Sno. | State Name | Proposal No. | RO/Ministry File Number | Proposal Name | Category | User Agency Name | Area (ha.) | Proposal Status | Date of Stage-I | View Report on Allocation of Fresh forest land (Form-A) Part-I | View Report (Part-II to Part-V and Stage-I Clearances) | View TimeLine Details | Site Inspection Report | Other Related Documents | Whether EC required (if so, status)? |
1
|
Assam
|
FP/AS/ROAD/16086/2015
|
3-AS C 009/2016-SHI
|
Four Lanning work from km 0 to km 17.3 of NH37A
|
Road
|
MINISTRY OF ROAD TRANSPORT AND HIGHWAYS
|
6
|
IN-PRINCIPLE
|
18-Sep-2017
|
|
|
|
|
|
No
|
2
|
Assam
|
FP/AS/Others/26889/2017
|
3-AS B 036/2017-SHI
|
DHOLPAHAR STONE MAHAL NO 1
|
Others
|
BISWAJIT BANIK
|
1
|
IN-PRINCIPLE
|
08-Jan-2018
|
|
|
|
|
|
Yes
Proposal Status: EC application yet to be submitted
|
3
|
Assam
|
FP/AS/Others/148136/2021
|
FRS.98/2022
|
Proposal for diversion of 0.0225 Hectare of Forest land for construction of Mobile tower location I-AS-MANG-ENB-9050 at Langtingmupa Reserve Forest under Dima Hasao East Division
|
Others
|
RELIANCE JIO INFO COMM LIMITED
|
0.0225
|
IN-PRINCIPLE
|
11-Jul-2022
|
|
|
|
|
|
No
|
4
|
Assam
|
FP/AS/Others/148065/2021
|
FRS.76/2022
|
Proposal for diversion of 0.0225 Hectare of Forest land for construction of Mobile tower location I-AS-MGRT-ENB-9110 at Namphai Reserve Forest under Digboi Forest Division
|
Others
|
RELIANCE JIO INFO COMM LIMITED
|
0.0225
|
IN-PRINCIPLE
|
11-Jul-2022
|
|
|
|
|
|
No
|
5
|
Assam
|
FP/AS/Others/42587/2019
|
FRS.92/2021
|
Diversion of 0.0225 Hectare of Forest land for construction of Mobile tower under Universal Service Obligation Fund for Provision of Mobile Services at Gobindpur Village.
|
Others
|
BHARTI AIRTEL ASSAM
|
0.0225
|
IN-PRINCIPLE
|
27-Dec-2021
|
|
|
|
|
|
No
|
6
|
Assam
|
FP/AS/Others/38014/2019
|
FRS.85/2021
|
Diversion of 0.0225 Ha. of Forest land for construction of Mobile tower under Universal Service Obligation Fund for Provision of Mobile Services at Hasto Village
|
Others
|
BHARTI AIRTEL ASSAM
|
0.0225
|
IN-PRINCIPLE
|
27-Dec-2021
|
|
|
|
|
|
No
|
7
|
Assam
|
FP/AS/QRY/27026/2017
|
3-AS B 030/2017-SHI
|
TOKRABANDHA HILL STONE QUARRY NO. 2
|
Quarrying
|
DEBESH CHANDRA ROY
|
1
|
IN-PRINCIPLE
|
08-Jan-2018
|
|
|
|
|
|
Yes
Proposal Status: EC application yet to be submitted
|
8
|
Assam
|
FP/AS/Others/40983/2019
|
ECF No.288615
|
Diversion of 0.0225 Ha. of Forest land for construction of Mobile tower under Universal Service Obligation Fund for Provision of Mobile Services at Kokila Bazar Forest Village
|
Others
|
BHARTI AIRTEL ASSAM
|
0.0225
|
IN-PRINCIPLE
|
03-Apr-2023
|
|
|
|
|
|
No
|
9
|
Assam
|
FP/AS/RAIL/155019/2022
|
ECF No.289649
|
Construction of Traction Sub-Station & approach road in Tingrai Railway Station in connection with Railway Electrification work of Rangiya(Excl) to markonseleck Section including branch lines
|
Railway
|
NORTHEAST FRONTIER RAILWAY, CONSTRUCTION,ELECTRICAL
|
0.4482
|
IN-PRINCIPLE
|
12-May-2023
|
|
|
|
|
|
No
|
10
|
Assam
|
FP/AS/Others/20093/2016
|
3-AS-B-044/2018/SHI
|
ROU for oil flow line from well No. NRAA to Nambar GGS in Nambor area
|
Others
|
OIL AND NATURAL GAS CORPORATION LIMITED
|
1.43
|
IN-PRINCIPLE
|
18-Jul-2023
|
|
|
|
|
|
No
|
11
|
Assam
|
FP/AS/Others/42599/2019
|
FRS.103/2021
|
Diversion of 0.0225 Hectare of Forest land for construction of Mobile tower under Universal Service Obligation Fund for Provision of Mobile Services at Nagpur Forest Village.
