List of Proposals accorded Stage-II Clearance (Proposals received on or after 15th July 2014)
Help
Using this report, you can view details of proposals (Received on or after 15th July 2014) .Click on   to print
 
Proposal Year :
Region : State :
Category : Status of the Proposal :
Enter value for Search :
Note :-All areas are in Hectares(ha.)
Sno.State NameProposal No.RO/Ministry File NumberProposal NameCategoryUser Agency NameArea (ha.)Proposal StatusImportant DatesAllocation of Fresh forest land (Form-A) Part-IView Report (Part-II to Part-V and Stage-I Clearances)Stage-II Approval on
1 Gujarat FP/GJ/Others/16210/2015 C/T-10/Land/69/72//2016-17 Diversion of 0.8286 Hect of Protected Forest land i.e road side strip plantation declared as protected forest for laying of 20/15 Cm dia Steel & 12.5/9 Cm of MDPE natural gas pipeline to supply natural gas to various en-route villages / industries in Taluka Morbi & Wankaner in Morbi District, Gujar Others GUJARAT GAS LIMITED 0.8286 IN-PRINCIPLE
Proposal received(at Nodal Officer)electronically on : 24 Oct 2015
Stage-I Approval on : 16 Jun 2016
Compliance Report Submitted by User Agency on : 28 Feb 2017
2 Gujarat FP/GJ/Others/8003/2014 C/T-10/Land/27-29/2016-17 Diversion of 0.6307 Hect of Protected Forest land i.e road side strip plantation declared as protected forest for laying of 125/90 mm dia MDPE natural gas pipeline to supply natural gas to various en-route villages / industries in Taluka/District Morbi. Others GSPC GAS COMPANY LIMITED 0.6307 IN-PRINCIPLE
Proposal received(at Nodal Officer)electronically on : 12 Nov 2014
Stage-I Approval on : 26 May 2016
Compliance Report Submitted by User Agency on : 28 Feb 2017
3 Gujarat FP/GJ/Others/7931/2014 C/FCA/T-3/54-57/2016-17 Proposal for obtaining permission for diversion of 0.8210 Hectare of Protected Forest Land (Road Side Strip Plantation) for laying Natural Gas Pipeline in Navsari District Others GSPC GAS COMPANY LIMITED 0.821 IN-PRINCIPLE
Proposal received(at Nodal Officer)electronically on : 07 Nov 2014
Stage-I Approval on : 23 May 2016
Compliance Report Submitted by User Agency on : 02 Mar 2017
4 Gujarat FP/GJ/Others/19825/2016 C/FCA/T-14/547-51/16-17 Laying of 18"dia Petroleum Product pipeline for transportation of finished petroleum product from existing dispatch terminal at Village Chadisar Dist. Palanpur Others Hindustan Petroleum Corporation Limited 0.002 IN-PRINCIPLE
Proposal received(at Nodal Officer)electronically on : 02 Jun 2016
Stage-I Approval on : 13 Jul 2016
Compliance Report Submitted by User Agency on : 01 Mar 2017
5 Haryana FP/HR/ROAD/19084/2016 9-HRB125-2016-CHA Const. of 2 lne ROB at LC No. 53 at km. 66/4-5 on road from Nizamur to Nangal Chaudhary road Road PWD B AND R NARNAUL 1.54 IN-PRINCIPLE
Proposal received(at Nodal Officer)electronically on : 23 Apr 2016
Stage-I Approval on : 07 Dec 2016
Compliance Report Submitted by User Agency on : 31 Jul 2017
6 Haryana FP/HR/IND/7797/2014 9-hrb136-2015-cha Diversion (Passages/Accesss) at the portion of the forest land enabling M/s ISGEC Havey Engineering Limited, in kilometer/RD No. 43 at Village Rattangarh, Distt. Yamunanagar Industry ISGEC 0.01104 IN-PRINCIPLE
Proposal received(at Nodal Officer)electronically on : 12 Dec 2014
Stage-I Approval on : 22 Jul 2016
