Proposal Year : Region :
State : Category :
Circle : Division :
Status of the Proposal : Whether EC required(Yes/No)? :
Enter value for Search :
Note :-All areas are in Hectares(ha.)
Sno.State NameProposal No.RO/Ministry File NumberProposal NameCategoryUser Agency NameArea (ha.)Proposal StatusProposal initially received on(Date)Proposal Pending Since(Date)View Report on Allocation of Fresh forest land (Form-A) Part-IView Report (Part-II to Part-V and Stage-I Clearances) View TimeLine DetailsOther Related DocumentsWhether EC required (if so, status)?
1 Rajasthan FP/RJ/ROAD/151862/2022 “Widening and Strengthening of Mahngi to Dudhli Mod Via Bhawani, Bhawani Khurd, Saipur, Andhi, Sriramnagar, Virasna, Gaonli,Newal Maksundanpura, Chawandiya , District -Jaipur (Rajasthan)” Road PUBLIC WORKS DEPARTMENT RAJASTHAN 3.5568 Pending With UA
01-Jan-1900
29-Sep-2022



No
2 Rajasthan FP/RJ/ROAD/149378/2021 Upgradation of Road from Bhanpura Kalan to Gol Via Nagal Tulsidas, Toda Meena, Tala, Jaichandpura , Gathwari, Bobari , Under PMGSY-III, District -Jaipur (Rajasthan) Road PUBLIC WORKS DEPARTMENT RAJASTHAN 4.584 Pending With UA
01-Jan-1900
29-Sep-2022



No
3 Rajasthan FP/RJ/Approach/154227/2022 “Construction of Approach Access for Proposed Hindustan Petroleum Corporation Retail Outlet on Shiv-Nimbla Road NH-68 (Old NH-15) LHS on Chainage 114+570.00 to 114+605.00 on Khasra No 822/506 At Village-Nimbla, Tehsil -Shiv & District – Barmer(Rajasthan)” Approach Access HINDUSTAN PETROLEUM CORPORATION LIMITED 0.1801 Pending at CF/CCF
29-Sep-2022
29-Sep-2022



No
4 Rajasthan FP/RJ/ROAD/34657/2018 Construction of road chorakhari to nayagoun via maheshpur Road PUBLIC WORKS DEPARTMENT 1.872 Pending With UA
01-Jan-1900
28-Sep-2022



No
5 Rajasthan FP/RJ/ROAD/34417/2018 Construction of road from Dikwani to gadar ishartori Road PUBLIC WORKS DEPARTMENT 6.21 Pending With UA
01-Jan-1900
28-Sep-2022



No
6 Rajasthan FP/RJ/ROAD/34416/2018 construction of road from ganjan to sunwas Road PUBLIC WORKS DEPARTMENT 3.425 Pending With UA
01-Jan-1900
28-Sep-2022



No
7 Rajasthan FP/RJ/ROAD/30083/2017 Construction of shahbad to rajpur road Road PUBLIC WORKS DEPARTMENT 4 Pending With UA
01-Jan-1900
28-Sep-2022



No
8 Rajasthan FP/RJ/ROAD/150326/2021 Development of Economic Corridors, Inter Corridors and Feeder Routes to improve the efficiency of freight movement in India under Bharatmala Pariyojana (Lot-6/Package-4) - Paniyala-Alwar-Barodameo. Road NATIONAL HIGHWAY AUTHORITY OF INDIA PIU SOHNA 0.76 Pending at CF/CCF
28-Sep-2022
28-Sep-2022
Yes
Proposal No.: IA/RJ/NCP/239740/2021
EC File No.: 10/48/2021-IA.III
Proposal Status: TOR GRANTED
9 Rajasthan FP/RJ/ROAD/35096/2018 Construction of Road Widening & Strengthening of Manoharpur to Itwa Bhopji Via Nawalpura Charanwas (MDR-187) Road PUBLIC WORK DEPARTMENT 1.4445 Pending at Nodal Officer
17-Jun-2019
28-Sep-2022



No
10 Rajasthan FP/RJ/WATER/153642/2022 KALITEER LIFT SCHEME,DHOLPUR(RAJASTHAN) Drinking Water SE,WRD, DHOLPUR (RAJ) 14.8859 Pending With UA
01-Jan-1900
21-Sep-2022



