Ministry of Environment,Forest and Climate Change
Government of India
Uttar Pradesh
State Forest Department
List of Proposals submitted Online by User Agencies (Proposals received on or after 15th July 2014)
Help
Using this report, you can view details of proposals (Received on or after 15th July 2014) . Click on Proposal no to view detail of FORM-A part I. Click on   to print
 
Proposal Year : Region :
State : Category :
Circle : Division :
Status of the Proposal : Whether EC required(Yes/No)? :
Enter value for Search :
Note :-All areas are in Hectares(ha.)
Sno.State NameProposal No.RO/Ministry File NumberProposal NameCategoryUser Agency NameArea (ha.)Proposal StatusProposal initially received at RO/HO(Date)Proposal Pending Since(Date)View Report on Allocation of Fresh forest land (Form-A) Part-IView Report (Part-II to Part-V and Stage-I Clearances) View TimeLine DetailsOther Related DocumentsWhether EC required (if so, status)?
1 Uttar Pradesh FP/UP/ROAD/152126/2022 8B/UP/06/194/2022 Improvement and Up-gradation of Existing Road (NH-731) to 4-Lane with Paved Shoulder from Km 123.650 to Km 175.080, Start of Shahabad Bypass to End of Hardoi Bypass of NH-731 on HAM basis of Hardoi Forest Division & District in the state of Uttar Pradesh (Total Length-51.430 Km of Package 2B) Road NATIONAL HIGHWAYS AUTHORITY OF INDIA PIU BAREILLY 5.546 IN-PRINCIPLE
13-Jul-2022
07-Sep-2022



No
2 Uttar Pradesh FP/UP/ROAD/146800/2021 8B/UP/06/156/2022/FC Improvement and Up-gradation of NH-731 to 4-Lane with Paved Shoulder from Km 175.08 to Km 229.070 under Package 3 in Hardoi District and Forest Division Road NATIONAL HIGHWAYS AUTHORITY OF INDIA PIU BAREILLY 46.601 IN-PRINCIPLE
01-Jul-2022
07-Sep-2022



No
3 Uttar Pradesh FP/UP/Pipeline/42646/2019 8B/UP/08/115/2022/FC The Proposal of diversion in forest Land for laying of LPG pipeline Under Kandla -Gorakhpur LPG pipeline project from UP Border To Unnao section. The proposed pipeline will cross MP-UP border entering Lalitpur and passes through forest divisions of Districts-Lalitpur ,Jhansi, Jalaun , Kanpur Dehat, Kanpur Nagar and Unnao in Uttar Pradesh . Pipeline IHB LIMITED 7.99674 IN-PRINCIPLE
30-May-2022
23-Aug-2022



No
4 Uttar Pradesh FP/UP/ROAD/148376/2021 8B/UP/06/55/2022/FC Improvement and Up-gradation of NH-731 to 2-Lane with Paved Shoulder from Km 40.00 to Km 88.750 under Package 1 in Shahjahanpur District and Forest Division (Total Length-48.75 Km of Package 1) Road NATIONAL HIGHWAYS AUTHORITY OF INDIA PIU BAREILLY 26.408 IN-PRINCIPLE
29-Apr-2022
03-Aug-2022



No
5 Uttar Pradesh FP/UP/ROAD/42458/2019 8B/UP/06/40/2022/FC Construction of 6-lane (expandable to 8 lane) Kanpur-Lucknow Expressway from Shaheed Path Intersection at NH-25 (district Lucknow) to Shuklaganj Intersection near Kanpur at NH-25 (district Unnao) in the state of Uttar Pradesh Road National Highways Authority of India 33.9919 IN-PRINCIPLE
28-Mar-2022
11-Jul-2022
Yes


Proposal Status: EC application yet to be submitted
6 Uttar Pradesh FP/UP/WATER/119894/2021 8B/UP/08/263/2021/FC Patwadh Group of Villages Water Supply Scheme – Construction of Intake works consisting of a jackwell and related facilities, 1.20 km pipeline is to be laid underground and a Water Treatment Plant are to be constructed at Village Kanach in Kaimur wild life divsion Mirzapur,district sonbhadra Drinking Water STATE WATER AND SANITATION MISSION NAMAMI GANGE AND RURAL WATER SUPPLY DEPARTMENT UP GOVERNMENT 6.4325 IN-PRINCIPLE
03-Dec-2021
17-Jun-2022



