Sno.State NameProposal No.RO/Ministry File NumberProposal NameCategoryUser Agency NameArea (ha.)Proposal StatusImportant DatesAllocation of Fresh forest land (Form-A) Part-IView Report (Part-II to Part-V and Stage-I Clearances)Stage-II Approval on
1 Gujarat FP/GJ/Others/16210/2015 C/T-10/Land/69/72//2016-17 Diversion of 0.8286 Hect of Protected Forest land i.e road side strip plantation declared as protected forest for laying of 20/15 Cm dia Steel & 12.5/9 Cm of MDPE natural gas pipeline to supply natural gas to various en-route villages / industries in Taluka Morbi & Wankaner in Morbi District, Gujar Others GUJARAT GAS LIMITED 0.8286 IN-PRINCIPLE
Proposal received(at Nodal Officer)electronically on : 24 Oct 2015
Stage-I Approval on : 16 Jun 2016
Compliance Report Submitted by User Agency on : 28 Feb 2017
2 Gujarat FP/GJ/Others/8003/2014 C/T-10/Land/27-29/2016-17 Diversion of 0.6307 Hect of Protected Forest land i.e road side strip plantation declared as protected forest for laying of 125/90 mm dia MDPE natural gas pipeline to supply natural gas to various en-route villages / industries in Taluka/District Morbi. Others GSPC GAS COMPANY LIMITED 0.6307 IN-PRINCIPLE
Proposal received(at Nodal Officer)electronically on : 12 Nov 2014
Stage-I Approval on : 26 May 2016
Compliance Report Submitted by User Agency on : 28 Feb 2017
3 Gujarat FP/GJ/Others/7931/2014 C/FCA/T-3/54-57/2016-17 Proposal for obtaining permission for diversion of 0.8210 Hectare of Protected Forest Land (Road Side Strip Plantation) for laying Natural Gas Pipeline in Navsari District Others GSPC GAS COMPANY LIMITED 0.821 IN-PRINCIPLE
Proposal received(at Nodal Officer)electronically on : 07 Nov 2014
Stage-I Approval on : 23 May 2016
Compliance Report Submitted by User Agency on : 02 Mar 2017
4 Gujarat FP/GJ/Others/19825/2016 C/FCA/T-14/547-51/16-17 Laying of 18"dia Petroleum Product pipeline for transportation of finished petroleum product from existing dispatch terminal at Village Chadisar Dist. Palanpur Others Hindustan Petroleum Corporation Limited 0.002 IN-PRINCIPLE
Proposal received(at Nodal Officer)electronically on : 02 Jun 2016
Stage-I Approval on : 13 Jul 2016
Compliance Report Submitted by User Agency on : 01 Mar 2017
5 Haryana FP/HR/Others/23216/2016 9-HRB101-2017-CHA Diversion of 0.35 ha. of Forest Land for laying of RCC Pipe NP-3, 450mm Dia Pipeline from Narwana Branch RD 290254 to Jyotisar Tirth R/Side of Saraswati Feeder in Distt. Kurukshetra Others SUB DIVISION OFFICER WATER SERVICES SUB DIVISION PEHOWA 0.35 IN-PRINCIPLE
Proposal received(at Nodal Officer)electronically on : 22 Dec 2016
Stage-I Approval on : 16 Sep 2017
Compliance Report Submitted by User Agency on : 02 Nov 2017
6 Haryana FP/HR/ROAD/28845/2017 D-III-8131 Diversion of forest land 0.1012 Hac. for access to the Proposed Petrol Pump of Bharat Petroleum Corporation Limited Along at Village – Kheri Kalan, Tehsil - Tigaon & District -Faridabad, State-Haryana Road BHARAT PETROLEUM CORPORATION LIMITED 0.1012 IN-PRINCIPLE
Proposal received(at Nodal Officer)electronically on : 22 Aug 2017
Stage-I Approval on : 27 Oct 2017
Compliance Report Submitted by User Agency on : 21 Nov 2017
