Ministry of Environment,Forest and Climate Change
Government of India
Uttar Pradesh
State Forest Department
List of Proposals submitted Online by User Agencies (Proposals received on or after 15th July 2014)
Help
Using this report, you can view details of proposals (Received on or after 15th July 2014) . Click on Proposal no to view detail of FORM-A part I. Click on   to print
 
Proposal Year : Region :
State : Category :
Circle : Division :
Status of the Proposal : Whether EC required(Yes/No)? :
Enter value for Search :
Note :-All areas are in Hectares(ha.)
Sno.State NameProposal No.RO/Ministry File NumberProposal NameCategoryUser Agency NameArea (ha.)Proposal StatusProposal initially received at RO/HO(Date)Proposal Pending Since(Date)View Report on Allocation of Fresh forest land (Form-A) Part-IView Report (Part-II to Part-V and Stage-I Clearances) View TimeLine DetailsOther Related DocumentsWhether EC required (if so, status)?
1 Uttar Pradesh FP/UP/THE/14236/2015 WATER PIPELINE CORRIDOR AND APPROACH ROAD FOR MIRZAPUR 1320 MW THERMAL POWER PROJECT Thermal WELSPUN ENERGY UP PRIVATE LIMITED 8.3581 Pending at RO
02-May-2016
12-Jun-2025



EC File NA
2 Uttar Pradesh FP/UP/ROAD/157011/2022 Construction of 4-laning of Kotdwar bypass of NH-119 connecting Najibabad-Kotdwar to Kotdwar-Pauriroad in the state of Uttar Pradesh and Uttrakhand under Bharatmala Pariyojana Lot-4/Pakage-2 from Ch 0+000 to 5+900 under forest division Najibabad Road NHAI PIU MEERUT 5.27 Pending at RO
06-Feb-2025
30-May-2025



No
3 Uttar Pradesh FP/UP/TRANS/15538/2015 8B/UP/04/05/2024/FC 765 kV S/C Mainpuri - Bara Transmission Line CKT - I Transmission Line SOUTH EAST UTTAR PRADESH POWER TRANSMISSION COMPANY LIMITED 23.5776 IN-PRINCIPLE
20-Jun-2024
08-Apr-2025



No
4 Uttar Pradesh FP/UP/ROAD/117639/2020 8B/UP/06/03/2024/FC Forest Land Proposed for Widening & Strengthening of Chopan-Mahalpur Road to Parsoi Road from Km. No. 0.000 to Km. No. 20.600 Under Road Connectivity Project on Left Wing Extremism Area (RCPLWEA) in Tehsil-Robertsganj, District:Sonbhadra Road PMGSY DIVISION PUBLIC WORKS DEPARTMENT SONEBHADRA 15.567 IN-PRINCIPLE
29-Feb-2024
29-Jun-2024

Corrigendum :
27 Aug 2024



No
5 Uttar Pradesh FP/UP/ROAD/146875/2021 8B/UP/06/180/2023/FC Upgradation of Sitapur -Pratap nagar of NH-330D in the State of Uttar Pradesh to Two/ Four Lane with Paved Shoulder Configuration (Package-01, From Ch: 0+000 to 38+800) under forest division SItapur and Forest division Hardoi Road EXECUTIVE ENGINEER 36.987 IN-PRINCIPLE
04-Oct-2023
22-Mar-2024

Corrigendum :
27 Aug 2024



No
6 Uttar Pradesh FP/UP/ROAD/147236/2021 8B/UP/06/161/2023/FC Improvement of Bahraich - Gonda section of State Highway No. 30 from Km 4+150 to Km 64+282 of SH-30 in Bahraich and Gonda district in the State of Uttar Pradesh Road UTTAR PARDESH (UP) PUBLIC WORKS DEPARTMENT (PWD) 82.7212 IN-PRINCIPLE
30-Jun-2023
13-Mar-2024



No
7 Uttar Pradesh FP/UP/ROAD/150065/2021 8B/UP/06/160/2023/FC Proposed Reserved Forest Land to be diverted for New Construction of different roads Bhatwari-Matwar,Matwaria-Matwar,Badohi-Parsia,Fuliyari, Silhata, Meza Band- Sagra and Kharihat-Tidwar Road(Total Length:37.79km) in Tehsil:Lalganj District: Mirzapur Road PROVINCIAL DIVISION PWD MIRZAPUR 34.902 IN-PRINCIPLE
27-Jun-2023
07-Mar-2024