No
7 Uttar Pradesh FP/UP/ROAD/149779/2021 8B/UP/06/36/2022/FC Forest Land Proposed to be diverted for Road Widening from Nakatiya River Bridge end to Invertis Bada Bypass Tiraha Ch. 254.400 to 260.400 (6000m) in Distt Bareilly Road BAREILLY DEVELOPMENT AUTHORITY 6.84 IN-PRINCIPLE
23-Mar-2022
15-Jun-2022



No
8 Uttar Pradesh FP/UP/ROAD/144793/2021 8B/UP/06/295/2021/FC Construction of 6 Lane 'Ganga Expressway' (Expandable upto 8 Lane), an access controlled Green field Expressway in district Meerut, Hapur, Bulandsahar, Amroha, Sambhal, Badaun, Shahjahanpur, Hardoi, Unnao, Raibareli, Partapgarh & Paryagraj, (CH 7+900-CH 601+847 Km) total length 593.947 Kms. Road UPEIDA (GANGA EXPRESSWAY) 121.4716 IN-PRINCIPLE
22-Dec-2021
26-May-2022

AIP Corrigendum :
13 Jul 2022



EC File NA
9 Uttar Pradesh FP/UP/ROAD/49626/2020 8B/UP/06/29/2022/FC Rehabilitation and Upgradation to 2-lane with paved shoulders configuration of Radhaita to Pilibhit Section of NH-731K ( Km 137.250 to Km 183.380) (Package-IV) in the State of Uttar Pradesh under Green National Highways Corridor Project (GNHCP) with the loan assistance of world Bank on EPC mode Road MINISTRY OF ROAD TRANSPORT AND HIGHWAYS GOVT OF INDIA 44.376 IN-PRINCIPLE
22-Feb-2022
28-Apr-2022



No
10 Uttar Pradesh FP/UP/ROAD/59458/2020 8B/UP/06/251/2021/FC WIDENING & STRENGTHENING OF PARWADH TO BASUHARI ROAD FROM KM. NO. 0.000 TO 61.500 UNDER ROAD CONNECTIVITY PROJECT ON LEFT WING EXTREMISIM AREA (RCPLWEA) IN TEHSIL:- ROBERTSGANJ, DISTRICT:- SONBHADRA Road PMGSY DIVISION PUBLIC WORKS DEPARTMENT SONEBHADRA 45.2925 IN-PRINCIPLE
15-Nov-2021
10-Jan-2022



No
11 Uttar Pradesh FP/UP/ROAD/35291/2018 8B/UP/06/58/2021/FC WIDENING & STRENGTHENING OF NAUGARH DHANKUWARI KALA TO KESAR ROAD FROM KM 0.00 TO 22.800 UNDER ROAD CONNECTIVITY PROJECT ON LEFT WING EXTREMISM AREA (RCPLWEA) IN TAH.-NAUGARH, DISTT.-CHANDAULI BY TEMPORARY-DIVISION (P.P.), P.W.D., CHANDAULI (U.P.) Road EE PMGSY PWD CHANDAULI 19.62 IN-PRINCIPLE
16-Feb-2021
27-Jul-2021



No
12 Uttar Pradesh FP/UP/ROAD/38699/2019 8B/UP/06/120/2020 Diversion of Protected Forest Land for ‘Six laning of Hapur Bypass to Moradabad section from existing km 85.850 to km 107.000 of NH-24 in Hapur and Amroha Districts of Uttar Pradesh State NHDP Phase V Road NATIONAL HIGHWAY DIVISION 25.023 IN-PRINCIPLE
18-Sep-2020
11-Dec-2020

Letter after AIP :
04 Jul 2022



No
13 Uttar Pradesh FP/UP/TRANS/42524/2019 8B/UP/04/169/2020 765 kV Ghatampur-Hapur S/C Transmission Line Transmission Line GHATAMPUR TRANSMISSION LIMITED 16.5761 IN-PRINCIPLE
24-Nov-2020
24-Nov-2020



No
14 Uttar Pradesh FP/UP/TRANS/40906/2019 8B/UP/04/90/2020 400kV D/C Jaunpur Obra Transmission Line Transmission Line OBRA C BADAUN TRANSMISSION LIMITED 89.632 IN-PRINCIPLE
14-Aug-2020
23-Oct-2020



