in violation of the Act or guidelines issued under the Act has been carried out : No
12. Whether work in violation is still in progres(Yes/No) : NIL
13. Details of compensatory afforestation scheme
Patch wise details for Degraded Area (To be earmarked by DFO)
(i). Total Financial Outlay for C.A(lacs): 33104080
Patch Wise Details
S.no Patch No.Area(ha.)Name of PF/RFRangeCompartment NoUploaded KML file of patch
1230Biswanath RFPabhoi SER2C8    View file
2110Behali RFBorgang SER3C26    View file
(ii). Copy of CA scheme details: (iii). Scanned copy of the Geo-referenced map of the forest land proposed for C.A. prepared by using DGPS or Total Station: (iv). Copy of Survey of India Toposheet indicating boundary of forest land proposed for C.A.:
 (V). Copy of NOC from Competent Authority :

Additional information Details
S. No. DocumentsRemarks
1 Toposheet Map
2 Georeferenced Map
3 CA Estimation
4 Vulnerability Report
5 Google Map
6 Land Suitability Certificate
7 Dwarf Species Estimation
8 Net Present Value
9 Total Financial Outlay

14. District Profile
S.no District NameGeographical area of the district (in ha.)Forest area of the district (in ha.)Total forest area diverted since 1980 (in ha.)No. of Approved CasesForest Land including penal C.A. (in ha.)Progress of compensatory afforestation as on(date)A) Forest land (in ha.)B) Non-forest land (in ha.)
1Biswanath141518.57666247.32929608/03/202100
15. Site inspection report of the DFO/CCF/Nodal Officer highlighting important facts pertaining to the forest land
Division NameCircleSite inspected ByWhether site inspectedNo. of times site visited Site inspection reportDate of visit
Sonitpur EastC.F N.A.C, TezpurDFOYesOne12/09/2020
 C.F N.A.C, TezpurCFYesOne18/09/2021
(Specific recommendation of the DFO/CCF/Nodal Officer with(Part II,III & Part IV))
16. Specific recommendation of the DFO/CCF/Nodal Officer for acceptance or otherwise of the proposal with reason
DivisionCircleRecommendation ByRecommendationReasonLetter Whether CF agreed
Sonitpur EastC.F N.A.C, TezpurDFO RecommendedThe setting up of a domestic Greenfield Airport at Hollongi, Arunachal Pradesh is Govt. of India project and the area for the proposed airport has been handed over to Airport Authority of India by District Administration of Papum Pare, Arunachal Pradesh. The proposed area consists of a 132KV inter state transmission line maintained by Power Grid Corporation of India Ltd. The line corridor is interfering with the aircraft’s approach and take off tunnel as well as the boundary of Hollongi Airport and hence the shifting of the said high tension line is necessary. As the boundary of the proposed airport is along the boundary of Assam & Arunachal Pradesh, the shifting of the line is to be routed only through Assam state and the entire area on Assam side along the inter state boundary falls under Gohpur RF. Therefore in order to facilitate the construction of the airport at Hollongi, the diversion of the forest land which is the barest minimum required as above is recommended for acceptance.
C.F N.A.C, TezpurCF RecommendedThe construction of Nirjuli Transmission line from LOC No.42 to LOC No. 64 due to upcoming Green Field Airport at Holongi Arunachal Predesh is a Govt. of India Project harving National interest. It will improve overall power scenario as well as communication system without causing major damage to the Forest and environment and also the diversion of the forest land which is the barest minimum required, the proposal is recommended for acceptance as per guideline of MoEF & CC under F.C.Act,1980. During winter, wild elephants movement noticed from the neighbouring RF areas of Arunachal Pradesh to 6th addition to Kaziranga National Park. For the safty of wild elephant it is suggested to maintain suitable mitigation measures for the wild life as per rules and regulation in force. Yes
Nodal Officer RecommendedThe construction of Nirjuli Transmission line from LOC No.42 to LOC No. 64 due to upcoming Green Field Airport at Holongi Arunachal Predesh is a Govt. of India Project having National interest.
Specific recommendation of the State Government(Part V)
17. Specific recommendation of the State Government for acceptance or otherwise of the proposal with reason ( Part V)
StateRecommendation ByRecommendationRecommendation DateRemarksSigning AuthorityNotificationRecommendation Letter
AssamState SecretaryRecommended18/12/2021RecommendedState Govt. OfficerNo Data
17. Stage-I Clearance Report
Regional OfficeRecommendation ByMoEF File No.Date of Stage-I ClearanceClearance Letter
GuwahatiRegional Office3-AS-C-074/2021/GHY28/12/2021
18. Payment made by User Agency
Proposal No.Application No.Total Amount (Rs.)Recieved Amount (Rs.)Transaction DateTransaction IDBank NameMode of PaymentUploaded Demand Letter
FP/AS/TRANS/44809/2020TRANS448092020364724123875000000001 Feb 2022SBIN203164910418Union Bank Of IndiaNEFT/RTGS (Challan)
FP/AS/TRANS/44809/2020TRANS448092020364724123872241238701 Feb 2022SBIN203164910418Union Bank Of IndiaNEFT/RTGS (Challan)
19. Uploaded Status of Land to be transferred to Forest Department under FCA (Mutation Details).
  (i). Whether CA Land is mandatorily required in this Proposal : Yes   (ii). Total Land identified for raising CA: 40   (iii). No. of Maintenance years: 10   (iv). Total No. of Patches/Parcel: 2
  No. of patches : 1
Patch wise details
Patch No. Shape of land identified for CA Area of Patch/Parcel(in ha.)
1Block(Polygon)30
  Status of CA Land so identified : Forest Area   Site Name : SER2C8   Location Details : SER2C8, BISWANATH RF, PABHOI RANGE   Uploaded GPS File :   Uploaded Scanned copy of Map :
Status of CA Land so identified
Name of Forest. Legal Status of Forest Land
Biswanath RFRF
  No. of patches : 2
Patch wise details
Patch No. Shape of land identified for CA Area of Patch/Parcel(in ha.)
2Block(Polygon)10
  Status of CA Land so identified : Forest Area   Site Name : SER3C26, BEHALI RF   Location Details : SER3C26, BEHALI RF, BORGANG RANGE   Uploaded GPS File :   Uploaded Scanned copy of Map :
Status of CA Land so identified
Name of Forest. Legal Status of Forest Land
BEHALI RFRF
20. Mutation Details Verified By Nodal Officer
Proposal No.Verified DateMutation LetterRemarks
FP/AS/TRANS/44809/202007 Jul 2022No Dataverified
21. Compliance Details Submitted by User Agency
Proposal No.Compliance Details submitted on(Date)Uploaded Letter
FP/AS/TRANS/44809/202027 Jul 2022
23. Stage-II Clearance Details
Proposal No.Date of Stage-II ClearanceProposal StatusClearance Letter
FP/AS/TRANS/44809/2020Approved In-PrincipleNo Data