Sno. | State Name | Proposal No. | RO/Ministry File Number | Proposal Name | Category | User Agency Name | Area (ha.) | Proposal Status | Proposal initially received at RO/HO(Date) | Proposal Pending Since(Date) | View Report on Allocation of Fresh forest land (Form-A) Part-I | View Report (Part-II to Part-V and Stage-I Clearances) | View TimeLine Details | Other Related Documents | Whether EC required (if so, status)? |
1
|
Uttar Pradesh
|
FP/UP/THE/14236/2015
|
|
WATER PIPELINE CORRIDOR AND APPROACH ROAD FOR MIRZAPUR 1320 MW THERMAL POWER PROJECT
|
Thermal
|
WELSPUN ENERGY UP PRIVATE LIMITED
|
8.3581
|
Pending at RO
|
02-May-2016
|
12-Jun-2025
|
|
|
|
|
EC File NA
|
2
|
Uttar Pradesh
|
FP/UP/ROAD/157011/2022
|
|
Construction of 4-laning of Kotdwar bypass of NH-119 connecting Najibabad-Kotdwar to Kotdwar-Pauriroad in the state of Uttar Pradesh and Uttrakhand under Bharatmala Pariyojana Lot-4/Pakage-2 from Ch 0+000 to 5+900 under forest division Najibabad
|
Road
|
NHAI PIU MEERUT
|
5.27
|
Pending at RO
|
06-Feb-2025
|
30-May-2025
|
|
|
|
|
No
|
3
|
Uttar Pradesh
|
FP/UP/TRANS/15538/2015
|
8B/UP/04/05/2024/FC
|
765 kV S/C Mainpuri - Bara Transmission Line CKT - I
|
Transmission Line
|
SOUTH EAST UTTAR PRADESH POWER TRANSMISSION COMPANY LIMITED
|
23.5776
|
IN-PRINCIPLE
|
20-Jun-2024
|
08-Apr-2025
|
|
|
|
|
No
|
4
|
Uttar Pradesh
|
FP/UP/ROAD/117639/2020
|
8B/UP/06/03/2024/FC
|
Forest Land Proposed for Widening & Strengthening of Chopan-Mahalpur Road to Parsoi Road from Km. No. 0.000 to Km. No. 20.600 Under Road Connectivity Project on Left Wing Extremism Area (RCPLWEA) in Tehsil-Robertsganj, District:Sonbhadra
|
Road
|
PMGSY DIVISION PUBLIC WORKS DEPARTMENT SONEBHADRA
|
15.567
|
IN-PRINCIPLE
|
29-Feb-2024
|
29-Jun-2024
|
|
|
|
|
No
|
5
|
Uttar Pradesh
|
FP/UP/ROAD/146875/2021
|
8B/UP/06/180/2023/FC
|
Upgradation of Sitapur -Pratap nagar of NH-330D in the State of Uttar Pradesh to Two/ Four Lane with Paved Shoulder Configuration (Package-01, From Ch: 0+000 to 38+800) under forest division SItapur and Forest division Hardoi
|
Road
|
EXECUTIVE ENGINEER
|
36.987
|
IN-PRINCIPLE
|
04-Oct-2023
|
22-Mar-2024
|
|
|
|
|
No
|
6
|
Uttar Pradesh
|
FP/UP/ROAD/147236/2021
|
8B/UP/06/161/2023/FC
|
Improvement of Bahraich - Gonda section of State Highway No. 30 from Km 4+150 to Km 64+282 of SH-30 in Bahraich and Gonda district in the State of Uttar Pradesh
|
Road
|
UTTAR PARDESH (UP) PUBLIC WORKS DEPARTMENT (PWD)
|
82.7212
|
IN-PRINCIPLE
|
30-Jun-2023
|
13-Mar-2024
|
|
|
|
|
No
|
7
|
Uttar Pradesh
|
FP/UP/ROAD/150065/2021
|
8B/UP/06/160/2023/FC
|
Proposed Reserved Forest Land to be diverted for New Construction of different roads Bhatwari-Matwar,Matwaria-Matwar,Badohi-Parsia,Fuliyari, Silhata, Meza Band- Sagra and Kharihat-Tidwar Road(Total Length:37.79km) in Tehsil:Lalganj District: Mirzapur
|
Road
|
PROVINCIAL DIVISION PWD MIRZAPUR
|
34.902
|
IN-PRINCIPLE
|
27-Jun-2023
|
07-Mar-2024
|
|
|
|
|
No
|
8
|
Uttar Pradesh
|
FP/UP/ROAD/153349/2022
|
8B/UP/06/32/2023/FC
|
Proposed Diversion for Construction of 4-lane green field highway from Km. 49.155 to Km. 74.700 (Singraur Uparhar to Baranpur Kadipur Ichauli) Crossing on NH-731A on Hybrid Annuity Mode in District:- Kaushambi.