No
15 Uttar Pradesh FP/UP/ROAD/41969/2019 8B/UP/06/85/2020/FC Widening and Strengthening of Chikasi-Hamirpur Road(Bilyaya-Panwari Road SH-21) from Ch.430.00 to 442.100 in Hamirpur District and From Ch.442.100 to 448.680 in Mahoba District Road EXECUTIVE ENGINEER CONSTRUCTION DIVISION TWO PWD HAMIRPUR 41.724 IN-PRINCIPLE
30-Jul-2020
30-Sep-2020



No
16 Uttar Pradesh FP/UP/ROAD/41235/2019 8B/UP/06/38/2020 Protected Forest Land Proposed to be diverted for 4-Laning and Strengthening of Bilraya-Panwari Road(SH21) From Ch..399.600 to 427.00, in District:Hamirpur Road EXECUTIVE ENGINEER CONSTRUCTION DIVISION TWO PWD HAMIRPUR 49.32 IN-PRINCIPLE
21-May-2020
19-Aug-2020



No
17 Uttar Pradesh FP/UP/ROAD/43247/2019 8B/UP/06/29/2020/FC Protected Forest Land Proposed for 4-Lane Widening &Strengthening of Puttulal Chauraha to Roza Adda(ODR) From Ch.0.00 to 2.950,Hathaura Chauraha to Puttulal Chauraha to Road(ODR) FROM Ch.0.00 to 2.750 ; GIC To Atsaliya Railway Fatak from Ch. 0.00 3.950 and Barailly Mode Chauraha to Garra Bridge Road(Old NH-24 City Part) from Ch.0.00 to 1.800 in S Road PROVINCIAL DIVISION PWD SHAHJAHANPUR 9.16 IN-PRINCIPLE
16-Mar-2020
16-Mar-2020



No
18 Uttar Pradesh FP/UP/IRRIG/20269/2016 8B/UP/02/31/2018/FC FOREST LAND PROPOSED TO BE DIVERTED FOR CONSTRUCTION OF KANHAR IRRIGATION PROJECT FOR AREA OF 127.1637 HA. IN SONEBHADRA DISTRICT (UP) Irrigation Kanhar Irrigation Project 127.1637 IN-PRINCIPLE
19-Mar-2018
27-Feb-2020



No
19 Uttar Pradesh FP/UP/ROAD/39827/2019 8B/UP/06/86/2019/FC Protected Forest Land Proposed to be diverted for 4-Lane Widening of Jhansi-Babina Road(City Part Of Old NH-26) from Km.3.00 to 11.00 in Jhansi District Road CONSTRUCTION DIVISION BHAWAN WING PWD JHANSI 14.8 IN-PRINCIPLE
01-Oct-2019
04-Feb-2020



No
20 Uttar Pradesh FP/UP/TRANS/39285/2019 8B/UP/04/105/2019/FC Forest Land Proposed to be diverted for construction 765 kV S/C Ghatampur-Agra Transmission Line passing through Reserve forest land in Etawah, Firozabad & Agra Districts and Protected Forest land in Crossing NH-86 at Km. 57.147, SH-46 at Km. 24.487, Etawah- Branch of Lower Ganga Canal in Kanpur Nagar, NH-25 at Km. 1559.650 in Kanpur Dehat, SH-21 Transmission Line GHATAMPUR TRANSMISSION LIMITED 79.4992 IN-PRINCIPLE
10-Dec-2019
10-Dec-2019



No
21 Uttar Pradesh FP/UP/RAIL/40280/2019 8B/UP/07/64/2019/FC Proposed Doubling of Sitapur Cant-Roza Section Protected Forest Land Proposed to be diverted from KM.0.00 to 80.300 passing through Districts Sitapur,Hardoi,Lakhimpur kheri and Shahajahanpur Railway NORTH RAILWAY MORADABAD 69.5992 IN-PRINCIPLE
26-Jul-2019
26-Jul-2019



No
22 Uttar Pradesh FP/UP/RAIL/29433/2017 8B/UP/07/3/2019 Protected Forest Land Proposed to be diverted for doubling of Allahabad-Varanasi Railway Track from Ch.209.8(Madudeeh) to 226.4 in Varanasi District Railway RVNL 14.691 IN-PRINCIPLE
11-Jan-2019
05-Feb-2019