7 Haryana FP/HR/Others/20967/2016 9-HRB180-2016-CHA Access to Randhawa Marriage Palace at Village Jiwan Nagar on Sirsa Ottu Rania Dabwali Road Km. 32.07 (R.H.S.) in Sirsa District Others RANDHAWA MARRIAGE PALACE 0.0064 IN-PRINCIPLE
Proposal received(at Nodal Officer)electronically on : 13 Aug 2016
Stage-I Approval on : 08 Sep 2017
Compliance Report Submitted by User Agency on : 26 Oct 2017
8 Himachal Pradesh FP/HP/VELEC/23144/2016 Ft. 48-3499/2016 (FCA) Construction of 33/11KV, 2x1.6MVA unmanned Sub Station Bhutti (LugValley) At Darka in District Kullu (HP). Village Electricity SR. EXECUTIVE ENGINEER, ELECTRICAL DIVISION HPSEBL KULLU 0.12 IN-PRINCIPLE
Proposal received(at Nodal Officer)electronically on : 20 Dec 2016
Stage-I Approval on : 08 Jun 2017
Compliance Report Submitted by User Agency on : 21 Sep 2017
9 Himachal Pradesh FP/HP/Others/21820/2016 Ft. 48-34692/2016 (FCA) In the era of Technology and being an integral part of national polity in view of the Global indispensability , the state Govt. of Himachal Pradesh is stimulating to the progress of Technical Education, Technically dexterous youths are required globally in the industries in abundance. Technical Educ Others Rajeshwar Goel 0.6885 IN-PRINCIPLE
Proposal received(at Nodal Officer)electronically on : 15 Nov 2016
Stage-I Approval on : 02 Aug 2017
Compliance Report Submitted by User Agency on : 01 Nov 2017
10 Himachal Pradesh FP/HP/Others/9129/2015 8B/HPB/09/49/2015 Construction of office building for Junior Engineer HPPWD Section at Badmain in Tehsil Suni Distt. Shimla HP Others HIMACHAL PRADESH PUBLIC WORK DEPARTMENT 0.06 IN-PRINCIPLE
Proposal received(at Nodal Officer)electronically on : 05 Jan 2015
Stage-I Approval on : 13 Jun 2016
Compliance Report Submitted by User Agency on : 07 Jun 2017
11 Kerala FP/KL/Others/20218/2016 4-KLB 1112/2017-BAN Cochin Shipyard Ltd. has taken over the existing marine workshop of Cochin Port Trust on 30 years lease for developing the same into an International Ship Repair Facility (ISRF) capable of repairing 84 vessels per annum Others Cochin Shipyard Ltd 0.01866 IN-PRINCIPLE
Proposal received(at Nodal Officer)electronically on : 27 Jun 2016
Stage-I Approval on : 07 Jun 2017
Compliance Report Submitted by User Agency on : 31 Oct 2017
12 Punjab FP/PB/TRANS/23272/2016 fca/1980/82/2017 220 KV Line from 400 KV Makhu to enhance Electric supply for area of 220 KV S/S Algon Kothi Transmission Line PSTCL TLSC 0.0683 IN-PRINCIPLE
Proposal received(at Nodal Officer)electronically on : 26 Dec 2016
Stage-I Approval on : 20 Jun 2017
Compliance Report Submitted by User Agency on : 26 Sep 2017
13 Punjab FP/PB/TRANS/17360/2016 9-PBB339-2016-CHA 11 KV M/s Magnificent Power Pvt. Ltd. to 11 KV S/S Jhunir. Transmission Line MAGNIFICENT POWER PVT LTD 0.0637 IN-PRINCIPLE
Proposal received(at Nodal Officer)electronically on : 02 Jan 2016
Stage-I Approval on : 31 May 2017
Compliance Report Submitted by User Agency on : 06 Aug 2017
14 Uttarakhand FP/UK/ROAD/11424/2015 1(553)/2015 This road is sanctioned by Government of Uttarakhand vide GO no 1440/III(2)/11-05(PE)/2010 for the length of 6 Km under CM village road connectivity Programme. Road PUBLIC WORK DEPARTMENT 1.485 IN-PRINCIPLE
Proposal received(at Nodal Officer)electronically on : 31 Mar 2015