No
8 Uttar Pradesh FP/UP/ROAD/153349/2022 8B/UP/06/32/2023/FC Proposed Diversion for Construction of 4-lane green field highway from Km. 49.155 to Km. 74.700 (Singraur Uparhar to Baranpur Kadipur Ichauli) Crossing on NH-731A on Hybrid Annuity Mode in District:- Kaushambi. Road OFFICE OF THE EXECUTIVE ENGINEER 15.461 IN-PRINCIPLE
02-Mar-2023
22-Dec-2023



No
9 Uttar Pradesh FP/UP/ROAD/25904/2017 8B/UP/06/104/2023/FC Reserved Forest Land to be diverted for Construction of Bypass Road from Dahi Chauki Power House to Agni Shaman Prashikshan Kendra Dostinagar in District: Unnao Road PUBLIC WORKS DEPARTMENT 7.3624 IN-PRINCIPLE
18-Apr-2023
18-Dec-2023

Corrigendum :
09 May 2024



No
10 Uttar Pradesh FP/UP/RAIL/41878/2019 8B/UP/07/118/2021/FC Protected Forest Land Proposed to be Diverted for Doubling of Ralway Track from Ch.1.900 to 10.900 in Ghazipur District and Ch.10.900 to 57.400 in Jaunpur District under Railway Track Doubling Aurihar-Jaunpur Section Railway DY CE CONSTRUCTION I NE RAILWAY VARANASI 49.92276 IN-PRINCIPLE
22-Mar-2021
20-Jul-2023



No
11 Uttar Pradesh FP/UP/WATER/155091/2022 8B/UP/08/75/2023/FC Diversion of 8.161809 Hectare of Forest Land for laying of Drinking Water Distribution Pipelines (Total KM. 96.30) under Jakhlaun Birdha, Dhorra, Balabehat, Kadesara Kalan and Mau Group of Villages Water Supply Scheme, District- Lalitpur (U.P.) Drinking Water STATE WATER & SANITATION MISSION LUCKNOW (UP) 8.161809 IN-PRINCIPLE
28-Mar-2023
21-Jun-2023



No
12 Uttar Pradesh FP/UP/ROAD/117342/2020 8B?UP/06/15/2023/FC Construction of 2-lane missing link road from Rath Bypass (Hamirpur District) to Garautha (Jhansi District) of SH-42 in the State of Uttar Pradesh Road UTTAR PRADESH PUBLIC WORKS DEPARTMENT (UPPWD) 18.1854 IN-PRINCIPLE
27-Jan-2023
14-Jun-2023



No
13 Uttar Pradesh FP/UP/ROAD/121267/2021 8B/UP/06/292/2022/FC Widening & Strengthening of Bhadai Arar to Makarivari Road from Km. No. 0.000 to Km. No. 46.050 Under Road Connectivity Project on Left Wing Extremism Area (RCPLWEA) in Tehsil: Robertsganj, District-Sonbhadra Road PMGSY DIVISION PUBLIC WORKS DEPARTMENT SONEBHADRA 18.5193 IN-PRINCIPLE
28-Oct-2022
27-Apr-2023



No
14 Uttar Pradesh FP/UP/WATER/150514/2021 8B/UP/08/168/2022/FC Proposed Forest Land to be Diverted for Laying of Water Distribution Line along different roads, under Gulara, Tilaitha, Bachawali and Budpura Village Group Drinking Water Scheme of Jal Jeevan Mission of Govt Of India, in District:- Jhansi (UP). Drinking Water UTTAR PRADESH WATER SUPPLY AND SANITATION MISSION 6.6873 IN-PRINCIPLE
07-Jul-2022
05-Apr-2023



No
15 Uttar Pradesh FP/UP/ROAD/119900/2021 8B/UP/06/316/2022/FC Proposed Road Widening and Strengthening of Saursot Khurd to Sirsiya Road from Km.0.00 to 19.200 Under Rural Road Connectvity Project on Left Wing Extermism Area(CPCPLWEA) in Tehsil:Robertsganj,Dist:Sonbhadra Road PMGSY DIVISION PUBLIC WORKS DEPARTMENT SONEBHADRA 11.79 IN-PRINCIPLE
14-Dec-2022
27-Mar-2023