|
Others
|
BHARTI AIRTEL ASSAM
|
0.0225
|
IN-PRINCIPLE
|
27-Dec-2021
|
|
|
|
|
|
No
|
12
|
Assam
|
FP/AS/Others/40961/2019
|
FRS.80/2021
|
Diversion of 0.0225 Ha. of Forest land for construction of Mobile tower under Universal Service Obligation Fund for Provision of Mobile Services at Pithaghat No.2 Village
|
Others
|
BHARTI AIRTEL ASSAM
|
0.0225
|
IN-PRINCIPLE
|
27-Dec-2021
|
|
|
|
|
|
No
|
13
|
Assam
|
FP/AS/Others/27092/2017
|
3-AS B 034/2017-SHI
|
Bipin Stone Mahal
|
Others
|
ZIAUR RAHMAN
|
1
|
IN-PRINCIPLE
|
25-Jan-2018
|
|
|
|
|
|
EC File NA
|
14
|
Assam
|
FP/AS/Others/38009/2019
|
FRS.74/2021
|
Diversion of 0.0225 Ha. of Forest land for construction of Mobile tower under Universal Service Obligation Fund for Provision of Mobile Services at Joyapathar No.2 Village
|
Others
|
BHARTI AIRTEL ASSAM
|
0.0225
|
IN-PRINCIPLE
|
27-Dec-2021
|
|
|
|
|
|
No
|
15
|
Assam
|
FP/AS/Others/27107/2017
|
3-AS B 026/2017-SHI
|
Jagiroad Stone Quarry No. F(3)
|
Others
|
SRI NRISHINGHA HAZARIKA
|
1
|
IN-PRINCIPLE
|
08-Jan-2018
|
|
|
|
|
|
Yes
Proposal No.:
EC File No.:
Proposal Status: No Proposal no.
|
16
|
Assam
|
FP/AS/QRY/27223/2017
|
3-AS B 041/2017-SHI
|
CHITALMARI STONE QUARRY NO.2
|
Quarrying
|
BONO DAS
|
1
|
IN-PRINCIPLE
|
08-Jan-2018
|
|
|
|
|
|
Yes
Proposal Status: EC application yet to be submitted
|
17
|
Assam
|
FP/AS/THE/8413/2014
|
3-AS B 007/2017-SHI
|
Construction of Water Intake Pump House at Dilli River, near to existing Intake pump house
|
Thermal
|
ASSAM POWER GENERATION CORPORATION LIMITED
|
0.069
|
IN-PRINCIPLE
|
27-Jul-2017
|
|
|
|
|
|
No
|
18
|
Assam
|
FP/AS/ROAD/46680/2020
|
3-AS-B-163/2023-GHY
|
Up-gradation of existing Jogighopa to Swahid Bedi (near Bongaigaon) road
|
Road
|
ASSAM PWRD
|
3.086
|
IN-PRINCIPLE
|
26-May-2023
|
|
|
|
|
|
No
|
19
|
Assam
|
FP/AS/Others/34953/2018
|
FRS.75/2021
|
Diversion of 0.0225 Hectare of Forest land for construction of Mobile tower under Universal Service Obligation Fund for Provision of Mobile Services at Da-Kawalipathar No.1 Village
|
Others
|
BHARTI AIRTEL ASSAM
|
0.0225
|
IN-PRINCIPLE
|
27-Dec-2021
|
|
|
|
|
|
No
|
20
|
Assam
|
FP/AS/TRANS/30498/2017
|
3-AS-B-044/2021/GHY
|
132 KV S/C Transmission line from Salakati Grid S/S to APM (Jogighopa)
|
Transmission Line
|
ASSAM ELECTRICITY GRID CORPORATION LINITED
|
1.9413
|
IN-PRINCIPLE
|
26-May-2023
|
|
|
|
|
|
No
|
21
|
Assam
|
FP/AS/MIN/37981/2018
|
F.NO 3 AS B 029/2021-GHY
|
To Drill 06 Nos of wells DPDD, DPDH, DPDI, DPDJ, DPDK and DPDL from new drill site.