Stage-I Approval on : 07 Nov 2015
Compliance Report Submitted by User Agency on : 13 Oct 2017
15 Uttarakhand FP/UK/ROAD/11378/2015 8B/UCP/06/255/2015/FC Construction of Jainti - Banzdhar - Malli Binola to Talli Binola Motor Road in Jageswer constituency,Distt Almora.Construction of Jainti - Banzdhar - Malli Binola to Talli Binola Motor Road is proposed as a extension of Jainti – Banzdhar motor road the sention lenth of proposed motor road is 3.00 k Road EXECUTIVE ENGINEER 0.45 IN-PRINCIPLE
Proposal received(at Nodal Officer)electronically on : 30 Mar 2015
Stage-I Approval on : 06 Jul 2016
Compliance Report Submitted by User Agency on : 22 Aug 2017
16 Uttarakhand FP/UK/ROAD/15684/2015 1(06)2016 Improvement and construction of roads and road links brings multiple socio-economic benefits to the rural areas and results in forming a strong backbone for the agro-based economy. Road EECDPWDUKM 0.97 IN-PRINCIPLE
Proposal received(at Nodal Officer)electronically on : 28 Sep 2015
Stage-I Approval on : 14 Mar 2016
Compliance Report Submitted by User Agency on : 08 Nov 2017
17 Uttarakhand FP/UK/Others/9605/2015 01(141)/2016 Construction of 30 M. Span Bridle Bridge on Bhonara-Pantoli Bridle Road at District Nainital Others PUBLIC WORKS DEPARTMENT 0.07 IN-PRINCIPLE
Proposal received(at Nodal Officer)electronically on : 27 Jan 2015
Stage-I Approval on : 13 Dec 2016
Compliance Report Submitted by User Agency on : 15 Jun 2017
18 Uttarakhand FP/UK/ROAD/10267/2015 1(56)/15 The road is required for providing connectivity to Village - Main situated in Block-Tharali of District Chamoli with a population of 355 numbers. The total length of the road is 4.50 km. Road RES PMGSY KARANPERAYAG 2.692 IN-PRINCIPLE
Proposal received(at Nodal Officer)electronically on : 25 Feb 2015
Stage-I Approval on : 30 Mar 2015
Compliance Report Submitted by User Agency on : 19 Aug 2017
19 Uttarakhand FP/UK/ROAD/15498/2015 01(186)/2016 Construction of Daulaghat to Gurna Motor Road in Someswer constituency,Distt Almora.Construction of Daulaghat to Gurna Motor Road is proposed as a extension of Koshi-Daulaghat motor road the sention lenth of proposed motor road is 4.00 km. The benifited village of this Road are. Gurana and Takoli Road EXECUTIVE ENGINEER 0.877 IN-PRINCIPLE
Proposal received(at Nodal Officer)electronically on : 24 Feb 2016
Stage-I Approval on : 22 Jul 2016
Compliance Report Submitted by User Agency on : 30 Aug 2017
20 Uttarakhand FP/UK/ROAD/13399/2015 1(457)/2015 Construction of Motor Road. Road PUBLIC WORK DEPARTMENT 0.609 IN-PRINCIPLE
Proposal received(at Nodal Officer)electronically on : 22 Jun 2015
Stage-I Approval on : 18 Sep 2015
Compliance Report Submitted by User Agency on : 21 Sep 2017
21 Uttarakhand FP/UK/ROAD/18619/2016 8B/UCP/06/97/2016-FC Under state sector,Hona'ble chief minister uttarakhand declaration construction of 80.0 meter span bridge and 0.250 km road in simli,karanprayag(chamoli). Road TEMPORARY DIVISION PUBLIC WORKS DEPARTMENT GAUCHAR 0.134 IN-PRINCIPLE
Proposal received(at Nodal Officer)electronically on : 21 Mar 2016
Stage-I Approval on : 15 Jun 2016
Compliance Report Submitted by User Agency on : 21 Sep 2016