No
11 Rajasthan FP/RJ/OFC/44022/2020 Permission for Laying underground OFC in ROW of existing road from Gudla to Karauli from Lat/long point 26° 33' 34.235" N 77° 1' 25.772" E to 26° 31' 29.409" N77° 1' 3.304" E , total length of 5.62 KM and total area 0.2531 ha. (Length and area in Forest is 03.32 . KM & 0.1494 ha & Length & area in Non -Forest is 2.30 KM & 0.1037 ha) along PWD r Optical Fibre Cable JIO DIGITAL FIBER PVT LTD 0.1494 Pending at Nodal Officer
04-Aug-2020
20-Sep-2022



No
12 Rajasthan FP/RJ/HYD/121439/2021 Construction of Shahpur (1800 MW) Pumped Storage Project by M/s Greenko Energies Private Limited, in Hanumanthkhera, Mungawali villages, G.P.-Mundiyar , Tehsil-Shahbad , Baran District , Rajasthan Hydel GREENKO ENERGIES PRIVATE LIMITED 413.9002 Pending With UA
01-Jan-1900
19-Sep-2022



No
13 Rajasthan FP/RJ/Approach/156636/2022 “Construction of Approach Access for Proposed Bharat Petroleum Corporation Limited Retail Outlet on Fatehpur to Bikaner Road NH-11 (New NH-52, LHS), At Chainage No. - 409+072.70 to 409+107.70 on Old Khasra No. 42 & New Khasra No. 313/312, At Village -Rohal ,Tehsil– Ramgarh Shekhawati , District - Sikar (Rajasthan)” Approach Access BHARAT PETROLEUM CORPORATLTD 0.1695 Pending at CF/CCF
19-Sep-2022
19-Sep-2022



No
14 Rajasthan FP/RJ/OFC/153375/2022 Permission for laying underground OFC in ROW of existing along PWD road Nathdwara to Iswal from Lat/ Long 24.892875/73.698969 to 24.910111/73.720915 in Rajsamand District. Total length & area in Forest & non forest area are 1.554 KM & 0.06993 ha and 1.812 KM & 0.08154 ha respectively in Rajsamand District. Optical Fibre Cable JIO DIGITAL FIBER PVT LTD 0.06993 Pending With UA
01-Jan-1900
15-Sep-2022



No
15 Rajasthan FP/RJ/MIN/40660/2019 Diversion of 0.7200 Ha. Forest Land for Sand Stone Mine Lease (M.L. No. 05/1999, Lease Area - 0.7200 Hectares) Village - Khodiya Kheri,Tehsil - Sangod, District - Kota (Rajasthan)" Mining OM PRAKASH SHARMA 0.72 Pending at CF/CCF
27-Sep-2022
15-Sep-2022
Yes


Proposal Status: EC application yet to be submitted
16 Rajasthan FP/RJ/OFC/150733/2022 Laying Underground Optical Fiber Cable along side road by Open Trench method within existing ROW from Rangama Talaab, Bichipur to Harnagar and Harnagar to Khoobnagar District Karouli Optical Fibre Cable TELESONIC NETWORKS LIMITED 0.477 Pending at Nodal Officer
21-Feb-2022
15-Sep-2022



No
17 Rajasthan FP/RJ/Approach/153859/2022 Construction of Approach Road for Proposed Hindustan Petroleum Corporation Ltd. Retail Outlet on Jaipur - Agra Road NH-21 (RHS) between KM Stone No. 187-188 (Chainage No. 187+710 TO 187+745)on Old Khasra No. 507/1705 & 507/1721 (New Khasra No. 1920/507 & 1922/507) at Village- Bhandana, Tehsil & District - Dausa, Rajasthan Approach Access HINDUSTAN PETROLEUM CORPORATION LTD. 0.1369 Pending at Nodal Officer
21-Sep-2022
12-Sep-2022



No
18 Rajasthan FP/RJ/Approach/153700/2022 Access road to cart the soil from Khodiya Kheri village Non Forest Land for Construction of Eight Lane Carriageway Starting Near Junction with NH-76 to Junction with NH-12 near Village Ummedpura (Ch.388.420 to Ch.419.00) Approach Access GHV (INDIA) PRIVATE LIMITED 0.9632 Pending at CF/CCF
29-Sep-2022
06-Sep-2022