No
16 Uttar Pradesh FP/UP/WATER/150368/2021 8B/UP/08/169/2022/FC Proposed Laying of Water Distribution Pipeline along different roads, under Salaiyya-Nathupura, Lahchoora-Kashipura, Dhawarra Sijwaha, Shivhar and Kabrai Group of Villages Drinking Water Supply Scheme of Jal Jeevan Mission of Govt Of India, in District:- Mahoba (UP). Drinking Water STATE WATER AND SANITATION MISSION 14.4534 IN-PRINCIPLE
07-Jul-2022
03-Mar-2023

EDS(Addl. Info) :
20 Sep 2022



No
17 Uttar Pradesh FP/UP/ROAD/121197/2021 8B/UP/06/221/2021/FC Diversion of P.F. Land for Construction of Choudhary Charan Singh Kavad Marg on RHS side Shoulder of Upper Ganga Canal from Km Ch. 51.910 To Km Ch.163.40 in district- Muzaffer Nagar, Meerut, Road CONSTRUCTION DIVISION PWD MEERUT 222.98 IN-PRINCIPLE
17-Aug-2021
06-Feb-2023

Corrigendum :
14 Jun 2023



No
18 Uttar Pradesh FP/UP/WATER/152706/2022 8B/UP/08/256/2022/FC Laying of Water Distribution Line Along different roads, under Patyora Danda Group of Villages Drinking Water Scheme of Jal Jeevan Mission of Govt. of India, in District:-Hamirpur & Mahoba. Drinking Water CONSTRUCTION DIVISION JAL NIGAM MAHOBA 6.3 IN-PRINCIPLE
31-Aug-2022
07-Nov-2022



No
19 Uttar Pradesh FP/UP/WATER/155109/2022 8B/UP/08/155/2022/FC Proposed forest land to be diverted for Laying of Water Distribution Line along different roads, under Sala Group of Villages Drinking Water Scheme of Jal Jeevan Mission of Govt. of India, in District:- Jhansi and Jalaun. Drinking Water UTTAR PRADESH WATER SUPPLY AND SANITATION MISSION 5.5287 IN-PRINCIPLE
30-Jun-2022
31-Oct-2022



No
20 Uttar Pradesh FP/UP/ROAD/118819/2021 8B/UP/06/33/2022/FC Proposed forest land to be diverted for Widening & Strengthening of RS Road (Sidhahawa) to Jogendra Road Via Khajura Road from Km. No. 0.000 to Km. No. 20.150 Under Road Connectivity Project on Left Wing Extremism Area (RCPLWEA) in Tehsil-Robertsganj, District-Sonbhadra by PMGSY Division, PWD Sonbhadra Road PMGSY DIVISION PUBLIC WORKS DEPARTMENT SONEBHADRA 14.5603 IN-PRINCIPLE
25-Feb-2022
20-Oct-2022



No
21 Uttar Pradesh FP/UP/ROAD/147420/2021 8B/UP/06/38/2022/FC Proposed Protected Forest Land to be diverted for development of Road Widening four lan along old road Carriage Way from km 0.800 to 5.100 0f Bareilly Cantt Road in District - Bareilly (U.P.) Road CONSTRUCTION DIVISION BUILDING PWD BAREILLY 7.055 IN-PRINCIPLE
23-Mar-2022
26-Sep-2022



No
22 Uttar Pradesh FP/UP/WATER/119894/2021 8B/UP/08/263/2021/FC Patwadh Group of Villages Water Supply Scheme – Construction of Intake works consisting of a jackwell and related facilities, 1.20 km pipeline is to be laid underground and a Water Treatment Plant are to be constructed at Village Kanach in Kaimur wild life divsion Mirzapur,district sonbhadra Drinking Water STATE WATER AND SANITATION MISSION NAMAMI GANGE AND RURAL WATER SUPPLY DEPARTMENT UP GOVERNMENT 6.4325 IN-PRINCIPLE
03-Dec-2021
17-Jun-2022



No
23 Uttar Pradesh FP/UP/ROAD/144793/2021 8B/UP/06/295/2021/FC Construction of 6 Lane 'Ganga Expressway' (Expandable upto 8 Lane), an access controlled Green field Expressway in district Meerut, Hapur, Bulandsahar, Amroha, Sambhal, Badaun, Shahjahanpur, Hardoi, Unnao, Raibareli, Partapgarh & Paryagraj, (CH 7+900-CH 601+847 Km) total length 593.947 Kms. Road UPEIDA (GANGA EXPRESSWAY) 121.4716 IN-PRINCIPLE
22-Dec-2021
26-May-2022