22 Uttarakhand FP/UK/ROAD/12704/2015 1(613)/2015 under the declaration of honourable chief minister uttarakhand, in state sector, construction of new motor road name kimdhar shayn kishanpur of length 1.350 KM Road PUBLIC WORKS DEPARTMENT GOPESHWAR UTTARAKHAND 0.946 IN-PRINCIPLE
Proposal received(at Nodal Officer)electronically on : 18 May 2015
Stage-I Approval on : 21 Mar 2016
Compliance Report Submitted by User Agency on : 02 Sep 2017
23 Uttarakhand FP/UK/ROAD/17582/2016 1(244)/2016 For constuction of Motor Road Total Area of Forest Land proposed for diversion 0.794 Ha.and Non-Forest Land required for this Project is 1.382 Ha. Road PUBLIC WORK DEPARTMENT 0.794 IN-PRINCIPLE
Proposal received(at Nodal Officer)electronically on : 18 Jan 2016
Stage-I Approval on : 24 Oct 2016
Compliance Report Submitted by User Agency on : 18 Aug 2017
24 Uttarakhand FP/UK/ROAD/8637/2014 1(428)/2015 This road will connect Simkhet, ReethaBaman & Maigari state Road EXICUTIVE ENGINEER 3.839 IN-PRINCIPLE
Proposal received(at Nodal Officer)electronically on : 18 Dec 2014
Stage-I Approval on : 13 Aug 2015
Compliance Report Submitted by User Agency on : 01 Sep 2017
25 Uttarakhand FP/UK/ROAD/11790/2015 1(506)/2015 under state sector, construction of new motor road from jaykandi to sirtoli of km length 4.25 Road PUBLIC WORKS DEPARTMENT GOPESHWAR UTTARAKHAND 2.3 IN-PRINCIPLE
Proposal received(at Nodal Officer)electronically on : 18 Apr 2015
Stage-I Approval on : 07 Nov 2015
Compliance Report Submitted by User Agency on : 31 Aug 2017
26 Uttarakhand FP/UK/ROAD/13260/2015 8B/UCP/06/185/2015/FC MOTOR ROAD FOR CONNECTING VILLAGES UTTHIND AND PELLING IN RUDRAPRAYAG DISTRICT.ROAD STARTS AT VILLAGE UTHIND AND GOES UPTO PELING.IT PASSES THROUGH PRIVATE LAND AND FOREST LAND.TOTAL 1300 PEOPLE WILL BE BENEFITED FROM THIS ROAD IN FARMING AND AGRICULTURE WORKS. Road PMGSY 0.63 IN-PRINCIPLE
Proposal received(at Nodal Officer)electronically on : 16 Jun 2015
Stage-I Approval on : 02 Aug 2017
Compliance Report Submitted by User Agency on : 25 Oct 2017
27 Uttarakhand FP/UK/ROAD/10924/2015 8B/UCP/06/105/2015-FC After Construction of this Motor Road, Students & Teachers will get beneficiary of Communication. Which will help in time saving of them. Road PUBLIC WORK DEPARTMENT 0.708 IN-PRINCIPLE
Proposal received(at Nodal Officer)electronically on : 15 Mar 2015
Stage-I Approval on : 22 Feb 2016
Compliance Report Submitted by User Agency on : 18 Aug 2017
28 Uttarakhand FP/UK/ROAD/9306/2015 1(586)/2015 Proposed Sirai link road Under Atal Adarsh Gram Yojna that will be bifurcated from 4th Km of Dadamandi-Dwarikhal motor road. Road ENGINEER IN CHIEF, PUBLIC WORK DEPARTMENT, DEHRADUN 0.9225 IN-PRINCIPLE
Proposal received(at Nodal Officer)electronically on : 14 Jan 2015
Stage-I Approval on : 21 Mar 2016
Compliance Report Submitted by User Agency on : 28 Jun 2017
29 Uttarakhand FP/UK/ROAD/10116/2015 1(343)/2015 The proposal has been made for construction of Amori-Chatkot to Ghurchum-Jamrari-Pali Motor Road under PMGSY Champawat which shall provide connectivity to villages Ghurchum with a population of 131,Jamrari with a population of 96 and Pali with a population of 83. Thus total population being served w Road PMGSY 4.58 IN-PRINCIPLE