|
Mining
|
JORHAT ASSET ONGC
|
2.73
|
IN-PRINCIPLE
|
20-Jun-2022
|
|
|
|
|
|
Yes
Proposal Status: EC application yet to be submitted
|
22
|
Assam
|
FP/AS/Others/42598/2019
|
FRS.102/2021
|
Diversion of 0.0225 Hectare of Forest land for construction of Mobile tower under Universal Service Obligation Fund for Provision of Mobile Services at Dighal Pani Miching Village.
|
Others
|
BHARTI AIRTEL ASSAM
|
0.0225
|
IN-PRINCIPLE
|
27-Dec-2021
|
|
|
|
|
|
No
|
23
|
Assam
|
FP/AS/Others/27120/2017
|
3-AS B 033/2017-SHI
|
Kafitoli Stone Mahal No. 1 (River Bed)
|
Others
|
JAYANTA KUMAR LASKAR
|
1
|
IN-PRINCIPLE
|
25-Jan-2018
|
|
|
|
|
|
EC File NA
|
24
|
Assam
|
FP/AS/Others/41945/2019
|
ECF No.288610
|
Diversion of 0.0225 Ha. of Forest land for construction of Mobile tower under Universal Service Obligation Fund for Provision of Mobile Services at Ganeshbari Forest Village
|
Others
|
BHARTI AIRTEL ASSAM
|
0.0225
|
IN-PRINCIPLE
|
03-Apr-2023
|
|
|
|
|
|
No
|
25
|
Assam
|
FP/AS/ROAD/155754/2022
|
3-AS-A-147/2022/GHY
|
WIDENING / UPGRADATION OF NH-29 FROM 2-LANE TO 4-LANE DIVIDED NATIONAL HIGHWAY FROM DABOKA TO LAHORIJAN (NAGAON SOUTH FOREST DIVISION, HOJAI PART) UNDER BHARATMALA PARIYOJANA (LOT-1-PACKAGE-II)
|
Road
|
NHIDCL
|
42.6
|
IN-PRINCIPLE
|
11-Apr-2023
|
|
|
|
|
|
No
|
26
|
Assam
|
FP/AS/MIN/146691/2021
|
3-AS-B-103/2022/GHY
|
Forest diversion proposal to drill 06 Development wells from DPDU cluster of area 2.75 ha in Kasomarigaon Addl PML
|
Mining
|
JORHAT ASSET ONGC
|
2.75
|
IN-PRINCIPLE
|
16-Mar-2023
|
|
|
|
|
|
Yes
Proposal Status: EC application yet to be submitted
|
27
|
Assam
|
FP/AS/Others/148141/2021
|
FRS.97/2022
|
Proposal for diversion of 0.0225 Hectare of Forest land for construction of Mobile tower location I-AS-MANG-ENB-9052 at Langtingmupa Reserve Forest under Dima Hasao East Division
|
Others
|
RELIANCE JIO INFO COMM LIMITED
|
0.0225
|
IN-PRINCIPLE
|
11-Jul-2022
|
|
|
|
|
|
No
|
28
|
Assam
|
FP/AS/Others/37629/2018
|
FRS.91/2021
|
Diversion of 0.0225 Ha. of Forest land for construction of Mobile tower under Universal Service Obligation Fund for Provision of Mobile Services at Kathonipur Village
|
Others
|
BHARTI AIRTEL ASSAM
|
0.0225
|
IN-PRINCIPLE
|
27-Dec-2021
|
|
|
|
|
|
No
|
29
|
Assam
|
FP/AS/Others/42585/2019
|
FRS.79/2021
|
Diversion of 0.0225 Hectare of Forest land for construction of Mobile tower under Universal Service Obligation Fund for Provision of Mobile Services at Terenga Pothar Village.
|
Others
|
BHARTI AIRTEL ASSAM
|
0.0225
|
IN-PRINCIPLE
|
27-Dec-2021
|
|
|
|
|
|
No
|
30
|
Assam
|
FP/AS/Others/42597/2019
|
FRS.69/2021
|
Diversion of 0.0225 Hectare of Forest land for construction of Mobile tower under Universal Service Obligation Fund for Provision of Mobile Services at Chawdang Pothar Village.