AIP Corrigendum :
13 Jul 2022

additionan tree :
08 May 2023

Corrigendum :
10 Jul 2023



EC File NA
24 Uttar Pradesh FP/UP/ROAD/49626/2020 8B/UP/06/29/2022/FC Rehabilitation and Upgradation to 2-lane with paved shoulders configuration of Radhaita to Pilibhit Section of NH-731K ( Km 137.250 to Km 183.380) (Package-IV) in the State of Uttar Pradesh under Green National Highways Corridor Project (GNHCP) with the loan assistance of world Bank on EPC mode Road MINISTRY OF ROAD TRANSPORT AND HIGHWAYS GOVT OF INDIA 44.376 IN-PRINCIPLE
22-Feb-2022
28-Apr-2022



No
25 Uttar Pradesh FP/UP/ROAD/59458/2020 8B/UP/06/251/2021/FC WIDENING & STRENGTHENING OF PARWADH TO BASUHARI ROAD FROM KM. NO. 0.000 TO 61.500 UNDER ROAD CONNECTIVITY PROJECT ON LEFT WING EXTREMISIM AREA (RCPLWEA) IN TEHSIL:- ROBERTSGANJ, DISTRICT:- SONBHADRA Road PMGSY DIVISION PUBLIC WORKS DEPARTMENT SONEBHADRA 45.2925 IN-PRINCIPLE
15-Nov-2021
10-Jan-2022



No
26 Uttar Pradesh FP/UP/ROAD/35291/2018 8B/UP/06/58/2021/FC WIDENING & STRENGTHENING OF NAUGARH DHANKUWARI KALA TO KESAR ROAD FROM KM 0.00 TO 22.800 UNDER ROAD CONNECTIVITY PROJECT ON LEFT WING EXTREMISM AREA (RCPLWEA) IN TAH.-NAUGARH, DISTT.-CHANDAULI BY TEMPORARY-DIVISION (P.P.), P.W.D., CHANDAULI (U.P.) Road EE PMGSY PWD CHANDAULI 19.62 IN-PRINCIPLE
16-Feb-2021
27-Jul-2021



No
27 Uttar Pradesh FP/UP/TRANS/42524/2019 8B/UP/04/169/2020 765 kV Ghatampur-Hapur S/C Transmission Line Transmission Line GHATAMPUR TRANSMISSION LIMITED 16.5761 IN-PRINCIPLE
24-Nov-2020
24-Nov-2020



No
28 Uttar Pradesh FP/UP/TRANS/40906/2019 8B/UP/04/90/2020 400kV D/C Jaunpur Obra Transmission Line Transmission Line OBRA C BADAUN TRANSMISSION LIMITED 89.632 IN-PRINCIPLE
14-Aug-2020
23-Oct-2020



No
29 Uttar Pradesh FP/UP/ROAD/41235/2019 8B/UP/06/38/2020 Protected Forest Land Proposed to be diverted for 4-Laning and Strengthening of Bilraya-Panwari Road(SH21) From Ch..399.600 to 427.00, in District:Hamirpur Road EXECUTIVE ENGINEER CONSTRUCTION DIVISION TWO PWD HAMIRPUR 49.32 IN-PRINCIPLE
21-May-2020
19-Aug-2020



No
30 Uttar Pradesh FP/UP/ROAD/43247/2019 8B/UP/06/29/2020/FC Protected Forest Land Proposed for 4-Lane Widening &Strengthening of Puttulal Chauraha to Roza Adda(ODR) From Ch.0.00 to 2.950,Hathaura Chauraha to Puttulal Chauraha to Road(ODR) FROM Ch.0.00 to 2.750 ; GIC To Atsaliya Railway Fatak from Ch. 0.00 3.950 and Barailly Mode Chauraha to Garra Bridge Road(Old NH-24 City Part) from Ch.0.00 to 1.800 in S Road PROVINCIAL DIVISION PWD SHAHJAHANPUR 9.16 IN-PRINCIPLE
16-Mar-2020
16-Mar-2020



No
31 Uttar Pradesh FP/UP/ROAD/39827/2019 8B/UP/06/86/2019/FC Protected Forest Land Proposed to be diverted for 4-Lane Widening of Jhansi-Babina Road(City Part Of Old NH-26) from Km.3.00 to 11.00 in Jhansi District Road CONSTRUCTION DIVISION BHAWAN WING PWD JHANSI 14.8 IN-PRINCIPLE
01-Oct-2019
04-Feb-2020