No
23 Uttar Pradesh FP/UP/ROAD/25036/2017 8B/UP/06/76/2018/FC Forest Land proposed for Four-laning of road from Naraini toKalinjar Road From CH-35.000 Km to CH-60.825 Km.and from 0.00 to 1.500 on Kalinjar to Baghelbari Road In Banda District (Uttar Pradesh) Road CONSTRUCTION DIVISION I PWD BANDA 31.58 IN-PRINCIPLE
07-Oct-2018
21-Dec-2018



No
24 Uttar Pradesh FP/UP/Others/34211/2018 8B/UP/08/77/2018/FC Protected Forest Land Proposed to be Diverted for Laying of 1100mm, 2 pipes for Estabilishment of Water Carrier System to Ghatampur Thermal Power Project along NH-86 from Ch.20.800 to 61.900 District:Kanpur Nagar Others NEYVELI UTTAR PRADESH POWER LIMITED 14.385 IN-PRINCIPLE
09-Oct-2018
12-Nov-2018



No
25 Uttar Pradesh FP/UP/ROAD/34116/2018 8B/UP/06/70/2018 Rehabilitation and widening of GT Road section at Begum Bazar at km 185+800 to Chaufatka at km 194+000 (total length 8.200 km) in district Allahabad, Uttar Pradesh. Road CD ONE PWD UP ALLAHABAD 6.418 IN-PRINCIPLE
31-Aug-2018
28-Sep-2018



No
26 Uttar Pradesh FP/UP/TRANS/29629/2017 8B/UP/04/38/2018 Protected Forest Land Proposed to be diverted for 11 KV Transmission line on NH-76(Allhabad-Banda) Road from km.349 to 332(RHS) in Chitrakoot District Transmission Line ELECTRICITY DISTRIBUTION DIVISION CHITRAKOOT 25.5 IN-PRINCIPLE
03-Apr-2018
28-Sep-2018



No
27 Uttar Pradesh FP/UP/ROAD/30569/2017 8B/UP/06/66/2018 Four Lane with paved shoulder from Varanasi to Hanumanha section of NH-7 passing through Varanasi, Chandauli and Mirzapur district in the state of Uttar Pradesh Road National Highways Authority of India 131.0175 IN-PRINCIPLE
25-Jul-2018
26-Sep-2018



No
28 Uttar Pradesh FP/UP/ROAD/25364/2017 8B/UP/06/26/2018 Proposal for the diversion of road side protected forest land for "Four lane Widening and Strengthening of Shikohabad- Bhogaon (SH-84) road " (Ch. 21.00 to 43.800 ) and Construction of Ghiror Bypass ( Length 6.56 km.) Total Length 25.66 Km. in Mainpuri District . Protected forest land required for diversion is 24.92755 Road PROVINCIAL DIVISION PWD MAINPURI 24.92755 IN-PRINCIPLE
05-Mar-2018
13-Aug-2018



No
29 Uttar Pradesh FP/UP/ROAD/27165/2017 8B/UP/06/63/2018/FC Rehabilitation and Up-gradation of Sultanpur - Pratapgarh section of NH-96 from existing km 60/000 to km 90/000 [Design Ch. 60.000 to Ch. 90.865] to Two lane with paved shoulders in the state of Uttar Pradesh on Engineering, Procurement & Construction (EPC) Basis Contract Road TY DIVISION NH PWD SULTANPUR 31.942 IN-PRINCIPLE
14-Jun-2018
20-Jul-2018



No
30 Uttar Pradesh FP/UP/ROAD/26890/2017 8B/UP/06/24/2018/FC Diversion of Protected Forest Land for Rehabilitation and Up-gradation to 4-lane with paved shoulders configuration from Mitrasen to Kanpur (Km 356.000 to Km 414.000) section of National Highway-91 in Kanpur District in the State of Uttar Pradesh Road NHAI 93.975 IN-PRINCIPLE
05-Mar-2018
02-Jul-2018



No
31 Uttar Pradesh FP/UP/Others/27358/2017 8B/UP/09/47/2018/FC City Gas Distribution (CGD) Network Porject in Saharanpur Geographical Area Others BHARAT PETROLEUM CORPORATION LIMITED 6.343 IN-PRINCIPLE
19-Apr-2018
07-Jun-2018