|
Road
|
OFFICE OF THE EXECUTIVE ENGINEER
|
15.461
|
IN-PRINCIPLE
|
02-Mar-2023
|
22-Dec-2023
|
|
|
|
|
No
|
9
|
Uttar Pradesh
|
FP/UP/ROAD/25904/2017
|
8B/UP/06/104/2023/FC
|
Reserved Forest Land to be diverted for Construction of Bypass Road from Dahi Chauki Power House to Agni Shaman Prashikshan Kendra Dostinagar in District: Unnao
|
Road
|
PUBLIC WORKS DEPARTMENT
|
7.3624
|
IN-PRINCIPLE
|
18-Apr-2023
|
18-Dec-2023
|
|
|
|
|
No
|
10
|
Uttar Pradesh
|
FP/UP/RAIL/41878/2019
|
8B/UP/07/118/2021/FC
|
Protected Forest Land Proposed to be Diverted for Doubling of Ralway Track from Ch.1.900 to 10.900 in Ghazipur District and Ch.10.900 to 57.400 in Jaunpur District under Railway Track Doubling Aurihar-Jaunpur Section
|
Railway
|
DY CE CONSTRUCTION I NE RAILWAY VARANASI
|
49.92276
|
IN-PRINCIPLE
|
22-Mar-2021
|
20-Jul-2023
|
|
|
|
|
No
|
11
|
Uttar Pradesh
|
FP/UP/WATER/155091/2022
|
8B/UP/08/75/2023/FC
|
Diversion of 8.161809 Hectare of Forest Land for laying of Drinking Water Distribution Pipelines (Total KM. 96.30) under Jakhlaun Birdha, Dhorra, Balabehat, Kadesara Kalan and Mau Group of Villages Water Supply Scheme, District- Lalitpur (U.P.)
|
Drinking Water
|
STATE WATER & SANITATION MISSION LUCKNOW (UP)
|
8.161809
|
IN-PRINCIPLE
|
28-Mar-2023
|
21-Jun-2023
|
|
|
|
|
No
|
12
|
Uttar Pradesh
|
FP/UP/ROAD/117342/2020
|
8B?UP/06/15/2023/FC
|
Construction of 2-lane missing link road from Rath Bypass (Hamirpur District) to Garautha (Jhansi District) of SH-42 in the State of Uttar Pradesh
|
Road
|
UTTAR PRADESH PUBLIC WORKS DEPARTMENT (UPPWD)
|
18.1854
|
IN-PRINCIPLE
|
27-Jan-2023
|
14-Jun-2023
|
|
|
|
|
No
|
13
|
Uttar Pradesh
|
FP/UP/ROAD/121267/2021
|
8B/UP/06/292/2022/FC
|
Widening & Strengthening of Bhadai Arar to Makarivari Road from Km. No. 0.000 to Km. No. 46.050 Under Road Connectivity Project on Left Wing Extremism Area (RCPLWEA) in Tehsil: Robertsganj, District-Sonbhadra
|
Road
|
PMGSY DIVISION PUBLIC WORKS DEPARTMENT SONEBHADRA
|
18.5193
|
IN-PRINCIPLE
|
28-Oct-2022
|
27-Apr-2023
|
|
|
|
|
No
|
14
|
Uttar Pradesh
|
FP/UP/WATER/150514/2021
|
8B/UP/08/168/2022/FC
|
Proposed Forest Land to be Diverted for Laying of Water Distribution Line along different roads, under Gulara, Tilaitha, Bachawali and Budpura Village Group Drinking Water Scheme of Jal Jeevan Mission of Govt Of India, in District:- Jhansi (UP).