|
Others
|
BHARTI AIRTEL ASSAM
|
0.0225
|
IN-PRINCIPLE
|
27-Dec-2021
|
|
|
|
|
|
No
|
31
|
Assam
|
FP/AS/ROAD/46695/2020
|
3-AS-C-139/2022/GHY
|
Up-gradation of Chapaguri to Amteka (Bhutan Border) Road
|
Road
|
ASSAM PWRD
|
36.92
|
IN-PRINCIPLE
|
07-Mar-2024
|
|
|
|
|
|
No
|
32
|
Assam
|
FP/AS/IND/16231/2015
|
F.No. 3-AS B 061/2016-SHI
|
Dirok Field Development Project
|
Industry
|
OIL INDIA LIMITED
|
4.8444
|
IN-PRINCIPLE
|
17-Jan-2017
|
|
|
|
|
|
Yes
Proposal Status: EC under process
|
33
|
Assam
|
FP/AS/MIN/146383/2021
|
3-AS-B-099/2022/GHY
|
Forest diversion proposal to drill 06 Development wells from KHDH cluster of area 2.569 ha in Khoraghat Ext -1 PML
|
Mining
|
JORHAT ASSET ONGC
|
2.569
|
IN-PRINCIPLE
|
16-Mar-2023
|
|
|
|
|
|
Yes
Proposal Status: EC application yet to be submitted
|
34
|
Assam
|
FP/AS/Pipeline/48074/2020
|
F.No.3- AS B 07 6 /2021-GHy
|
Laying of Proposed 18" Ø (Carbon steel) Natural Gas Pipeline along with OFC Conduit From Guwahati to Panisagar.
|
Pipeline
|
INDRADHANUSH GAS GRID LIMITED
|
4.7289
|
IN-PRINCIPLE
|
09-Mar-2022
|
|
|
|
|
|
No
|
35
|
Assam
|
FP/AS/Others/148124/2021
|
FRS.92/2022
|
Proposal for diversion of 0.0225 Hectare of Forest land for construction of Mobile tower location I-AS-SONY-ENB-9040 at Inner Line Reserve Forest under Cachar Forest Division
|
Others
|
RELIANCE JIO INFO COMM LIMITED
|
0.0225
|
IN-PRINCIPLE
|
11-Jul-2022
|
|
|
|
|
|
No
|
36
|
Assam
|
FP/AS/Others/148170/2021
|
FRS.95/2022
|
Proposal for diversion of 0.0225 Hectare of Forest land for construction of Mobile tower location I-AS-MANG-ENB-9075 at Langtingmupa Reserve Forest under Dima Hasao East Division
|
Others
|
RELIANCE JIO INFO COMM LIMITED
|
0.0225
|
IN-PRINCIPLE
|
11-Jul-2022
|
|
|
|
|
|
No
|
37
|
Assam
|
FP/AS/Others/42600/2019
|
FRS.96/2021
|
Diversion of 0.0225 Hectare of Forest land for construction of Mobile tower under Universal Service Obligation Fund for Provision of Mobile Services at Damodar No. 2 Village.
|
Others
|
BHARTI AIRTEL ASSAM
|
0.0225
|
IN-PRINCIPLE
|
27-Dec-2021
|
|
|
|
|
|
No
|
38
|
Assam
|
FP/AS/Others/37624/2018
|
FRS.100/2021
|
Diversion of 0.0225 Ha. of Forest land for construction of Mobile tower under Universal Service Obligation Fund for Provision of Mobile Services at Chainpur Village
|
Others
|
BHARTI AIRTEL ASSAM
|
0.0225
|
IN-PRINCIPLE
|
27-Dec-2021
|
|
|
|
|
|
No
|
39
|
Assam
|
FP/AS/Others/42590/2019
|
FRS.95/2021
|
Diversion of 0.0225 Hectare of Forest land for construction of Mobile tower under Universal Service Obligation Fund for Provision of Mobile Services at Madhupur No.1 Village.
