Sno. | State Name | Proposal No. | RO/Ministry File Number | Proposal Name | Category | User Agency Name | Area (ha.) | Proposal Status | Date of Stage-I | View Report on Allocation of Fresh forest land (Form-A) Part-I | View Report (Part-II to Part-V and Stage-I Clearances) | View TimeLine Details | Site Inspection Report | Other Related Documents | Whether EC required (if so, status)? |
1
|
Andhra Pradesh
|
FP/AP/MIN/10972/2015
|
4-APB029-2017-CHN
|
Quarry lease of black granite over an extent of 4.79 Ha in favour of BKR Granites.
|
Mining
|
BKR GRANITES
|
4.79
|
IN-PRINCIPLE
|
28-Aug-2017
|
|
|
|
|
|
Yes
Proposal Status: EC application yet to be submitted
|
2
|
Andhra Pradesh
|
FP/AP/ROAD/28781/2017
|
4-APC045/2017-CHN
|
Chennai - Chittoor - Bangalore Road NH-4 road is included in NHDP-IV to upgrading to 4-lane from TN/AP Boarder to AP/KA Boarder Km 133/600 to 216/975 in Chittoor District, AP
|
Road
|
PROJECT DIRECTOR NHAI PIU TIRUPATI
|
23.23
|
IN-PRINCIPLE
|
05-Oct-2017
|
|
|
|
|
|
No
|
3
|
Andhra Pradesh
|
FP/AP/ROAD/28781/2017
|
4-APC045/2017-CHN
|
Chennai - Chittoor - Bangalore Road NH-4 road is included in NHDP-IV to upgrading to 4-lane from TN/AP Boarder to AP/KA Boarder Km 133/600 to 216/975 in Chittoor District, AP
|
Road
|
PROJECT DIRECTOR NHAI PIU TIRUPATI
|
23.23
|
IN-PRINCIPLE
|
05-Oct-2017
|
|
|
|
|
|
No
|
4
|
Andhra Pradesh
|
FP/AP/ROAD/37312/2018
|
G.O.Ms.No.9
|
Solabham to Ambalmamidi
|
Road
|
Executive Engineer PR Paderu
|
1.82
|
IN-PRINCIPLE
|
19-May-2020
|
|
|
|
|
|
No
|
5
|
Andhra Pradesh
|
FP/AP/ROAD/34966/2018
|
G.O.Ms.No.130
|
Formation and BT to the Road including Construction of Culverts from Jerrila to Kothawada
|
Road
|
EXECUTIVE ENGINEER PIU VISAKHAPATNAM
|
1.52
|
IN-PRINCIPLE
|
16-Nov-2018
|
|
|
|
|
|
No
|
6
|
Andhra Pradesh
|
FP/AP/ROAD/52119/2020
|
4-APB114/2021-VIJ
|
Road from Nimmalapadu Bongija to Lungaparthi from 0/00 to 10/00 km (Via) Patti
|
Road
|
Executive Engineer PR Paderu
|
1.54
|
IN-PRINCIPLE
|
12-Apr-2022
|
|
|
|
|
|
No
|
7
|
Andhra Pradesh
|
FP/AP/OFC/42713/2019
|
3106/Sec.II/2022/1939297
|
Laying of Under Ground Optical Fiber Cable (OFC)
|
Optical Fibre Cable
|
JIO DIGITAL FIBRE PRIVATE LIMITED
|
0.26
|
IN-PRINCIPLE
|
10-Jan-2023
|
|
|
|
|
|
No
|
8
|
Andhra Pradesh
|
FP/AP/IRRIG/34996/2018
|
4-APA088/2018-CHN
|
Diversion of 281.50 Ha for Investigation, Design and Earth work excavation of GNSS Main Canal including construction of CM & CD works from KM 141.350 to Km 161.250/163.550 including Distributory system to irrigate an ayacut under GNSS Package-05/06 of Phase-II in Kadapa District
|
Irrigation
|
EE NTR TGP DIV II KDP
|
281.5
|
IN-PRINCIPLE
|
24-May-2019
|
|
|
|
|
Copy of SIR uploaded by Regional Office on: 08 Feb 2019
|
No
|
9
|
Andhra Pradesh
|
FP/AP/IRRIG/31863/2018
|
4-APA077/2018-CHN
|
Diversion of 433.88 Ha for Excavation of GNSS Main Canal from KM 96.50 to KM 119.00 of Phase-II Package 03/06
|
Irrigation
|
EE SKD GNSS PDTR
|
433.88
|
IN-PRINCIPLE
|
04-Feb-2020
|
|
|
|
|
Copy of SIR uploaded by Regional Office on: 26 Nov 2018
Copy of SIR uploaded by Regional Office on: 26 Nov 2018
|
EC File NA
|
10
|
Andhra Pradesh
|
FP/AP/ROAD/37757/2018
|