|
Drinking Water
|
UTTAR PRADESH WATER SUPPLY AND SANITATION MISSION
|
6.6873
|
IN-PRINCIPLE
|
07-Jul-2022
|
05-Apr-2023
|
|
|
|
|
No
|
15
|
Uttar Pradesh
|
FP/UP/ROAD/119900/2021
|
8B/UP/06/316/2022/FC
|
Proposed Road Widening and Strengthening of Saursot Khurd to Sirsiya Road from Km.0.00 to 19.200 Under Rural Road Connectvity Project on Left Wing Extermism Area(CPCPLWEA) in Tehsil:Robertsganj,Dist:Sonbhadra
|
Road
|
PMGSY DIVISION PUBLIC WORKS DEPARTMENT SONEBHADRA
|
11.79
|
IN-PRINCIPLE
|
14-Dec-2022
|
27-Mar-2023
|
|
|
|
|
No
|
16
|
Uttar Pradesh
|
FP/UP/WATER/150368/2021
|
8B/UP/08/169/2022/FC
|
Proposed Laying of Water Distribution Pipeline along different roads, under Salaiyya-Nathupura, Lahchoora-Kashipura, Dhawarra Sijwaha, Shivhar and Kabrai Group of Villages Drinking Water Supply Scheme of Jal Jeevan Mission of Govt Of India, in District:- Mahoba (UP).
|
Drinking Water
|
STATE WATER AND SANITATION MISSION
|
14.4534
|
IN-PRINCIPLE
|
07-Jul-2022
|
03-Mar-2023
|
|
|
|
|
No
|
17
|
Uttar Pradesh
|
FP/UP/ROAD/121197/2021
|
8B/UP/06/221/2021/FC
|
Diversion of P.F. Land for Construction of Choudhary Charan Singh Kavad Marg on RHS side Shoulder of Upper Ganga Canal from Km Ch. 51.910 To Km Ch.163.40 in district- Muzaffer Nagar, Meerut,
|
Road
|
CONSTRUCTION DIVISION PWD MEERUT
|
222.98
|
IN-PRINCIPLE
|
17-Aug-2021
|
06-Feb-2023
|
|
|
|
|
No
|
18
|
Uttar Pradesh
|
FP/UP/WATER/152706/2022
|
8B/UP/08/256/2022/FC
|
Laying of Water Distribution Line Along different roads, under Patyora Danda Group of Villages Drinking Water Scheme of Jal Jeevan Mission of Govt. of India, in District:-Hamirpur & Mahoba.
|
Drinking Water
|
CONSTRUCTION DIVISION JAL NIGAM MAHOBA
|
6.3
|
IN-PRINCIPLE
|
31-Aug-2022
|
07-Nov-2022
|
|
|
|
|
No
|
19
|
Uttar Pradesh
|
FP/UP/WATER/155109/2022
|
8B/UP/08/155/2022/FC
|
Proposed forest land to be diverted for Laying of Water Distribution Line along different roads, under Sala Group of Villages Drinking Water Scheme of Jal Jeevan Mission of Govt. of India, in District:- Jhansi and Jalaun.
|
Drinking Water
|
UTTAR PRADESH WATER SUPPLY AND SANITATION MISSION
|
5.5287
|
IN-PRINCIPLE
|
30-Jun-2022
|
31-Oct-2022
|
|
|
|
|
No
|
20
|
Uttar Pradesh
|
FP/UP/ROAD/118819/2021
|
8B/UP/06/33/2022/FC
|
Proposed forest land to be diverted for Widening & Strengthening of RS Road (Sidhahawa) to Jogendra Road Via Khajura Road from Km. No. 0.000 to Km. No. 20.150 Under Road Connectivity Project on Left Wing Extremism Area (RCPLWEA) in Tehsil-Robertsganj, District-Sonbhadra by PMGSY Division, PWD Sonbhadra
|
Road
|
PMGSY DIVISION PUBLIC WORKS DEPARTMENT SONEBHADRA
|
14.5603
|
IN-PRINCIPLE
|
25-Feb-2022
|
20-Oct-2022
|
|
|
|
|
No
|
21
|
Uttar Pradesh
|
FP/UP/ROAD/147420/2021
|
8B/UP/06/38/2022/FC
|
Proposed Protected Forest Land to be diverted for development of Road Widening four lan along old road Carriage Way from km 0.800 to 5.100 0f Bareilly Cantt Road in District - Bareilly (U.P.)