|
Others
|
BHARTI AIRTEL ASSAM
|
0.0225
|
IN-PRINCIPLE
|
08-Feb-2022
|
|
|
|
|
|
No
|
40
|
Assam
|
FP/AS/ROAD/48518/2020
|
3-AS-B-153/2023/GHY
|
Diversion of forest land for improvement and upgradation of Hamren to Howrahghat Section of SH-19 under Axom Mala roads in the state of Assam
|
Road
|
ASSAM PWRD
|
4.193
|
IN-PRINCIPLE
|
10-Jul-2023
|
|
|
|
|
|
No
|
41
|
Assam
|
FP/AS/Others/26735/2017
|
3-AS C 028/2018-SHI
|
Extension of Brahmaputra Dyke Ph-IV from Chaulkhowa Medela gaon to Madhupur Deurigaon
|
Others
|
EXECUTIVE ENGINEER DIBRUGARH WATER RESOURCE DIVISION
|
20.5
|
IN-PRINCIPLE
|
28-Aug-2018
|
|
|
|
|
|
No
|
42
|
Assam
|
FP/AS/ROAD/146185/2021
|
3-AS-B-135/2022/GHY
|
WIDENING / UP-GRADATION OF NH-29 FROM 2-LANE TO 4-LANE DIVIDED NATIONAL HIGHWAY FROM DABOKA TO LAHORIJAN (KARBI ANGLONG WEST FOREST DIVISION PART) UNDER BHARATMALA PARIYOJANA (LOT-1-PACKAGE-7)
|
Road
|
NHIDCL
|
0.81
|
IN-PRINCIPLE
|
13-Dec-2022
|
|
|
|
|
|
No
|
43
|
Assam
|
FP/AS/Others/44399/2020
|
FRS.76/2022
|
Diversion of 0.0225 Hectare of Forest land for construction of Mobile tower under Universal Service Obligation Fund for Provision of Mobile Services at Pachim Panbari Village.
|
Others
|
BHARTI AIRTEL ASSAM
|
0.0225
|
IN-PRINCIPLE
|
11-Jul-2022
|
|
|
|
|
|
No
|
44
|
Assam
|
FP/AS/Others/40949/2019
|
FRS.71/2021
|
Diversion of 0.0225 Ha. of Forest land for construction of Mobile tower under Universal Service Obligation Fund for Provision of Mobile Services at Kempur Village
|
Others
|
BHARTI AIRTEL ASSAM
|
0.0225
|
IN-PRINCIPLE
|
27-Dec-2021
|
|
|
|
|
|
No
|
45
|
Assam
|
FP/AS/MIN/47775/2020
|
3ASC132/2022/GHY
|
ONGC Silchar exploratory drilling TNAA
|
Mining
|
OIL AND NATURAL GAS CORPORATION LIMITED
|
6.09
|
IN-PRINCIPLE
|
09-Aug-2024
|
|
|
|
|
|
Yes
Proposal Status: EC application yet to be submitted
|
46
|
Assam
|
FP/AS/MIN/23241/2016
|
3_AS_B_111/2020/SHI
|
Drilling Location DGR
|
Mining
|
OIL INDIA LIMITED
|
3.411
|
IN-PRINCIPLE
|
28-Jul-2023
|
|
|
|
|
|
Yes
Proposal No.: IA/AS/IND2/61415/2016
EC File No.: J- 11011/388/2016-IA.II(I)
Proposal Status: TOR GRANTED
|
47
|
Assam
|
FP/AS/MIN/23925/2017
|
3-AS B 081/2017-SHI
|
ONGC drilling location KHDF
|
Mining
|
OIL AND NATURAL GAS CORPORATION LIMITED
|
3.48
|
IN-PRINCIPLE
|
29-Nov-2018
|
|
|
|
|
|
Yes
EC File No.: No.J-11011/147/2008-1A-11(1)
Proposal Status: EC Granted
|
48
|
Assam
|
FP/AS/WATER/149088/2021
|
FRS.61/2022
|
JICA Assisted GWSP
|
Drinking Water
|
GUWAHATI METROPOLITAN DRINKING WATER AND SEWERAGE BOARD
|
0.96
|
IN-PRINCIPLE
|
27-May-2022
|
|
|
|
|
|
No
|
49
|
Assam
|
FP/AS/Others/148128/2021
|
FRS.101/2022
|
Proposal for diversion of 0.0225 Hectare of Forest land for construction of Mobile tower location I-AS-KATC-ENB-9018 at Inner Line Reserve Forest under Hailakandi Forest Division
|
Others
|
RELIANCE JIO INFO COMM LIMITED
|
0.0225
|
IN-PRINCIPLE
|
11-Jul-2022
|
|
|
|
|
|
No
|
50
|
Assam
|
FP/AS/Others/38015/2019
|
FRS.81/2021
|
Diversion of 0.0225 Ha. of Forest land for construction of Mobile tower under Universal Service Obligation Fund for Provision of Mobile Services at Kiyazu Village
|
Others
|
BHARTI AIRTEL ASSAM
|
0.0225
|
IN-PRINCIPLE
|
27-Dec-2021
|
|
|
|
|
|
No
|
|