G.O.Ms.No.38
|
Road from Pachnapalli to Gemmeli
|
Road
|
Executive Engineer PR Paderu
|
3.18
|
IN-PRINCIPLE
|
03-Dec-2019
|
|
|
|
|
|
No
|
11
|
Andhra Pradesh
|
FP/AP/ROAD/37340/2018
|
G.O.Ms.No.8
|
Lolangipadu to Pedapolam
|
Road
|
Executive Engineer PR Paderu
|
1.79
|
IN-PRINCIPLE
|
18-May-2020
|
|
|
|
|
|
No
|
12
|
Andhra Pradesh
|
FP/AP/ROAD/65068/2020
|
4-APB113/2021-VIJ
|
Diversion of 1.33 Ha of land for Road from Pandra road 2/4 km to thumbali of Seethampeta mandal in Srikakulam District in comp No409,41I of Kotturu battili RF of Bagga Beat,Pathapatnam range Srikakula
|
Road
|
EXECUTIVE ENGINEER PANCHAYAT RAJ ENGINEERING DIVISION
|
1.33
|
IN-PRINCIPLE
|
17-Jun-2022
|
|
|
|
|
|
No
|
13
|
Andhra Pradesh
|
FP/AP/ROAD/17576/2016
|
2382/Section-II/2016
|
Upgradation of NH-565 from Km.425/400 to 509/400 i.e from Penchalakona to Yerpedu Section
|
Road
|
MINISTRY OF ROAD TRANSPORT AND HIGHWAYS GOVT OF INDIA
|
0.9916
|
IN-PRINCIPLE
|
20-Aug-2016
|
|
|
|
|
|
No
|
14
|
Andhra Pradesh
|
FP/AP/WATER/14575/2015
|
G.O.RT No.195,Dt:23/07/2016
|
DRINKING WATER PROJECT
|
Drinking Water
|
RURAL WATER SUPPLY AND SANITATION DEPARTMENT
|
0.1541
|
IN-PRINCIPLE
|
23-Jul-2016
|
|
|
|
|
|
No
|
15
|
Andhra Pradesh
|
FP/AP/ROAD/35172/2018
|
G.O.Ms.No.11
|
Formation and BT to the road including construction of culverts from Vadamamidi to China Agraharam
|
Road
|
EXECUTIVE ENGINEER PIU VISAKHAPATNAM
|
3.09
|
IN-PRINCIPLE
|
31-Jan-2019
|
|
|
|
|
|
No
|
16
|
Andhra Pradesh
|
FP/AP/ROAD/34563/2018
|
G.O.Ms.No.112
|
Formation and BT to the road including construction of culverts from Mullumetta to Kothapalem via Vanchula
|
Road
|
EXECUTIVE ENGINEER PIU VISAKHAPATNAM
|
4.26
|
IN-PRINCIPLE
|
29-Oct-2018
|
|
|
|
|
|
No
|
17
|
Andhra Pradesh
|
FP/AP/TRANS/39550/2019
|
4-APB232/2024-VIJ
|
Diversion of 1.06 Ha. Land for Laying and maintaining of 33 KV line beside Narsipatnam-Tuni road from Thandava junction to Gandhinagaram
|
Transmission Line
|
DIVISIONAL ENGINEER, NARSIPATNAM, APEPDCL
|
1.06
|
IN-PRINCIPLE
|
05-Apr-2024
|
|
|
|
|
|
No
|
18
|
Andhra Pradesh
|
FP/AP/ROAD/29874/2017
|
4-APC129/2021-VIJ
|
Upgradation of NH-167B from Km 99/103 to 191/050 i.e from CS puram to Singarayakonda (Old NH 16 ) to two lanes with paved shoulders under NHDP IV in the State of Andhra Pradesh
|
Road
|
MINISTRY OF ROAD TRANSPORT AND HIGHWAYS GOVT OF INDIA
|
9.33
|
IN-PRINCIPLE
|
30-Mar-2022
|
|
|
|
|
|
No
|
19
|
Andhra Pradesh
|
FP/AP/Pipeline/149027/2021
|
4-APB164/2022-VIJ
|
Laying of pipeline for development of Centre for Coastal aquaculture activities by National Fisheries Development Board (NFDB)
|
Pipeline
|
NATIONAL FISHERIES DEVELOPMENT BOARD
|
0.39
|
IN-PRINCIPLE
|
30-Apr-2022
|
|
|
|
|
|
No
|
20
|
Andhra Pradesh
|
FP/AP/ROAD/27472/2017
|
G.O.Rt.No.205
|
Laying of BT road from GPY - Nunaparthi Road at KM 1/8 to Nadimpalli village in Atchutapuram Mandal in Visakhapatnam District
|
Road
|
EXECUTIVE ENGINEER PIU VISAKHAPATNAM
|
0.78
|
IN-PRINCIPLE
|
13-Dec-2017
|
|
|
|
|
|
No
|
21
|
Andhra Pradesh
|
FP/AP/ROAD/22780/2016
|
G.O.Rt.No.62
|
Formation of Ring Road around Madakasira Town from Km 0/0 to 20/0 in Ananthapuram Dist in the State of Andhra Pradesh.