Compliance Report Submitted by User Agency on : 16 Aug 2017
7 Himachal Pradesh FP/HP/DISP/14923/2015 8B/HPB/09/86/2016 The hospital is situated in the center of Mandi Distt. provide the health facility to the people of six constituencies. The annual OPD of hospital is more than two lacs.There are so many accident prone areas and there is a heavy load of post mortem work and therefore there is a need for modern mortu Dispensary/Hospital HEALTH AND FAMILY WELFARE DEPARTMENT 0.1685 IN-PRINCIPLE
Proposal received(at Nodal Officer)electronically on : 25 Aug 2015
Stage-I Approval on : 13 Apr 2017
Compliance Report Submitted by User Agency on : 01 Sep 2017
8 Himachal Pradesh FP/HP/VELEC/23144/2016 Ft. 48-3499/2016 (FCA) Construction of 33/11KV, 2x1.6MVA unmanned Sub Station Bhutti (LugValley) At Darka in District Kullu (HP). Village Electricity SR. EXECUTIVE ENGINEER, ELECTRICAL DIVISION HPSEBL KULLU 0.12 IN-PRINCIPLE
Proposal received(at Nodal Officer)electronically on : 20 Dec 2016
Stage-I Approval on : 08 Jun 2017
Compliance Report Submitted by User Agency on : 21 Sep 2017
9 Himachal Pradesh FP/HP/Others/12456/2015 8B/HPB/09/33/2016/FC Establishment Govt. Industrial Training Institute Ghumarwin District Bilaspur HP Others Rajeshwar Goel 1.8512 IN-PRINCIPLE
Proposal received(at Nodal Officer)electronically on : 13 May 2015
Stage-I Approval on : 28 Mar 2017
Compliance Report Submitted by User Agency on : 21 Sep 2017
10 Himachal Pradesh FP/HP/Others/9129/2015 8B/HPB/09/49/2015 Construction of office building for Junior Engineer HPPWD Section at Badmain in Tehsil Suni Distt. Shimla HP Others HIMACHAL PRADESH PUBLIC WORK DEPARTMENT 0.06 IN-PRINCIPLE
Proposal received(at Nodal Officer)electronically on : 05 Jan 2015
Stage-I Approval on : 13 Jun 2016
Compliance Report Submitted by User Agency on : 07 Jun 2017
11 Punjab FP/PB/TRANS/10532/2015 9-PBB412-2015-CHA 66KV Welspun Solar Power Plant Teona Pujarian to 66KV S/S Jaga Ram Tirath SC/DC Tower line Transmission Line BHANDARI ENGG. CO. PVT. LTD. 0.0612 IN-PRINCIPLE
Proposal received(at Nodal Officer)electronically on : 27 Feb 2015
Stage-I Approval on : 17 Sep 2015
Compliance Report Submitted by User Agency on : 19 Aug 2017
12 Punjab FP/PB/TRANS/10453/2015 9-PBB347-2015-CHA 66KV line from 66KV Essel Clean Energy Solar Plant Lakhmirwala to 66Kv Kotdharmu Substation SC/DC Tower Line Transmission Line BHANDARI ENGG. CO. PVT. LTD. 0.0252 IN-PRINCIPLE
Proposal received(at Nodal Officer)electronically on : 25 Feb 2015
Stage-I Approval on : 24 Apr 2015
Compliance Report Submitted by User Agency on : 19 Aug 2017
13 Punjab FP/PB/Others/22988/2016 9-PBB396-2017-CHA Div. of 0.09406 ha. forest land for Proposed Retail Outlet at Vill. Thehri-1 on Bathinda – Malout Road New KM. Stone No. 321-322 RHS Teh. Gidderbaha Distt. Shri Muktsar Sahib Others PROPOSED RETAIL OUTLET VILL THEHRI 0.09406 IN-PRINCIPLE
Proposal received(at Nodal Officer)electronically on : 10 Dec 2016
Stage-I Approval on : 28 Aug 2017
Compliance Report Submitted by User Agency on : 22 Sep 2017
14 Punjab FP/PB/ROAD/20360/2016 9-PBB370-2017-CHA Four laning of NH-15 (New NH-54) Faridkot - Kotkapura - Bajakhana Section KM 243.00 to 266.00 on EPC Mode in the State of Punjab Road PUBLIC WORKS DEPTT BUILDING AND ROADS 3.22 IN-PRINCIPLE