No
19 Rajasthan FP/RJ/OFC/117648/2020 Laying of Underground Optical Fiber Cable Along the Road Within the Existing Row from Salamgarh to Banswara , M/s Telesonic Networks Limited. Total Route Length - 69.160 km.” District - Pratapgarh & Banswara (Rajasthan) Optical Fibre Cable TELESONIC NETWORKS LIMITED 0.6606 Pending With UA
01-Jan-1900
26-Aug-2022



No
20 Rajasthan FP/RJ/MIN/142599/2021 Diversion of 74.2490 Ha. Forest Land In Favour Of RDSA MINING LLP For Opencast Marble Mining in Revenue Village - Danta, Tehsil- Pipalkhunth, District – Pratapgarh, Rajasthan Mining RDSA MINING LLP 74.249 Pending at CF/CCF
30-Sep-2022
24-Aug-2022
Yes


Proposal Status: EC application yet to be submitted
21 Rajasthan FP/RJ/TRANS/149363/2021 SHIFTING /MODIFICATION OF 132 KV D/C LILO LINE FOR 132 KV GSS SISARAMA (220 KV AMBERI & 132 KV GOGUNDA DOUBLE CIRCUIT ) 339 MT.LENTH Transmission Line RVPNL T AND C UDAIPUR RAJASTHAN 0.9153 Pending With UA
01-Jan-1900
22-Aug-2022



No
22 Rajasthan FP/RJ/ROAD/15973/2015 Construction of BT Road from Sone Ka Gurja Simarra Village to Uwasa Village. Road PUBLIC WORKS DEPARTMENT RAJASTHAN JAIPUR 0.96 Pending With UA
01-Jan-1900
22-Aug-2022



No
23 Rajasthan FP/RJ/ROAD/45388/2020 Construction of Approach road sangahedi Road PUBLIC WORKS DEPARTMENT RAJASTHAN JAIPUR 0.41 Pending With UA
01-Jan-1900
18-Aug-2022



No
24 Rajasthan FP/RJ/TRANS/41653/2019 Construction of 33 KV Transmission Line From Badli Gss to Gura, Tehsil- Kotra District Udaipur (Raj) Total Route Lenth 6.327km Transmission Line AJMER VIDYUT VITRAN NIGAM LIMITED 2.301 Pending With UA
01-Jan-1900
17-Aug-2022



No
25 Rajasthan FP/RJ/IND/153357/2022 Laying of railway line for private siding for Cement plant. Industry WONDER CEMENT LIMITED 7.3792 Pending at Nodal Officer
21-Sep-2022
08-Aug-2022
Yes
Proposal No.: IA/RJ/IND/253066/2022
EC File No.: IA-J-11011/24/2022-IA-II(IND-I)
Proposal Status: TOR GRANTED
26 Rajasthan FP/RJ/ROAD/21362/2016 Development of Arain-Sarwad Highway, Section of SH-7E, from existing km 44.300 to km 0.000, in the state of Rajasthan Road PWD JAIPUR 1.2401 Pending With UA
01-Jan-1900
07-Aug-2022



No
27 Rajasthan FP/RJ/ROAD/21332/2016 Development of Bewar Masuda- Goyala Road , Section of SH-26A From Km. 2+550 to Km. 72.400, in the state of Rajasthan Road RAJASTHAN PWD 4.9696 Pending With UA
01-Jan-1900
07-Aug-2022



No
28 Rajasthan FP/RJ/MIN/7942/2014 Diversion of 32.5417 Ha. Forest Land for Quartz and Felspar Mine in Revenue Village-Buchara & Dudawas, Tehsil-Kotputli, District -Jaipur (Raj) Mining VISHNU KUMAR AGRAWAL 32.5417 Pending With UA
01-Jan-1900
01-Aug-2022



EC File NA
29 Rajasthan FP/RJ/MIN/142600/2021 Diversion of 10.4162 Ha. Forest Land In Favour of RDSA MINING LLP For Opencast Marble Mining (Plot No.02/2019 in Revenue Village – Kela Mela, Tehsil- Pipalkhunth, District – Pratapgarh, Rajasthan Mining RDSA MINING LLP 10.4162 Pending at Nodal Officer
13-Sep-2022
27-Jul-2022
Yes