|
Road
|
EXECUTIVE ENGINEER
|
1.95
|
IN-PRINCIPLE
|
16-Mar-2017
|
|
|
|
|
|
No
|
22
|
Andhra Pradesh
|
FP/AP/ROAD/7928/2014
|
G.O.Rt.No.356
|
Providing BT surface to the road from Kotagunnala to Vanabhalingam in G.K.Veedhi Mandal
|
Road
|
Executive Engineer PR Paderu
|
2.9
|
IN-PRINCIPLE
|
21-Dec-2015
|
|
|
|
|
|
No
|
23
|
Andhra Pradesh
|
FP/AP/ROAD/9197/2015
|
G.O.Rt.No.5, Dt:05.01.2017
|
Road from Mamidipadu(Medaparthi) to Venukonda(Mettavalasa) of Ananthagiri mandal Visakhapatnam
|
Road
|
Executive Engineer PR Paderu
|
1.3747
|
IN-PRINCIPLE
|
05-Jan-2017
|
|
|
|
|
|
No
|
24
|
Andhra Pradesh
|
FP/AP/ROAD/22943/2016
|
G.O.Rt.No.63
|
Upgradation of NH-67 from Km.641/000 to Km.695/000 i.e from Dornla T Junction to Atmakur Section in SPSR Nellore District
|
Road
|
MINISTRY OF ROAD TRANSPORT AND HIGHWAYS GOVT OF INDIA
|
0.933
|
IN-PRINCIPLE
|
16-Mar-2017
|
|
|
|
|
|
No
|
25
|
Andhra Pradesh
|
FP/AP/ROAD/142780/2021
|
4-APB204/2023-VIJ
|
Road from NR Puram(D K Parthi) to Gadilalova
|
Road
|
Executive Engineer PR Paderu
|
4.96
|
IN-PRINCIPLE
|
16-Jun-2023
|
|
|
|
|
|
No
|
26
|
Andhra Pradesh
|
FP/AP/ROAD/35939/2018
|
4-APB173/2022-VIJ
|
Providing BT to the Road from R&B road to Gollaguppa
|
Road
|
EEPIUKKD
|
2.84
|
IN-PRINCIPLE
|
19-Jul-2023
|
|
|
|
|
|
No
|
27
|
Andhra Pradesh
|
FP/AP/ROAD/31955/2018
|
G.O.Rt.No.78
|
Bangarumetta to Chinthagunnela
|
Road
|
Executive Engineer PR Paderu
|
2
|
IN-PRINCIPLE
|
13-Jun-2018
|
|
|
|
|
|
No
|
28
|
Andhra Pradesh
|
FP/AP/ROAD/34815/2018
|
G.O.Ms.No.107
|
Udapalem to Andanapali
|
Road
|
Executive Engineer PR Paderu
|
2.14
|
IN-PRINCIPLE
|
29-Oct-2018
|
|
|
|
|
|
No
|
29
|
Andhra Pradesh
|
FP/AP/ROAD/34558/2018
|
G.O.Ms.No.118
|
Formation of road and Providing BT surface to the road including construction of culverts from Kotagunnala to Gosaigondi via Vartanapalli
|
Road
|
EXECUTIVE ENGINEER PIU VISAKHAPATNAM
|
3.16
|
IN-PRINCIPLE
|
29-Oct-2018
|
|
|
|
|
|
No
|
30
|
Andhra Pradesh
|
FP/AP/ROAD/6871/2014
|
5998/2014-FCA3
|
Providing BT road from Pedduru to Seetharampuram via Rolangi in Chintapalli Mandal
|
Road
|
EXECUTIVE ENGINEER
|
1.85
|
IN-PRINCIPLE
|
05-Nov-2015
|
|
|
|
|
|
No
|
31
|
Andhra Pradesh
|
FP/AP/IRRIG/34553/2018
|
4-APA080/2018-CHN
|
Diversion of 101.24 Ha for Excavation of GNSS Main Canal from KM 87.400 to KM 94.800 of Phase-II Package 02/06
|
Irrigation
|
EE SKD GNSS PLVL
|
101.24
|
IN-PRINCIPLE
|
24-May-2019
|
|
|
|
|