Proposal received(at Nodal Officer)electronically on : 06 Jul 2016
Stage-I Approval on : 31 May 2017
Compliance Report Submitted by User Agency on : 17 Jul 2017
15 Punjab FP/PB/TRANS/17360/2016 9-PBB339-2016-CHA 11 KV M/s Magnificent Power Pvt. Ltd. to 11 KV S/S Jhunir. Transmission Line MAGNIFICENT POWER PVT LTD 0.0637 IN-PRINCIPLE
Proposal received(at Nodal Officer)electronically on : 02 Jan 2016
Stage-I Approval on : 31 May 2017
Compliance Report Submitted by User Agency on : 06 Aug 2017
16 Uttarakhand FP/UK/ROAD/8970/2014 1(59)/15 Road Construction Road PMGSY 0.991 IN-PRINCIPLE
Proposal received(at Nodal Officer)electronically on : 31 Dec 2014
Stage-I Approval on : 01 Apr 2015
Compliance Report Submitted by User Agency on : 08 Sep 2017
17 Uttarakhand FP/UK/ROAD/11378/2015 8B/UCP/06/255/2015/FC Construction of Jainti - Banzdhar - Malli Binola to Talli Binola Motor Road in Jageswer constituency,Distt Almora.Construction of Jainti - Banzdhar - Malli Binola to Talli Binola Motor Road is proposed as a extension of Jainti – Banzdhar motor road the sention lenth of proposed motor road is 3.00 k Road EXECUTIVE ENGINEER 0.45 IN-PRINCIPLE
Proposal received(at Nodal Officer)electronically on : 30 Mar 2015
Stage-I Approval on : 06 Jul 2016
Compliance Report Submitted by User Agency on : 22 Aug 2017
18 Uttarakhand FP/UK/ROAD/9773/2015 1(29/2015 The road is for providing connectivity to the village Vijaypur with a population of 263 numbers under PMGSY scheme. The proposed road is located in Block-Tharali of District Chamoli in Uttrakhand. The proposed length of the road is 10.00 km. Road RES PMGSY KARANPERAYAG 3.71 IN-PRINCIPLE
Proposal received(at Nodal Officer)electronically on : 30 Jan 2015
Stage-I Approval on : 20 Mar 2015
Compliance Report Submitted by User Agency on : 19 Aug 2017
19 Uttarakhand FP/UK/ROAD/9684/2015 1(113)/15 The road is for providing connectivity to 12 villages with a total population of 3249 situated in Tehsil Tharali of District Chamoli. The total length of the road is 31.25km, however forest land is required for 11.72km only as clearance for the remaining length has already been obtained. Road RES PMGSY KARANPERAYAG 4.756 IN-PRINCIPLE
Proposal received(at Nodal Officer)electronically on : 28 Jan 2015
Stage-I Approval on : 21 Apr 2015
Compliance Report Submitted by User Agency on : 08 Aug 2017
20 Uttarakhand FP/UK/Others/9605/2015 01(141)/2016 Construction of 30 M. Span Bridle Bridge on Bhonara-Pantoli Bridle Road at District Nainital Others PUBLIC WORKS DEPARTMENT 0.07 IN-PRINCIPLE
Proposal received(at Nodal Officer)electronically on : 27 Jan 2015
Stage-I Approval on : 13 Dec 2016
Compliance Report Submitted by User Agency on : 15 Jun 2017
21 Uttarakhand FP/UK/ROAD/10267/2015 1(56)/15 The road is required for providing connectivity to Village - Main situated in Block-Tharali of District Chamoli with a population of 355 numbers. The total length of the road is 4.50 km. Road RES PMGSY KARANPERAYAG 2.692 IN-PRINCIPLE
Proposal received(at Nodal Officer)electronically on : 25 Feb 2015
Stage-I Approval on : 30 Mar 2015
Compliance Report Submitted by User Agency on : 19 Aug 2017