|
Road
|
CONSTRUCTION DIVISION BUILDING PWD BAREILLY
|
7.055
|
IN-PRINCIPLE
|
23-Mar-2022
|
26-Sep-2022
|
|
|
|
|
No
|
22
|
Uttar Pradesh
|
FP/UP/WATER/119894/2021
|
8B/UP/08/263/2021/FC
|
Patwadh Group of Villages Water Supply Scheme – Construction of Intake works consisting of a jackwell and related facilities, 1.20 km pipeline is to be laid underground and a Water Treatment Plant are to be constructed at Village Kanach in Kaimur wild life divsion Mirzapur,district sonbhadra
|
Drinking Water
|
STATE WATER AND SANITATION MISSION NAMAMI GANGE AND RURAL WATER SUPPLY DEPARTMENT UP GOVERNMENT
|
6.4325
|
IN-PRINCIPLE
|
03-Dec-2021
|
17-Jun-2022
|
|
|
|
|
No
|
23
|
Uttar Pradesh
|
FP/UP/ROAD/144793/2021
|
8B/UP/06/295/2021/FC
|
Construction of 6 Lane 'Ganga Expressway' (Expandable upto 8 Lane), an access controlled Green field Expressway in district Meerut, Hapur, Bulandsahar, Amroha, Sambhal, Badaun, Shahjahanpur, Hardoi, Unnao, Raibareli, Partapgarh & Paryagraj, (CH 7+900-CH 601+847 Km) total length 593.947 Kms.
|
Road
|
UPEIDA (GANGA EXPRESSWAY)
|
121.4716
|
IN-PRINCIPLE
|
22-Dec-2021
|
26-May-2022
|
|
|
|
|
EC File NA
|
24
|
Uttar Pradesh
|
FP/UP/ROAD/49626/2020
|
8B/UP/06/29/2022/FC
|
Rehabilitation and Upgradation to 2-lane with paved shoulders configuration of Radhaita to Pilibhit Section of NH-731K ( Km 137.250 to Km 183.380) (Package-IV) in the State of Uttar Pradesh under Green National Highways Corridor Project (GNHCP) with the loan assistance of world Bank on EPC mode
|
Road
|
MINISTRY OF ROAD TRANSPORT AND HIGHWAYS GOVT OF INDIA
|
44.376
|
IN-PRINCIPLE
|
22-Feb-2022
|
28-Apr-2022
|
|
|
|
|
No
|
25
|
Uttar Pradesh
|
FP/UP/ROAD/59458/2020
|
8B/UP/06/251/2021/FC
|
WIDENING & STRENGTHENING OF PARWADH TO BASUHARI ROAD FROM KM. NO. 0.000 TO 61.500 UNDER ROAD CONNECTIVITY PROJECT ON LEFT WING EXTREMISIM AREA (RCPLWEA) IN TEHSIL:- ROBERTSGANJ, DISTRICT:- SONBHADRA
|
Road
|
PMGSY DIVISION PUBLIC WORKS DEPARTMENT SONEBHADRA
|
45.2925
|
IN-PRINCIPLE
|
15-Nov-2021
|
10-Jan-2022
|
|
|
|
|
No
|
26
|
Uttar Pradesh
|
FP/UP/ROAD/35291/2018
|
8B/UP/06/58/2021/FC
|
WIDENING & STRENGTHENING OF NAUGARH DHANKUWARI KALA TO KESAR ROAD FROM KM 0.00 TO 22.800 UNDER ROAD CONNECTIVITY PROJECT ON LEFT WING EXTREMISM AREA (RCPLWEA) IN TAH.-NAUGARH, DISTT.-CHANDAULI BY TEMPORARY-DIVISION (P.P.), P.W.D., CHANDAULI (U.P.)