Proposal received(at Nodal Officer)electronically on : 14 Feb 2015
Stage-I Approval on : 25 Jul 2015
Compliance Report Submitted by User Agency on : 18 Nov 2017
30 Uttarakhand FP/UK/ROAD/10870/2015 1(468)/2015 Construction of Odagad to Nai Motor road under PMGSY ID Srinagr District Pauri Garhwal, having length is 6.45 Km. This Road has covered 1.552 Ha. of forest land for road construction, because of no other option this road facilitated in term of Employment, transportation etc. to the village Nai. Road EXECUTIVE ENGINEER 1.552 IN-PRINCIPLE
Proposal received(at Nodal Officer)electronically on : 12 Mar 2015
Stage-I Approval on : 30 Oct 2015
Compliance Report Submitted by User Agency on : 07 Nov 2017
31 Uttarakhand FP/UK/ROAD/15355/2015 1(24)/2016 This road Joing the rikholi village distt almora uttrakhand Road PUBLIC WORK DEPARTMENT 0.36 IN-PRINCIPLE
Proposal received(at Nodal Officer)electronically on : 11 Sep 2015
Stage-I Approval on : 08 Apr 2016
Compliance Report Submitted by User Agency on : 31 Jul 2017
32 Uttarakhand FP/UK/ROAD/6957/2014 1(164)/2015 Construction of Kharsi link km 5 to Indroli Kandhar motor road under PMGSY in Dehradun district Road EXECUTIVE ENGINEER 4.275 IN-PRINCIPLE
Proposal received(at Nodal Officer)electronically on : 09 Sep 2014
Stage-I Approval on : 30 May 2015
Compliance Report Submitted by User Agency on : 29 Aug 2017
33 Uttarakhand FP/UK/ROAD/12530/2015 1(501)/2015 C/O 60 Mtr Span Steel Girder Birdge Dhakakhet (Sariyatal)Under State Sector. Road PUBLIC WORKS DEPARTMENT 0.315 IN-PRINCIPLE
Proposal received(at Nodal Officer)electronically on : 09 May 2015
Stage-I Approval on : 30 Oct 2015
Compliance Report Submitted by User Agency on : 27 Sep 2017
34 Uttarakhand FP/UK/ROAD/11555/2015 1(537)/2015 Population Of 266 number Will Be Benefited After Construction Of The road. Road PMGSY 3.1675 IN-PRINCIPLE
Proposal received(at Nodal Officer)electronically on : 09 Apr 2015
Stage-I Approval on : 03 Nov 2015
Compliance Report Submitted by User Agency on : 09 Oct 2017
35 Uttarakhand FP/UK/ROAD/15889/2015 1(23)/2016 this road joining Villages chamini gair,chamini dhar& kunshyari almora distt in uttrakhnd Road PUBLIC WORK DEPARTMENT 0.72 IN-PRINCIPLE
Proposal received(at Nodal Officer)electronically on : 08 Oct 2015
Stage-I Approval on : 08 Apr 2016
Compliance Report Submitted by User Agency on : 31 Jul 2017
36 Uttarakhand FP/UK/ROAD/22233/2016 1 (26)/2017 This motor road is connecting village kunjethi,khetinadala, jaggibagwan,bedulaban and serving population of total 1273,these villages are not connected through any motor road yet.Villagers will benefited through many ways from this road,this roads is the only means of connectivity for these villages Road PMGSY 0.99 IN-PRINCIPLE
Proposal received(at Nodal Officer)electronically on : 08 Nov 2016
Stage-I Approval on : 06 Jul 2017
Compliance Report Submitted by User Agency on : 02 Nov 2017
37 Uttarakhand FP/UK/ROAD/12492/2015 1(539)/2015 Construction of Road Road PUBLIC WORK DEPARTMENT 2.025 IN-PRINCIPLE
Proposal received(at Nodal Officer)electronically on : 08 May 2015
Stage-I Approval on : 03 Nov 2015
Compliance Report Submitted by User Agency on : 05 Sep 2017