Proposal Status: EC application yet to be submitted
30 Rajasthan FP/RJ/ROAD/127971/2021 CONSTRUCTION OF UPGRADATION RURAL ROAD FROM T11-SUHAGPUR TO ACHALAWDA UPTO BLOCK BORDER ROAD KM 0/0 TO 8/000 Road PWD DN II PRATAPGARH 4.62 Pending With UA
01-Jan-1900
25-Jul-2022



No
31 Rajasthan FP/RJ/ROAD/148609/2021 “Construction of Widening ,Strengthening on Kranapur Mandrail -Ond-Chandelipura Road (MDR-3A) From Kranpur MDR-3A KM Stone No-00.00 to MDR-3A KM Stone No-34.00 , Tehsil–Mandrail ,District -Karauli (Rajasthan)” Road PUBLIC WORKS DEPARTMENT RAJASTHAN 8.5635 Pending With UA
01-Jan-1900
22-Jul-2022



No
32 Rajasthan FP/RJ/TRANS/30091/2017 CONSTRUCTION OF 220 KV S/C SURATGARH - PADAMPUR TRANSMISSION LINE, DISTRICT-SRI GANGANAGAR (RAJ.) Transmission Line RAJASTHAN RAJYA VIDYUT PRASARAN NIGAM LTD HANUMANGARH 1.3407 Pending at CF/CCF
24-Aug-2022
20-Jul-2022



No
33 Rajasthan FP/RJ/OFC/117656/2020 “Laying of Underground Optical Fiber Cable Along the Road Within the Existing Row from From Rinchhri to Ganora, M/s Telesonic Networks Limited. Total Route Length - 84.040km.” District - Pratapgarh & Banswara (Rajasthan)” Optical Fibre Cable TELESONIC NETWORKS LIMITED 0.6615 Pending With UA
01-Jan-1900
08-Jul-2022



No
34 Rajasthan FP/RJ/SCH/148169/2021 Diversion of 0.9830 Hector for construction of Existing School established since 1963 for Extension Government Secondary School at Village-Rampura Nyola , Tehsil-Suratgarh,District -Sri Ganganagar (Rajasthan)” School DISTRICT EDUCATION OFFICER SECONDARY EDUCATION SHRI GANGANAGAR 0.983 Pending at Nodal Officer
20-Sep-2022
24-Jun-2022



No
35 Rajasthan FP/RJ/IRRIG/141323/2021 Shikhargatta Minor Irrigation Project (MIW) Tehsil-Shahpura Distt.-Jaipur. Rajasthan Irrigation EXECUTIVE ENGINEER WATER RESOURCE DIVISION JAIPUR 4 Pending With UA
01-Jan-1900
17-Jun-2022



No
36 Rajasthan FP/RJ/ROAD/34866/2018 Construction of Road from Industrial Area to Bikaner Bypass ,Sikar Road URBAN IMPROVMENT TRUST,SIKAR 1.35 Pending at Nodal Officer
21-Sep-2022
17-Jun-2022



No
37 Rajasthan FP/RJ/OFC/150737/2022 Laying of Underground Optical Fiber Cable Along the Road Within the Existing Row from Roneeja-Kumaharla to Bundi-Tonk District Border to Dhadrola -Dooni M/s Telesonic Networks Limited (Rajasthan)” Optical Fibre Cable TELESONIC NETWORKS LIMITED 0.4104 Pending at Nodal Officer
06-Sep-2022
14-Jun-2022



No
38 Rajasthan FP/RJ/Others/41843/2019 Construction of Stadium at Gram Panchyat Kolayat , District Bikaer (Raj.) Others PANCHAYAT SAMITI KOLAYAT BIKANER 3.66 Pending With UA
01-Jan-1900
10-Jun-2022



No
39 Rajasthan FP/RJ/TRANS/143945/2021 Construction of Sikar-II_Neemrana 400 KV D/C Transmission Line(Twin HTLS*)in Rajasthan Transmission Line SIKAR NEW TRANSMISSION LIMITED (A 100% WHOLLY OWNED SUBSIDIARY OF POWERGRID CORPORATION OF INDIA LIMITED) 13.0134 Pending at Nodal Officer
19-Sep-2022
26-Apr-2022