|
Road
|
EE PMGSY PWD CHANDAULI
|
19.62
|
IN-PRINCIPLE
|
16-Feb-2021
|
27-Jul-2021
|
|
|
|
|
No
|
27
|
Uttar Pradesh
|
FP/UP/TRANS/42524/2019
|
8B/UP/04/169/2020
|
765 kV Ghatampur-Hapur S/C Transmission Line
|
Transmission Line
|
GHATAMPUR TRANSMISSION LIMITED
|
16.5761
|
IN-PRINCIPLE
|
24-Nov-2020
|
24-Nov-2020
|
|
|
|
|
No
|
28
|
Uttar Pradesh
|
FP/UP/TRANS/40906/2019
|
8B/UP/04/90/2020
|
400kV D/C Jaunpur Obra Transmission Line
|
Transmission Line
|
OBRA C BADAUN TRANSMISSION LIMITED
|
89.632
|
IN-PRINCIPLE
|
14-Aug-2020
|
23-Oct-2020
|
|
|
|
|
No
|
29
|
Uttar Pradesh
|
FP/UP/ROAD/41235/2019
|
8B/UP/06/38/2020
|
Protected Forest Land Proposed to be diverted for 4-Laning and Strengthening of Bilraya-Panwari Road(SH21) From Ch..399.600 to 427.00, in District:Hamirpur
|
Road
|
EXECUTIVE ENGINEER CONSTRUCTION DIVISION TWO PWD HAMIRPUR
|
49.32
|
IN-PRINCIPLE
|
21-May-2020
|
19-Aug-2020
|
|
|
|
|
No
|
30
|
Uttar Pradesh
|
FP/UP/ROAD/43247/2019
|
8B/UP/06/29/2020/FC
|
Protected Forest Land Proposed for 4-Lane Widening &Strengthening of Puttulal Chauraha to Roza Adda(ODR) From Ch.0.00 to 2.950,Hathaura Chauraha to Puttulal Chauraha to Road(ODR) FROM Ch.0.00 to 2.750 ; GIC To Atsaliya Railway Fatak from Ch. 0.00 3.950 and Barailly Mode Chauraha to Garra Bridge Road(Old NH-24 City Part) from Ch.0.00 to 1.800 in S
|
Road
|
PROVINCIAL DIVISION PWD SHAHJAHANPUR
|
9.16
|
IN-PRINCIPLE
|
16-Mar-2020
|
16-Mar-2020
|
|
|
|
|
No
|
31
|
Uttar Pradesh
|
FP/UP/ROAD/39827/2019
|
8B/UP/06/86/2019/FC
|
Protected Forest Land Proposed to be diverted for 4-Lane Widening of Jhansi-Babina Road(City Part Of Old NH-26) from Km.3.00 to 11.00 in Jhansi District
|
Road
|
CONSTRUCTION DIVISION BHAWAN WING PWD JHANSI
|
14.8
|
IN-PRINCIPLE
|
01-Oct-2019
|
04-Feb-2020
|
|
|
|
|
No
|
32
|
Uttar Pradesh
|
FP/UP/RAIL/40280/2019
|
8B/UP/07/64/2019/FC
|
Proposed Doubling of Sitapur Cant-Roza Section Protected Forest Land Proposed to be diverted from KM.0.00 to 80.300 passing through Districts Sitapur,Hardoi,Lakhimpur kheri and Shahajahanpur
|
Railway
|
NORTH RAILWAY MORADABAD
|
69.5992
|
IN-PRINCIPLE
|
26-Jul-2019
|
26-Jul-2019
|
|
|
|
|
No
|
33
|
Uttar Pradesh
|
FP/UP/RAIL/29433/2017
|
8B/UP/07/3/2019
|
Protected Forest Land Proposed to be diverted for doubling of Allahabad-Varanasi Railway Track from Ch.209.8(Madudeeh) to 226.4 in Varanasi District
|
Railway
|
RVNL
|
14.691
|
IN-PRINCIPLE
|
11-Jan-2019
|
05-Feb-2019
|
|
|
|
|
No
|
34
|
Uttar Pradesh
|
FP/UP/ROAD/25036/2017
|
8B/UP/06/76/2018/FC
|
Forest Land proposed for Four-laning of road from Naraini toKalinjar Road From CH-35.000 Km to CH-60.825 Km.and from 0.00 to 1.500 on Kalinjar to Baghelbari Road In Banda District (Uttar Pradesh)
|
Road
|
CONSTRUCTION DIVISION I PWD BANDA
|
31.58
|
IN-PRINCIPLE
|
07-Oct-2018
|
21-Dec-2018
|
|
|
|
|
No
|
35
|
Uttar Pradesh
|
FP/UP/Others/34211/2018
|
8B/UP/08/77/2018/FC
|
Protected Forest Land Proposed to be Diverted for Laying of 1100mm, 2 pipes for Estabilishment of Water Carrier System to Ghatampur Thermal Power Project along NH-86 from Ch.20.800 to 61.900 District:Kanpur Nagar
|
Others
|
NEYVELI UTTAR PRADESH POWER LIMITED
|
14.385
|
IN-PRINCIPLE
|
09-Oct-2018
|
12-Nov-2018
|
|
|
|
|
No
|
36
|
Uttar Pradesh
|
FP/UP/ROAD/34116/2018
|
8B/UP/06/70/2018
|
Rehabilitation and widening of GT Road section at Begum Bazar at km 185+800 to Chaufatka at km 194+000 (total length 8.200 km) in district Allahabad, Uttar Pradesh.