22 Uttarakhand FP/UK/ROAD/15498/2015 01(186)/2016 Construction of Daulaghat to Gurna Motor Road in Someswer constituency,Distt Almora.Construction of Daulaghat to Gurna Motor Road is proposed as a extension of Koshi-Daulaghat motor road the sention lenth of proposed motor road is 4.00 km. The benifited village of this Road are. Gurana and Takoli Road EXECUTIVE ENGINEER 0.877 IN-PRINCIPLE
Proposal received(at Nodal Officer)electronically on : 24 Feb 2016
Stage-I Approval on : 22 Jul 2016
Compliance Report Submitted by User Agency on : 30 Aug 2017
23 Uttarakhand FP/UK/ROAD/13399/2015 1(457)/2015 Construction of Motor Road. Road PUBLIC WORK DEPARTMENT 0.609 IN-PRINCIPLE
Proposal received(at Nodal Officer)electronically on : 22 Jun 2015
Stage-I Approval on : 18 Sep 2015
Compliance Report Submitted by User Agency on : 21 Sep 2017
24 Uttarakhand FP/UK/ROAD/18619/2016 8B/UCP/06/97/2016-FC Under state sector,Hona'ble chief minister uttarakhand declaration construction of 80.0 meter span bridge and 0.250 km road in simli,karanprayag(chamoli). Road TEMPORARY DIVISION PUBLIC WORKS DEPARTMENT GAUCHAR 0.134 IN-PRINCIPLE
Proposal received(at Nodal Officer)electronically on : 21 Mar 2016
Stage-I Approval on : 15 Jun 2016
Compliance Report Submitted by User Agency on : 21 Sep 2016
25 Uttarakhand FP/UK/ROAD/12704/2015 1(613)/2015 under the declaration of honourable chief minister uttarakhand, in state sector, construction of new motor road name kimdhar shayn kishanpur of length 1.350 KM Road PUBLIC WORKS DEPARTMENT GOPESHWAR UTTARAKHAND 0.946 IN-PRINCIPLE
Proposal received(at Nodal Officer)electronically on : 18 May 2015
Stage-I Approval on : 21 Mar 2016
Compliance Report Submitted by User Agency on : 02 Sep 2017
26 Uttarakhand FP/UK/ROAD/17582/2016 1(244)/2016 For constuction of Motor Road Total Area of Forest Land proposed for diversion 0.794 Ha.and Non-Forest Land required for this Project is 1.382 Ha. Road PUBLIC WORK DEPARTMENT 0.794 IN-PRINCIPLE
Proposal received(at Nodal Officer)electronically on : 18 Jan 2016
Stage-I Approval on : 24 Oct 2016
Compliance Report Submitted by User Agency on : 18 Aug 2017
27 Uttarakhand FP/UK/ROAD/8637/2014 1(428)/2015 This road will connect Simkhet, ReethaBaman & Maigari state Road EXICUTIVE ENGINEER 3.839 IN-PRINCIPLE
Proposal received(at Nodal Officer)electronically on : 18 Dec 2014
Stage-I Approval on : 13 Aug 2015
Compliance Report Submitted by User Agency on : 01 Sep 2017
28 Uttarakhand FP/UK/ROAD/11790/2015 1(506)/2015 under state sector, construction of new motor road from jaykandi to sirtoli of km length 4.25 Road PUBLIC WORKS DEPARTMENT GOPESHWAR UTTARAKHAND 2.3 IN-PRINCIPLE
Proposal received(at Nodal Officer)electronically on : 18 Apr 2015
Stage-I Approval on : 07 Nov 2015
Compliance Report Submitted by User Agency on : 31 Aug 2017
29 Uttarakhand FP/UK/ROAD/10924/2015 8B/UCP/06/105/2015-FC After Construction of this Motor Road, Students & Teachers will get beneficiary of Communication. Which will help in time saving of them. Road PUBLIC WORK DEPARTMENT 0.708 IN-PRINCIPLE
Proposal received(at Nodal Officer)electronically on : 15 Mar 2015
Stage-I Approval on : 22 Feb 2016
Compliance Report Submitted by User Agency on : 18 Aug 2017
30 Uttarakhand FP/UK/ROAD/9306/2015 1(586)/2015 Proposed Sirai link road Under Atal Adarsh Gram Yojna that will be bifurcated from 4th Km of Dadamandi-Dwarikhal motor road. Road ENGINEER IN CHIEF, PUBLIC WORK DEPARTMENT, DEHRADUN 0.9225 IN-PRINCIPLE