No
40 Rajasthan FP/RJ/Approach/149862/2021 Construction of Approach Road for Proposed Nayara Energy Limited (Formerly Essar Oil Ltd.) Retail Outlet on Suratgarh - Ganganagar Road (City Road) LHS in the Part of Murba No. 11, Kila No. 6 & 7, Village-1G Chotti, Tehsil & District- Sri Ganganagar, Raj Approach Access NAYARA ENERGY LIMITED 0.0432 Pending With UA
01-Jan-1900
18-Apr-2022



No
41 Rajasthan FP/RJ/WATER/150070/2021 “Construction of OHSR at Bandha Basti, Ward No-23,Shastri Nagar Jaipur(Rajasthan)” Drinking Water SUPERINTENDING ENGINEER PHED CITY CIRCLE(N) JAIPUR 0.1225 Pending at CF/CCF
12-Sep-2022
14-Apr-2022



No
42 Rajasthan FP/RJ/TRANS/152039/2022 “Construction of 33 KV Overhead Transmission Line From 400 KV GSS Bhadla to HPCL Rajasthan Refinery Ltd Nachana District -Jaisalmer” Transmission Line JODHPUR VIDYUT VITRAN NIGAM LIMITED , JAISALMER 18.4125 Pending at DFO/DCF
27-Sep-2022
07-Mar-2022



No
43 Rajasthan FP/RJ/ROAD/149560/2021 “Construction of Widening ,Strengthening on SH-32A From Jhameshwarji to Jagat Road KM Stone No-67/0 to 80/0, Tehsil–Girwa, District -Udaipur (Rajasthan)” Road PUBLIC WORKS DEPARTMENT RAJASTHAN 6.75 Pending at DFO/DCF
02-Sep-2022
21-Feb-2022



No
44 Rajasthan FP/RJ/MIN/20707/2016 Diversion of 33.12 ha. Forest land for China Clay Mines in Revenue Tatera, Buchara & Basri Ganeshpura, Tehsil – Shrimadhopur & Kotputli, District –Sikar & Jaipur (Raj.) Mining SHRI MODI LEVIGATED KAOLIN PVT LTD 33.12 Pending With UA
01-Jan-1900
08-Feb-2022
Yes


Proposal Status: EC application yet to be submitted
45 Rajasthan FP/RJ/ROAD/29906/2017 construction of missing link road in forest block udansari ,sikar Road PUBLIC WORKS DEPT DN FATEHPUR 0.5359 Pending at Nodal Officer
20-Sep-2022
17-Jan-2022



No
46 Rajasthan FP/RJ/ROAD/146408/2021 Construction of road from Basoli To Bhojgarh via Baliya Gudda, Rooppura,Ramhatai, Dudiya Mahadev Road PUBLIC WORK DEPARTMENT BUNDI 5.388 Pending at Nodal Officer
19-Sep-2022
09-Dec-2021



No
47 Rajasthan FP/RJ/ROAD/33196/2018 Construction of B.T. Road from Majewala to Pachmata Road PUBLIC WORKS DEPARTMENT 0.87 Pending at CF/CCF
14-Apr-2022
04-Dec-2021



No
48 Rajasthan FP/RJ/OFC/122165/2021 Permission for laying underground OFC in ROW of existing PWD road from Ajmer to Harsore from Lat/long point 26.6671/74.704598 to 26.666798/74.715323 for total and area in forest are 1.071 KM & 0.0482 ha Optical Fibre Cable JIO DIGITAL FIBER PVT LTD 0.0482 Pending at DFO/DCF
26-Sep-2022
02-Dec-2021



No
49 Rajasthan FP/RJ/TRANS/145262/2021 Construction of 132 KV S/C Badisid-Bap TSS Transmission line on D/C Tower from 220 KV GSS Badisid to Railway TSS Bap (Total Length 9644 Meters) Transmission Line RAJASTHAN RAJYA VIDYUT PRASARAN NIGAM LIMITED 0.1004 Pending at DFO/DCF
27-Sep-2022
26-Nov-2021



No
50 Rajasthan FP/RJ/ROAD/35275/2018 Construction of Road from Silpur Road to Palanpur ,District-Karauli (Rajasthan) Road PUBLIC DEPARTMENT WORK KARAULI 1.179 Pending at Nodal Officer
12-Sep-2022
22-Nov-2021



No