No
32 Uttar Pradesh FP/UP/WATER/32379/2018 8B/UP/08/33/2018/FC AGRA WATER SUPPLY (GANGA JAL) PROJECT Drinking Water UTTAR PRADESH JAL NIGAM 10.22375 IN-PRINCIPLE
26-Mar-2018
30-May-2018



No
33 Uttar Pradesh FP/UP/ROAD/26451/2017 8B/UP/06/25/2017/FC Diversion of Protected Forest Land for Rehabilitation and Up-gradation to 4-lane with paved shoulders configuration from Naviganj to Mitrason section (Km 289.000 to Km 356.000 )Package-IV section of National Highway-91 in Kannuj District in the State of Uttar Pradesh Road NHAI 99.328 IN-PRINCIPLE
05-Mar-2018
16-May-2018



No
34 Uttar Pradesh FP/UP/ROAD/24596/2017 8B/UP/06/13/2018/FC Diversion of Protected Forest Land for Rehabilitation and Up-gradation of Road in 4-lane with paved shoulders configuration from Kalyanpur to Naviganj (Km 229.000 to Km 289.000) section of National Highway-91 in Mainpuri District in the State of Uttar Pradesh Road NHAI 97.896 IN-PRINCIPLE
06-Feb-2018
16-Apr-2018



No
35 Uttar Pradesh FP/UP/ROAD/22374/2016 8B/UP/06/12/2018 Diversion of Protected Forest Land for Rehabilitation and Up-gradation to 4-lane with paved shoulders configuration from Bhadwas to Kalyanpur section (Km 186.000 to Km 229.000 )Package-II section of National Highway-91 in Etah District in the State of Uttar Pradesh Road NHAI 65.495 IN-PRINCIPLE
06-Feb-2018
16-Apr-2018



No
36 Uttar Pradesh FP/UP/ROAD/28804/2017 8B/UP/06/37/2017/FC Development of Purvanchal Expressway via Lucknow, Barabanki, Amethi, Faizabad, Sultanpur, Ambedkarnagar, Azamgarh, Mau & Ghazipur Road UTTAR PRADESH EXPRESSWAYS INDUSTRIAL DEVELOPMENT AUTHORITY (UPEIDA) 17.5714 IN-PRINCIPLE
03-Jan-2018
26-Feb-2018



EC File NA
37 Uttar Pradesh FP/UP/ROAD/23705/2017 8B/UP/06/53/2017/FC Froest Land proposed to be Diverted for from 2 Laning to 4 Laning ON (SH-18) Road widening and Strenthening from Jarif nagar Durgpur to Ujhani from Ch. 162.000 Km to 207.400 Km on Meerut - Budaun Road in Budaun District Road CONSTRUCTION DIVISION PWD BADAUN 64.6 IN-PRINCIPLE
01-Aug-2017
25-Jan-2018



No
38 Uttar Pradesh FP/UP/ROAD/23576/2017 8B/06/52/2017 Forest Land Proposed to be diverted for Meerut-Badaun Road Widening and Strengthening from Ch.142.600 to 162.00 in Sambhal District Road PWD SAMBHAL 23.28 IN-PRINCIPLE
02-Aug-2017
23-Jan-2018



No
39 Uttar Pradesh FP/UP/ROAD/22835/2016 8B/UP/06/22/2017/FC Forest Land proposed to be diverted for Widening and strengthening of Chibramau-Saurikh-Bidhuna(MDR-13) in Knnauj District Road CONSTRUCTION DIVISION PWD KANNAUJ 21.6 IN-PRINCIPLE
16-Mar-2017
23-Jan-2018



No
40 Uttar Pradesh FP/UP/ROAD/23699/2017 8B/UP/06/57/2017/FC Froest Land proposed to be Diverted for 4-Laning of SH-33 Road from Lalpur Badi Zayarat to Ujhani bypass from Ch 102.115 Km to Ch 114.20 Km on Pilibhit-Bareilly-Mathura-Bharatpur Road in Budaun District Road PRVINCIAL DIVISION PWD BADAUN 13.29 IN-PRINCIPLE
24-Aug-2017
18-Jan-2018



No
41 Uttar Pradesh FP/UP/TRANS/24154/2017 8B/UP/04/50/2017 Construction of 132KV Jigana-Dadarkala Transmission Line for Evacuation of energy generated from proposed solar power plant having 75MW in Mirzapur District Transmission Line ELECTRICITY TRANSMISSION DIVISION UPPTCL MIRZAPUR 6.5475 IN-PRINCIPLE
02-Aug-2017
26-Dec-2017