No
32 Uttar Pradesh FP/UP/RAIL/40280/2019 8B/UP/07/64/2019/FC Proposed Doubling of Sitapur Cant-Roza Section Protected Forest Land Proposed to be diverted from KM.0.00 to 80.300 passing through Districts Sitapur,Hardoi,Lakhimpur kheri and Shahajahanpur Railway NORTH RAILWAY MORADABAD 69.5992 IN-PRINCIPLE
26-Jul-2019
26-Jul-2019



No
33 Uttar Pradesh FP/UP/RAIL/29433/2017 8B/UP/07/3/2019 Protected Forest Land Proposed to be diverted for doubling of Allahabad-Varanasi Railway Track from Ch.209.8(Madudeeh) to 226.4 in Varanasi District Railway RVNL 14.691 IN-PRINCIPLE
11-Jan-2019
05-Feb-2019



No
34 Uttar Pradesh FP/UP/ROAD/25036/2017 8B/UP/06/76/2018/FC Forest Land proposed for Four-laning of road from Naraini toKalinjar Road From CH-35.000 Km to CH-60.825 Km.and from 0.00 to 1.500 on Kalinjar to Baghelbari Road In Banda District (Uttar Pradesh) Road CONSTRUCTION DIVISION I PWD BANDA 31.58 IN-PRINCIPLE
07-Oct-2018
21-Dec-2018



No
35 Uttar Pradesh FP/UP/Others/34211/2018 8B/UP/08/77/2018/FC Protected Forest Land Proposed to be Diverted for Laying of 1100mm, 2 pipes for Estabilishment of Water Carrier System to Ghatampur Thermal Power Project along NH-86 from Ch.20.800 to 61.900 District:Kanpur Nagar Others NEYVELI UTTAR PRADESH POWER LIMITED 14.385 IN-PRINCIPLE
09-Oct-2018
12-Nov-2018



No
36 Uttar Pradesh FP/UP/ROAD/34116/2018 8B/UP/06/70/2018 Rehabilitation and widening of GT Road section at Begum Bazar at km 185+800 to Chaufatka at km 194+000 (total length 8.200 km) in district Allahabad, Uttar Pradesh. Road CD ONE PWD UP ALLAHABAD 6.418 IN-PRINCIPLE
31-Aug-2018
28-Sep-2018



No
37 Uttar Pradesh FP/UP/TRANS/29629/2017 8B/UP/04/38/2018 Protected Forest Land Proposed to be diverted for 11 KV Transmission line on NH-76(Allhabad-Banda) Road from km.349 to 332(RHS) in Chitrakoot District Transmission Line ELECTRICITY DISTRIBUTION DIVISION CHITRAKOOT 25.5 IN-PRINCIPLE
03-Apr-2018
28-Sep-2018



No
38 Uttar Pradesh FP/UP/ROAD/30569/2017 8B/UP/06/66/2018 Four Lane with paved shoulder from Varanasi to Hanumanha section of NH-7 passing through Varanasi, Chandauli and Mirzapur district in the state of Uttar Pradesh Road National Highways Authority of India 131.0175 IN-PRINCIPLE
25-Jul-2018
26-Sep-2018



No
39 Uttar Pradesh FP/UP/ROAD/25364/2017 8B/UP/06/26/2018 Proposal for the diversion of road side protected forest land for "Four lane Widening and Strengthening of Shikohabad- Bhogaon (SH-84) road " (Ch. 21.00 to 43.800 ) and Construction of Ghiror Bypass ( Length 6.56 km.) Total Length 25.66 Km. in Mainpuri District . Protected forest land required for diversion is 24.92755 Road PROVINCIAL DIVISION PWD MAINPURI 24.92755 IN-PRINCIPLE
05-Mar-2018
13-Aug-2018



No
40 Uttar Pradesh FP/UP/ROAD/26890/2017 8B/UP/06/24/2018/FC Diversion of Protected Forest Land for Rehabilitation and Up-gradation to 4-lane with paved shoulders configuration from Mitrasen to Kanpur (Km 356.000 to Km 414.000) section of National Highway-91 in Kanpur District in the State of Uttar Pradesh Road NHAI 93.975 IN-PRINCIPLE
05-Mar-2018
02-Jul-2018