|
Road
|
CD ONE PWD UP ALLAHABAD
|
6.418
|
IN-PRINCIPLE
|
31-Aug-2018
|
28-Sep-2018
|
|
|
|
|
No
|
37
|
Uttar Pradesh
|
FP/UP/TRANS/29629/2017
|
8B/UP/04/38/2018
|
Protected Forest Land Proposed to be diverted for 11 KV Transmission line on NH-76(Allhabad-Banda) Road from km.349 to 332(RHS) in Chitrakoot District
|
Transmission Line
|
ELECTRICITY DISTRIBUTION DIVISION CHITRAKOOT
|
25.5
|
IN-PRINCIPLE
|
03-Apr-2018
|
28-Sep-2018
|
|
|
|
|
No
|
38
|
Uttar Pradesh
|
FP/UP/ROAD/30569/2017
|
8B/UP/06/66/2018
|
Four Lane with paved shoulder from Varanasi to Hanumanha section of NH-7 passing through Varanasi, Chandauli and Mirzapur district in the state of Uttar Pradesh
|
Road
|
National Highways Authority of India
|
131.0175
|
IN-PRINCIPLE
|
25-Jul-2018
|
26-Sep-2018
|
|
|
|
|
No
|
39
|
Uttar Pradesh
|
FP/UP/ROAD/25364/2017
|
8B/UP/06/26/2018
|
Proposal for the diversion of road side protected forest land for "Four lane Widening and Strengthening of Shikohabad- Bhogaon (SH-84) road " (Ch. 21.00 to 43.800 ) and Construction of Ghiror Bypass ( Length 6.56 km.) Total Length 25.66 Km. in Mainpuri District . Protected forest land required for diversion is 24.92755
|
Road
|
PROVINCIAL DIVISION PWD MAINPURI
|
24.92755
|
IN-PRINCIPLE
|
05-Mar-2018
|
13-Aug-2018
|
|
|
|
|
No
|
40
|
Uttar Pradesh
|
FP/UP/ROAD/26890/2017
|
8B/UP/06/24/2018/FC
|
Diversion of Protected Forest Land for Rehabilitation and Up-gradation to 4-lane with paved shoulders configuration from Mitrasen to Kanpur (Km 356.000 to Km 414.000) section of National Highway-91 in Kanpur District in the State of Uttar Pradesh
|
Road
|
NHAI
|
93.975
|
IN-PRINCIPLE
|
05-Mar-2018
|
02-Jul-2018
|
|
|
|
|
No
|
41
|
Uttar Pradesh
|
FP/UP/Others/27358/2017
|
8B/UP/09/47/2018/FC
|
City Gas Distribution (CGD) Network Porject in Saharanpur Geographical Area
|
Others
|
BHARAT PETROLEUM CORPORATION LIMITED
|
6.343
|
IN-PRINCIPLE
|
19-Apr-2018
|
07-Jun-2018
|
|
|
|
|
No
|
42
|
Uttar Pradesh
|
FP/UP/WATER/32379/2018
|
8B/UP/08/33/2018/FC
|
AGRA WATER SUPPLY (GANGA JAL) PROJECT
|
Drinking Water
|
UTTAR PRADESH JAL NIGAM
|
10.22375
|
IN-PRINCIPLE
|
26-Mar-2018
|
30-May-2018
|
|
|
|
|
No
|
43
|
Uttar Pradesh
|
FP/UP/ROAD/26451/2017
|
8B/UP/06/25/2017/FC
|
Diversion of Protected Forest Land for Rehabilitation and Up-gradation to 4-lane with paved shoulders configuration from Naviganj to Mitrason section (Km 289.000 to Km 356.000 )Package-IV section of National Highway-91 in Kannuj District in the State of Uttar Pradesh
|
Road
|
NHAI
|
99.328
|