38 Uttarakhand FP/UK/ROAD/12506/2015 1(536)/2015 Construction of Road Road PUBLIC WORK DEPARTMENT 1.9125 IN-PRINCIPLE
Proposal received(at Nodal Officer)electronically on : 08 May 2015
Stage-I Approval on : 02 Nov 2015
Compliance Report Submitted by User Agency on : 05 Sep 2017
39 Uttarakhand FP/UK/Others/20399/2016 8B/UCP/09/250/2016/FC 1800 mtr. tracking path redevelopment from providing facilities of yatri/tourist and 1 no. dharamsala withe canteen 201.75 sqm. covered area for stay of pilgrims and 1 no. toilet constructed for providing for public facilities. Others UTTARAKHAND PAYJAL SANSADHAN VIKAS AVAM NIRMAN NIGAM 0.2905 IN-PRINCIPLE
Proposal received(at Nodal Officer)electronically on : 08 Jul 2016
Stage-I Approval on : 24 Jul 2017
Compliance Report Submitted by User Agency on : 24 Oct 2017
40 Uttarakhand FP/UK/ROAD/12420/2015 1(538)/2015 Construction to Road Road PUBLIC WORK DEPARTMENT 1.71 IN-PRINCIPLE
Proposal received(at Nodal Officer)electronically on : 07 May 2015
Stage-I Approval on : 30 Oct 2015
Compliance Report Submitted by User Agency on : 06 Sep 2017
41 Uttarakhand FP/UK/ROAD/13794/2015 1(588)/2015 Construction of Motor Road. Road PUBLIC WORK DEPARTMENT 0.957 IN-PRINCIPLE
Proposal received(at Nodal Officer)electronically on : 07 Jul 2015
Stage-I Approval on : 07 Nov 2015
Compliance Report Submitted by User Agency on : 21 Sep 2017
42 Uttarakhand FP/UK/ROAD/20366/2016 8B/UCP/06/29/2017 Diversion of Forest Land for 2-lane with paved shoulder from km 328.500 (Ufalda) to 343.500 (Chamdhar Fadasu) of NH-58 in Pauri Garhwal District in the State of Uttarakhand Road MINISTRY OF ROAD TRANSPORT AND HIGHWAYS 8.8188 IN-PRINCIPLE
Proposal received(at Nodal Officer)electronically on : 06 Jul 2016
Stage-I Approval on : 25 Aug 2017
Compliance Report Submitted by User Agency on : 02 Nov 2017
43 Uttarakhand FP/UK/WATER/16392/2015 8B/UCP/09/237/2016/FC There is only water source to tap water for the nearby villages needs.No other water source is available on non-forest land, so diversion of forest land is required. Drinking Water UTTARAKHAND PAYJAL SANSADHAN VIKAS AVAM NIRMAN NIGAM 3.23 IN-PRINCIPLE
Proposal received(at Nodal Officer)electronically on : 05 Nov 2015
Stage-I Approval on : 02 Aug 2017
Compliance Report Submitted by User Agency on : 19 Sep 2017
44 Uttarakhand FP/UK/ROAD/17814/2016 1(185)/2016 The Proposed road is for providing the connectivity to the village Unana, Burkot and Roomdhar total population of these villages are 1551, total length is 4.00 km Road PWD 0.245 IN-PRINCIPLE
Proposal received(at Nodal Officer)electronically on : 04 Feb 2016
Stage-I Approval on : 31 Mar 2017
Compliance Report Submitted by User Agency on : 14 Nov 2017
45 Uttarakhand FP/UK/ROAD/14360/2015 8B/UCP/06/257/2015 The road is for providing connectivity to 6 no villages with a total population of 2338 and situated in Tehsil Dhari of District Nainital. The total length of the road is 36.950 km. The road passes through Reserve Forest land, Van Panchayat land, Civil land and Nap land. Road PUBLIC WORK DEPARTMENT 23.03 IN-PRINCIPLE
Proposal received(at Nodal Officer)electronically on : 03 Aug 2015
Stage-I Approval on : 22 May 2017
Compliance Report Submitted by User Agency on : 06 Sep 2017