Copy of SIR uploaded by Regional Office on: 26 Nov 2018
Copy of SIR uploaded by Regional Office on: 26 Nov 2018
|
No
|
32
|
Andhra Pradesh
|
FP/AP/ROAD/41072/2019
|
4-APB127/2021-VIJ
|
Upgrading the road from Tada-Srikalahasthi road to Kambakam of Varadaiahpalem Mandal of Chittoor District
|
Road
|
EXECUTIVE ENGINEER PANCHAYAT RAJ TIRUPATI
|
0.99
|
IN-PRINCIPLE
|
30-Jul-2021
|
|
|
|
|
|
No
|
33
|
Andhra Pradesh
|
FP/AP/ROAD/31643/2018
|
G.O.Rt.No.102
|
Formation and BT to the road including construction of culverts from G.Agraharam road to Lakkavaram.
|
Road
|
Executive Engineer PR Paderu
|
2.89
|
IN-PRINCIPLE
|
25-Jul-2018
|
|
|
|
|
|
No
|
34
|
Andhra Pradesh
|
FP/AP/ROAD/36387/2018
|
4-APB090/2018-CHN
|
Construction of CC road from Akkacheruvupadu to Nellore-Podalakur road for road connectivity
|
Road
|
MUNICIPAL CORPORATION NELLORE
|
0.75
|
IN-PRINCIPLE
|
20-Dec-2018
|
|
|
|
|
|
No
|
35
|
Andhra Pradesh
|
FP/AP/Others/138915/2021
|
4-APB229/2024-VIJ
|
Providing CPWS scheme to Beerakuppam and 9 other habitations in Sathyavedu Constiency.
|
Others
|
EXECUTIVE ENGINEER RWS TIRUPATI
|
0.2
|
IN-PRINCIPLE
|
29-Jan-2024
|
|
|
|
|
|
No
|
36
|
Andhra Pradesh
|
FP/AP/ROAD/44671/2020
|
4-APB108/2021-VIJ
|
Dabbagunta to Pallapudungada
|
Road
|
EXICUTIVE ENGINEER
|
4.36
|
IN-PRINCIPLE
|
05-May-2022
|
|
|
|
|
|
No
|
37
|
Andhra Pradesh
|
FP/AP/ROAD/141402/2021
|
4-APB170/2022-VIJ
|
Road from Vetaganivalasa to Thangalam in Pachipenta Mandal of Vizianagaram District
|
Road
|
EXICUTIVE ENGINEER
|
3.37
|
IN-PRINCIPLE
|
07-Jun-2022
|
|
|
|
|
|
No
|
38
|
Andhra Pradesh
|
FP/AP/ROAD/6912/2014
|
22916/2013,FCA3
|
Formation of BT road from teemulabanda to vadamamidi village of GK Veedhi
|
Road
|
Executive Engineer PR Paderu
|
3.46
|
IN-PRINCIPLE
|
05-Nov-2015
|
|
|
|
|
|
No
|
39
|
Andhra Pradesh
|
FP/AP/ROAD/34557/2018
|
G.O.Rt.No.108
|
Formation of road and Providing BT surface to the road including construction of culverts from Sammagiri to Rachapanasa
|
Road
|
EXECUTIVE ENGINEER PIU VISAKHAPATNAM
|
2.78
|
IN-PRINCIPLE
|
29-Oct-2018
|
|
|
|
|
|
No
|
40
|
Andhra Pradesh
|
FP/AP/ROAD/34562/2018
|
G.O.Ms.No.113
|
Formation and BT to the road including construction of culverts from P.K.Gudem to Pamurai
|
Road
|
EXECUTIVE ENGINEER PIU VISAKHAPATNAM
|
2.67
|
IN-PRINCIPLE
|
29-Oct-2018
|
|
|
|
|
|
No
|
41
|
Andhra Pradesh
|
FP/AP/ROAD/36458/2018
|
G.O.Ms.No.138
|
Nurmathi R&B Road to Pedajageeru of G.Madugula Mandal
|
Road
|