IN-PRINCIPLE
|
05-Mar-2018
|
16-May-2018
|
|
|
|
|
No
|
44
|
Uttar Pradesh
|
FP/UP/ROAD/24596/2017
|
8B/UP/06/13/2018/FC
|
Diversion of Protected Forest Land for Rehabilitation and Up-gradation of Road in 4-lane with paved shoulders configuration from Kalyanpur to Naviganj (Km 229.000 to Km 289.000) section of National Highway-91 in Mainpuri District in the State of Uttar Pradesh
|
Road
|
NHAI
|
97.896
|
IN-PRINCIPLE
|
06-Feb-2018
|
16-Apr-2018
|
|
|
|
|
No
|
45
|
Uttar Pradesh
|
FP/UP/ROAD/22374/2016
|
8B/UP/06/12/2018
|
Diversion of Protected Forest Land for Rehabilitation and Up-gradation to 4-lane with paved shoulders configuration from Bhadwas to Kalyanpur section (Km 186.000 to Km 229.000 )Package-II section of National Highway-91 in Etah District in the State of Uttar Pradesh
|
Road
|
NHAI
|
65.8249
|
IN-PRINCIPLE
|
06-Feb-2018
|
16-Apr-2018
|
|
|
|
|
No
|
46
|
Uttar Pradesh
|
FP/UP/ROAD/17826/2016
|
8B/UP/06/44/2017
|
Widening & strengthening of U.P. State Highway-46, Pukharayan-Ghatampur- Bindiki Road.by U.P. State Highways Authority, Lucknow (U.P.)
|
Road
|
UTTAR PRADESH STATE HIGHWAY AUTHORITY LUCKNOW
|
75.5235
|
IN-PRINCIPLE
|
19-Jul-2017
|
04-Apr-2018
|
|
|
|
|
No
|
47
|
Uttar Pradesh
|
FP/UP/ROAD/28804/2017
|
8B/UP/06/37/2017/FC
|
Development of Purvanchal Expressway via Lucknow, Barabanki, Amethi, Faizabad, Sultanpur, Ambedkarnagar, Azamgarh, Mau & Ghazipur
|
Road
|
UTTAR PRADESH EXPRESSWAYS INDUSTRIAL DEVELOPMENT AUTHORITY (UPEIDA)
|
17.5714
|
IN-PRINCIPLE
|
03-Jan-2018
|
26-Feb-2018
|
|
|
|
|
EC File NA
|
48
|
Uttar Pradesh
|
FP/UP/ROAD/23705/2017
|
8B/UP/06/53/2017/FC
|
Froest Land proposed to be Diverted for from 2 Laning to 4 Laning ON (SH-18) Road widening and Strenthening from Jarif nagar Durgpur to Ujhani from Ch. 162.000 Km to 207.400 Km on Meerut - Budaun Road in Budaun District
|
Road
|
CONSTRUCTION DIVISION PWD BADAUN
|
64.6
|
IN-PRINCIPLE
|
01-Aug-2017
|
25-Jan-2018
|
|
|
|
|
No
|
49
|
Uttar Pradesh
|
FP/UP/ROAD/23576/2017
|
8B/06/52/2017
|
Forest Land Proposed to be diverted for Meerut-Badaun Road Widening and Strengthening from Ch.142.600 to 162.00 in Sambhal District
|
Road
|
PWD SAMBHAL
|
23.28
|
IN-PRINCIPLE
|
02-Aug-2017
|
23-Jan-2018
|
|
|
|
|
No
|
50
|
Uttar Pradesh
|
FP/UP/ROAD/22835/2016
|
8B/UP/06/22/2017/FC
|
Forest Land proposed to be diverted for Widening and strengthening of Chibramau-Saurikh-Bidhuna(MDR-13) in Knnauj District
|
Road
|
CONSTRUCTION DIVISION PWD KANNAUJ
|
21.6
|
IN-PRINCIPLE
|
16-Mar-2017
|
23-Jan-2018
|
|
|
|
|
No
|
|