No
41 Uttar Pradesh FP/UP/Others/27358/2017 8B/UP/09/47/2018/FC City Gas Distribution (CGD) Network Porject in Saharanpur Geographical Area Others BHARAT PETROLEUM CORPORATION LIMITED 6.343 IN-PRINCIPLE
19-Apr-2018
07-Jun-2018



No
42 Uttar Pradesh FP/UP/WATER/32379/2018 8B/UP/08/33/2018/FC AGRA WATER SUPPLY (GANGA JAL) PROJECT Drinking Water UTTAR PRADESH JAL NIGAM 10.22375 IN-PRINCIPLE
26-Mar-2018
30-May-2018



No
43 Uttar Pradesh FP/UP/ROAD/26451/2017 8B/UP/06/25/2017/FC Diversion of Protected Forest Land for Rehabilitation and Up-gradation to 4-lane with paved shoulders configuration from Naviganj to Mitrason section (Km 289.000 to Km 356.000 )Package-IV section of National Highway-91 in Kannuj District in the State of Uttar Pradesh Road NHAI 99.328 IN-PRINCIPLE
05-Mar-2018
16-May-2018



No
44 Uttar Pradesh FP/UP/ROAD/24596/2017 8B/UP/06/13/2018/FC Diversion of Protected Forest Land for Rehabilitation and Up-gradation of Road in 4-lane with paved shoulders configuration from Kalyanpur to Naviganj (Km 229.000 to Km 289.000) section of National Highway-91 in Mainpuri District in the State of Uttar Pradesh Road NHAI 97.896 IN-PRINCIPLE
06-Feb-2018
16-Apr-2018



No
45 Uttar Pradesh FP/UP/ROAD/22374/2016 8B/UP/06/12/2018 Diversion of Protected Forest Land for Rehabilitation and Up-gradation to 4-lane with paved shoulders configuration from Bhadwas to Kalyanpur section (Km 186.000 to Km 229.000 )Package-II section of National Highway-91 in Etah District in the State of Uttar Pradesh Road NHAI 65.8249 IN-PRINCIPLE
06-Feb-2018
16-Apr-2018

EDS(Addl. Info) :
01 Feb 2023



No
46 Uttar Pradesh FP/UP/ROAD/17826/2016 8B/UP/06/44/2017 Widening & strengthening of U.P. State Highway-46, Pukharayan-Ghatampur- Bindiki Road.by U.P. State Highways Authority, Lucknow (U.P.) Road UTTAR PRADESH STATE HIGHWAY AUTHORITY LUCKNOW 75.5235 IN-PRINCIPLE
19-Jul-2017
04-Apr-2018



No
47 Uttar Pradesh FP/UP/ROAD/28804/2017 8B/UP/06/37/2017/FC Development of Purvanchal Expressway via Lucknow, Barabanki, Amethi, Faizabad, Sultanpur, Ambedkarnagar, Azamgarh, Mau & Ghazipur Road UTTAR PRADESH EXPRESSWAYS INDUSTRIAL DEVELOPMENT AUTHORITY (UPEIDA) 17.5714 IN-PRINCIPLE
03-Jan-2018
26-Feb-2018



EC File NA
48 Uttar Pradesh FP/UP/ROAD/23705/2017 8B/UP/06/53/2017/FC Froest Land proposed to be Diverted for from 2 Laning to 4 Laning ON (SH-18) Road widening and Strenthening from Jarif nagar Durgpur to Ujhani from Ch. 162.000 Km to 207.400 Km on Meerut - Budaun Road in Budaun District Road CONSTRUCTION DIVISION PWD BADAUN 64.6 IN-PRINCIPLE
01-Aug-2017
25-Jan-2018



No
49 Uttar Pradesh FP/UP/ROAD/23576/2017 8B/06/52/2017 Forest Land Proposed to be diverted for Meerut-Badaun Road Widening and Strengthening from Ch.142.600 to 162.00 in Sambhal District Road PWD SAMBHAL 23.28 IN-PRINCIPLE
02-Aug-2017
23-Jan-2018



No
50 Uttar Pradesh FP/UP/ROAD/22835/2016 8B/UP/06/22/2017/FC Forest Land proposed to be diverted for Widening and strengthening of Chibramau-Saurikh-Bidhuna(MDR-13) in Knnauj District Road CONSTRUCTION DIVISION PWD KANNAUJ 21.6 IN-PRINCIPLE
16-Mar-2017
23-Jan-2018



No
12
Please wait ...