No
42 Uttar Pradesh FP/UP/ROAD/21109/2016 8B/UP/06/32/2017/FC To connect Etah Kasganj Dist Hq with Four lane by widening and strengthning of Etah kasganj road (O.D.R) from dist Hq Etah (G.T. Road N.H. 91 junction) and Bareilly mathura road (S.H.- 33) up to dist Hq Kasganj (Length =24.300+16.500=40.800Km) Road PWD UTTAR PRADESH 46.808 IN-PRINCIPLE
30-May-2017
22-Dec-2017



No
43 Uttar Pradesh FP/UP/ROAD/24640/2017 8B/UP/06/2017/FC PROPOSAL FOR THE DIVERSION OF ROAD SIDE PROTECTED FOREST STRIP FOR THE WIDENING AND STRENGTHENING OF SHIKOHABD -BHOGAON ROAD(SH-84) FROM CH.0.000 TO 19.5185 FROM SHIKOHABD TO VILLAGE BHARAUL , AND CONSTRUCTION ARAON BYPASS (2.500 KM) ,BHARAUL BYPASS (1.700 KM) TOTAL LENGHTH 19.5185 IN FIROZABAD DISTRI Road PWD 26.143158 IN-PRINCIPLE
27-Oct-2017
13-Dec-2017



No
44 Uttar Pradesh FP/UP/ROAD/22879/2016 8B/RAJ/06/19/2017/FC Forest Land Proposed to be diverted for road widening from km 0.00(G.T Road Kalyanpur) to 10.97km (Bithoor), Tehsil: Sadar, District: Kanpur Nagar Road KDA 6.011 IN-PRINCIPLE
03-Mar-2017
05-Dec-2017



No
45 Uttar Pradesh FP/UP/ROAD/17752/2016 8B/UP/06/48/2017 Rehabilatatiung and upgrading to 4-lane with paved shoulder configuration of Chutmalpur - Ganeshpur section of NH-72A and Roorkee-Chutmalpur-Saharanpur-UP/Haryana Border section of NH-73 in the State of Uttar Pradesh Road NATIONAL HIGHWAY AUTHORTY OF INDIA PIU DEHRADUN 70.201 IN-PRINCIPLE
31-Jul-2017
08-Nov-2017



No
46 Uttar Pradesh FP/UP/ROAD/21661/2016 8B/UP/06/41/2017/FC Forest Land proposed to be diverted for Widening and Strengthening of NH-234 Triwa-Bela Road From CH.142.00 to 123.00 in Kannauj District Road CONSTRUCTION DIVISION PWD KANNAUJ 9.5 IN-PRINCIPLE
30-Jun-2017
23-Oct-2017



No
47 Uttar Pradesh FP/UP/ROAD/23693/2017 8B/UP/06/43/2017/FC Construction of Four Lane Bilrayan-Panwari Road (SH-21) From Chainage 318.000 to 352.000 District Jalaun, State Uttar Pradesh Road CDTHREEPWDORAI 42.60301 IN-PRINCIPLE
17-Jul-2017
28-Aug-2017



No
48 Uttar Pradesh FP/UP/ROAD/14208/2015 8B/UP/06/05/2017/FC Improvement / Widening of Nanau-Dadau Road (MDR 82W) (0.000km to 30.000km) Road PWD 10.184 IN-PRINCIPLE
03-Jan-2017
23-Aug-2017



No
49 Uttar Pradesh FP/UP/ROAD/20685/2016 8B/UP/06/108/2016/FC Forest Proposed to diverted for Four-Lane Widening Internal Portion of Old NH-2 from CH.161.800 to 180.000 (Kokhraj to Manauri) in District Kaushambhi Road UP PWD LUCKNOW 17.626 IN-PRINCIPLE
29-Nov-2016
17-Aug-2017



No
50 Uttar Pradesh FP/UP/ROAD/10947/2015 8B/UP/06/02/2017/FC Development of Dasna - Meerut Greenfield Alignment of Delhi Meerut Expressway in the State of Uttar Pradesh Road NHAI 15.053 IN-PRINCIPLE
29-Dec-2016
10-Aug-2017
Yes

EC File No.: 10-63/2013-IA.III
Proposal Status: EC Granted
12