Executive Engineer PR Paderu
|
2.48
|
IN-PRINCIPLE
|
18-Dec-2018
|
|
|
|
|
|
No
|
42
|
Andhra Pradesh
|
FP/AP/OFC/148408/2021
|
1769/Section-II/2023
|
Laying of Optical Fibre Cable (OFC) along existing Right of Way of the Roads passing through Forests under Proddatur WL Division
|
Optical Fibre Cable
|
JIO DIGITAL FIBRE PRIVATE LIMITED
|
0.36
|
IN-PRINCIPLE
|
23-Aug-2023
|
|
|
|
|
|
No
|
43
|
Andhra Pradesh
|
FP/AP/ROAD/44481/2020
|
4-APB149/2022-VIJ
|
WIDENING and STRENGTHENING of NARSIPANAM – DEVIPATNAM Road from Km 7/4 to 12/0, 16/0 to 17/0, 21/0 to 25/0 and 29/500 to 30/0 including construction of Culverts, Retaining Walls in Narsipatnam, Go
|
Road
|
EXECUTIVE ENGINEER
|
2.1
|
IN-PRINCIPLE
|
11-Apr-2022
|
|
|
|
|
|
No
|
44
|
Andhra Pradesh
|
FP/AP/ROAD/105981/2020
|
4-APB165/2022-VIJ
|
Road from Munagarapalli to Vanchula
|
Road
|
Executive Engineer PR Paderu
|
2.34
|
IN-PRINCIPLE
|
30-Apr-2022
|
|
|
|
|
|
No
|
45
|
Andhra Pradesh
|
FP/AP/ROAD/49021/2020
|
4-APB162/2022-VIJ
|
Road from Nerellabanda to Sagulu
|
Road
|
Executive Engineer PR Paderu
|
1.23
|
IN-PRINCIPLE
|
30-Apr-2022
|
|
|
|
|
|
No
|
46
|
Andhra Pradesh
|
FP/AP/ROAD/141404/2021
|
4-APC153/2022-VIJ
|
Road from Vetaganivalasa to Araku Road via Sathabi in Pachipenta Mandal of Vizianagaram District
|
Road
|
EXICUTIVE ENGINEER
|
6.48
|
IN-PRINCIPLE
|
03-May-2022
|
|
|
|
|
|
No
|
47
|
Andhra Pradesh
|
FP/AP/ROAD/37597/2018
|
4-APC161/2022-VIJ
|
Providing BT road including formation and construction of CD works from Yerrabanda to Sarabannapalem
|
Road
|
EXECUTIVE ENGINEER PIU VISAKHAPATNAM
|
5.92
|
IN-PRINCIPLE
|
03-May-2022
|
|
|
|
|
|
No
|
48
|
Andhra Pradesh
|
FP/AP/IRRIG/13795/2015
|
8-38/2016-FC
|
Chintalapudi Lift Irrigation Scheme
|
Irrigation
|
WATER RESOURCES DEPARTMENT
|
469.18
|
IN-PRINCIPLE
|
20-Nov-2017
|
|
|
|
|
|
Yes
Proposal Status: EC application yet to be submitted
|
49
|
Andhra Pradesh
|
FP/AP/WATER/18719/2016
|
G. O. Rt.No.256, Dt.19.10.2016
|
Providing Comprehensive protected water supply scheme to habitations in Gudur mandal in SPSR Nellore District
|
Drinking Water
|
RURAL WATER SUPPLY AND SANITATION DEPARTMENT
|
0.149
|
IN-PRINCIPLE
|
19-Oct-2016
|
|
|
|
|
|
No
|
50
|
Andhra Pradesh
|
FP/AP/ROAD/9196/2015
|
G.O.Rt.No.4, Dt:05.01.2017
|
Road from Pedakota(Jalada) to Velamamidi of Ananthagiri Mandal Visakhapatnam
|
Road
|
Executive Engineer PR Paderu
|
2.0828
|
IN-PRINCIPLE
|
05-Jan-2017
|
|
|
|
|
|
No
|
|