Proposal received(at Nodal Officer)electronically on : 14 Jan 2015
Stage-I Approval on : 21 Mar 2016
Compliance Report Submitted by User Agency on : 28 Jun 2017
31 Uttarakhand FP/UK/ROAD/15355/2015 1(24)/2016 This road Joing the rikholi village distt almora uttrakhand Road PUBLIC WORK DEPARTMENT 0.36 IN-PRINCIPLE
Proposal received(at Nodal Officer)electronically on : 11 Sep 2015
Stage-I Approval on : 08 Apr 2016
Compliance Report Submitted by User Agency on : 31 Jul 2017
32 Uttarakhand FP/UK/ROAD/6957/2014 1(164)/2015 Construction of Kharsi link km 5 to Indroli Kandhar motor road under PMGSY in Dehradun district Road EXECUTIVE ENGINEER 4.275 IN-PRINCIPLE
Proposal received(at Nodal Officer)electronically on : 09 Sep 2014
Stage-I Approval on : 30 May 2015
Compliance Report Submitted by User Agency on : 29 Aug 2017
33 Uttarakhand FP/UK/ROAD/15889/2015 1(23)/2016 this road joining Villages chamini gair,chamini dhar& kunshyari almora distt in uttrakhnd Road PUBLIC WORK DEPARTMENT 0.72 IN-PRINCIPLE
Proposal received(at Nodal Officer)electronically on : 08 Oct 2015
Stage-I Approval on : 08 Apr 2016
Compliance Report Submitted by User Agency on : 31 Jul 2017
34 Uttarakhand FP/UK/ROAD/12492/2015 1(539)/2015 Construction of Road Road PUBLIC WORK DEPARTMENT 2.025 IN-PRINCIPLE
Proposal received(at Nodal Officer)electronically on : 08 May 2015
Stage-I Approval on : 03 Nov 2015
Compliance Report Submitted by User Agency on : 05 Sep 2017
35 Uttarakhand FP/UK/ROAD/12506/2015 1(536)/2015 Construction of Road Road PUBLIC WORK DEPARTMENT 1.9125 IN-PRINCIPLE
Proposal received(at Nodal Officer)electronically on : 08 May 2015
Stage-I Approval on : 02 Nov 2015
Compliance Report Submitted by User Agency on : 05 Sep 2017
36 Uttarakhand FP/UK/ROAD/12420/2015 1(538)/2015 Construction to Road Road PUBLIC WORK DEPARTMENT 1.71 IN-PRINCIPLE
Proposal received(at Nodal Officer)electronically on : 07 May 2015
Stage-I Approval on : 30 Oct 2015
Compliance Report Submitted by User Agency on : 06 Sep 2017
37 Uttarakhand FP/UK/ROAD/13794/2015 1(588)/2015 Construction of Motor Road. Road PUBLIC WORK DEPARTMENT 0.957 IN-PRINCIPLE
Proposal received(at Nodal Officer)electronically on : 07 Jul 2015
Stage-I Approval on : 07 Nov 2015
Compliance Report Submitted by User Agency on : 21 Sep 2017
38 Uttarakhand FP/UK/WATER/16392/2015 8B/UCP/09/237/2016/FC There is only water source to tap water for the nearby villages needs.No other water source is available on non-forest land, so diversion of forest land is required. Drinking Water UTTARAKHAND PAYJAL SANSADHAN VIKAS AVAM NIRMAN NIGAM 3.23 IN-PRINCIPLE
Proposal received(at Nodal Officer)electronically on : 05 Nov 2015
Stage-I Approval on : 02 Aug 2017
Compliance Report Submitted by User Agency on : 19 Sep 2017
39 Uttarakhand FP/UK/ROAD/14360/2015 8B/UCP/06/257/2015 The road is for providing connectivity to 6 no villages with a total population of 2338 and situated in Tehsil Dhari of District Nainital. The total length of the road is 36.950 km. The road passes through Reserve Forest land, Van Panchayat land, Civil land and Nap land. Road PUBLIC WORK DEPARTMENT 23.03 IN-PRINCIPLE
Proposal received(at Nodal Officer)electronically on : 03 Aug 2015
Stage-I Approval on : 22 May 2017
Compliance Report Submitted by User Agency on : 06 Sep 2017